CN108241771A CN201711025002.6A CN201711025002A CN108241771A CN 108241771 A CN108241771 A CN 108241771A CN 201711025002 A CN201711025002 A CN 201711025002A CN 108241771 A CN108241771 A CN 108241771A
Authority
CN
China
Prior art keywords
secondary device
simulation
electromagnetic transient
network
transient simulation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711025002.6A
Other languages
Chinese (zh)
Inventor
陈剑
周长江
庄哲寅
马生坤
李世倩
郭晏
张洁华
俸仲文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BEIJING IN-TO EMULATION TECHNOLOGY Co Ltd
National Grid Jiangsu Electric Power Co Skills Training Center
Original Assignee
BEIJING IN-TO EMULATION TECHNOLOGY Co Ltd
National Grid Jiangsu Electric Power Co Skills Training Center
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BEIJING IN-TO EMULATION TECHNOLOGY Co Ltd, National Grid Jiangsu Electric Power Co Skills Training Center filed Critical BEIJING IN-TO EMULATION TECHNOLOGY Co Ltd
Priority to CN201711025002.6A priority Critical patent/CN108241771A/en
Publication of CN108241771A publication Critical patent/CN108241771A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/30Circuit design
    • G06F30/39Circuit design at the physical level
    • GPHYSICS
    • G09EDUCATION; CRYPTOGRAPHY; DISPLAY; ADVERTISING; SEALS
    • G09BEDUCATIONAL OR DEMONSTRATION APPLIANCES; APPLIANCES FOR TEACHING, OR COMMUNICATING WITH, THE BLIND, DEAF OR MUTE; MODELS; PLANETARIA; GLOBES; MAPS; DIAGRAMS
    • G09B9/00Simulators for teaching or training purposes
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2203/00Indexing scheme relating to details of circuit arrangements for AC mains or AC distribution networks
    • H02J2203/20Simulating, e g planning, reliability check, modelling or computer assisted design [CAD]
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation

Landscapes

  • Engineering & Computer Science (AREA)
  • Theoretical Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Computer Hardware Design (AREA)
  • Educational Administration (AREA)
  • Educational Technology (AREA)
  • Business, Economics & Management (AREA)
  • Power Engineering (AREA)
  • Evolutionary Computation (AREA)
  • Geometry (AREA)
  • General Engineering & Computer Science (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The present invention provides a kind of secondary device modeling method based on electromagnetic transient simulation platform; on the basis of now mature power grid primary equipment electromagnetic transient simulation (DDRTS analogue systems) technology; the digital model of various relay protection devices in power grid is established using graphical simulation support platform system; by protection definite value merging digital relay protection device models at different levels in power grid; by carrying out various electromagnetic transient emulation to power grid; the action situation of each relay protection device is observed, so as to examine the correctness of relay protection constant value at different levels in power grid.

Description

Secondary device modeling method based on electromagnetic transient simulation platform
Technical field
The invention belongs to field of power more particularly to a kind of secondary device based on electromagnetic transient simulation platform to build Mould method.
Background technology
Existing analogue system has following deficiency:
The trend that secondary device constantly upgrades is not adapted to
The protective device that analogue system room is configured at present and actual motion substation secondary device are basically identical, still, with The technology innovation of protective device, the device of Classroom will appear difference, and difference certainly with the device of actual motion substation It is possible that gradually expand.Secondary device purchases that infusion of financial resources amount is larger, and equipment renewal speed just needs fund endlessly soon Input, larger puzzlement is brought to analogue system room upgrading.
Do not adapt to the actual demand that training range gradually extends
Current simulation practice laboratory has only built the simulation training system of 220kV, also to establish 500kV and 110kV from now on The training scale of voltage class is to meet the real training of Jiangsu Province power grid unit technical staff at different levels, and analogue system room place has at present Limit, transformer station secondary system equipment accesses scale by larger limitation, even if popularization, the secondary device of Training Room is not yet It may unlimitedly access, lead to the production training requirement of reorganization and expansion cannot meet.
The development trend of following secondary device systematization is not adapted to
According to the design of New Generation of Intelligent substation and construction theory, site, domain of standing, system will be presented in secondary device The trend of change.The originally concept of single device, will gradually be replaced by " systematization ", and the secondary device between whole station is even stood passes through Optical fiber connects the structure to form networking, these development trends all propose new requirement to the development of Classroom next step.Example It such as, in next step at the scene will be towards the side of " replaceable " maintenance currently for the regular inspection of single set equipment, maintenance and debugging efforts To development, and similar " domain protective device of standing " is such across interval, systematization equipment, will acquire more than ten or even tens simultaneously The analog quantity at a interval and switching value information, this requires training from now on by emphasis from single set equipment to systematization turn Become, have to the operation conditions of whole station or even whole region power grid and more fully recognize, to the various exceptions and failure of whole system Phenomenon has stronger analysis and adaptibility to response.
Invention content
For the situation present on, with reference to actual production skills training demand, the present invention provides a kind of based on power train The secondary device number physical mixed modeling method of system electro-magnetic transient real-time simulation platform, passes through the systematization to a power grid The modeling and virtualization of electrical secondary system, the hybrid modeling of digitlization and real equipment, are finally reached following purpose:
Realize transformer station secondary system digital modeling, protection that can be according to situ configuration and its principle of compositionality, easily and fast Realization its digital model foundation, reach and the hair of protection technique coped with the constant of secondary device digital modeling tool Exhibition and the variation of field device configuration.
It realizes the digitlization of analogue system room secondary physical equipment, and reaches mutually melting mutually for digital model and physical equipment It is logical.With reference to the customization model of primary system, be combined debugging, the power grid of New Generation of Intelligent in future station electrical secondary system are primary, two Fault identification, analysis and the processing of subsystem provide more powerful technological means.
Training pattern and management means are innovated, empty (digitlization) real (physical equipment) combines, realize substation simulation process The hybrid simulation of middle secondary physical equipment and secondary mathematical model greatly reduces current real training under the premise of teaching result is ensured The limitation in place.Reduce analogue system room later stage fund input.
To solve the above problems, the present invention provides a kind of secondary device modeling method based on electromagnetic transient simulation platform, It includes the following steps:
Electric power networks are divided into N number of sub-network, wherein, N is the natural number more than 1, and according to network segmentation object letter Number carries out the optimization of each sub-network, and the network segmentation object function is:
S=a1 2+a2 2+a3 2+as 2,
Wherein S be object function, a1、a2、a3For the number of nodes in the sub-network, asBetween the sub-network Connecting line quantity;
Different simulation step lengths is set respectively, and the simulation step length of the electric power networks is set for each sub-network The common divisor of simulation step length for each sub-network;
It is emulated, is established per height using EMTP methods using the sub-network and the simulation step length of the electric power networks The model of different force devices in network is simultaneously deposited into database;
According to the model foundation primary system operating status model of the force device, and output voltage and electricity is calculated It flows and is deposited into database;
Secondary device is classified according to the operation principle of secondary device and carries out simulation modeling respectively, while this secondary is set It is standby to be inserted into the sub-network, and the electric values of the secondary device are obtained according to the output voltage and Current calculation And it is deposited into database;
Data acquisition module obtains the electric values of secondary device from database, and by the electric values with prestoring Electrical quantity threshold value be compared, when the electric values exceed the pre-stored electrical quantity threshold value when judge starting protection Operation, and protection adjusted value is calculated, logic judgment module is sent out according to the protection adjusted value to the model of the force device Go out adjustment order, that is, complete fault simulation.
Preferably, in the secondary device modeling method based on electromagnetic transient simulation platform, the force device For generator, exciter and excitation regulation device, governor, motor, transformer, load, breaker, power transmission line, reactance Device and string complement part.
Preferably, in the secondary device modeling method based on electromagnetic transient simulation platform,
The model of the force device is built using electromagnetic transient simulation system;
After the electromagnetic transient simulation system obtains the data of each step-length and a step-length has been calculated, data are deposited Enter in database, the order for reading data is then sent to data acquisition module, and itself enters wait state;
Data acquisition module obtains data after receiving the order for reading data from database and carries out operation, and handle In operation result deposit database, the order for calculating next step-length is then sent to the electromagnetic transient simulation system, and certainly Body enters wait state;
The electromagnetic transient simulation system receives the order for calculating next step-length, carries out the calculating of the step-length.
Preferably, it in the secondary device modeling method based on electromagnetic transient simulation platform, further includes:
The modification order of user is received, performs the behaviour of the modification to the parameter of each force device and the secondary device Make.
Part is illustrated to embody by further advantage, target and the feature of the present invention by following, and part will also be by this The research and practice of invention and be understood by the person skilled in the art.
Description of the drawings
Fig. 1 provides connecing for the primary system in the secondary device modeling method based on electromagnetic transient simulation platform for the present invention Line chart;
Fig. 2 provides the main interface figure in the secondary device modeling method based on electromagnetic transient simulation platform for the present invention;
Fig. 3 provides the synchronous generator ginseng in the secondary device modeling method based on electromagnetic transient simulation platform for the present invention Number setting interface;
Fig. 4 provides the electricity of the secondary device in the secondary device modeling method based on electromagnetic transient simulation platform for the present invention Transformer device parameter setting interface;
Fig. 5 provides the electricity of the secondary device in the secondary device modeling method based on electromagnetic transient simulation platform for the present invention Current transformer parameter setting interface;
Fig. 6 provides the electricity of the secondary device in the secondary device modeling method based on electromagnetic transient simulation platform for the present invention Press transformer parameter setting interface;
Fig. 7 provides the circuit breaker parameters in the secondary device modeling method based on electromagnetic transient simulation platform for the present invention and sets Put interface;
Fig. 8 provides the line parameter circuit value setting in the secondary device modeling method based on electromagnetic transient simulation platform for the present invention Interface;
Fig. 9 provides the electricity of the secondary device in the secondary device modeling method based on electromagnetic transient simulation platform for the present invention Pressure passageway signal configuration interface;
Figure 10 provides the secondary device in the secondary device modeling method based on electromagnetic transient simulation platform for the present invention Current channel signal configuration interface;
Figure 11 provides the secondary device in the secondary device modeling method based on electromagnetic transient simulation platform for the present invention Failure sets interface;
Figure 12 provides the secondary device event in the secondary device modeling method based on electromagnetic transient simulation platform for the present invention Hinder position interface;
Figure 13 is provided for the present invention in the secondary device in the secondary device modeling method based on electromagnetic transient simulation platform Fault message sets interface;
The real-time closed-loop that Figure 14 is provided for the present invention in the secondary device modeling method based on electromagnetic transient simulation platform is surveyed Rehearsal Bo Tu-single-phase fault successful reclosing figure;
The real-time closed-loop that Figure 15 is provided for the present invention in the secondary device modeling method based on electromagnetic transient simulation platform is surveyed Rehearsal Bo Tu-single-phase fault unsuccessful reclosing figure;
The real-time closed-loop that Figure 16 is provided for the present invention in the secondary device modeling method based on electromagnetic transient simulation platform is surveyed Rehearsal Bo Tu-evolved fault figure;
Figure 17 provides the secondary device in the secondary device modeling method based on electromagnetic transient simulation platform for the present invention Modeling principle figure;
Figure 18 provides the data acquisition module in the secondary device modeling method based on electromagnetic transient simulation platform for the present invention The schematic diagram of block;
Figure 19 provides the protection operation work in the secondary device modeling method based on electromagnetic transient simulation platform for the present invention Make schematic diagram;
Figure 20 provides the logic judgment mould in the secondary device modeling method based on electromagnetic transient simulation platform for the present invention The structure diagram of block;
The pressing plate throwing that Figure 21 is provided for the present invention in the secondary device modeling method based on electromagnetic transient simulation platform, which is moved back, to be shown It is intended to;
Figure 22 provides the power frequency variation in the secondary device modeling method based on electromagnetic transient simulation platform for the present invention Relay protective scheme figure;
The current differential that Figure 23 is provided for the present invention in the secondary device modeling method based on electromagnetic transient simulation platform is protected Protect logic chart.
Specific embodiment
The present invention is described in further detail below, to enable those skilled in the art being capable of evidence with reference to specification word To implement.
It should be appreciated that such as " having ", "comprising" and " comprising " term used herein do not allot one or more The presence or addition of a other element or combinations.
Power grid is the unified system connected by numerous elements in itself, and the requirement to relay protection device in power grid is not only It is limited only to that logic function is correct, reliable in action, it is often more important that emphasize the action behavior of the relay protection device of power grids at different levels Must strictly it coordinate, when primary equipment breaks down, protective device, which must accomplish that this is moved, to be moved, it is impossible to malfunction.Relay protection The direct basis that can definite value correctly act as protection equipment, the cooperation of protective relaying device action behaviors at different levels is actually Exactly protect the cooperation of definite value.It must take into account protection definite values at different levels if being verified to the correctness for protecting definite value Coordinate step by step, contact the verification that power grids at different levels carry out definite value system.
It is existing due to the instantaneity of electric power system fault, sudden, destructive and failure process irreversibility Technological means still cannot the inspections of protecting definite values carry out systems at different levels to power grid.The present invention is once set in now mature power grid On the basis of standby electromagnetic transient simulation (DDRTS analogue systems) technology, power grid is established using graphical simulation support platform system In various relay protection devices digital model, by power grid it is at different levels protection definite values merging digital relay protection equipment moulds Type by carrying out various electromagnetic transient emulation to power grid, observes the action situation of each relay protection device, so as to examine The correctness of relay protection constant value at different levels in power grid.
The digital relay protection device model that the present invention establishes uses the various protection algorisms of true protective device completely Structure, sampling, filtering, Fourier transform including Current Voltage instantaneous value signal, various electrical components calculate, and circuit is indulged Poor protection, distance protection, zero-sequenceprotection, three_phase reclosing and bus differential protecting etc..
Power grid primary system is built using DDRTS systems in the present system, and uses electro-magnetic transient algorithm, and electrical secondary system I.e. for protective device then using the structure operation of graphical simulation support platform system, two systems realize that data are handed over by real-time data base It changes and mutually instructs control.
The result data of each step-length of EM transient calculation of DDRTS systems is sent into real-time data base, protective device Data are then obtained from real-time data base by sampling element, in case of acting, then give DDRTS systems by command mode Sending action information.
The protection of a switch is established on same map sheet in emulation support platform system, in this way in primary system Switch is clicked on figure, when checking its relaying configuration, emulation support platform system will be given to send map sheet and recall order, in emulation branch It will show that the switch matches protection information automatically on support plateform system.
Digital dynamic Electromagnetic Simulation experiment porch (DDRTS) is complete based on the open architecture of microcomputer and independent development Chinese Graphic power system simulation software, the modeling of power grid primary system is based on digital dynamic Electromagnetic Simulation experiment porch.Platform Including abundant power system component model, such as generator, exciter and excitation regulation device, governor, motor, transformation Device, load, breaker, power transmission line, reactor, string complement part etc., can be according to system physical cabling structure, component parameters pair The operating condition of primary system completely draw and accurately calculate, output and system actually identical voltage, current wave Shape.User can modify to electric network composition and component parameters by graphical interfaces, and can neatly change system and once connect Line mode, so as to carry out complete analogue simulation to running situation.
Simulating grid primary system can arbitrarily be built according to real training demand, this project is said by taking 500kV substations as an example Bright, primary system is made of 500kVA substations, 220kVB substations.The complete string of 2 of 500kV, 1 500kV main transformer, 220kV2 outlet.Primary system is as shown in Figure 1.
The graphical control module support platform of electrical secondary system is the digitlization mould of the various protective relays of electric grid secondary system The structure of type and the platform tools of driving operation, the platform employ advanced model construction principle, have stability it is good, The features such as reliability is high, code operational efficiency is high, while the platform develops figure also using newest computer graphics techniques The powerful graphical functions such as shape drafting, graphical modeling and graphical commissioning test.System has also been fully considered imitates with other The compatibility of true system, for the identifiable text model of other analogue systems structure, this system can be by text model It automatically forms patterned model or this paper models is added in existing graphical model and can also conveniently realized With the data connection of other systems.
System provides a very intuitive patterned model build tool, need to only be hauled out from algorithms library algorithm to Model area, you can the input and output of each module with connecting line are connected, have just been built into a new mould by one module of generation Type, connecting line can arbitrarily add and subtract node, so as to beautify the wiring of model.The input and output amount initial value of each module can be non- It often easily modifies, module operating rate, operation the modifications such as are freezed and be convenient to, can also be to the input of each module The description of output quantity redefines, in short, the system embody well the rapidity of graphical structure model, convenience and Intuitive.
System can an easily self-defined new algorithm, and can be that algorithm design one is very vivid The pel of change;Combinational algorithm can be built with infinite stages, when the model that there is general utility functions into one with several module constructions When, which can be packaged, be redefined as a combinational algorithm, so as to easily with the combinational algorithm structure Other more complicated models are built, this process can be carried out with infinite stages, construct complicated multi-level combinational algorithm.
Second protection concrete configuration is as follows:
1 protective relaying device allocation list of table
Digital dynamic Electromagnetic Simulation experiment porch (DDRTS) is complete based on the open architecture of microcomputer and independent development Chinese Graphic power system simulation software, the modeling of power grid primary system is based on digital dynamic Electromagnetic Simulation experiment porch.Platform Including abundant power system component model, such as generator, exciter and excitation regulation device, governor, motor, transformation Device, load, breaker, power transmission line, reactor, string complement part etc., can be according to system physical cabling structure, component parameters pair The operating condition of primary system completely draw and accurately calculate, output and system actually identical voltage, current wave Shape.User can modify to electric network composition and component parameters by graphical interfaces, and can neatly change system and once connect Line mode, so as to carry out complete analogue simulation to running situation.Platform employs advanced model construction principle, tool There is the features such as stability is good, reliability is high, code operational efficiency is high, while the system also utilizes newest computer graphical skill Art, the graphical functions such as exploitation graphic plotting, graphical modeling and graphical commissioning test.
The protective device type of electric system reality is various, complicated, and protective device modeling has very big difficulty.One Aspect, it is uneconomic that all protective devices of power grid actual disposition, which are purchased again for emulation,;On the other hand, it uses Virtual protection device is modeled, and there is also problems with:First, the protection of all kinds of models of every branch configuration of power grid is filled It is huge to put the workload modeled in detail, and two are limited to intellectual property and trade secret, and protective device producer is to granddad The relay protective scheme of cloth and the protective device of scene reality are also not quite similar, and can not realize the accurate mould of protective device of specific model The foundation of type.
Relay protection general digital model construction thinking is:Based on typical protective relaying device, according to protection type Classify, extract same type relay protection and peace from the general character part of device, forming apparatus general module.By to general Module is configured, and forms the exemplary device model of all kinds of protections.
Platform provides a very intuitive patterned model build tool, need to only be hauled out from algorithms library algorithm to Model area, you can the input and output of each module with connecting line are connected, have just been built into a new mould by one module of generation Type, connecting line can arbitrarily add and subtract node, so as to beautify the wiring of model.The input and output amount initial value of each module can be non- It often easily modifies, module operating rate, operation the modifications such as are freezed and be convenient to, can also be to the input of each module The description of output quantity redefines, in short, the platform embody well the rapidity of graphical structure model, convenience and Intuitive.
The emulation that traditional protection philosophy model is protected using the size of simple comparison electrical quantity and principle definite value, It is only capable of describing the reasonability of definite value from principal level.The universal protection device model that this platform uses is directly from electro-magnetic transient meter It calculates result and obtains data, converted by Fu's formula and the true algorithm process basic data of other protective devices, target when will carry Voltage, magnitude of current input universal protection device model, are returned by the logic of the start-up criterion join protection device of protective device Road emulates the actual act of protective device.
The emulation of protective relaying device action logic should be able to reflect the principle grade acting characteristic, each of various protective relaying devices The configuration relation of kind of protective relaying device, protection are to the cooperation of reflection and the protection of various failures, the correct sequence of movement of protection Consequence generated with result, false protection or tripping etc..
In order to realize the logical simulation of each quasi-representative protective device, the guarantor of a reflection protective device logical relation need to be established Protect logic diagram.Relay protective scheme block diagram does not lack code insurance shield producer and model, establishes typical protection act logic.Logical relation Block diagram should also have input/output signal amount, sample frequency, acting characteristic in addition to logical relation between each module of reflection protection Attributes are waited, to achieve the purpose that approach the internal algorithm and structure of specific protective device.
Power grid primary system is built using DDRTS systems in the present system, and uses electro-magnetic transient algorithm, and electrical secondary system I.e. for protective device then using the structure operation of graphical simulation support platform system, two systems realize that data are handed over by real-time data base It changes and mutually instructs control.
The result data of each step-length of EM transient calculation of DDRTS systems is sent into real-time data base, protective device Data are then obtained from real-time data base by sampling element, in case of acting, then give DDRTS systems by command mode Sending action information.The key of problem is how protective device data sampling ensures same with the EM transient calculation of DDRTS systems Step, that is, the stationary problem that primary system is calculated with electrical secondary system.When in this system using establishing exclusive variable and obtaining Between after the mode that identifies realizes that a step-length has been calculated for DDRTS in synchronization, specific process, write data into real-time database, and Notice electrical secondary system can read data afterwards, and itself enters wait state, wait for the notice of electrical secondary system.Secondary system After system is notified, data are obtained from real-time data base and carry out operation, while the temporal information of DDRTS system-computeds It tells modules, time-triggered protocol is carried out, and operation result is written in real-time database by module self, then notice is primary System can read and carry out calculating for next step length, and itself enters wait state.
When building electrical secondary system model in graphical simulation support platform system, need to contact with the foundation of DDRTS systems, It realizes data exchange, is actually contacted with real-time data base foundation, carry out data exchange with real-time data base, system uses The mode of interface algorithm.In this way when with interface algorithm generation module, if select corresponding primary equipment such as switch names, Busbar title can be achieved with the connection with primary system.
The protection of a switch is established on same map sheet in emulation support platform system, in this way in primary system Switch is clicked on figure, when checking its relaying configuration, emulation support platform system will be given to send map sheet and recall order, in emulation branch It will show that the switch matches protection information automatically on support plateform system.
The present invention realizes synchronization by the way of exclusive variable and acquisition time identifier is established, and specific process is It after a step-length has been calculated in DDRTS, writes data into real-time database, then notifies electrical secondary system that can read data, and Itself enters wait state, waits for the notice of electrical secondary system.After electrical secondary system is notified, number is obtained from real-time data base According to and carry out operation, while modules are told the temporal information of DDRTS system-computeds, by module self carry out the time Reason, and operation result is written in real-time database, then notify primary system that can read and carries out calculating long in next step , and itself enters wait state.
When building electrical secondary system model in graphical simulation support platform system, need to contact with the foundation of DDRTS systems, It realizes data exchange, is actually contacted with real-time data base foundation, carry out data exchange with real-time data base, system uses The mode of interface algorithm.In this way when with interface algorithm generation module, if select corresponding primary equipment such as switch names, Busbar title can be achieved with the connection with primary system.
Primary system of the present invention the processing of adjustment power supply and can meet size arbitrarily to change in a manner of power network wiring, arbitrary Place sets various failures, and two second part may be used virtual relay protection fexible unit platform and establish, and can also use true General relay protection experimental device and DDRTS simulation primary system be seamlessly connected, can also use with scene it is true Each protection producer actual device and the primary system of DDRTS simulations be seamlessly connected.The system is truly realized plug-in unit pattern, Two second part support virtual bench, also support true general secondary experimental provision, also support the protective device of real scene, do Real plug and play is arrived.
Analogue system have the graphical simulation modeling software based on artwork library integrated technique, user can according to oneself NETWORK STRUCTURE PRESERVING POWER SYSTEM adopts graphically founding mathematical models.User can set various typical faults, and can be arbitrary The parameters such as type and the impedance ground of failure are set.
Modeling follows open principle, and human-computer interaction interface uses Windows systems;
System component parameter uses data base administration;It can independent defined parameters to each class component and each element Bound, and can be changed by user, the data of bound preserve in the database;
The waveform of simulation data can show, print, carrying out waveform analysis and stored and played back with document form;
There is wave shape playback, system should be able to read COMTRADE files (different-format and the sampling frequency of live recording The comtrade files of rate) and the big system of export simulation waveform, COMTRADE can be opened by dynamic waveform playback system File carries out wave shape playback test;
System provide in playback file voltage, the frequency analysis function of current waveform, letter to be analyzed is calculated by FFT Number DC component and each harmonic amplitude and phase angle;
With good stability and maintainability.Modeling environment with graphical, modularization, interactive mode.Exploitation Engineer can conveniently realize the graphical modeling of power grid primary connection circuit system according to produced on-site flow;
The software main interface of analogue system is as shown in Fig. 2, its modeling pattern uses international recent software standard.Each electric power The parameter setting of element is as shown in Fig. 3,4,5,6,7,8.
It exports as shown in Figure 9 to the voltage channel signal configuration of protective relaying device.
It exports and shows to the current channel signal configuration such as figure institute 10 of protective relaying device.
Abort situation can set connecting line directly to be set in system diagram by Graphics Control, as shown in FIG. 11 and 12.
Fault parameter, fault type can be set by double-clicking fault element icon, as shown in figure 13.
Electromagnetic transient simulation is calculated using instantaneous value mode, the frequency electric of real-time simulation not only computing system, and And considering aperiodic and high fdrequency component and quick dynamic process, computing system has following major function:
System can carry out the electromagnetic transient real-time simulated animation of electric system;
System has the computational methods of optimization, under electromagnetic transient simulation pattern, when emulating the system of certain node scale, Calculating speed can reach real-time;
System can simulate various types failure and multiple failure, including turn in conversion hysteria failure in area, area external area error, Turn troubles inside the sample space etc. outside area;
Fault type can arbitrarily be set, and including fault time, fault resistance etc., can simulate the action of reclosing Phenomena such as with protection together in permanent fault, in failure process, fault resstance can change;
Synchronous Machine Models should be the PARK equation solutions of standard, can be on the basis of simulated machine fundamental characteristics The saturation of simulated machine and the excitation of generator and governing system.System should provide the excitation and governing system of ieee standard, It also can User Defined excitation and governing system;
System has power of fixed frequency model, and external characteristics includes tidal currenttype (i.e. balance nodes, PV node, PQ sections Point), active power, reactive power, voltage magnitude and voltage-phase;
System has motor model, and can simulate the starting process of various capacity electric machines;
System have single-phase two-winding transformer, three-phase two-simulation transformer and three-phase three-winding transformer model (including Auto-transformer), transformer neutral point should include various earthing types;
System has two kinds of circuit models of lumped parameter and distributed constant, does not replace circuit mould with parallel lines on same tower double back also Type, can be with the transient process of accurate simulation circuit;
System has the model of high-voltage shunt reactor;
System has voltage transformer and current transformer model.Voltage transformer has two type of electromagnetic type and condenser type Type.System should can the transient process of accurate simulation CVT and the saturation process of CT;
System has all kinds of passive element models:Resistance, inductance, capacitance, series connection RL, parallel connection RL, series connection RC, parallel connection RC, string Join RLC, parallel connection RLC, reactor, earthing reactor etc.;
System has all kinds of modeling of nonlinear components:Saturable reactor, arrester and discharging gap etc.;
Analogue system operational effect is as shown in Figure 14,15,16.
By using true, accurate markers, sequential and external input, output to entire analogue system itself carry out Synchronization Control, be responsible for entire emulation testing process sequential and Synchronization Control, ensure calculate real-time and multiple signals it is same Step property, so as to ensure the slitless connection of simulation software and true physical equipment.Real-time should meet protective device action logic and The requirement of failure wave-recording.
Analogue system ensures the reasonability and correctness of simulation primary system circuit both sides protection act Outlet time, with true Protect the synchronization of both sides operating time of protection.
The control of analogue system real-time process should ensure that in the sequential and substation of primary complete simulation process really disturbance, Failure, the sequential of operation logically, on the time are consistent.
The electrical secondary system part of electric system is the various and complicated system of a type, is set comprising various It is standby, but study carefully its mechanism, nothing more than several classifications.In this way, the identical secondary device of principle is classified as one kind by us, DDRTS is used Self-defined control module writes one section of code to describe its general character, and its characteristic part is separated, with several control modules To indicate.Two second part can be modeled by the control module of graphical simulation system, wherein control mould includes abundant each generic module, Using these basic modules, all controllers can be built in current electric system (such as:The field regulator and tune of generator Fast device, variable-impedance component, voltage source, current source etc.).The module include more than 20 kinds of different mathematical function module, more than ten kinds Different basic time modules, eight kinds of signal generators, five kinds of logical functions, seven kinds of basic nonlinear function modules, three kinds of controls Function processed and self-defined control variable.Self-defined control variable system provides open platform, can be protected according to various principles Self-defined relay protective scheme.
Secondary device modeling principle is as shown in figure 17.Secondary device modeling is included based on emulation platform, protection two modelings Three data sampling, protection operation, logic judgment modules.
Data sampling modeling is as shown in figure 18.
Data sampling is introduced by emulation platform signal, can introduce the electrical quantity such as voltage, electric current, frequency, introducing it is electrical Amount can freely define type, equipment, position, after collecting customized signal, according to the data that protection algorism needs, data Sampling module is according to the powered-down tolerance of sampling algorithm the output phase and judges whether starting protection computing module.
Protection operation module is as shown in figure 19.
Computing module is protected to receive the sampled value of data sampling output, and inputs the preset definite value of protection, is calculated according to protection Method, calculates whether protection acts and output action signal.
Protection algorism can be write general protection algorism by protections such as circuit, transformer, busbares, such as:
Power frequency variation difference stream starts:
ΔId1.25 Δ I of >dt+Idth
Wherein:
ΔIdtIt for floating door, is gradually improved automatically as variable quantity exports increase, takes 1.25 times can ensure threshold electricity Pressure slightly above uneven output always.
The respectively power frequency variation of each side electric current of transformer.
ΔIdHalf-cycle integration value for difference stream.
IdthFor fixed door.Power frequency variation difference stream initiating element is not influenced by load current, and sensitivity is very high, is started Definite value is adjusted by device inner setting without user.
This initiating element is used for opening power frequency variation biased differential protection.
Power frequency variation ratio differential protection act equation
ΔIr=max | Δ I|+|ΔI|+....+|ΔI|}
Wherein:
ΔIdtFor floating door, gradually improved automatically as variable quantity exports increase.Threshold electricity can be ensured by taking 1.25 times Pressure slightly above uneven output always, ensures, in system oscillation or frequency shift (FS), to protect not malfunction.
The respectively power frequency variation of each side electric current of transformer.
ΔIdPower frequency variation for difference current.
IdthFor fixed door.
ΔIrFor the power frequency variation of stalling current, maximum mutually braking is taken.
Logic judgment module is as shown in figure 20, and it is as shown in figure 21 that operation principle is moved back in pressing plate throwing.
Relay protective scheme judges that mathematical algorithm can be write general logic judgment algorithm by protections such as circuit, transformer, busbares, As depicted in figures 22 and 23.
Circuit is tested:
Arbitrary point short circuit (containing single-phase, two-phase and three-phase);
Arbitrary perforated line (containing single-phase, two-phase and three-phase);
Compound failure, including multipoint earthing, multiple spot in system be short-circuit, arbitrary a variety of primary equipment simultaneous faults, switch Short trouble etc. occurs simultaneously for tripping;
Metallicity failure, evolved fault, resistance grounded failure, hand close to failure, are inside and outside circuit transitory waveform, area It breaks down again in system oscillation and oscillation;
Transitory waveform is tested
Single-phase earthing, two phase ground, line to line fault, three-phase shortcircuit and three-phase shortcircuit ground connection are simulated in protected circuit end Failure, the transitory waveform of distance protection should not exceed 5%.
Metallicity failure in area:In protection circuit outlet, midpoint, end each point simulation single-phase earthing, two phase ground, three-phase Short circuit and three-phase shortcircuit earth fault.Various failures simulate transient fault and permanent fault respectively.
External area error:Single-phase earthing, two phase ground, three-phase shortcircuit and three-phase shortcircuit ground connection event are simulated at adjacent lines both ends Barrier.Various failures simulate transient fault.
Evolved fault:Evolved fault of the same trouble point simulation through different time span inside protected circuit; The different name phase evolved fault between close trouble point is simulated between protected circuit and adjacent lines;Protected circuit with Cross-line phase-to phase fault is simulated between adjacent lines.
Resistance grounded failure:The single failure of various strip resistances is simulated at both ends and midpoint inside protected circuit; Adjacent lines simulates the single failure of various strip resistances.Singlephase earth fault transition resistance be 0~300 Ω, phase-to phase fault resistance For 0~100 Ω.
Hand is closed to failure:System is single-side power, simulates protected circuit respectively in outlet, midpoint and end three-phase ground Breaker is closed under state.
It breaks down again in system oscillation and oscillation:Circuit is mutually run entirely, and dynamic steady destruction occurs due to failure for system;It is shaking Various short troubles outside simulation Nei He areas of protected circuit area during swinging
System double-loop wire heavy service causes system power system oscillation due to open-phase operation occurs for adjacent lines, is shaking Various short troubles outside simulation Nei He areas of protected circuit area during swinging
System double-loop wire is run, and is caused system power system oscillation due to breaker one phase in this circuit side disconnects, is being vibrated Various short troubles outside Nei He areas of protected circuit area are simulated in the process.
Transformer body and its related experiment:
Transformer fault, including phase fault, ground short circuit;
Transformer airdrop test;
Transformer non-electricity signal:The light gas of ontology grave gas, ontology, have load-carrying gas, have carry light gas, oil temperature it is high, Oil temperature exception, pressure release and cooler full cut-off etc.;
Busbar is tested:
Busbar short-circuit;
Busbar grounding;
Instantaneity, permanent fault;
Capacitor, reactor instantaneity, permanent fault experiment
Switch main body and its relevant experiment:
Switch failure;
Switch jump;
Open-phase operation;
The various exceptions of switch (forbid tripping by pressure reduction;Pressure reduction No switching on;Reclosing is forbidden in pressure reduction; Pressure reduction quiescing;Switch pressure, oil pressure reduce);
Switch is closed on faulty circuit or busbar;
Secondary circuit is tested:
TA/TV broken strings, polar orientation, short circuit, secondary circuit open circuit;
For powerful configuration function, it is arbitrarily different that user can simulate secondary circuit by the separate relay that software controls Normal or phenomenon of the failure.
Measurement amount needed for base electromagnetic transient simulation algorithm acquisition device action simulation, and coupling apparatus mathematical model realizes electricity Net fault recurrence and cascading failure simulation analysis.
(1) acquisition of failure amount
System simulation platform is based on electrical-magnetic model and calculates transient process after failure, each protective position electricity of output power grid Pressure, electric current obtain sample information when the sample information of target containing when, fault recurrence and cascading failure emulation module and input typical guarantor Protection unit.
(2) device measurement amount is analyzed
The structure of the modeling module of protective relaying device general digital model including device, action logic, measurement amount place Reason method;Electric current, the voltage data that electro-magnetic transient provides are introduced, is obtained by the measurement quantity algorithm of device and is moved applied to device Make the measurement amount of logic, and then calculated according to the action logic of device needs and measure impedance, phase current, negative-sequence current, zero sequence The measurement data of all kinds of protection applications such as electric current, power, phase voltage, negative sequence voltage, residual voltage.
(3) fault recurrence and cascading failure simulation analysis
According to the action logic of fexible unit model, the design of protection act emulation universal method is carried out, realizes that consideration is disconnected Road device actuation time, reclosure time, prepared auto restart action, protection or breaker tripping, distance I sections of transitory waveforms, power flow transfers Cause to hide all kinds of simulation analysis such as malfunction of load protection;Needs are analyzed according to physical fault, the discharge state of breaker is anti- Simulated grid model is fed to, carry out the whole network electromagnetic transient analysis again and is exported to protective device, realizes the cascading failure of protection Emulation is until failure vanishes.
Fault recurrence and cascading failure simulation analysis module are according to the equipment and mounted cast in the simulation scale of acquisition, really Situations such as recognizing the intrinsic actuation time such as protection exit, circuit breaker trip, and considering relay fail, breaker tripping.This mould The key technology point of block for overall logic design and with other module combined calculation emulation interfaces.
After system startup separator playback function, the data according to needed for fault recurrence obtain simulation scale, simulator respectively Model, device electrical quantity sampling value, and backer be according to need set tripping switch or protection.Data acquisition is completed can be into Row emulation carries out the analysis of device logic according to the device measurement electrical quantity obtained, determines whether to enter according to analysis result and open Close the emulation of displacement cascading failure, the cascading failure emulation of switch failure.After emulation simulation result is shown according to platform, and Form simulation report.
Although the embodiments of the present invention have been disclosed as above, but its be not restricted in specification and embodiment it is listed With it can be fully applied to various fields suitable for the present invention, for those skilled in the art, can be easy Other modification is realized on ground, therefore without departing from the general concept defined in the claims and the equivalent scope, and the present invention is not It is limited to specific details and legend shown and described herein.

Claims (4)

1. the secondary device modeling method based on electromagnetic transient simulation platform, which is characterized in that include the following steps:
Electric power networks are divided into N number of sub-network, wherein, N is natural number more than 1, and according to network segmentation object function into The optimization of each sub-network of row, the network segmentation object function are:
S=a1 2+a2 2+a3 2+as 2,
Wherein S be object function, a1、a2、a3For the number of nodes in the sub-network, asFor the connecting line between the sub-network Quantity;
Different simulation step lengths is set respectively, and the simulation step length of the electric power networks is set as every for each sub-network The common divisor of the simulation step length of a sub-network;
It is emulated using the sub-network and the simulation step length of the electric power networks using EMTP methods, establishes each sub-network In different force devices model and be deposited into database;
According to the model foundation primary system operating status model of the force device, and output voltage and electric current is calculated simultaneously It is deposited into database;
Secondary device is classified according to the operation principle of secondary device and carries out simulation modeling respectively, while the secondary device is inserted Enter into the sub-network, and according to the output voltage and Current calculation obtain the secondary device electric values and by its It is stored in database;
Data acquisition module obtains the electric values of secondary device from database, and by the electric values and pre-stored electricity Tolerance threshold value is compared, and judges starting protection operation when the electric values exceed the pre-stored electrical quantity threshold value, And protection adjusted value is calculated, logic judgment module sends out adjustment according to the protection adjusted value to the model of the force device Order, that is, complete fault simulation.
2. the secondary device modeling method based on electromagnetic transient simulation platform as described in claim 1, which is characterized in that described Force device is generator, exciter and excitation regulation device, governor, motor, transformer, load, breaker, transmission of electricity Line, reactor and string complement part.
3. the secondary device modeling method based on electromagnetic transient simulation platform as described in claim 1, which is characterized in that
The model of the force device is built using electromagnetic transient simulation system;
After the electromagnetic transient simulation system obtains the data of each step-length and a step-length has been calculated, data are deposited into number According in library, the order of data is then read to data acquisition module transmission, and itself enters wait state;
Data acquisition module obtains data after receiving the order for reading data from database and carries out operation, and operation As a result be stored in database, then send the order for calculating next step-length to the electromagnetic transient simulation system, and itself into Enter wait state;
The electromagnetic transient simulation system receives the order for calculating next step-length, carries out the calculating of the step-length.
4. the secondary device modeling method based on electromagnetic transient simulation platform as described in claim 1, which is characterized in that also wrap It includes:
The modification order of user is received, performs the operation of the modification to the parameter of each force device and the secondary device.
CN201711025002.6A 2017-10-27 2017-10-27 Secondary device modeling method based on electromagnetic transient simulation platform Pending CN108241771A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711025002.6A CN108241771A (en) 2017-10-27 2017-10-27 Secondary device modeling method based on electromagnetic transient simulation platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711025002.6A CN108241771A (en) 2017-10-27 2017-10-27 Secondary device modeling method based on electromagnetic transient simulation platform

Publications (1)

Publication Number Publication Date
CN108241771A true CN108241771A (en) 2018-07-03

Family

ID=62700390

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711025002.6A Pending CN108241771A (en) 2017-10-27 2017-10-27 Secondary device modeling method based on electromagnetic transient simulation platform

Country Status (1)

Country Link
CN (1) CN108241771A (en)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109190305A (en) * 2018-10-19 2019-01-11 国网四川省电力公司电力科学研究院 Panorama real-time emulation method for electric system
CN109240124A (en) * 2018-10-31 2019-01-18 海南电网有限责任公司电力科学研究院 A kind of electric power stability control strategy analogue system
CN110233477A (en) * 2019-05-29 2019-09-13 海南电网有限责任公司电力科学研究院 Steady control analogue system based on three lines of defence emulation
CN110348066A (en) * 2019-06-17 2019-10-18 国网西藏电力有限公司电力科学研究院 Access the protective relaying device check method of weak grid on a large scale for new energy
CN111162506A (en) * 2020-01-13 2020-05-15 华电国际电力股份有限公司邹县发电厂 Double-speed motor protection measurement and control device
CN111181149A (en) * 2018-10-24 2020-05-19 北京天诚同创电气有限公司 Micro-grid simulation method and device
CN111413890A (en) * 2020-04-01 2020-07-14 国网四川省电力公司技能培训中心 Intelligent substation primary platform simulation method based on digital physical hybrid simulation
CN111969639A (en) * 2020-08-17 2020-11-20 中国科学院电工研究所 Multi-time scale transient modeling method for power electronic power grid cascade type converter
CN113376468A (en) * 2021-06-23 2021-09-10 四川华能宝兴河水电有限责任公司 Systematic detection method for defects of electrical secondary circuit
CN113659574A (en) * 2021-08-25 2021-11-16 王文林 Closed-loop and open-loop simulation platform and simulation method for power distribution network with phase angle difference
CN117724447A (en) * 2023-12-15 2024-03-19 昆易电子科技(上海)有限公司 Data processing method of simulation device, test simulation device and simulation system
CN117724447B (en) * 2023-12-15 2024-05-31 昆易电子科技(上海)有限公司 Data processing method of simulation device, test simulation device and simulation system

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103150426A (en) * 2013-02-09 2013-06-12 国家电网公司 Unified modeling method for regulation and control integrated simulation of primary grid equipment and secondary grid equipment
CN103594013A (en) * 2013-11-06 2014-02-19 国家电网公司 Hybrid simulation and regulating-and-controlling-integrated simulation united simulation data interaction system and method
CN104077441A (en) * 2014-06-25 2014-10-01 国电南瑞科技股份有限公司 Unified modeling method of primary and secondary equipments for substation and dispatching master station
CN105429291A (en) * 2015-10-26 2016-03-23 山东网聪信息科技有限公司 Correlation method of primary wiring diagram and secondary system logic connecting diagram of intelligent substation
CN105808892A (en) * 2016-04-27 2016-07-27 国家电网公司 Hierarchical modeling method of power system relay protection simulation training system
US20170085076A1 (en) * 2015-09-23 2017-03-23 Xj Group Corporation Setting and coordination calculation method for protection setting value of dc system
CN106886616A (en) * 2015-12-15 2017-06-23 中国电力科学研究院 A kind of automatic subnetting method of extensive electro-magnetic transient grid simulation

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103150426A (en) * 2013-02-09 2013-06-12 国家电网公司 Unified modeling method for regulation and control integrated simulation of primary grid equipment and secondary grid equipment
CN103594013A (en) * 2013-11-06 2014-02-19 国家电网公司 Hybrid simulation and regulating-and-controlling-integrated simulation united simulation data interaction system and method
CN104077441A (en) * 2014-06-25 2014-10-01 国电南瑞科技股份有限公司 Unified modeling method of primary and secondary equipments for substation and dispatching master station
US20170085076A1 (en) * 2015-09-23 2017-03-23 Xj Group Corporation Setting and coordination calculation method for protection setting value of dc system
CN105429291A (en) * 2015-10-26 2016-03-23 山东网聪信息科技有限公司 Correlation method of primary wiring diagram and secondary system logic connecting diagram of intelligent substation
CN106886616A (en) * 2015-12-15 2017-06-23 中国电力科学研究院 A kind of automatic subnetting method of extensive electro-magnetic transient grid simulation
CN105808892A (en) * 2016-04-27 2016-07-27 国家电网公司 Hierarchical modeling method of power system relay protection simulation training system

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
WWW.BEST-WAYTECH.COM: "www.best-waytech.com", 《百度》 *
李一龙 等: "《智能微电网控制技术》", 31 August 2017 *
王双 等: "电力系统继电保护的数字化仿真研究", 《河南科技》 *
胡晓丽 等: "江苏220kv 数字物理混合仿真系统实例", 《华东科技》 *

Cited By (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109190305B (en) * 2018-10-19 2022-11-15 国网四川省电力公司电力科学研究院 Panoramic real-time simulation method for power system
CN109190305A (en) * 2018-10-19 2019-01-11 国网四川省电力公司电力科学研究院 Panorama real-time emulation method for electric system
CN111181149B (en) * 2018-10-24 2021-08-31 北京天诚同创电气有限公司 Micro-grid simulation method and device
CN111181149A (en) * 2018-10-24 2020-05-19 北京天诚同创电气有限公司 Micro-grid simulation method and device
CN109240124A (en) * 2018-10-31 2019-01-18 海南电网有限责任公司电力科学研究院 A kind of electric power stability control strategy analogue system
CN110233477A (en) * 2019-05-29 2019-09-13 海南电网有限责任公司电力科学研究院 Steady control analogue system based on three lines of defence emulation
CN110233477B (en) * 2019-05-29 2020-08-14 海南电网有限责任公司电力科学研究院 Stability control simulation system based on three-defense line simulation
CN110348066A (en) * 2019-06-17 2019-10-18 国网西藏电力有限公司电力科学研究院 Access the protective relaying device check method of weak grid on a large scale for new energy
CN111162506B (en) * 2020-01-13 2022-02-18 华电国际电力股份有限公司邹县发电厂 Double-speed motor protection measurement and control device
CN111162506A (en) * 2020-01-13 2020-05-15 华电国际电力股份有限公司邹县发电厂 Double-speed motor protection measurement and control device
CN111413890A (en) * 2020-04-01 2020-07-14 国网四川省电力公司技能培训中心 Intelligent substation primary platform simulation method based on digital physical hybrid simulation
CN111413890B (en) * 2020-04-01 2023-07-11 国网四川省电力公司技能培训中心 Primary platform simulation method of intelligent substation based on digital physical hybrid simulation
CN111969639A (en) * 2020-08-17 2020-11-20 中国科学院电工研究所 Multi-time scale transient modeling method for power electronic power grid cascade type converter
CN113376468A (en) * 2021-06-23 2021-09-10 四川华能宝兴河水电有限责任公司 Systematic detection method for defects of electrical secondary circuit
CN113376468B (en) * 2021-06-23 2022-08-30 四川华能宝兴河水电有限责任公司 Systematic detection method for defects of electrical secondary circuit
CN113659574A (en) * 2021-08-25 2021-11-16 王文林 Closed-loop and open-loop simulation platform and simulation method for power distribution network with phase angle difference
CN113659574B (en) * 2021-08-25 2023-11-21 王文林 Power distribution network closed-loop simulation platform with phase angle difference and simulation method
CN117724447A (en) * 2023-12-15 2024-03-19 昆易电子科技(上海)有限公司 Data processing method of simulation device, test simulation device and simulation system
CN117724447B (en) * 2023-12-15 2024-05-31 昆易电子科技(上海)有限公司 Data processing method of simulation device, test simulation device and simulation system

Similar Documents

Publication Publication Date Title
CN108241771A (en) Secondary device modeling method based on electromagnetic transient simulation platform
CN105022874B (en) A kind of power distribution network Digital Simulation method for automatic modeling and system
CN105429291B (en) The correlating method of intelligent substation primary connection figure and electrical secondary system logic connectivity diagram
CN104749466B (en) A kind of intelligent substation relay protection test system, method of testing and implementation method
CN109103880A (en) The emulation of intelligent substation panorama and test macro
CN103778230B (en) Online automatic generation method for black-start scheme
CN104483643B (en) Modeling method based on detection platform of fault indicator for physical simulation of power distribution network
CN104360227B (en) Substation cable outlet fault monitoring method based on traveling wave method and transient basic frequency method
CN103713214A (en) Intelligent transformer station relay protection closed loop test system
CN101153884A (en) Relay-protection steady-state digital moving die test system
CN105205244B (en) Loop Closing Operation analogue system based on electromechanics-electromagnetism hybrid simulation technology
CN109240124A (en) A kind of electric power stability control strategy analogue system
CN107180314A (en) A kind of O&M business model modeling method based on an electrical secondary system incidence relation
CN105093017B (en) Intelligent substation GOOSE integrated testabilities device and its method of testing
CN104505941A (en) Monitoring system and simulating running system for intelligent substation network
CN109918725A (en) Integrated test method based on the modeling of emulation platform secondary device
CN106877500A (en) A kind of intelligent substation secondary loop void terminal automatic connecting method and device
CN113887157A (en) Active distribution network automatic terminal network closed-loop test method based on RTDS
CN103823143B (en) The emulation mode of substation equipment safety analysis after a kind of extra-high voltage increase-volume
CN203102283U (en) Wind power plant modeling simulation system based on real time digital simulator (RTDS)
CN110021995A (en) A kind of distribution network automated information joint debugging emulation test system
Pereira Jr et al. Performance assessment of a line protection implemented with process bus and GOOSE through transient closed loop tests
Gérin-Lajoie et al. Simulation of an extra large network in EMTP: From electromagnetic to electromechanical transients
CN108492660A (en) Substation's peace arranges analogy method, device and system
CN204129734U (en) A kind of digital dynamic realtime emulation system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180703