CN109103880A - The emulation of intelligent substation panorama and test macro - Google Patents

The emulation of intelligent substation panorama and test macro Download PDF

Info

Publication number
CN109103880A
CN109103880A CN201811217091.9A CN201811217091A CN109103880A CN 109103880 A CN109103880 A CN 109103880A CN 201811217091 A CN201811217091 A CN 201811217091A CN 109103880 A CN109103880 A CN 109103880A
Authority
CN
China
Prior art keywords
intelligent
substation
protection
panorama
test
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811217091.9A
Other languages
Chinese (zh)
Inventor
徐明宇
姜鹏
崔佳鹏
穆兴华
陈晓光
武国良
刘志鹏
谷博文
关万琳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Heilongjiang Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Heilongjiang Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Electric Power Research Institute of State Grid Heilongjiang Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201811217091.9A priority Critical patent/CN109103880A/en
Publication of CN109103880A publication Critical patent/CN109103880A/en
Pending legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • H02J13/0006
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2203/00Indexing scheme relating to details of circuit arrangements for AC mains or AC distribution networks
    • H02J2203/20Simulating, e g planning, reliability check, modelling or computer assisted design [CAD]

Abstract

The present invention provides the emulation of intelligent substation panorama and test macro of a kind of good test effect, belongs to substation simulation testing field.The present invention includes: panorama simulator, for the scene of Virtual Intelligent substation, realizes the dynamic simulation of intelligent substation primary system;Intelligent station electrical secondary system minimal configuration area, for reflecting the electrical secondary system operating condition of tri- voltage class intelligent substations of 500kV, 220kV and 110kV, the protection interval of each voltage class configuration is using minimum configuration;Test platform is interacted and is tested with intelligent station electrical secondary system minimal configuration area for controlling panorama simulator.The present invention is capable of the operation of artificial intelligence transforming plant primary system, the various different scenes such as the method for operation, substation's difference connection type, the station of power grid locating for substation can arbitrarily be adjusted, whole station level intelligent Substation Systemization is supported to test, support intelligent substation accident reconstruction and confirmation of responsibility function, test is comprehensively and effect is close to true.

Description

The emulation of intelligent substation panorama and test macro
Technical field
The present invention relates to a kind of analogue system, in particular to a kind of intelligent substation panorama emulation and test macro belong to Substation simulation testing field.
Background technique
Intelligent substation construction is in the Fast Growth stage, and new technology and new equipment emerge one after another, the performance of new equipment Stable not enough, the design and configuration experience of system are abundant not enough, are easy to appear mistake.Guarantee that system is reliable, throws on time Fortune reduces the pressure to operation, maintenance, it is necessary that the quality of test.Intelligent substation test center pilot project is not only Known problem sufficiently verified, to be more good at being found by experiment that and solve the problems, such as potential, be put into operation for system It removes the obstacles.With the construction and development of intelligent substation, how strong skill is provided for intelligent substation safe and reliable operation Art support, is the matter of utmost importance that everybody faces.
In intelligent substation, an interval is only being protected control device, intelligent terminal and combining unit simultaneously and is being incorporated When be just able to achieve its complete protection control function, therefore debugging should be whole as one the electrical secondary system of composition " interval " Body carries out, existing to carry out intelligent substation reaying protection test in the following ways:
The inspection of some protective devices is carried out using digital relay protection tester.Or whole using routine transformer Every debugging, the inspection of relay protection device is carried out using traditional relay protection tester.
Above-mentioned test mode is tested just for part electrical secondary system, not can reflect panorama, test effect is not It is good.
Summary of the invention
In view of the above deficiencies, the present invention provides the emulation of intelligent substation panorama and test macro of a kind of good test effect.
A kind of intelligent substation panorama emulation of the invention and test macro, the system comprises:
Panorama simulator realizes that the dynamic of intelligent substation primary system is imitative for the scene of Virtual Intelligent substation Very;
Intelligent station electrical secondary system minimal configuration area, for reflecting that tri- voltage class of 500kV, 220kV and 110kV intelligently become The electrical secondary system operating condition in power station, the protection interval of each voltage class configuration is using minimum configuration;
Test platform is interacted and is surveyed with intelligent station electrical secondary system minimal configuration area for controlling panorama simulator Examination.
Preferably, the intelligent station electrical secondary system minimal configuration area includes protection and measure and control device, center switch, prison Control system, combining unit, intelligent terminal, telecontrol communication system and optical fiber distributing area:
Protection and measure and control device, for configuring 1 mother protection interval, 1 bus protection interval, 2 routes guarantor for high pressure level Shield interval and 1 main transformer high-pressure side protection interval, middle pressure grade configure 1 main transformer medium voltage side interval;Low pressure grade configures 1 main transformer low pressure Side protection interval;
Center switch, for providing a group network data with measure and control device, monitoring system and telecontrol communication system for protection;
Monitoring system, for monitoring protection and measure and control device;
Combining unit includes conventional combining unit and bus PT combining unit;
Conventional combining unit is used for main transformer protection or other spaced merging of institute;
Bus PT combining unit is cascaded with conventional combining unit and is used for merging the bus PT of two voltage class;
Intelligent terminal is used for split-phase or three-phase operation function, corresponds to main transformer protection use or other all intervals use, It is also used to use for line differential protection or other all intervals uses;
Telecontrol communication system, for supervisory scheduling to be interacted and received with adjacent substations;
The protection and measure and control device configuration SV interchanger, GOOSE interchanger and MMS interchanger;SV interchanger, GOOSE interchanger and MMS interchanger with center switch network communication;
Combining unit and intelligent terminal pass through optical fiber distributing area realization SV point-to-point connection.
Preferably, the test platform includes intelligent station interface arrangement, network message detection device and client terminal device;
Intelligent station interface arrangement, for realizing the company between panorama simulator and intelligent station electrical secondary system minimal configuration area It connects, realizes interaction;Network message detection device, for obtaining the process-level network in intelligent station electrical secondary system minimal configuration area, standing Control message information in layer network;
Client terminal device, for the configuration of each device, display simulation result, substation configuration description file parsing and verification, message Analysis record, recording and message play back.
Preferably, the panorama simulator is used to simulate the operation of intelligent substation primary equipment system, to history Intelligent substation under the method for operation, the current method of operation, planning operation mode carries out real-time simulation, arbitrarily adjustment substation Locate the method for operation, the scene of substation's difference connection type, station of power grid.
Preferably, the client terminal device is parsed for the configuration file to any intelligent substation, is executed All IED communication connection visual analyzings are realized in SCL syntax check, be also used to Communication in configuration file and IED attribute of an element carries out unique constraints inspection, and carries out validity constraint inspection to element index, can be to different editions Configuration file compare and analyze.
Preferably, the system also includes reaying protection test templates, and the reaying protection test template is according to correlation Relay protection test standard obtains;
Client terminal device realizes test for being emulated to intelligent substation panorama according to reaying protection test template;Also For the simulation to any transient process of power grid, different failure phase, fault resistance, starting and duration are set, are also used to Fault simulation is realized according to set sequential combination by failure sequence.
Preferably, the client terminal device is by message, to SV, GOOSE, MMS message progress real-time online or offline Analysis, to SV message information and SCD configuration MAC Address, SVID, it is synchronous whether, the progress consistency inspection of port number, quality factor It looks into;To SV message delay, dispersion, frame losing, out-of-order inspection;It is also used to carry out real time parsing to GOOSE message, equipment summarizes, Sequence, tracking, snapshot, double nets summarize comparison, the comparison of double net single devices;GOOSE new events are supported to summarize, new and old event comparison solution Analysis;Support GOOSE frame losing, time-out check, description SCD is imported, the consistency check of MAC Address, GOID, variable number;MMS is reported Literary real time parsing, including session summarizes, tracks, snapshot, double net sessions comparison.
Preferably, monomer, monospace, multi-compartment and power transformation of the system to intelligent station electrical secondary system minimal configuration area The other combined debugging of station level.
Preferably, the system is by electric network data simulated accident process, according to intelligent station electrical secondary system minimal configuration Analyze cause of accident in area;By client terminal device, accident message is played back, determines that accident responsibility, accident responsibility include that SCD file is matched It is abnormal to set mistake, combining unit design defect, intelligent protection logic error and channel signal transmission.
Preferably, the system also includes protective relaying device model library, the system carries out protective relaying device Simulation modeling configures part electrical secondary system according to configuration file and carries out digital simulation, and research substation increases relay newly and protects Cooperation between protection unit networking sequence and original device, is used for Transfomer Substation Reconstruction project study.
Beneficial effects of the present invention, the present invention can be realized the emulation of the panorama simulation and electrical secondary system of primary system, real Now grid simulation is modeled, the interaction and test of primary system and electrical secondary system are realized by test platform, passes through simple operations The building of " power grid panorama " can be completed;It is capable of the operation of artificial intelligence transforming plant primary system, can arbitrarily adjusts substation The various different scenes such as the method for operation, substation's difference connection type, the station of locating power grid support substation's configuration Visual analyzing and SCD file checking function support protective relaying device dynamic simulation test and complicated station domain protection technique research, tool There is network message to record in real time and analytic function, whole station level intelligent Substation Systemization is supported to test, supports intelligent substation thing Therefore reproduction and confirmation of responsibility function, station level monitoring system and fault diagnosis system can be tested, test is comprehensive and effect is pasted It is close true.
Detailed description of the invention
Fig. 1 is the principle of the present invention schematic diagram;
Fig. 2 is the connection relationship of test platform and intelligent station electrical secondary system minimal configuration area;
Fig. 3 is 220kV Substation Bus Arrangement schematic diagram;
Fig. 4 is the schematic illustration in intelligent station electrical secondary system minimal configuration area;
Fig. 5 (a)-(d) is that four kinds of typical power grid panoramas construct schematic diagram, and Fig. 5 (a) is the maintenance scene of bus II, Fig. 5 (b) the planning scene for being route II, Fig. 5 (c) are the different mode of connection scenes of double-bus fanout operation, and Fig. 5 (d) is route mistake Carry scene;
Fig. 6 SCD file visualization parsing example;
Fig. 7 is by taking voltage device as an example, and Templated schematic illustration is tested in intelligent protection.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, those of ordinary skill in the art without creative labor it is obtained it is all its His embodiment, shall fall within the protection scope of the present invention.
It should be noted that in the absence of conflict, the feature in embodiment and embodiment in the present invention can phase Mutually combination.
The present invention will be further explained below with reference to the attached drawings and specific examples, but not as the limitation of the invention.
As shown in Figure 1, a kind of intelligent substation panorama emulation of present embodiment and test macro, the system comprises:
Panorama simulator realizes that the dynamic of intelligent substation primary system is imitative for the scene of Virtual Intelligent substation Very;The panorama simulator of present embodiment can realize the dynamic analog of intelligent substation " virtual panoramic ", substitute practical intelligence " virtual panoramic " and secondary system of intelligent substation are seamlessly connected by the primary system of substation by test platform;
Intelligent station electrical secondary system minimal configuration area, for reflecting that tri- voltage class of 500kV, 220kV and 110kV intelligently become The electrical secondary system operating condition in power station, the protection interval of each voltage class configuration is using minimum configuration;
Test platform is interacted and is surveyed with intelligent station electrical secondary system minimal configuration area for controlling panorama simulator Examination.
Present embodiment can be realized the emulation of the panorama simulation and electrical secondary system of primary system, and grid simulation is built in realization Mould is realized the interaction and test of primary system and electrical secondary system by test platform, can be completed that " power grid is complete by simple operations The building of scape ", and then tested.
In preferred embodiment, the intelligent station electrical secondary system minimal configuration area of present embodiment include protection with measure and control device, Center switch, monitoring system, combining unit, intelligent terminal, telecontrol communication system and optical fiber distributing area:
Protection and measure and control device, for configuring 1 mother protection interval, 1 bus protection interval, 2 routes guarantor for high pressure level Shield interval and 1 main transformer high-pressure side protection interval, middle pressure grade configure 1 main transformer medium voltage side interval;Low pressure grade configures 1 main transformer low pressure Side protection interval;
Center switch, for providing a group network data with measure and control device, monitoring system and telecontrol communication system for protection;
Monitoring system, for monitoring protection and measure and control device;
Combining unit includes conventional combining unit and bus PT combining unit;
Conventional combining unit is used for main transformer protection or other spaced merging of institute;
Bus PT combining unit is cascaded with conventional combining unit and is used for merging the bus PT of two voltage class;
Intelligent terminal is used for split-phase or three-phase operation function, corresponds to main transformer protection use or other all intervals use, It is also used to use for line differential protection or other all intervals uses;
Telecontrol communication system, for supervisory scheduling to be interacted and received with adjacent substations;
The protection and measure and control device configuration SV interchanger, GOOSE interchanger and MMS interchanger;SV interchanger, GOOSE interchanger and MMS interchanger with center switch network communication;
Combining unit and intelligent terminal pass through optical fiber distributing area realization SV point-to-point connection.
Present embodiment establishes the allusion quotation consistent with practical intelligent substation by protection and measure and control device, interchanger etc. Type electrical secondary system (minimal configuration) has various station levels, wall, process layer devices, sets up station identical with actual disposition Layer, process-level network are controlled, by parsing actual substation configuration description file (SCD file), by the primary of electrical secondary system and simulation The panorama emulation of intelligent substation is realized in system seamless connection.
The secondary system of intelligent substation construction of present embodiment considers really reflect 500kV, 220kV and 110kV The electrical secondary system operating condition of three voltage class intelligent substations, the protection interval of each voltage class configuration is using minimum Configuration (does not consider double net spare conditions), it may be assumed that each voltage class includes 1 mother protection interval, 1 bus protection interval, 2 routes Protection interval (forming differential or two outlets), 1 main transformer protection interval.Below with typical 220kV secondary system of intelligent substation For, as shown in Figure 3:
The part 220kV includes: 1 bus interval, 1 mother interval, 2 line segregations (forming differential or two outlets), 1 main transformer High-pressure side interval;
The part 110kV includes: 1 bus interval, 1 mother interval, 2 line segregations (forming differential or two outlets), 1 main transformer Medium voltage side interval;
The part 10kV includes: 1 main transformer low-pressure side interval.
As shown in figure 4, to electrical secondary system carry out modular division, comprising: 220kV part, 110kV part, 10kV part, Protection and measure and control device, center switch, combining unit and intelligent terminal, monitoring system and telecontrol communication system:
A) protection and measure and control device: protection and measure and control device and practical station configuration consistency for each interval, The part 220kV configures one group of interchanger (including each one of SV, GOOSE, MMS interchanger), configures one group of exchange in the part 110kV Machine (including each one of SV, GOOSE, MMS interchanger).
B) center switch: be separately connected the SV interchanger in the region 200kV, 110kV, 10kV, GOOSE interchanger and MMS interchanger provides group with recording as our station station level and process layer total switch, for monitoring system, telecontrol system, net point Network data.
C) combining unit and intelligent terminal: whole any according to meeting using by way of modifying configuration file multiplexing Every the requirement of test, the quantity of combining unit and intelligent terminal is configured.
A. combining unit: accounting for according to bus PT and non-bus PT combining unit, configure 3 conventional combining units and 2 bus PT combining units, conventional combining unit can be female as main transformer protection or other all typical spacing combining units Line PT combining unit is cascaded with conventional combining unit and is used as the bus PT combining unit of two voltage class;
B. it intelligent terminal: is accounted for according to voltage class, configures 3 220kV and above and 2 110kV And the intelligent terminal that following voltage class uses, the intelligent terminal of 220kV and above have split-phase or three-phase operation Function, corresponds to main transformer protection use or other all intervals use, the intelligent terminal of 110kV and following voltage grade, It can be used for line differential protection or other all intervals use.
D) other: each 1, the optic fiber configureing area including monitoring system, telecontrol system.
In preferred embodiment, as shown in Fig. 2, the test platform of present embodiment includes intelligent station interface arrangement, network report Literary detection device and client terminal device;
Intelligent station interface arrangement, for realizing the company between panorama simulator and intelligent station electrical secondary system minimal configuration area It connects, realizes interaction;Network message detection device, for obtaining the process-level network in intelligent station electrical secondary system minimal configuration area, standing Control message information in layer network;
Client terminal device, for the configuration of each device, display simulation result, substation configuration description file parsing and verification, message Analysis record, recording and message play back.
By intelligent station interface arrangement, the primary system of simulation and secondary system of intelligent substation are seamlessly connected;
Message information in the acquisition of network message monitoring device and recording process layer network, station level network, client terminal device Analysis grid event in real time, realizes whole station level intelligent Substation System test function.
Present embodiment is combined using true electrical secondary system with test platform, can adapt to different usage scenarios, from Planning and designing are to equipment debugging, from technical research to system testing, from educational training to engineering construction, are easy to profound understanding intelligence Substation's architecture and knowledge frame help technical staff from the superficial to the deep to grasp relevant knowledge and technical ability.
The electrical secondary system of present embodiment can configure (SCD) file by change substation, simulate any intelligent substation The configuration and extension of electrical secondary system, holding equipment and network can test and debug to any link.
Present embodiment can model grid simulation, including power supply, synchronous generator, route, transformer, load, open Pass, circuit breaker failure element etc.;Have Substation Bus Arrangement template abundant, " power grid panorama " can be completed by simple operations Building;Panorama simulator is used to simulate the operation of intelligent substation primary equipment system, to history run mode, current fortune Intelligent substation under line mode, planning operation mode carries out real-time simulation, any operation side for adjusting power grid locating for substation The scene of formula, substation's difference connection type, station, as shown in Figure 5.
Present embodiment supports substation's configuration visual analyzing and SCD file checking function, in preferred embodiment, this reality The client terminal device for applying mode is parsed for the configuration file to any intelligent substation, executes SCL syntax check, real Now all IED communicate to connect visual analyzings, be also used to Communication and IED attribute of an element in configuration file into Row unique constraints inspection, and validity constraint inspection is carried out to element index, the configuration file of different editions can be carried out Comparative analysis.
As shown in fig. 6, all input and output that IED (PL2211A2211 route protection 1) is attached thereto in the part (A) Relationship is shown by visual mode, and it is defeated that the IED (ML2211A2211 route combining unit) being attached thereto is entered after click Enter the part output relation (B), click SV signal (from ML2211A2211 route combining unit to the observing and controlling of CL2211A2211 route) Afterwards, (C) can partially show the virtual terminator details of the signal.
Present embodiment supports protective relaying device dynamic simulation test and complicated station domain protection technique research, preferred embodiment In, the system also includes reaying protection test template, the reaying protection test template is according to related relay protection test mark Standard obtains;
Client terminal device realizes test for being emulated to intelligent substation panorama according to reaying protection test template;Also For the simulation to any transient process of power grid, different failure phase, fault resistance, starting and duration are set, are also used to Fault simulation is realized according to set sequential combination by failure sequence.
Protective relaying device dynamic simulation test is still the key content of intelligent substation technical research.In present embodiment, after Templating, standardization, batch-automated, the intelligent protection test template by taking transformer as an example are realized in the test of electrical protective device dynamic model It is as shown in Figure 7 to change schematic diagram.
According to related relay protection test standard, present embodiment has the exemplary simulation template of all kinds of protections, can cover The various common test types for including in lid standard, as metallicity failure inside and outside airdrop test, actuation time, differential protection area, Through transition resistive short, developing fault, permanent fault, system oscillation, switching low-voltage lateral capacitance, reactor, adjust tap Head, CT broken string and saturation, PT saturation, intermittent defect, system frequency excursion etc..Meanwhile it can be in a simulation process certainly Dynamic batch completes all test contents.These standards include " GB/T 26864-2011 relay protection of power system product dynamic model examination Test ", " 15145 line protection general technical specifications of GB/T ", " the 670 general skill of PC bus protection device of DL/T Art condition ", " 671 microcomputer generator-transformer protection device general technical specifications of DL/T " " 770 microcomputer transformer of DL/T protect Protection unit general technical specifications " etc..
In addition, present embodiment also supports the mould of any transient process of power grid (operation transient state, resonance transient state, fault transient) Quasi-, settable different failure phase, fault resistance, starting and duration realize simple fault simulation, and pass through failure sequence Column realize complicated fault simulation according to set sequential combination, support complicated station domain Protective strategy.
Present embodiment records in real time with network message and analytic function, deposits by the way that network message monitoring device is recordable The network message for storing up electrical secondary system, in preferred embodiment, client terminal device carries out SV, GOOSE, MMS message real by message When online or off-line analysis, to SV message information and SCD configure MAC Address, SVID, it is synchronous whether, port number, quality factor into Row consistency check;To SV message delay, dispersion, frame losing, out-of-order inspection;It is also used to carry out real time parsing to GOOSE message, Equipment summarizes, sorts, tracking, snapshot, double nets summarize comparison, the comparison of double net single devices;GOOSE new events are supported to summarize, is new and old Event comparison parsing;Support GOOSE frame losing, time-out check, description SCD is imported, the consistency inspection of MAC Address, GOID, variable number It looks into;To MMS message real time parsing, including session summarizes, tracks, snapshot, double net sessions comparison.
Present embodiment supports whole station level intelligent Substation Systemization to test, and in preferred embodiment, present embodiment is System is to the monomer in intelligent station electrical secondary system minimal configuration area, monospace, multi-compartment and substation's rank combined debugging, including process Layer combining unit and intelligent terminal, wall protection and measuring and controlling equipment, the monitoring system of station level, process-level network SV The MMS message etc. of message and GOOSE message and dead level network of standing.It, can be to fortune after test platform starts substation operation simulation Primary system in row carries out the control such as switch changed position, fault setting, load adjustment, in conjunction with network message real-time monitoring, realizes The interactive analysis of whole station level, to complete all configurations of entire intelligent substation, information flow, the correctness survey of functions of the equipments Examination.
Present embodiment supports intelligent substation accident reconstruction and confirmation of responsibility function, after intelligent substation generation accident, Virtual panoramic when accident occurs can be rebuild using panorama simulator by grid operation data, according to intelligent substation SCD File simulates simulated accident evolutionary process, analyzes accident producing cause;In addition, being usually constructed with after the accident corresponding Recorded wave file record can check problem place by message playback function.
The system of present embodiment is by electric network data simulated accident process, according to intelligent station electrical secondary system minimal configuration area Analyze cause of accident;By client terminal device, accident message is played back, determines that accident responsibility, accident responsibility include SCD file configuration Mistake, combining unit design defect, intelligent protection logic error and channel signal transmission are abnormal, and then change to problem link Into step card of going forward side by side, to ensure the reliable and stable operation of intelligent substation.
Present embodiment station level monitoring system and fault diagnosis system are tested, due to replacing primary system using panorama simulation System, can arbitrarily be operated on the primary system of simulation, thus test monitor system function, validation fault diagnostic system result Correctness.Present embodiment can realize to electrical quantity, non-electric quantity information communication customized test function, background system to When the primary system of simulation issues instruction, the response of primary system finally to give monitoring system by MMS message in form, together When in conjunction with network message analytic function, it can be achieved that testing the partial function of monitoring system, electrical secondary system equipment.
For example, background system is conjugated by graphical interfaces Operation switch, MMS message is formed, through in station level network message Appearance is obtained by measure and control device, and forms GOOSE message submitting, and analogue system subscribes to the message, realizes the primary system in simulation Middle switch changed position, switch changed position information send GOOSE message to measure and control device, are further sent to station level network, for monitoring System senses.
Present embodiment supports combining unit and intelligent terminal to test,
Combining unit can be tested by intelligent station interface arrangement through power amplifier;Pass through additional simulation open circuit Device can test intelligent terminal.
Present embodiment protective relaying device is simulated and Transfomer Substation Reconstruction project study, in preferred embodiment, this embodiment party The system of formula further includes protective relaying device model library, and the system carries out simulation modeling to protective relaying device, to part two Subsystem according to configuration file configure carry out digital simulation, research substation increase newly protective relaying device networking sequence, with Cooperation between original device is used for Transfomer Substation Reconstruction project study.
Although describing the present invention herein with reference to specific embodiment, it should be understood that, these realities Apply the example that example is only principles and applications.It should therefore be understood that can be carried out to exemplary embodiment Many modifications, and can be designed that other arrangements, without departing from spirit of the invention as defined in the appended claims And range.It should be understood that different appurtenances can be combined by being different from mode described in original claim Benefit requires and feature described herein.It will also be appreciated that the feature in conjunction with described in separate embodiments can be used In other described embodiments.

Claims (10)

1. a kind of intelligent substation panorama emulation and test macro, which is characterized in that the system comprises:
Panorama simulator realizes the dynamic simulation of intelligent substation primary system for the scene of Virtual Intelligent substation;
Intelligent station electrical secondary system minimal configuration area, for reflecting tri- voltage class intelligent substations of 500kV, 220kV and 110kV Electrical secondary system operating condition, the protection interval of each voltage class configuration is using minimizing configuration;
Test platform is interacted and is tested with intelligent station electrical secondary system minimal configuration area for controlling panorama simulator.
2. intelligent substation panorama emulation according to claim 1 and test macro, which is characterized in that the intelligent station two Subsystem minimal configuration area includes protection and measure and control device, center switch, monitoring system, combining unit, intelligent terminal, telemechanical Communication system and optical fiber distributing area:
Protection and measure and control device, for being configured between 1 mother protection interval, 1 bus protection interval, 2 route protections for high pressure level Every with 1 main transformer high-pressure side protection interval, middle pressure grade configures 1 main transformer medium voltage side interval;Low pressure grade configures 1 main transformer low-pressure side and protects Shield interval;
Center switch, for providing a group network data with measure and control device, monitoring system and telecontrol communication system for protection;
Monitoring system, for monitoring protection and measure and control device;
Combining unit includes conventional combining unit and bus PT combining unit;
Conventional combining unit is used for main transformer protection or other spaced merging of institute;
Bus PT combining unit is cascaded with conventional combining unit and is used for merging the bus PT of two voltage class;
Intelligent terminal is used for split-phase or three-phase operation function, corresponds to main transformer protection use or other all intervals use, also use It is used in for line differential protection use or other all intervals;
Telecontrol communication system, for supervisory scheduling to be interacted and received with adjacent substations;
The protection and measure and control device configuration SV interchanger, GOOSE interchanger and MMS interchanger;SV interchanger, GOOSE are handed over Change planes and MMS interchanger with center switch network communication;
Combining unit and intelligent terminal pass through optical fiber distributing area realization SV point-to-point connection.
3. intelligent substation panorama emulation according to claim 1 and test macro, which is characterized in that the test platform Including intelligent station interface arrangement, network message detection device and client terminal device;
Intelligent station interface arrangement, for realizing the connection between panorama simulator and intelligent station electrical secondary system minimal configuration area, Realize interaction;Network message detection device, for obtaining process-level network, the station level in intelligent station electrical secondary system minimal configuration area Message information in network;
Client terminal device, for the configuration of each device, display simulation result, substation configuration description file parsing and verification, message analysis Record, recording and message play back.
4. intelligent substation panorama emulation according to claim 1 and test macro, which is characterized in that the panorama simulation Device is used to simulate the operation of intelligent substation primary equipment system, to history run mode, the current method of operation, planning operation Intelligent substation under mode carries out real-time simulation, and any method of operation, substation's difference for adjusting power grid locating for substation connects Line form, the scene of station.
5. intelligent substation panorama emulation according to claim 1 and test macro, which is characterized in that
The client terminal device is parsed for the configuration file to any intelligent substation, executes SCL syntax check, real Now all IED communicate to connect visual analyzings, be also used to Communication and IED attribute of an element in configuration file into Row unique constraints inspection, and validity constraint inspection is carried out to element index, the configuration file of different editions can be carried out Comparative analysis.
6. intelligent substation panorama emulation according to claim 1 and test macro, which is characterized in that
The system also includes reaying protection test template, the reaying protection test template is according to related relay protection test mark Standard obtains;
Client terminal device realizes test for being emulated to intelligent substation panorama according to reaying protection test template;It is also used to Simulation to any transient process of power grid is arranged different failure phase, fault resistance, starting and duration, is also used to pass through Failure sequence realizes fault simulation according to set sequential combination.
7. intelligent substation panorama emulation according to claim 1 and test macro, which is characterized in that
The client terminal device carries out real-time online or off-line analysis by message, to SV, GOOSE, MMS message, to SV message Information and SCD configuration MAC Address, SVID, it is synchronous whether, the progress consistency check of port number, quality factor;SV message is prolonged When, dispersion, frame losing, out-of-order check;It is also used to carry out real time parsing to GOOSE message, equipment summarizes, sorts, tracking, fastly Summarize comparison, the comparison of double net single devices according to, double nets;GOOSE new events are supported to summarize, the comparison parsing of new and old event;Support GOOSE Frame losing, time-out check, description SCD are imported, the consistency check of MAC Address, GOID, variable number;To MMS message real time parsing, Summarize including session, track, snapshot, double net sessions comparison.
8. intelligent substation panorama emulation according to claim 1 and test macro, which is characterized in that the system is to intelligence Monomer, monospace, multi-compartment and substation's rank combined debugging in the electrical secondary system that can stand minimal configuration area.
9. intelligent substation panorama emulation according to claim 1 and test macro, which is characterized in that the system passes through Electric network data simulated accident process analyzes cause of accident according to intelligent station electrical secondary system minimal configuration area;By client terminal device, Playback accident message determines that accident responsibility, accident responsibility include SCD file configuration error, combining unit design defect, intelligence guarantor It protects logic error and channel signal transmission is abnormal.
10. intelligent substation panorama emulation according to claim 1 and test macro, which is characterized in that the system is also Including protective relaying device model library, the system to protective relaying device carry out simulation modeling, to part electrical secondary system according to Configuration file configuration carries out digital simulation, and research substation increases newly between protective relaying device networking sequence and original device Cooperation, be used for Transfomer Substation Reconstruction project study.
CN201811217091.9A 2018-10-18 2018-10-18 The emulation of intelligent substation panorama and test macro Pending CN109103880A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811217091.9A CN109103880A (en) 2018-10-18 2018-10-18 The emulation of intelligent substation panorama and test macro

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811217091.9A CN109103880A (en) 2018-10-18 2018-10-18 The emulation of intelligent substation panorama and test macro

Publications (1)

Publication Number Publication Date
CN109103880A true CN109103880A (en) 2018-12-28

Family

ID=64869070

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811217091.9A Pending CN109103880A (en) 2018-10-18 2018-10-18 The emulation of intelligent substation panorama and test macro

Country Status (1)

Country Link
CN (1) CN109103880A (en)

Cited By (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109765451A (en) * 2019-03-27 2019-05-17 山东磐诚电子科技有限公司 A kind of intelligent distribution network terminal simulation test platform, system and method
CN109888923A (en) * 2019-03-07 2019-06-14 国网冀北电力有限公司检修分公司 A kind of simulation detection system of automation of transformation substations equipment
CN110611312A (en) * 2019-09-29 2019-12-24 深圳供电局有限公司 On-line simulation system and method for panoramic data of substation bay level
CN110703029A (en) * 2019-11-06 2020-01-17 国网河北省电力有限公司保定供电分公司 Fault detection system and method for primary and secondary systems of intelligent substation
CN110768379A (en) * 2019-10-30 2020-02-07 国网四川省电力公司电力科学研究院 Method for deducing primary wiring diagram of field primary equipment by SCD virtual terminal
CN110865263A (en) * 2019-11-29 2020-03-06 国网河南省电力公司洛阳供电公司 Intelligent substation virtual test method based on minimum test system
CN111046543A (en) * 2019-12-01 2020-04-21 贵州电网有限责任公司 Intelligent substation test simulation method
CN111597691A (en) * 2020-04-26 2020-08-28 国网北京市电力公司 Secondary model implementation method and system for monitoring mechanism simulation
CN111654111A (en) * 2020-06-15 2020-09-11 国网宁夏电力有限公司电力科学研究院 GOOSE simulation test method for secondary system of intelligent substation
CN112737878A (en) * 2020-12-25 2021-04-30 国网四川省电力公司电力科学研究院 Station control layer switch testing system and testing method of hybrid communication capability and port mirror image bearing capacity thereof
CN112865309A (en) * 2021-01-13 2021-05-28 湖南依中紫光电气科技有限公司 Intelligent substation analysis method and system with automatic modeling function
CN113096476A (en) * 2021-04-07 2021-07-09 国网浙江省电力有限公司检修分公司 Debugging platform of monitoring system
CN113270854A (en) * 2021-05-14 2021-08-17 广东电网有限责任公司 Hierarchical protection system based on virtual container and establishment method thereof
CN113343446A (en) * 2021-05-25 2021-09-03 国网湖北省电力有限公司荆门供电公司 Data analysis and verification method and system for transformer substation monitoring system
CN114095396A (en) * 2021-11-15 2022-02-25 中国电力科学研究院有限公司 Intelligent substation data communication detection method, system, equipment and storage medium
CN114124765A (en) * 2021-11-12 2022-03-01 中国电力科学研究院有限公司 Detection method, system, equipment and medium for new energy transformer substation coupling model
CN114184864A (en) * 2021-12-07 2022-03-15 武汉中元华电电力设备有限公司 Intelligent oscillograph test method and system
CN116979523A (en) * 2023-08-14 2023-10-31 广东工业大学 Scene-based substation secondary system simulation method and computer equipment

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202488214U (en) * 2012-02-01 2012-10-10 华北电力科学研究院有限责任公司 Intelligent substation simulation system
CN102867274A (en) * 2012-07-27 2013-01-09 江苏省电力公司电力科学研究院 Management and graphical display system for intelligent substation SCL (substation configuration description language) configuration files
CN104749466A (en) * 2015-03-27 2015-07-01 广州至德电力科技有限公司 Intelligent transformer station relay protection testing system and method and realization method
CN106712001A (en) * 2016-12-30 2017-05-24 国网浙江省电力公司绍兴供电公司 Data modeling method for network message recording analysis device
CN107169212A (en) * 2017-05-22 2017-09-15 广东电网有限责任公司教育培训评价中心 Substation equipment fault simulation Training Methodology, device and system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202488214U (en) * 2012-02-01 2012-10-10 华北电力科学研究院有限责任公司 Intelligent substation simulation system
CN102867274A (en) * 2012-07-27 2013-01-09 江苏省电力公司电力科学研究院 Management and graphical display system for intelligent substation SCL (substation configuration description language) configuration files
CN104749466A (en) * 2015-03-27 2015-07-01 广州至德电力科技有限公司 Intelligent transformer station relay protection testing system and method and realization method
CN106712001A (en) * 2016-12-30 2017-05-24 国网浙江省电力公司绍兴供电公司 Data modeling method for network message recording analysis device
CN107169212A (en) * 2017-05-22 2017-09-15 广东电网有限责任公司教育培训评价中心 Substation equipment fault simulation Training Methodology, device and system

Cited By (25)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109888923A (en) * 2019-03-07 2019-06-14 国网冀北电力有限公司检修分公司 A kind of simulation detection system of automation of transformation substations equipment
CN109765451A (en) * 2019-03-27 2019-05-17 山东磐诚电子科技有限公司 A kind of intelligent distribution network terminal simulation test platform, system and method
CN110611312A (en) * 2019-09-29 2019-12-24 深圳供电局有限公司 On-line simulation system and method for panoramic data of substation bay level
CN110768379A (en) * 2019-10-30 2020-02-07 国网四川省电力公司电力科学研究院 Method for deducing primary wiring diagram of field primary equipment by SCD virtual terminal
CN110768379B (en) * 2019-10-30 2022-07-19 国网四川省电力公司电力科学研究院 Method for deducing primary wiring diagram of field primary equipment by SCD virtual terminal
CN110703029B (en) * 2019-11-06 2022-03-08 国网河北省电力有限公司保定供电分公司 Fault detection system and method for primary and secondary systems of intelligent substation
CN110703029A (en) * 2019-11-06 2020-01-17 国网河北省电力有限公司保定供电分公司 Fault detection system and method for primary and secondary systems of intelligent substation
CN110865263A (en) * 2019-11-29 2020-03-06 国网河南省电力公司洛阳供电公司 Intelligent substation virtual test method based on minimum test system
CN111046543A (en) * 2019-12-01 2020-04-21 贵州电网有限责任公司 Intelligent substation test simulation method
CN111597691A (en) * 2020-04-26 2020-08-28 国网北京市电力公司 Secondary model implementation method and system for monitoring mechanism simulation
CN111654111A (en) * 2020-06-15 2020-09-11 国网宁夏电力有限公司电力科学研究院 GOOSE simulation test method for secondary system of intelligent substation
CN112737878A (en) * 2020-12-25 2021-04-30 国网四川省电力公司电力科学研究院 Station control layer switch testing system and testing method of hybrid communication capability and port mirror image bearing capacity thereof
CN112737878B (en) * 2020-12-25 2022-06-17 国网四川省电力公司电力科学研究院 Station control layer switch test system and performance test method thereof
CN112865309A (en) * 2021-01-13 2021-05-28 湖南依中紫光电气科技有限公司 Intelligent substation analysis method and system with automatic modeling function
CN112865309B (en) * 2021-01-13 2022-08-02 湖南依中紫光电气科技有限公司 Intelligent substation analysis method and system with automatic modeling function
CN113096476A (en) * 2021-04-07 2021-07-09 国网浙江省电力有限公司检修分公司 Debugging platform of monitoring system
CN113270854A (en) * 2021-05-14 2021-08-17 广东电网有限责任公司 Hierarchical protection system based on virtual container and establishment method thereof
CN113270854B (en) * 2021-05-14 2022-05-27 广东电网有限责任公司 Hierarchical protection system based on virtual container and establishment method thereof
CN113343446B (en) * 2021-05-25 2022-07-01 国网湖北省电力有限公司荆门供电公司 Data analysis and verification method and system for transformer substation monitoring system
CN113343446A (en) * 2021-05-25 2021-09-03 国网湖北省电力有限公司荆门供电公司 Data analysis and verification method and system for transformer substation monitoring system
CN114124765A (en) * 2021-11-12 2022-03-01 中国电力科学研究院有限公司 Detection method, system, equipment and medium for new energy transformer substation coupling model
CN114095396A (en) * 2021-11-15 2022-02-25 中国电力科学研究院有限公司 Intelligent substation data communication detection method, system, equipment and storage medium
CN114095396B (en) * 2021-11-15 2023-07-25 中国电力科学研究院有限公司 Intelligent substation data communication detection method, system, equipment and storage medium
CN114184864A (en) * 2021-12-07 2022-03-15 武汉中元华电电力设备有限公司 Intelligent oscillograph test method and system
CN116979523A (en) * 2023-08-14 2023-10-31 广东工业大学 Scene-based substation secondary system simulation method and computer equipment

Similar Documents

Publication Publication Date Title
CN109103880A (en) The emulation of intelligent substation panorama and test macro
CN103680238B (en) A kind of intelligent substation Hybrid Simulation Training System for Industry
CN105429291B (en) The correlating method of intelligent substation primary connection figure and electrical secondary system logic connectivity diagram
CN104749466B (en) A kind of intelligent substation relay protection test system, method of testing and implementation method
CN106971663B (en) A kind of wind power plant analogue system and method
CN103123758B (en) A kind of dispatching automation numeral physical mixed simulation training system
CN106026087B (en) Fault scenes analogy method containing distributed power distribution network
CN108241771A (en) Secondary device modeling method based on electromagnetic transient simulation platform
CN103076520A (en) Dynamic analogue simulation detection platform and analogue simulation method for secondary system of intelligent substation
CN102831792B (en) Distribution Network Failure analogue system and emulation mode thereof
WO2018209945A1 (en) Active power distribution network feeder automation system test method
CN109191591A (en) Substation Training Simulator construction method based on augmented reality
CN105093017B (en) Intelligent substation GOOSE integrated testabilities device and its method of testing
CN104505941B (en) The monitoring system and the simulative running system of intelligent substation network
CN104007978A (en) Intelligent substation secondary equipment logic emulation system
CN107481598A (en) A kind of emulation training platform of intelligent substation
CN109697903A (en) A kind of substation relay protection safety practical training method based on VR
CN112311098A (en) Sequence control function debugging system for substation equipment
CN203630997U (en) Intelligent substation hybrid simulation training system
CN110148940A (en) Distribution network failure visual Simulation backtracking system and its simulation retrogressive method
CN110021995A (en) A kind of distribution network automated information joint debugging emulation test system
CN102508052B (en) Test method for field band channel operation of automatic bus transfer system of area network
CN104318833B (en) The method of work of power network schedule automation experience system
Stevic et al. A two-step simulation approach for joint analysis of power systems and communication infrastructures
CN109754662A (en) A kind of intelligent substation O&M method based on simulation training system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20181228