CN106971663B - A kind of wind power plant analogue system and method - Google Patents
A kind of wind power plant analogue system and method Download PDFInfo
- Publication number
- CN106971663B CN106971663B CN201710377961.8A CN201710377961A CN106971663B CN 106971663 B CN106971663 B CN 106971663B CN 201710377961 A CN201710377961 A CN 201710377961A CN 106971663 B CN106971663 B CN 106971663B
- Authority
- CN
- China
- Prior art keywords
- wind power
- power plant
- blower
- station
- student
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000000034 method Methods 0.000 title claims abstract description 36
- 238000012544 monitoring process Methods 0.000 claims abstract description 77
- 238000012549 training Methods 0.000 claims abstract description 57
- 238000004088 simulation Methods 0.000 claims abstract description 41
- 238000010248 power generation Methods 0.000 claims abstract description 7
- 230000008859 change Effects 0.000 claims abstract description 4
- 230000001360 synchronised effect Effects 0.000 claims description 36
- 238000007726 management method Methods 0.000 claims description 35
- 238000012806 monitoring device Methods 0.000 claims description 15
- 238000011084 recovery Methods 0.000 claims description 11
- 238000012545 processing Methods 0.000 claims description 10
- 238000012790 confirmation Methods 0.000 claims description 9
- 238000013024 troubleshooting Methods 0.000 claims description 9
- 238000005516 engineering process Methods 0.000 description 21
- 230000006870 function Effects 0.000 description 12
- 230000008569 process Effects 0.000 description 11
- 230000005684 electric field Effects 0.000 description 5
- 230000005611 electricity Effects 0.000 description 5
- 238000007689 inspection Methods 0.000 description 4
- 238000004519 manufacturing process Methods 0.000 description 4
- 230000009466 transformation Effects 0.000 description 4
- 230000002159 abnormal effect Effects 0.000 description 3
- 230000007812 deficiency Effects 0.000 description 3
- 238000013461 design Methods 0.000 description 3
- 238000011161 development Methods 0.000 description 3
- 230000002452 interceptive effect Effects 0.000 description 3
- 230000005856 abnormality Effects 0.000 description 2
- 238000004458 analytical method Methods 0.000 description 2
- 230000004888 barrier function Effects 0.000 description 2
- 230000008901 benefit Effects 0.000 description 2
- 238000005094 computer simulation Methods 0.000 description 2
- 230000007547 defect Effects 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 230000003993 interaction Effects 0.000 description 2
- 238000005259 measurement Methods 0.000 description 2
- 230000007246 mechanism Effects 0.000 description 2
- 230000003362 replicative effect Effects 0.000 description 2
- 241000208340 Araliaceae Species 0.000 description 1
- 235000005035 Panax pseudoginseng ssp. pseudoginseng Nutrition 0.000 description 1
- 235000003140 Panax quinquefolius Nutrition 0.000 description 1
- 206010037660 Pyrexia Diseases 0.000 description 1
- 208000037656 Respiratory Sounds Diseases 0.000 description 1
- 238000009825 accumulation Methods 0.000 description 1
- 230000009471 action Effects 0.000 description 1
- 230000005540 biological transmission Effects 0.000 description 1
- 239000003990 capacitor Substances 0.000 description 1
- 238000004891 communication Methods 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 238000009826 distribution Methods 0.000 description 1
- 238000011156 evaluation Methods 0.000 description 1
- 235000008434 ginseng Nutrition 0.000 description 1
- 230000010354 integration Effects 0.000 description 1
- 230000007774 longterm Effects 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 230000007257 malfunction Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000011022 operating instruction Methods 0.000 description 1
- 238000013439 planning Methods 0.000 description 1
- 238000003825 pressing Methods 0.000 description 1
- 230000033458 reproduction Effects 0.000 description 1
- 238000011160 research Methods 0.000 description 1
- 238000012360 testing method Methods 0.000 description 1
Classifications
-
- G—PHYSICS
- G09—EDUCATION; CRYPTOGRAPHY; DISPLAY; ADVERTISING; SEALS
- G09B—EDUCATIONAL OR DEMONSTRATION APPLIANCES; APPLIANCES FOR TEACHING, OR COMMUNICATING WITH, THE BLIND, DEAF OR MUTE; MODELS; PLANETARIA; GLOBES; MAPS; DIAGRAMS
- G09B25/00—Models for purposes not provided for in G09B23/00, e.g. full-sized devices for demonstration purposes
- G09B25/02—Models for purposes not provided for in G09B23/00, e.g. full-sized devices for demonstration purposes of industrial processes; of machinery
Landscapes
- Engineering & Computer Science (AREA)
- Business, Economics & Management (AREA)
- Physics & Mathematics (AREA)
- Educational Administration (AREA)
- Educational Technology (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Supply And Distribution Of Alternating Current (AREA)
- Wind Motors (AREA)
Abstract
The present invention relates to a kind of wind power plant analogue system and methods, the system includes: instructor station, Xue Yuanzhan, wind power plant SCADA system, energy management platform, case change monitoring system, wind power prediction system, blower tower bottom screen station and booster stations monitoring system, wherein, the instructor station is used to receive the dummy instruction and operating parameter of the various wind power plants of coach's input;Restore blower for handling the blower and boosting station failure of instructor station triggering and operate normally, fan trouble picture is searched according to fan trouble, and select failure cause in the student station;The wind power plant SCADA system is used to receive the dummy instruction for the various wind power plants that the instructor station is sent and the simulation operating condition of operating parameter display wind power plant.According to the technical solution of the present invention, be able to solve in the prior art due to the missing of wind power plant artificial product cause user can not simulating wind power generation field real scene to student carry out skills training the problem of.
Description
Technical field
The present invention relates to be related to wind power plant simulation technical field, and in particular to a kind of wind power plant analogue system and
Method.
Background technique
Wind power plant simulation training system is to carry out modeling to wind power plant wind-driven generator and first and second equipment gamut to imitate
Very, it is detailed with the systems such as automatically-monitored that generator model, control system, measurement system, ac and dc systems, protection are specifically included
Thin model, while influence and generator of the wind direction to generator detailed model are considered to grid simulation abstract model
It influences.
The major function of wind power plant simulation training system has: normal operating, the simulation training of equipment-patrolling, accident and exception
The functions such as guidance and auxiliary training.The key technology of use has: virtual instrument technology, virtual reality technology, component modeling technique
With dynamic human machine interface technologies etc..
Wind power plant simulation training system is emulated using virtual instrument technology and virtual reality technology.Virtual instrument technology
Essence be that the function of traditional instrument instrument is realized using computer technology.The system uses virtual instrument technology by generating field
Various secondary devices respective physical characteristic be installed generate respective virtual unit respectively.
There are no the products formed on the market, largely rest on theoretical research stage, some wind power plant artificial products
It is perfect not enough.The missing of wind power plant artificial product so that user can not simulating wind power generation field real scene to student
Carry out skills training.
Summary of the invention
In view of this, it is an object of the invention to overcome the deficiencies of the prior art and provide a kind of wind power plant emulation systems
System and method, to solve in the prior art since the missing of wind power plant artificial product causes user can not simulating wind power generation
The problem of field real scene carries out skills training to student.
In order to achieve the above object, the present invention adopts the following technical scheme:
A kind of wind power plant analogue system, comprising: instructor station, Xue Yuanzhan, wind power plant SCADA system, energy management
Platform, case become monitoring system, wind power prediction system, blower tower bottom screen station and booster stations monitoring system, wherein
The instructor station is used to receive the dummy instruction and operating parameter of the various wind power plants of coach's input, packet
It includes: the operating parameter of Work condition analogue instruction, the fault simulation instruction and blower of monitoring device of blower;
The student station is operated normally for handling the blower and boosting station failure of instructor station triggering, recovery blower, root
Fan trouble picture is searched according to fan trouble, and selects failure cause, so that student carries out simulated training;
The wind power plant SCADA system is used to receive the dummy instruction for the various wind power plants that the instructor station is sent
The simulation operating condition of wind power plant is shown with operating parameter;
The energy management platform dispatches limited load, scheduling adjustment active power for simulating wind power generation field;
The case becomes monitoring system and is used to calculate the operating condition that air box becomes in wind power plant simulated training scene;
The wind power prediction system is used to calculate short term power and ultra-short term power under prediction meteorological condition;
The blower tower bottom screen station is for simulative debugging blower, processing fan trouble, inquiry failure file;
The booster stations monitoring system is for calculating wind power plant simulated training scene whole audience boosting station equipment operation ginseng
Number, boost station equipment operating condition.
A kind of wind power plant emulation mode, applied in above-mentioned wind power plant analogue system, comprising:
Step S1, when instructor station receives the wind speed instruction of coach's input, it is sent to wind power plant SCADA system, with
The wind power plant SCADA system is set to instruct display current working according to the wind speed;
Step S2, when the described instructor station detects that coach triggers any fan trouble, to the wind power plant SCADA
System sends the fault message of the blower, so that the wind power plant SCADA system shows the Fans according to the fault message
Failure;
Step S3, it when the described instructor station receives the operation simulation instruction of coach's input, is sent to energy pipe and pats
Platform, so that the energy management plateform system instructs the power output situation to show blower according to the operation simulation;
Step S4, when the described instructor station detects that coach triggers any booster stations monitoring equipment fault, to described
Booster stations monitoring system sends the fault message of the booster stations monitoring device, so that the booster stations monitoring system is according to the event
Barrier information shows the failure of the booster stations monitoring device.
Preferably, the step S1 further include: the wind power plant SCADA system is as follows according to the wind speed command synchronization
The operating condition of system:
Synchronous energy manages the active power of platform separate unit blower, wind speed;
Synchronous case becomes the active power of monitoring system separate unit blower;
The whole audience active power of synchronous boost station monitoring system;
The wind speed of synchronous blower tower bottom screen station.
Preferably, the step S2 further include: the wind power plant SCADA system synchronizes following system according to the fault message
The operating condition of system:
The failure of synchronous energy management platform separate unit blower;
Synchronous case becomes the active power of monitoring system;
The active power of synchronous boost station monitoring system;
The fan trouble of synchronous blower tower bottom screen station.
Preferably, the step S2 further include:
When the instructor station detects that coach triggers any fan trouble, stands to the student and send the blower
Fault message;
Student station judges the fan trouble picture of student's confirmation and the failure principle of student's selection is with troubleshooting method
It is no correct, if so, student, which stands, sends the fault recovery instruction of the blower to the wind power plant SCADA system, so that the wind-powered electricity generation
The failure blower of field SCADA system restores normal.
Preferably, the step S2 further include:
Student station judges the fan trouble picture of student's confirmation and the failure principle of student's selection is with troubleshooting method
It is no correct, if so, student station becomes monitoring system, booster stations monitoring system and blower tower to the energy management platform, case respectively
Bottom screen station sends the fault recovery instruction of the blower, so that the event of the energy management platform and blower tower bottom screen station
Hinder blower recovery normally and the case becomes monitoring system and the monitoring data of booster stations monitoring system restores normal.
Preferably, the step S3 further include:
The energy management plateform system instructs to synchronize the operating condition of following system according to the operation simulation:
The active power of wind power plant SCADA system separate unit blower synchronous with energy management platform;
The active power of blower tower bottom screen station separate unit blower synchronous with energy management platform;
Booster stations monitoring system can active power synchronous with energy management platform;
Case becomes monitoring system active power synchronous with energy management platform.
Preferably, the step S4 further include:
When the instructor station detects that coach triggers any booster stations monitoring equipment fault, stands and send out to the student
Give the fault message of the booster stations monitoring device;
Student station judges the booster stations monitoring equipment fault picture of student's confirmation and the failure principle and failure of student's selection
Whether treating method is correct, if so, student stands, the failure for sending the booster stations monitoring device to the booster stations monitoring system is extensive
Multiple instruction, so that the failure blower of the booster stations monitoring system restores normal.
Preferably, the wind power plant emulation mode, further includes:
When instructor station receives the prediction meteorology numerical value of coach's input, it is sent to wind power prediction system, so that wind
Power prediction system can calculate short term power and ultra-short term power under prediction meteorological condition.
Preferably, the wind power plant emulation mode, further includes:
When instructor station receives the analog operational parameters of any blower of coach's input, it is sent to the wind power plant
SCADA system, so that the wind power plant SCADA system can be run according to the analog operational parameters.
The invention adopts the above technical scheme, at least have it is following the utility model has the advantages that
As shown from the above technical solution, this wind power plant analogue system and method provided by the invention, in computer
Upper realization is to simulated object, that is, wind power generating set, booster stations, AGC (Automation generation control, Automatic
Generation Control), case becomes the dynamic simulation of monitoring, wind power prediction dispatch control system, while also including on the spot
The emulation of equipment blower tower bottom screen station operation.The composition of replicating machine software is by Simulation Platform Software, simulation model software, people
Machine interface and coach and examination system are constituted.
According to the technical solution of the present invention, the emulation that wind power plant production run overall process may be implemented improves entire imitative
The consistency of true training system, authenticity and correctness, training function is more perfect, can be to wind by coach station and student station
Electric field power transformation operation personnel carry out the emulation training of comprehensive, overall process, whole scene.
Detailed description of the invention
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below
There is attached drawing needed in technical description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this
Some embodiments of invention for those of ordinary skill in the art without creative efforts, can be with
It obtains other drawings based on these drawings.
Fig. 1 is a kind of schematic block diagram for wind power plant analogue system that one embodiment of the invention provides;
Fig. 2 is a kind of flow diagram for wind power plant emulation mode that one embodiment of the invention provides.
Specific embodiment
To make the object, technical solutions and advantages of the present invention clearer, technical solution of the present invention will be carried out below
Detailed description.Obviously, described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.Base
Embodiment in the present invention, those of ordinary skill in the art are obtained all without making creative work
Other embodiment belongs to the range that the present invention is protected.
Below by drawings and examples, technical scheme of the present invention will be described in further detail.
Referring to Fig. 1, a kind of wind power plant analogue system 1 of one embodiment of the invention offer, comprising: instructor station 11,
Student station 12, wind power plant SCADA system 13, energy management platform 14, case become monitoring system 15, wind power prediction system 16, wind
Machine tower bottom screen station 17 and booster stations monitoring system 18, wherein
The instructor station 11 is used to receive the dummy instruction and operating parameter of the various wind power plants of coach's input,
It include: the Work condition analogue instruction of blower, the fault simulation of monitoring device instructs and the operating parameter of blower;
The student station 12 is used to handle the blower and boosting station failure of instructor station triggering, restores blower normal operation,
Fan trouble picture is searched according to fan trouble, and selects failure cause, so that student carries out simulated training;
The simulation that the wind power plant SCADA system 13 is used to receive the various wind power plants that the instructor station is sent refers to
Enable the simulation operating condition that wind power plant is shown with operating parameter;
The energy management platform 14 dispatches limited load, scheduling adjustment active power for simulating wind power generation field;
The case becomes monitoring system 15 and is used to calculate the operating condition that air box becomes in wind power plant simulated training scene;
The wind power prediction system 16 is used to calculate short term power and ultra-short term power under prediction meteorological condition;
The blower tower bottom screen station 17 is for simulative debugging blower, processing fan trouble, inquiry failure file;
The booster stations monitoring system 18 is for calculating the boosting station equipment operation of the wind power plant simulated training scene whole audience
Parameter, boost station equipment operating condition.
Referring to fig. 2, the invention also provides a kind of wind power plant emulation modes, imitative applied to above-mentioned wind power plant
In true system, comprising:
Step S1, when instructor station receives the wind speed instruction of coach's input, it is sent to wind power plant SCADA system, with
The wind power plant SCADA system is set to instruct display current working according to the wind speed;
Step S2, when the described instructor station detects that coach triggers any fan trouble, to the wind power plant SCADA
System sends the fault message of the blower, so that the wind power plant SCADA system shows the Fans according to the fault message
Failure;
Step S3, it when the described instructor station receives the operation simulation instruction of coach's input, is sent to energy pipe and pats
Platform, so that the energy management plateform system instructs the power output situation to show blower according to the operation simulation;
Step S4, when the described instructor station detects that coach triggers any booster stations monitoring equipment fault, to described
Booster stations monitoring system sends the fault message of the booster stations monitoring device, so that the booster stations monitoring system is according to the event
Barrier information shows the failure of the booster stations monitoring device.
Preferably, the step S1 further include: the wind power plant SCADA system is as follows according to the wind speed command synchronization
The operating condition of system:
Synchronous energy manages the active power of platform separate unit blower, wind speed;
Synchronous case becomes the active power of monitoring system separate unit blower;
The whole audience active power of synchronous boost station monitoring system;
The wind speed of synchronous blower tower bottom screen station.
Preferably, the step S2 further include: the wind power plant SCADA system synchronizes following system according to the fault message
The operating condition of system:
The failure of synchronous energy management platform separate unit blower;
Synchronous case becomes the active power of monitoring system;
The active power of synchronous boost station monitoring system;
The fan trouble of synchronous blower tower bottom screen station.
Preferably, the step S2 further include:
When the instructor station detects that coach triggers any fan trouble, stands to the student and send the blower
Fault message;
Student station judges the fan trouble picture of student's confirmation and the failure principle of student's selection is with troubleshooting method
It is no correct, if so, student, which stands, sends the fault recovery instruction of the blower to the wind power plant SCADA system, so that the wind-powered electricity generation
The failure blower of field SCADA system restores normal.
Preferably, the step S2 further include:
Student station judges the fan trouble picture of student's confirmation and the failure principle of student's selection is with troubleshooting method
It is no correct, if so, student station becomes monitoring system, booster stations monitoring system and blower tower to the energy management platform, case respectively
Bottom screen station sends the fault recovery instruction of the blower, so that the event of the energy management platform and blower tower bottom screen station
Hinder blower recovery normally and the case becomes monitoring system and the monitoring data of booster stations monitoring system restores normal.
Preferably, the step S3 further include:
The energy management plateform system instructs to synchronize the operating condition of following system according to the operation simulation:
The active power of wind power plant SCADA system separate unit blower synchronous with energy management platform;
The active power of blower tower bottom screen station separate unit blower synchronous with energy management platform;
Booster stations monitoring system can active power synchronous with energy management platform;
Case becomes monitoring system active power synchronous with energy management platform.
Preferably, the step S4 further include:
When the instructor station detects that coach triggers any booster stations monitoring equipment fault, stands and send out to the student
Give the fault message of the booster stations monitoring device;
Student station judges the booster stations monitoring equipment fault picture of student's confirmation and the failure principle and failure of student's selection
Whether treating method is correct, if so, student stands, the failure for sending the booster stations monitoring device to the booster stations monitoring system is extensive
Multiple instruction, so that the failure blower of the booster stations monitoring system restores normal.
Preferably, the wind power plant emulation mode, further includes:
When instructor station receives the prediction meteorology numerical value of coach's input, it is sent to wind power prediction system, so that wind
Power prediction system can calculate short term power and ultra-short term power under prediction meteorological condition.
Preferably, the wind power plant emulation mode, further includes:
When instructor station receives the analog operational parameters of any blower of coach's input, it is sent to the wind power plant
SCADA system, so that the wind power plant SCADA system can be run according to the analog operational parameters.
As shown from the above technical solution, this wind power plant analogue system and method provided by the invention, in computer
Upper realization is to simulated object, that is, wind power generating set, booster stations, AGC (Automation generation control, Automatic
Generation Control), case becomes the dynamic simulation of monitoring, wind power prediction dispatch control system, while also including on the spot
The emulation of equipment blower tower bottom screen station operation.The composition of replicating machine software is by Simulation Platform Software, simulation model software, people
Machine interface and coach and examination system are constituted.
According to the technical solution of the present invention, the emulation that wind power plant production run overall process may be implemented improves entire imitative
The consistency of true training system, authenticity and correctness, training function is more perfect, can be to wind by coach station and student station
Electric field power transformation operation personnel carry out the emulation training of comprehensive, overall process, whole scene.
It should be noted that this wind power plant analogue system provided by the invention and method:
One, design object
Using the integrated design of wind power plant emulation and grid simulation based on Physical Mechanism, it can correctly reflect wind-powered electricity generation
Interaction, the relationship that interacts between power grid, may be implemented the emulation of wind power plant production run overall process, improve
The consistency of entire simulation training system, authenticity and correctness, training function is more perfect, can transport to wind power plant power transformation
Administrative staff carries out the emulation training of comprehensive, overall process, whole scene.
This system support system is using the Development of Simulation Software platform that can support interactive, distributing emulation system, solution
Interoperability, distributivity and space-time consistency problem between Simulation Application in distributed emulation training system of having determined, can be by wind
Electric Field Simulation, grid simulation and teacher and student's system integration meet wind-powered electricity generation emulation training into a comprehensive simulated environment
System is needed with future development at present.Simulation software support system uses the symmetrical architecture of bus type, has good scale
Scalability and extendibility, can satisfy the needs of various scale distribution formula simulation training systems, and trainee can be in each wind
Training is received by electric power enterprise network in electric field, realizes the remote training based on wide area network of cross-region.
This system has the requirement for adapting to current power system automation technology development, keeps technology hair over a period to come
The top standard of exhibition.This system can need flexibly, easily to add and dismantle submodule according to training;Interface standard is configured,
It can easily modify, increase the system interface of new submodule and new type.
This system provides complete rights management, stands settable different access right to long-range teacher station, long-range student,
With flexile operational mode (such as independent, grouping, joint), it is able to satisfy different training method needs.This system operation
Securely and reliably, practical function, easy to use, technical indicator be advanced rationally, construction standard specification, it is easy to maintain, be easy to modify, expand
It fills.System design should follow international standard, using the current advanced technology in the world, it is ensured that soft, hard platform is nearest and following one
Adaptability, opening, scalability and the maintainability etc. in section period;All functional modules interface standard is unified, can support the
The access of tripartite's hardware and software and system upgrade are to meet long term planning requirement.This system using scheme, touch, library integrated modelling
Mode has and conveniently, flexibly modifies, expands, upgrade function, according to electric network composition, scale, newly-built and transformation wind power plant tool
Body actual conditions, can simulation scale to simulation training system and function carry out flexibly, convenient modification and expand, at any time with
Track wind power plant practical operation situation.
This system provides the training evaluation system of intelligence, meets wind power plant operation person on duty, wind power plant operation correlation
Technology and the theory and skill examination of administrative staff, match, identification require.This system has the space-time one of high fidelity, height
Cause property and reliability can sufficiently meet the requirement of real-time of simulation training system operation.This system has efficient communication branch
Mechanism is held, guarantees the reliability and safety of network transmission, has the ability of system interconnection.
Two, application function
This system is to be by wind power plant emulation, booster stations emulation and teacher and student's being combined into one of system
System, realize power grid, wind power plant production run process it is fully simulated, can correctly reflect the interaction of wind power plant and power grid,
It interacts, substantially increases the consistency of whole system, authenticity and practicability, training function is more perfect, can be to wind
Electric field operations staff carries out comprehensive training.
The training of basic operation technical ability.Post training is carried out to the operations staff on the hilllock wind power plant Xin Dao, wind power plant is run
The basic service ability of personnel is giveed training and is examined, make its be familiar with wind farm device and wind farm monitoring system, electric network composition,
The method of operation, electric network swim grasp basic operation operation and operating standard.
Wind-powered electricity generation is trained in the various equipment such as disconnecting link, transformer, bus, route, capacitor and its relevant troubleshooting training
Field operations staff has found that accident, exception, the power grid environment emulated judge failure and handling failure, and right after training
Accident is analyzed, and accident of resetting occurs and the overall process of processing.Wind farm operator can be made to understand by simulation training
Various accidents there is a phenomenon where summarize accumulation process experience, enhance confidence when accident treatment by reason and change procedure.
Wind power plant primary equipment is normally trained with special tour.It is maked an inspection tour by three interactive walkthroughs of wind power plant primary equipment
System realizes three reproductions and pseudo operation of wind power plant primary equipment, facilitates student and be familiar with and understand field condition, replacement
Theoretical knowledge is combined with practical experience.
Administrative staff are carried out with the conceptual training of wind power plant and operation of power networks.Administrative staff can be with by Simulated training
Understand the characteristic of power grid, the status of wind power plant, the method for operation, operating instruction and power grid and wind power plant operation.
Three, function is trained
Monitoring and normal operating training.Supervise disk and meter reading.Realize the prison disk work of wind farm operator, including to one,
The operation monitoring of electrical secondary system and operation monitoring, the record of implementation state, statistics, analysis to historical data believe failure
Inquiry, the report of breath.Training on operation.Various operable equipment in wind power plant, including being spaced apart in equipment, pressing plate, button,
Switching switch etc. can operate, and the project of the various needs inspections in wind power plant can check, and all behaviour
It all automatically records, checks and read and appraise convenient for teacher.It include: single wind generator group or more wind power generating sets from stopping
To starting, single wind generator group or more typhoon power generators from starting to stop, locking yaw with yaw manually, manually therefore
Hinder involution, the throwing of heater and cooler etc. is moved back.
Equipment is normally trained with special tour.All operable equipment and observable dynamic amount all belong in tour training
Hold, all inspections can be carried out automatically recording, convenient for examination scoring.
Accident, abnormality processing training.Accident and abnormal processing training are the piths of wind power plant simulation training system,
Due to this system in modeling using the modeling method based on physical principle, it is credible because the accident and abnormal phenomenon are true to nature
Degree is high, regardless of and student's processing to mistake, system all can provide reasonable phenomenon according to equipment principle, in student's processing
In the case where mistake, consequence caused by error handle is provided, is deepened the impression.This system accident, abnormal setting are flexible, Er Qieke
In any combination.
Accident, abnormality processing mainly include the following contents:
Troubleshooting training.Blower in the process of running, since the exception and failure of different phenomenons can occur for various factors,
Such as over-voltage, turns round cable failure at overcurrent.Unit exception will cause corresponding alarm signal when occurring, and respective picture and supervisory instrument are anti-
It should be consistent with scene.
Defect processing training.Scene operation, maintenance, test in be frequently found equipment deficiency, some jeopardize safety but not yet
Constitution equipment exception and accident, it is necessary to be handled.Such as: the greasy dirt crackle of fan blade, the fever of power frame connecting terminal be rubescent,
Boosting, which becomes, is grounded fracture etc. of getting rusty.In training process, coach can be inserted into due course equipment deficiency (defect have the analysis of causes and
The explanation of respective handling method), and examine student that can find and be correspondingly processed in time during equipment-patrolling.
The recovery operation of system after accident.Trainee carries out a series of operation on simulation training system, makes to have solved
The blower of column is restored to normal operating mode.
Four, technical characterstic
Wind power plant simulation training system carries out modeling and simulating to first and second equipment gamut of wind power plant.Specifically include power generation
The detailed models such as machine model, control system, measurement system, ac and dc systems, protection and Automatic monitoring systems.And consider wind
Influence and generator influence to grid simulation abstract model of the power wind direction to generator detailed model.
The emulation of wind power plant primary equipment is emulated using virtual reality technology.The system is in equipment appearance emulation and equipment
In tour, wind power plant primary equipment three-dimensional interactive virtual field is developed using the virtual reality technology based on Open GL
Scape system, realizes the three-dimensional reconstruction of wind power generating set equipment, visually reflect the operation of wind power generating set, stopping,
Yaw, exception, malfunction and its action process, can be to the equipment-patrolling in virtual scene, inspection, roaming.
Wind power plant Automatic monitoring systems use dynamic human machine interface technologies, dynamic icon based on man-machine interface server
Technology, dynamic menu technology, middleware Technology and programming automation technology are realized and are managed collectively to multiple wind power generating sets
And monitoring.
The above description is merely a specific embodiment, but scope of protection of the present invention is not limited thereto, any
Those familiar with the art in the technical scope disclosed by the present invention, can easily think of the change or the replacement, and should all contain
Lid is within protection scope of the present invention.Therefore, protection scope of the present invention should be based on the protection scope of the described claims.
Term " first ", " second " are used for descriptive purposes only and cannot be understood as indicating or suggesting relative importance.Term " multiple " refers to
Two or more, unless otherwise restricted clearly.
Claims (10)
1. a kind of wind power plant analogue system characterized by comprising instructor station, Xue Yuanzhan, wind power plant SCADA system,
Energy management platform, case become monitoring system, wind power prediction system, blower tower bottom screen station and booster stations monitoring system,
In,
The instructor station is used to receive the dummy instruction and operating parameter of the various wind power plants of coach's input, comprising:
The operating parameter of Work condition analogue instruction, the fault simulation instruction and blower of monitoring device of blower;
Restore blower for handling the blower and boosting station failure of instructor station triggering and operate normally, according to wind in the student station
Machine trouble shoot fan trouble picture, and failure cause is selected, so that student carries out simulated training;
The wind power plant SCADA system is used to receive the dummy instruction and fortune for the various wind power plants that the instructor station is sent
Row parameter shows the simulation operating condition of wind power plant;
The energy management platform dispatches limited load, scheduling adjustment active power for simulating wind power generation field;
The case becomes monitoring system and is used to calculate the operating condition that air box becomes in wind power plant simulated training scene;
The wind power prediction system is used to calculate short term power and ultra-short term power under prediction meteorological condition;
The blower tower bottom screen station is for simulative debugging blower, processing fan trouble, inquiry failure file;
The booster stations monitoring system rises for calculating wind power plant simulated training scene whole audience boosting station equipment operating parameter
Press station equipment operating condition.
2. a kind of wind power plant emulation mode, which is characterized in that be applied to wind power plant described in claim 1 emulation system
In system characterized by comprising
Step S1, when instructor station receives the wind speed instruction of coach's input, it is sent to wind power plant SCADA system, so that institute
It states wind power plant SCADA system and display current working is instructed according to the wind speed;
Step S2, when the described instructor station detects that coach triggers any fan trouble, to the wind power plant SCADA system
The fault message of the blower is sent, so that the wind power plant SCADA system shows the failure of the blower according to the fault message;
Step S3, when the described instructor station receives the operation simulation instruction of coach's input, it is sent to energy management platform, with
The energy management plateform system is set to instruct the power output situation to show blower according to the operation simulation;
Step S4, when the described instructor station detects that coach triggers any booster stations monitoring equipment fault, to the boosting
Monitoring system of standing sends the fault message of the booster stations monitoring device, so that the booster stations monitoring system is believed according to the failure
Breath shows the failure of the booster stations monitoring device.
3. wind power plant emulation mode according to claim 2, which is characterized in that the step S1 further include: described
Wind power plant SCADA system is according to the operating condition of the following system of wind speed command synchronization:
Synchronous energy manages the active power of platform separate unit blower, wind speed;
Synchronous case becomes the active power of monitoring system separate unit blower;
The whole audience active power of synchronous boost station monitoring system;
The wind speed of synchronous blower tower bottom screen station.
4. wind power plant emulation mode according to claim 2, which is characterized in that the step S2 further include: described
Wind power plant SCADA system synchronizes the operating condition of following system according to the fault message:
The failure of synchronous energy management platform separate unit blower;
Synchronous case becomes the active power of monitoring system;
The active power of synchronous boost station monitoring system;
The fan trouble of synchronous blower tower bottom screen station.
5. wind power plant emulation mode according to claim 4, which is characterized in that the step S2 further include:
When the instructor station detects that coach triggers any fan trouble, stands to the student and send the failure of the blower
Information;
Whether just student station judges the failure principle that the fan trouble picture of student's confirmation and student select and troubleshooting method
Really, if so, student, which stands, sends the fault recovery instruction of the blower to the wind power plant SCADA system, so that the wind power plant
The failure blower of SCADA system restores normal.
6. wind power plant emulation mode according to claim 5, which is characterized in that the step S2 further include:
Whether just student station judges the failure principle that the fan trouble picture of student's confirmation and student select and troubleshooting method
Really, if so, student station becomes monitoring system, booster stations monitoring system and blower tower bottom screen to the energy management platform, case respectively
Station sends the fault recovery instruction of the blower, so that the failure wind of the energy management platform and blower tower bottom screen station
Machine restores the normal and described case change monitoring system and the monitoring data of booster stations monitoring system restores normal.
7. wind power plant emulation mode according to claim 2, which is characterized in that the step S3 further include:
The energy management plateform system instructs to synchronize the operating condition of following system according to the operation simulation:
The active power of wind power plant SCADA system separate unit blower synchronous with energy management platform;
The active power of blower tower bottom screen station separate unit blower synchronous with energy management platform;
Booster stations monitoring system can active power synchronous with energy management platform;
Case becomes monitoring system active power synchronous with energy management platform.
8. wind power plant emulation mode according to claim 2, which is characterized in that the step S4 further include:
When the instructor station detects that coach triggers any booster stations monitoring equipment fault, stands to send to the student and be somebody's turn to do
The fault message of booster stations monitoring device;
Student station judges the booster stations monitoring equipment fault picture of student's confirmation and the failure principle and troubleshooting of student's selection
Whether method is correct, refers to if so, student stands to the fault recovery that the booster stations monitoring system sends the booster stations monitoring device
It enables, so that the failure blower of the booster stations monitoring system restores normal.
9. wind power plant emulation mode according to claim 2, which is characterized in that further include:
When instructor station receives the prediction meteorology numerical value of coach's input, it is sent to wind power prediction system, so that wind power
Forecasting system can calculate short term power and ultra-short term power under prediction meteorological condition.
10. wind power plant emulation mode according to claim 2, which is characterized in that further include:
When instructor station receives the analog operational parameters of any blower of coach's input, it is sent to the wind power plant SCADA
System, so that the wind power plant SCADA system can be run according to the analog operational parameters.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201710377961.8A CN106971663B (en) | 2017-05-25 | 2017-05-25 | A kind of wind power plant analogue system and method |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201710377961.8A CN106971663B (en) | 2017-05-25 | 2017-05-25 | A kind of wind power plant analogue system and method |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN106971663A CN106971663A (en) | 2017-07-21 |
| CN106971663B true CN106971663B (en) | 2018-12-25 |
Family
ID=59325736
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201710377961.8A Expired - Fee Related CN106971663B (en) | 2017-05-25 | 2017-05-25 | A kind of wind power plant analogue system and method |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN106971663B (en) |
Families Citing this family (12)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109658788A (en) * | 2018-11-06 | 2019-04-19 | 北京优利康达科技股份有限公司 | A kind of Wind turbines experience system and Training Methodology |
| CN109356791B (en) * | 2018-12-12 | 2021-03-26 | 北京金风科创风电设备有限公司 | Wind power plant control method and system, farm group controller and wind generating set |
| CN111176246B (en) * | 2020-02-25 | 2021-06-01 | 杭州和利时自动化有限公司 | Remote simulation method and system for distributed control system |
| CN112610407B (en) * | 2020-12-17 | 2024-04-02 | 华能辽宁清洁能源有限责任公司 | Novel simulation maintenance method for variable pitch system of wind generating set |
| CN112610420B (en) * | 2020-12-17 | 2024-04-02 | 华能辽宁清洁能源有限责任公司 | Novel wind generating set safety chain simulation maintenance method |
| CN112594129B (en) * | 2020-12-17 | 2024-04-02 | 华能辽宁清洁能源有限责任公司 | Novel wind generating set frequency converter simulation maintenance method |
| CN112950419B (en) * | 2021-02-04 | 2024-11-22 | 中国电建集团贵阳勘测设计研究院有限公司 | A wind farm wind turbine operation and maintenance virtual training and emergency drill system |
| CN113012484A (en) * | 2021-02-24 | 2021-06-22 | 国家电投集团电站运营技术(北京)有限公司 | VR-based wind power generation engineering teaching information processing method, device and equipment |
| CN113066351A (en) * | 2021-03-31 | 2021-07-02 | 国网浙江省电力有限公司检修分公司 | Intelligent substation monitoring system training system based on MMS message |
| CN113409660A (en) * | 2021-06-11 | 2021-09-17 | 北京国电思达科技有限公司 | Wind turbine generator control system and method for training |
| CN115681021A (en) * | 2022-11-01 | 2023-02-03 | 内蒙古龙源蒙东新能源有限公司 | Fan fault simulation method and device, storage medium and electronic equipment |
| CN118840900B (en) * | 2023-04-25 | 2025-11-11 | 北京金风慧能技术有限公司 | Simulation training system of wind generating set |
Family Cites Families (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN202434104U (en) * | 2011-12-22 | 2012-09-12 | 华锐风电科技(集团)股份有限公司 | Virtual reality simulation system of wind generating set |
| CN102779450B (en) * | 2012-06-26 | 2014-11-05 | 上海工程技术大学 | Comprehensive experiment platform of wind power generation |
| CN103337208B (en) * | 2013-05-27 | 2015-11-18 | 广西电网公司 | Based on wind power generating set simulation system and the analogy method of Power Electronic Technique |
| CN203689807U (en) * | 2014-01-02 | 2014-07-02 | 沈阳工程学院 | Wind power generator simulation training management system |
| CN204808684U (en) * | 2015-04-02 | 2015-11-25 | 江苏协合新能源科技有限公司 | Real platform of instructing of wind generator system experiment |
| CN104835394A (en) * | 2015-04-30 | 2015-08-12 | 神华集团有限责任公司 | Wind power generation farm operation and maintenance simulation system |
-
2017
- 2017-05-25 CN CN201710377961.8A patent/CN106971663B/en not_active Expired - Fee Related
Also Published As
| Publication number | Publication date |
|---|---|
| CN106971663A (en) | 2017-07-21 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN106971663B (en) | A kind of wind power plant analogue system and method | |
| CN101894488B (en) | Distributed three-dimensional simulation training system for regional power system transformer station | |
| CN105225566B (en) | A kind of electric network emergency drills visual simulating deduction system | |
| CN102663912B (en) | Computer simulation systems for integrated dispatching and monitoring of regional power network | |
| CN103617760B (en) | A kind of power distribution network DTS analogue system and emulation mode thereof | |
| CN103123758B (en) | A kind of dispatching automation numeral physical mixed simulation training system | |
| CN102054386B (en) | Transformer station simulation training system based on mixed digital/analogy simulation technology | |
| CN107369347A (en) | A kind of universal power station Three-dimensional Simulation System | |
| CN108257439A (en) | A kind of distribution automation Training Methodology and analogue system for adapting to various modes | |
| CN109697903A (en) | A kind of substation relay protection safety practical training method based on VR | |
| CN103400516A (en) | Dispatching automation simulating training system and method | |
| CN104835394A (en) | Wind power generation farm operation and maintenance simulation system | |
| CN103823952B (en) | The dataflow design method of bulk power grid regulation and control integration whole process simulation training system | |
| CN110288866A (en) | A dispatching data network simulation training system and method | |
| CN104064065A (en) | Distribution network fault simulation analysis training system implementation method | |
| CN104091514A (en) | Power grid dispatching personnel training simulation system | |
| CN109785702A (en) | Power grid simulation training system based on monitoring signal simulation | |
| CN201315104Y (en) | Simulation training and examination system for unmanned comprehensive automation substation | |
| CN115472057A (en) | Metering acquisition operation and maintenance simulation system, method and medium | |
| CN106781910A (en) | A kind of intelligent substation virtual reality emulation training system based on hardware in loop | |
| JP2000112515A (en) | System simulation device and computer readable storage medium | |
| Susumago et al. | Development of a large-scale dispatcher training simulator and training results | |
| Gao et al. | The Research and Development of Integrated Operation-Maintenance Simulation Training System | |
| Bose et al. | Challenges in operator training: Avoiding blackouts in the evolving power grid | |
| Sato et al. | Dynamic simulation of a power system network for dispatcher training |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20181225 Termination date: 20200525 |