CN103885438B - The Auto-Test System of a kind of transformer station measuring and controlling equipment and method - Google Patents
The Auto-Test System of a kind of transformer station measuring and controlling equipment and method Download PDFInfo
- Publication number
- CN103885438B CN103885438B CN201410104304.2A CN201410104304A CN103885438B CN 103885438 B CN103885438 B CN 103885438B CN 201410104304 A CN201410104304 A CN 201410104304A CN 103885438 B CN103885438 B CN 103885438B
- Authority
- CN
- China
- Prior art keywords
- test
- measurement
- control equipment
- background server
- automatic
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000012360 testing method Methods 0.000 title claims abstract description 287
- 238000000034 method Methods 0.000 title claims abstract description 28
- 238000005259 measurement Methods 0.000 claims description 134
- 238000004891 communication Methods 0.000 claims description 22
- 238000001514 detection method Methods 0.000 claims description 20
- 238000009863 impact test Methods 0.000 claims description 15
- 230000008569 process Effects 0.000 claims description 15
- 238000012545 processing Methods 0.000 claims description 14
- 230000004044 response Effects 0.000 claims description 12
- 238000004458 analytical method Methods 0.000 claims description 11
- 230000011664 signaling Effects 0.000 claims description 8
- 238000010998 test method Methods 0.000 claims description 7
- 230000008859 change Effects 0.000 claims description 6
- 238000004364 calculation method Methods 0.000 claims description 4
- 238000006073 displacement reaction Methods 0.000 claims description 3
- 238000010438 heat treatment Methods 0.000 claims description 3
- 230000001360 synchronised effect Effects 0.000 abstract 1
- 238000002474 experimental method Methods 0.000 description 5
- 238000005516 engineering process Methods 0.000 description 4
- 238000012544 monitoring process Methods 0.000 description 4
- 238000010276 construction Methods 0.000 description 3
- 238000011160 research Methods 0.000 description 3
- 239000000306 component Substances 0.000 description 2
- 230000007812 deficiency Effects 0.000 description 2
- 238000011161 development Methods 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 238000007689 inspection Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 239000008358 core component Substances 0.000 description 1
- 238000013480 data collection Methods 0.000 description 1
- 238000013523 data management Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000011156 evaluation Methods 0.000 description 1
- 238000011990 functional testing Methods 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012827 research and development Methods 0.000 description 1
- 238000005070 sampling Methods 0.000 description 1
- 230000009897 systematic effect Effects 0.000 description 1
Landscapes
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
- Supply And Distribution Of Alternating Current (AREA)
Abstract
Description
技术领域technical field
本发明属于自动化设备测试技术领域,具体涉及一种变电站测控设备的自动测试系统和方法。The invention belongs to the technical field of automatic equipment testing, and in particular relates to an automatic testing system and method for substation measurement and control equipment.
背景技术Background technique
目前,随着智能电网调度自动化和智能变电站建设的开展,国内外很多科研单位和高校纷纷开展相关的智能变电站试验、测试技术研究工作,但是电网调度主站自动化系统的测试较少。国内外一些测试仪器厂家已着手开发智能变电站继电保护等二次设备测试仪。OMICRON公司开发的电力系统测试装置,其v2.22以上的版本中提供了对IEC61850的支持。国内中元华电、博电、广富晖等保护测试仪厂家也开展了智能变电站保护测试仪研发,但是目前国内外都没有建成能对调度自动化和变电站自动化系统进行全方位检测的综合检验平台,针对变电站测控设备自动测试技术的研究也还没有完整的展开,也找不到关于此技术方面完整的论文。At present, with the development of smart grid scheduling automation and smart substation construction, many scientific research institutes and universities at home and abroad have carried out related smart substation experiments and testing technology research work, but there are few tests on the grid dispatching master station automation system. Some test instrument manufacturers at home and abroad have begun to develop secondary equipment testers such as intelligent substation relay protection. The power system test device developed by OMICRON provides support for IEC61850 in versions above v2.22. Domestic Zhongyuan Huadian, Bodian, Guangfuhui and other protection tester manufacturers have also carried out the research and development of intelligent substation protection testers, but at present, there is no comprehensive inspection platform capable of comprehensive inspection of dispatching automation and substation automation systems at home and abroad. The research on the automatic test technology of substation measurement and control equipment has not been fully developed, and no complete papers on this technology can be found.
随着电力自动化技术的发展,每年都会有很多变电站自动化系统新产品投入使用和升级换代,需要有变电站自动化系统及各项应用功能的测试工具,但是目前市场上尚无对变电站测控设备的自动化测试工具,特别是一直缺少对变电站测控设备的自动检测手段,所有测试基本还停留在人工测试阶段,自动化程度不高,测试方法和测试仪器也相对落后,测试的标准化、测试的闭环性、检测报告的标准化、测试过程的透明化、测试的可扩展性等方面都存在很大的欠缺。针对变电站测控设备测试的新特性,研究智能变电站测控设备自动测试的新方法,能够实现测试任务的自动生成、检测步骤的自动执行和检测报告的自动生成,减少人工因素干扰,排除测试随机性,提高测试效率和测试的可靠性,实现测试可重复性,保证测试工作的可追溯性,保障测试结果的可靠性和一致性。With the development of power automation technology, many new products of substation automation system are put into use and upgraded every year, and testing tools for substation automation system and various application functions are needed, but there is no automated test for substation measurement and control equipment in the market Tools, especially the lack of automatic detection methods for substation measurement and control equipment, all tests are basically still in the manual test stage, the degree of automation is not high, the test methods and test instruments are relatively backward, the standardization of testing, closed-loop testing, and testing reports There are great deficiencies in standardization, transparency of the testing process, and scalability of testing. Aiming at the new characteristics of substation measurement and control equipment testing, a new method of automatic testing of intelligent substation measurement and control equipment is studied, which can realize the automatic generation of test tasks, automatic execution of detection steps and automatic generation of detection reports, reduce artificial factor interference, and eliminate test randomness. Improve test efficiency and test reliability, realize test repeatability, ensure the traceability of test work, and ensure the reliability and consistency of test results.
发明内容Contents of the invention
为了克服上述现有技术的不足,本发明提供一种变电站测控设备的自动测试系统和方法,能够实现测试任务的自动生成、检测步骤的自动执行和检测报告的自动生成,减少人工因素干扰,排除测试随机性,提高测试效率和测试的可靠性,实现测试可重复性,保证测试工作的可追溯性,保障测试结果的可靠性和一致性。In order to overcome the deficiencies of the prior art above, the present invention provides an automatic test system and method for substation measurement and control equipment, which can realize the automatic generation of test tasks, the automatic execution of detection steps and the automatic generation of detection reports, reduce the interference of artificial factors, eliminate Test randomness, improve test efficiency and test reliability, realize test repeatability, ensure the traceability of test work, and ensure the reliability and consistency of test results.
为了实现上述发明目的,本发明采取如下技术方案:In order to realize the above-mentioned purpose of the invention, the present invention takes the following technical solutions:
本发明提供一种变电站测控设备的自动测试系统,所述系统包括测试后台服务器、交换机、网络测试仪、智能测试仪、三相标准表、可控电源和GPS时钟模块;所述网络测试仪、智能测试仪、三相标准表和可控电源分别通过交换机与测试后台服务器之间进行数据交换,所述测试后台服务器通过网络协议与所述测控设备进行通信,控制可控电源为测控设备供电,同时通过GPS时钟模块实现测试后台服务器与测控设备的时间同步。The invention provides an automatic test system for substation measurement and control equipment, the system includes a test background server, a switch, a network tester, an intelligent tester, a three-phase standard meter, a controllable power supply and a GPS clock module; the network tester, The intelligent tester, the three-phase standard meter and the controllable power supply exchange data with the test background server respectively through the switch, and the test background server communicates with the measurement and control equipment through the network protocol, controls the controllable power supply to supply power for the measurement and control equipment, At the same time, the time synchronization between the test background server and the measurement and control equipment is realized through the GPS clock module.
所述测试后台服务器通过IEC60870-5104通信协议或IEC61850通信标准与所述测控设备进行通信。The test background server communicates with the measurement and control equipment through the IEC60870-5104 communication protocol or the IEC61850 communication standard.
所述测试后台服务器控制可控电源输出交流176V~253V电压,从而为测控设备供电。The test background server controls the controllable power supply to output an AC voltage of 176V-253V, so as to supply power for the measurement and control equipment.
所述测试后台服务器控制所述智能测试仪,从而控制测试进程,并通过读取三相标准表的数据及测控设备的数据,进行数据处理分析,最终形成测试报告。The test background server controls the intelligent tester, thereby controlling the test process, and reads the data of the three-phase standard meter and the data of the measurement and control equipment, performs data processing and analysis, and finally forms a test report.
所述系统通过GPS时钟模块接收GPS时间同步信号,以保证测试后台服务器、智能测试仪及测控设备的时间同步。The system receives the GPS time synchronization signal through the GPS clock module to ensure the time synchronization of the test background server, the intelligent tester and the measurement and control equipment.
本发明同时还提供一种变电站测控设备的自动测试方法,其特征在于:所述方法包括以下步骤:The present invention also provides an automatic test method for substation measurement and control equipment, characterized in that: the method includes the following steps:
步骤1:所述测试后台服务器采集所述测控设备的内部数据信息;Step 1: the test background server collects the internal data information of the measurement and control equipment;
步骤2:所述测试后台服务器与测控设备和可控电源进行通信;Step 2: The test background server communicates with the measurement and control equipment and the controllable power supply;
步骤3:对测控设备进行自动测试,并控制测控设备的测试进程;Step 3: Automatically test the measurement and control equipment, and control the testing process of the measurement and control equipment;
步骤4:读取所述三相标准表数据,将其与采集的测控设备数据进行比较,并进行数据处理分析,记录测试结果;Step 4: Read the data of the three-phase standard meter, compare it with the collected measurement and control equipment data, perform data processing and analysis, and record the test results;
步骤5:所述测试后台服务器自动分析测试结果,生成测试报告。Step 5: The test background server automatically analyzes the test results and generates a test report.
所述步骤2中,测试后台服务器控制可控电源分别输出176V、220V、253V的电压,并分别记录测控设备在以上三个电压等级时的遥测值、遥信及遥控,通过与读取的智能测试仪及三相标准表数据进行分析计算,从而确定测控设备的供电电源在176V~253V时,其功能和性能的正确性。In the step 2, the test background server controls the controllable power supply to output voltages of 176V, 220V, and 253V respectively, and records the telemetry value, remote signal, and remote control of the measurement and control equipment at the above three voltage levels, and passes and reads the intelligent The tester and three-phase standard table data are analyzed and calculated to determine the correctness of the function and performance of the measurement and control equipment when the power supply is 176V-253V.
所述步骤3中,对测控设备进行自动测试的测试内容包括测控设备和调度自动化主站之间通信规约测试、测控设备模拟量测试、测控设备数字量测试、测控设备时间同步及响应时间测试、测控设备电源影响测试和测控设备稳定运行定时自动测试。In the step 3, the test content of the automatic test of the measurement and control equipment includes the communication protocol test between the measurement and control equipment and the dispatching automation master station, the measurement and control equipment analog quantity test, the measurement and control equipment digital quantity test, the measurement and control equipment time synchronization and response time test, The power supply of the measurement and control equipment affects the test and the stable operation of the measurement and control equipment is automatically tested regularly.
测控设备和调度自动化主站之间通信规约测试中,测控设备满足IEC60870-5104通信协议或IEC61850通信标准,通过所述自动测试系统模拟产生开关量和交流遥测量,完成测控设备和调度自动化主站之间通信规约测试,并通过测试后台服务器实现规约一致性测试;In the communication protocol test between the measurement and control equipment and the dispatching automation master station, the measurement and control equipment meets the IEC60870-5104 communication protocol or the IEC61850 communication standard, and the switching value and AC telemetry are simulated by the automatic test system to complete the measurement and control equipment and the dispatching automation master station Inter-communication protocol test, and implement the protocol consistency test through the test background server;
测控设备模拟量测试包括基本遥测测试和交流遥测影响量测试,交流遥测影响量测试包括频率变化影响测试、三相电流不平衡情况下三相有功/无功功率测试、加谐波分量电压/电流/有功/无功测试、三相电压/电流超量限测试、线路间影响测试、功率因数变化影响测试、自热影响测试、连续过输入后测试、短期过输入后测试和故障电流测试;Measurement and control equipment analog quantity test includes basic telemetry test and AC telemetry influence quantity test, AC telemetry influence quantity test includes frequency change influence test, three-phase active/reactive power test under three-phase current unbalanced condition, and harmonic component voltage/current /Active/reactive power test, three-phase voltage/current over-limit test, inter-line impact test, power factor change impact test, self-heating impact test, continuous over-input test, short-term over-input post-test and fault current test;
测控设备数字量测试包括遥信变位正确性测试、事件顺序记录站内分辨率测试、遥信雪崩处理能力测试和事件顺序记录防抖功能测试;The digital quantity test of the measurement and control equipment includes the correctness test of the remote signal displacement, the internal resolution test of the event sequence record, the remote signal avalanche processing capability test and the anti-shake function test of the event sequence record;
测控设备时间同步及响应时间测试的测试内容包括测控设备对时功能测试、遥信数据响应时间测试和遥测数据响应时间测试;The test content of the time synchronization and response time test of the measurement and control equipment includes the time synchronization function test of the measurement and control equipment, the response time test of the remote signaling data and the response time test of the telemetry data;
测控设备电源影响测试中,可控电源为测控设备提供电源,输出直流253V、交流253V以下电压,通过测试后台服务器控制可控电源的输出即可完成测控设备电源影响测试;In the power impact test of the measurement and control equipment, the controllable power supply provides power for the measurement and control equipment, and the output voltage is below 253V DC and AC 253V. The power impact test of the measurement and control equipment can be completed by controlling the output of the controllable power supply through the test background server;
测控设备稳定运行定时自动测试中,通过在测试后台服务器设置智能测试仪定时输出,实现测控设备72小时连续稳定通电试验的定时测试。In the automatic timing test of the stable operation of the measurement and control equipment, by setting the timing output of the intelligent tester on the test background server, the timing test of the 72-hour continuous and stable power-on test of the measurement and control equipment is realized.
所述步骤4中,测试后台服务器通过控制智能测试仪和可控电源从而控制测试进程,读取三相标准表数据和测控设备上送数据并进行数据处理分析,测控设备测试模拟量的误差需满足《GB/T13729远动终端设备》检测标准;在对测控设备进行测试时的误差为智能测试仪输出值和测控设备数据之间的误差。In the step 4, the test background server controls the test process by controlling the intelligent tester and the controllable power supply, reads the three-phase standard table data and the data sent by the measurement and control equipment, and performs data processing and analysis. It meets the testing standard of "GB/T13729 Telecontrol Terminal Equipment"; the error when testing the measurement and control equipment is the error between the output value of the intelligent tester and the data of the measurement and control equipment.
所述步骤5中,测试后台服务器首先根据设定的检测报告模板和选定的测试项目生成报告模板,随后根据测试内容和计算结果将测试结果对应填入报告模板中;在此过程中,测试后台服务器根据不同的用户设定不同的优先级,达到控制检测报告真实性的要求,并增加检测报告的灵活性。In the step 5, the test background server first generates a report template according to the set detection report template and selected test items, and then fills the test results into the report template correspondingly according to the test content and calculation results; in this process, the test The background server sets different priorities according to different users, so as to meet the requirements of controlling the authenticity of the detection report and increase the flexibility of the detection report.
与现有技术相比,本发明的有益效果在于:Compared with prior art, the beneficial effect of the present invention is:
能够根据各测试任务要求实现测试任务的自动生成、检测步骤的自动执行和检测报告的自动生成,减少人工因素干扰,排除测试随机性,提高测试效率和测试的可靠性,实现测试可重复性,保证测试工作的可追溯性,保障测试结果的可靠性和一致性。According to the requirements of each test task, it can realize the automatic generation of test tasks, automatic execution of detection steps and automatic generation of test reports, reduce the interference of human factors, eliminate test randomness, improve test efficiency and test reliability, and realize test repeatability. Guarantee the traceability of the test work and the reliability and consistency of the test results.
另外,通过自动测试平台建设,可形成一套对测控设备性能进行评价的方式、方法和具体的指标体系,建立有效的检测和评估标准体系,有效评价智能变电站的整体性能,促进测控设备检测的规范性,进而推动智能变电站建设的有序、有效和实用化,创造重大经济效益和社会效益。In addition, through the construction of an automatic test platform, a set of methods, methods and specific index systems for evaluating the performance of measurement and control equipment can be formed, an effective detection and evaluation standard system can be established, the overall performance of smart substations can be effectively evaluated, and the detection of measurement and control equipment can be promoted. Standardization, and then promote the orderly, effective and practical construction of smart substations, creating significant economic and social benefits.
附图说明Description of drawings
图1是变电站测控设备的自动测试系统示意图;Figure 1 is a schematic diagram of an automatic test system for substation measurement and control equipment;
图2是变电站测控设备的自动测试方法中检测报告自动生成流程图。Fig. 2 is a flow chart of automatic generation of test reports in the automatic test method of substation measurement and control equipment.
具体实施方式detailed description
下面结合附图对本发明作进一步详细说明。The present invention will be described in further detail below in conjunction with the accompanying drawings.
图1为基于以太网通信的变电站测控设备自动测试系统示意图,以太网通信具有网络速度快、带宽较宽、网络结构简单、网络设备标准统一,与测试后台计算机接口方便的特点,从而使网络上的节点之间的实时访问成为现实。自动测试系统中的各个设备通过以太网连接,通讯规约使用标准的IEC60870-5104和IEC61850规约,通过不同装置的IP地址进行分辨。自动测试系统通过GPS卫星时钟实现自动检测系统的时间同步,可以实现系统内测试仪器和被测设备在统一GPS时间基准下的运行监控,提高了时间顺序记录的时间准确性,提高了交流采集量的数据可靠性,提高了测试的准确度。Figure 1 is a schematic diagram of an automatic test system for substation measurement and control equipment based on Ethernet communication. Ethernet communication has the characteristics of fast network speed, wide bandwidth, simple network structure, unified network equipment standards, and convenient interface with the test background computer. Real-time access between nodes becomes a reality. Each device in the automatic test system is connected through Ethernet, and the communication protocol uses the standard IEC60870-5104 and IEC61850 protocol, and is distinguished by the IP address of different devices. The automatic test system realizes the time synchronization of the automatic test system through the GPS satellite clock, which can realize the operation monitoring of the test instrument and the tested equipment in the system under the unified GPS time reference, which improves the time accuracy of the time sequence record and increases the amount of AC collection The reliability of the data improves the accuracy of the test.
测试后台服务器作为本自动测试系统的核心组件,使用一台计算机完成以下几部分功能:As the core component of this automatic test system, the test background server uses a computer to complete the following functions:
依据检测要求确定变电站测控设备所要测试的内容;Determine the content to be tested for substation measurement and control equipment according to the testing requirements;
控制智能测试仪和可控电源从而控制测试进程;Control the intelligent tester and controllable power supply to control the test process;
读取三相高精度表数据和被测设备上送数据并进行数据处理分析;Read the data of the three-phase high-precision meter and the data sent by the device under test, and perform data processing and analysis;
依据测试内容和测试数据生成检测报告;Generate test reports based on test content and test data;
变电站测控设备自动测试实验平台测试内容:Substation measurement and control equipment automatic test experiment platform test content:
1.变电站测控设备和调度自动化主站之间通信规约的测试1. Test of communication protocol between substation measurement and control equipment and dispatching automation master station
智能变电站测控设备自动测试实验平台设备之间的通信使用符合IEC60870-5104或IEC61850标准的通信规约。被测设备在接入测试系统时首先必须自身满足IEC60870-5104或IEC61850标准,另外通过自动测试系统模拟产生各种开关量、交流遥测量等数据,即可以完成智能变电站测控设备基于IEC60870-5104或IEC61850标准的通信规约的测试,亦可以使用测试后台规约通信规约测试软件实现规约一致性测试。The communication between the equipment of the automatic test experiment platform of the intelligent substation measurement and control equipment uses the communication protocol conforming to the IEC60870-5104 or IEC61850 standard. When the equipment under test is connected to the test system, it must first meet the IEC60870-5104 or IEC61850 standard. In addition, through the automatic test system to simulate and generate various switching values, AC remote measurement and other data, the intelligent substation measurement and control equipment can be completed based on IEC60870-5104 or IEC60870-5104 or The test of the communication protocol of the IEC61850 standard can also use the test background protocol communication protocol test software to realize the protocol conformance test.
2.变电站测控设备模拟量测试2. Analog measurement of substation measurement and control equipment
变电站测控设备作为智能变电站综合自动化系统中数据的采集和命令执行单元,其一个重要的任务是完成变电站模拟遥测数据的采集、处理及上送任务,并通过采样的模拟遥测数据进而判断变电站的运行情况,为调度主站全面分析变电站运行安全和电网运行安全提供全面的数据支持,在针对变电站测控设备的检测过程中,变电站测控设备模拟遥测数据的采集、处理及上送功能也是检测中的重要内容,模拟遥测数据检测主要分为两部分进行:Substation measurement and control equipment is the data collection and command execution unit in the intelligent substation integrated automation system. One of its important tasks is to complete the collection, processing and uploading of substation analog telemetry data, and judge the operation of the substation through the sampled analog telemetry data. In order to provide comprehensive data support for the dispatching master station to comprehensively analyze the operation safety of substations and power grids, in the detection process of substation measurement and control equipment, the collection, processing and uploading functions of analog telemetry data of substation measurement and control equipment are also important in the detection. Content, analog telemetry data detection is mainly divided into two parts:
第一部分是遥测基本测试,主要包括:The first part is the basic telemetry test, which mainly includes:
1.交流遥测三相电压、电流(0~100%量程);1. AC telemetry three-phase voltage and current (0-100% range);
2.交流遥测功率因数为1时的有功功率和功率因数为0时的无功功率(0~100%量程);2. AC telemetry active power when the power factor is 1 and reactive power when the power factor is 0 (0-100% range);
3.交流遥测功率因数为0.5L、0.5C时的有功功率;3. Active power when AC telemetry power factor is 0.5L, 0.5C;
4.交流遥测功率因数为0.866L、0.866C时的无功功率;4. The reactive power when the AC telemetry power factor is 0.866L and 0.866C;
5.直流遥测模拟量输入A/D误差测试。5. DC telemetry analog input A/D error test.
第二部分是交流遥测影响量测试,主要包括:The second part is the AC telemetry impact test, which mainly includes:
1.频率变化影响测试:45Hz、50Hz、55Hz三相电压、电流,功率因数为1时的有功功率和功率因数为0时的无功功率(测量0~100%量程)测试;1. Frequency change impact test: 45Hz, 50Hz, 55Hz three-phase voltage, current, active power when the power factor is 1 and reactive power when the power factor is 0 (measurement range 0-100%);
2.三相电流不平衡情况下三相有功、无功功率测试;2. Three-phase active and reactive power test under the condition of unbalanced three-phase current;
3.加谐波分量电压、电流、有功、无功测试;3. Add harmonic component voltage, current, active power and reactive power test;
4.三相电压、电流超量限(120%)测试;4. Three-phase voltage and current over-limit (120%) test;
5.线路间影响测试:(Ua=Ub=额定值,Uc=0V;Ia=Ib=0A,Ic=额定值);5. Inter-line influence test: (Ua=Ub=rated value, Uc=0V; Ia=Ib=0A, Ic=rated value);
6.功率因数变化影响测试:有功功率(相角为0°、70°、290°)测试,无功功率(相角为90°、20°、160°)测试6. Power factor change impact test: active power (phase angle is 0°, 70°, 290°) test, reactive power (phase angle is 90°, 20°, 160°) test
7.自热影响测试:7. Self-heating effect test:
a)被测设备开机1~3min三相电压、电流,功率因数为1时的有功功率和功率因数为0时的无功功率(测量0~100%量程);a) Three-phase voltage and current of the equipment under test starting for 1-3 minutes, active power when the power factor is 1, and reactive power when the power factor is 0 (measurement range 0-100%);
b)被测设备开机30~35min三相电压、电流,功率因数为1时的有功功率和功率x因数为0时的无功功率(0~100%量程);b) The three-phase voltage and current of the equipment under test starting for 30-35 minutes, the active power when the power factor is 1 and the reactive power when the power x factor is 0 (0-100% range);
8.连续过输入后测试:连续输入三相电压、电流120%额定值两小时后测试三相电压、屯流,功率因数为1时的有功功率和功率因数为0时的无功功率(0~100%量程);8. Test after continuous over-input: test the three-phase voltage and current after continuously inputting three-phase voltage and current 120% of the rated value for two hours, the active power when the power factor is 1 and the reactive power when the power factor is 0 (0 ~100% range);
9.短期过输入后测试:20倍A/s CT额定电流,间隔5分钟,共五次;2倍V/s PT额定电流,间隔5分钟,共五次;9. Test after short-term over-input: 20 times A/s CT rated current, 5 minutes apart, five times in total; 2 times V/s PT rated current, 5 minutes apart, five times in total;
10.故障电流测试:电流输出(2.5In、10In、20In可选择)测试。10. Fault current test: current output (2.5In, 10In, 20In optional) test.
3.变电站测控设备数字量测试3. Digital quantity test of substation measurement and control equipment
变电站测控设备作为智能变电站综合自动化系统中数据的采集和命令执行单元,其另外一个重要的任务是完成变电站相关开关量输入信号采集、事件记录,对断路器、隔离开关等进行控制等功能,即日常术语中的遥信、SOE的采集和对断路器、隔离开关等一次设备及二次设备软压板等的遥控功能及对变压器分接头等的遥调功能。通过遥信、SOE的采集为分析故障的情况及断路器等设备动作的先后顺序提供了有力的证据,为电网安全稳定监视和控制系统创造了良好的技术条件;通过对断路器、隔离开关等一次设备及二次设备软压板等的遥控功能及对变压器分接头等的遥调功能为实现无人值守变电站提供了可能。在针对变电站测控设备的检测过程中,变电站测控设备遥信、SOE(事件顺序记录)、遥控功能也是检测中的重要内容,数字量检测主要有以下几部分:1.遥信变位正确性测试;2.SOE站内分辨率测试;3.遥信雪崩处理能力测试;4.SOE防抖功能测试。Substation measurement and control equipment is used as the data acquisition and command execution unit in the intelligent substation integrated automation system. Another important task is to complete the functions of substation related switch input signal acquisition, event recording, and control of circuit breakers and isolating switches. In daily terms, remote signaling, SOE collection, remote control functions for primary equipment such as circuit breakers and isolating switches, and secondary equipment soft pressure plates, etc., and remote adjustment functions for transformer taps, etc. The collection of remote signaling and SOE provides strong evidence for the analysis of fault conditions and the sequence of equipment actions such as circuit breakers, and creates good technical conditions for the safety and stability monitoring and control system of the power grid; The remote control function of primary equipment and secondary equipment, such as soft pressure plates, and the remote adjustment function of transformer taps, etc. provide the possibility to realize unattended substations. In the detection process of substation measurement and control equipment, remote signaling, SOE (sequence of events record), and remote control functions of substation measurement and control equipment are also important contents in the detection. The digital quantity detection mainly includes the following parts: 1. Remote signal displacement correctness test ; 2. SOE station resolution test; 3. Remote signaling avalanche processing capability test; 4. SOE anti-shake function test.
4.变电站测控IED设备时间同步及响应时间测试4. Time synchronization and response time test of substation measurement and control IED equipment
随着变电站自动化水平的提高,在综自变电站中计算机监控系统、微机保护装置、微机故障录波装置以及各类数据管理机得到了广泛的应用,而这些自动装置的配合工作需要有一个精确统一的时间。当电力系统发生故障时,即可实现全站各系统在同一时间基准下的运行监控和事故后故障分析,也可通过各保护动作、开关分合的先后顺序及准确时间来分析事故的原因及过程。随着电网的日趋复杂和电网的扩大,提供标准时间的时钟基准成为变电站乃至整个电力系统的迫切需要,时钟的统一是保证电力系统安全运行,提高运行水平的一个重要措施,是综自变电站自动化系统的最基本要求之一。所以变电站测控设备对时功能和遥测、遥信响应时间也是需要重点检测的项目之一。With the improvement of substation automation level, computer monitoring system, microcomputer protection device, microcomputer fault recording device and various data management machines have been widely used in comprehensive automatic substations, and the cooperation of these automatic devices requires a precise and unified time. When a fault occurs in the power system, the operation monitoring and post-accident fault analysis of all systems in the whole station can be realized under the same time base, and the cause of the accident can also be analyzed through the sequence of protection actions, switch opening and closing, and accurate time. process. With the increasing complexity of the power grid and the expansion of the power grid, it is an urgent need to provide a standard time clock reference for the substation and even the entire power system. The unification of the clock is an important measure to ensure the safe operation of the power system and improve the operation level. One of the most basic requirements of the system. Therefore, the time synchronization function of substation measurement and control equipment and the response time of telemetry and remote signaling are also one of the items that need to be key tested.
近年来几乎所有变电站测控设备时间同步主要是基于GPS时钟卫星同步系统来实现,因此本自动测试系统主要考虑GPS对时方式。主要测试内容有:1.变电站测控设备对时功能测试;2.遥信数据响应时间测试;3.遥测数据响应时间测试。In recent years, the time synchronization of almost all substation measurement and control equipment is mainly based on the GPS clock satellite synchronization system, so this automatic test system mainly considers the GPS time synchronization method. The main test contents are: 1. Time synchronization function test of substation measurement and control equipment; 2. Remote signaling data response time test; 3. Telemetry data response time test.
5.变电站测控设备电源影响测试5. Power supply impact test of substation measurement and control equipment
依据《GB/T13729远动终端设备》检测标准,变电站测控设备在额定供电电源-20%~15%之间变化时,变电站测控设备应该能够正常工作。在自动测试实验平台上,智能可控电源为被测变电站测控设备提供电源,它可以根据不同的要求输出直流264V、交流264V以下电压,通过测试后台控制可控电源的输出即可完成变电站测控设备电源影响测试。According to the detection standard of "GB/T13729 Telecontrol Terminal Equipment", when the substation measurement and control equipment changes between -20% and 15% of the rated power supply, the substation measurement and control equipment should be able to work normally. On the automatic test experiment platform, the intelligent controllable power supply provides power for the substation measurement and control equipment under test. It can output voltages below DC 264V and AC 264V according to different requirements, and the substation measurement and control equipment can be completed by controlling the output of the controllable power supply through the test background. Power Impact Test.
6.变电站测控设备稳定运行定时自动测试6. Timed automatic test for stable operation of substation measurement and control equipment
依据《GB/T13729远动终端设备》检测标准,变电站测控设备在出厂前进行不少于72小时连续稳定的通电试验,考核其稳定性。通过在测试后台进行设置,可以设置智能测试仪定时输出,从而实现72小时连续稳定通电试验的定时测试。According to the testing standard of "GB/T13729 Telecontrol Terminal Equipment", the substation measurement and control equipment shall be subjected to a continuous and stable power-on test for no less than 72 hours before leaving the factory to assess its stability. By setting in the test background, you can set the timing output of the intelligent tester, so as to realize the timing test of the 72-hour continuous and stable power-on test.
3)变电站测控设备自动测试实验平台数据处理分析功能3) Data processing and analysis function of automatic test experiment platform for substation measurement and control equipment
测试后台不仅需要能够控制智能测试仪和可控电源从而控制测试进程,亦需要读取三相高精度表数据和被测设备上送数据并进行数据处理分析,变电站测控设备测试的一个重要指标即为模拟量的误差需要满足《GB/T13729远动终端设备》检测标准。在测量工作中,大量实践表明,当用测量仪器对某一未知量进行多次观测时,各观测值之间总存在着差异,这就是测量误差。产生测量误差的原因主要有:仪器误差、观测误差和外界环境。测量误差按其产生的原因和对观测结果的影响性质的不同,可以分为系统误差、偶然误差和粗差三类。在对变电站测控设备进行测试时主要误差有两种:1.智能测试仪输出值和变电站测控设备采样数据之间的误差;2.模拟遥测交流遥测部分影响量测试时的结果与基本测量结果之间的变差。测试后台需根据不同的测试项目分别计算出不同的误差并输出。The test background not only needs to be able to control the intelligent tester and controllable power supply to control the test process, but also needs to read the data of the three-phase high-precision meter and the data sent by the device under test and perform data processing and analysis. An important indicator for the test of substation measurement and control equipment is The error of the analog quantity needs to meet the testing standard of "GB/T13729 Telecontrol Terminal Equipment". In the measurement work, a lot of practice has shown that when a measuring instrument is used to make multiple observations of an unknown quantity, there will always be differences between the observed values, which is the measurement error. The main reasons for the measurement error are: instrument error, observation error and external environment. Measurement errors can be divided into three categories: systematic errors, accidental errors, and gross errors according to their causes and the nature of their impact on observation results. There are two main errors when testing substation measurement and control equipment: 1. The error between the output value of the intelligent tester and the sampling data of the substation measurement and control equipment; variation between. The test background needs to calculate and output different errors according to different test items.
4)变电站测控设备自动测试实验平台自动生成检测报告功能4) Automatic test report function of automatic test platform for substation measurement and control equipment
测试后台最后需完成的一个功能是依据测试内容和测试数据及计算结果自动生成检测报告,从而完成全部的测试。本功能测试后台首先需能够根据设定的检测报告模板和选定的测试项目生成一个具体的报告模板,随后测试后台需能够根据测试内容和计算结果将测试结果对应填入报告模板中。在此过程中,可根据不同的用户设定不同的优先级,从而不仅达到控制检测报告真实性的要求,亦可增加检测报告的灵活性。The last function to be completed in the test background is to automatically generate a test report based on the test content, test data and calculation results, so as to complete all tests. First, the functional test background needs to be able to generate a specific report template according to the set test report template and selected test items, and then the test background needs to be able to fill in the test results into the report template according to the test content and calculation results. In this process, different priorities can be set according to different users, so as to not only meet the requirement of controlling the authenticity of the test report, but also increase the flexibility of the test report.
最后应当说明的是:以上实施例仅用以说明本发明的技术方案而非对其限制,尽管参照上述实施例对本发明进行了详细的说明,所属领域的普通技术人员应当理解:依然可以对本发明的具体实施方式进行修改或者等同替换,而未脱离本发明精神和范围的任何修改或者等同替换,其均应涵盖在本发明的权利要求范围当中。Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention and not to limit them. Although the present invention has been described in detail with reference to the above embodiments, those of ordinary skill in the art should understand that: the present invention can still be Any modification or equivalent replacement that does not depart from the spirit and scope of the present invention shall be covered by the scope of the claims of the present invention.
Claims (9)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410104304.2A CN103885438B (en) | 2014-03-20 | 2014-03-20 | The Auto-Test System of a kind of transformer station measuring and controlling equipment and method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410104304.2A CN103885438B (en) | 2014-03-20 | 2014-03-20 | The Auto-Test System of a kind of transformer station measuring and controlling equipment and method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103885438A CN103885438A (en) | 2014-06-25 |
CN103885438B true CN103885438B (en) | 2016-08-31 |
Family
ID=50954386
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410104304.2A Active CN103885438B (en) | 2014-03-20 | 2014-03-20 | The Auto-Test System of a kind of transformer station measuring and controlling equipment and method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103885438B (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107450520A (en) * | 2017-08-21 | 2017-12-08 | 中国西安卫星测控中心 | A kind of self-service joint debugging inspection method of multistation measuring and controlling equipment timesharing |
CN109613906A (en) * | 2018-11-08 | 2019-04-12 | 国网湖南省电力有限公司 | The third-generation intelligent substation measurement and control sub-machine test system and its application method |
Families Citing this family (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104155970B (en) * | 2014-08-04 | 2015-09-30 | 国家电网公司 | A kind of intelligent substation monitoring host computer closed loop test system and method for testing thereof |
CN104237592B (en) * | 2014-09-04 | 2016-11-09 | 国家电网公司 | A distributed comparison system and comparison and source analysis method for electrical measurement errors |
CN104391244B (en) * | 2014-11-21 | 2016-06-08 | 广东电网有限责任公司电力调度控制中心 | The relay protection device closed loop method of inspection and system |
CN104765332A (en) * | 2014-12-05 | 2015-07-08 | 国家电网公司 | Substation equipment online monitoring data access management method |
CN104502877A (en) * | 2014-12-22 | 2015-04-08 | 国家电网公司 | Automatic detection system and method of synchronous phasor measurement device |
CN105242134B (en) * | 2015-09-22 | 2018-06-19 | 许继集团有限公司 | A kind of distributed test method suitable for intelligent high-voltage equipment system level testing |
CN108243025A (en) * | 2016-12-23 | 2018-07-03 | 大唐移动通信设备有限公司 | A kind of network test server-side, network test terminal and test method |
CN112556749A (en) * | 2020-11-30 | 2021-03-26 | 薛峰 | Detection method for redundant measurement and control device |
CN113552857A (en) * | 2021-07-20 | 2021-10-26 | 中国电力科学研究院有限公司 | Automatic excitation detection method and system in autonomous controllable intelligent substation |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP1850142A1 (en) * | 2006-04-24 | 2007-10-31 | Abb Research Ltd. | System level testing for substation automation systems |
CN202204891U (en) * | 2011-09-21 | 2012-04-25 | 国电南瑞科技股份有限公司 | Test device for input/output loop of electric power measurement and control protection apparatus |
CN102819004A (en) * | 2012-08-31 | 2012-12-12 | 江苏省电力公司电力科学研究院 | Comprehensive detecting and analyzing platform for performance of digital electric energy metering systems of intelligent transformer substations |
CN102821010A (en) * | 2012-08-23 | 2012-12-12 | 广东电网公司电力调度控制中心 | Simulator for protector |
CN102967839A (en) * | 2012-11-21 | 2013-03-13 | 广东电网公司电力科学研究院 | Detection method and device for online monitoring communication system of transformer substation |
CN103412208A (en) * | 2013-07-15 | 2013-11-27 | 国家电网公司 | Intelligent substation electric telecontrol device closed loop test method |
-
2014
- 2014-03-20 CN CN201410104304.2A patent/CN103885438B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP1850142A1 (en) * | 2006-04-24 | 2007-10-31 | Abb Research Ltd. | System level testing for substation automation systems |
CN202204891U (en) * | 2011-09-21 | 2012-04-25 | 国电南瑞科技股份有限公司 | Test device for input/output loop of electric power measurement and control protection apparatus |
CN102821010A (en) * | 2012-08-23 | 2012-12-12 | 广东电网公司电力调度控制中心 | Simulator for protector |
CN102819004A (en) * | 2012-08-31 | 2012-12-12 | 江苏省电力公司电力科学研究院 | Comprehensive detecting and analyzing platform for performance of digital electric energy metering systems of intelligent transformer substations |
CN102967839A (en) * | 2012-11-21 | 2013-03-13 | 广东电网公司电力科学研究院 | Detection method and device for online monitoring communication system of transformer substation |
CN103412208A (en) * | 2013-07-15 | 2013-11-27 | 国家电网公司 | Intelligent substation electric telecontrol device closed loop test method |
Non-Patent Citations (2)
Title |
---|
《智能变电站状态监测技术及应用》;金逸;《江苏电机工程》;20120331;第31卷(第2期);正文第12-15页 * |
《智能变电站的设计及其应用》;周和;《中国优秀硕士学位论文全文数据库(工程科技II辑)》;20110915(第9期);正文第8页第2.2.2节,第16页3.2节第2段,图2-2 * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107450520A (en) * | 2017-08-21 | 2017-12-08 | 中国西安卫星测控中心 | A kind of self-service joint debugging inspection method of multistation measuring and controlling equipment timesharing |
CN109613906A (en) * | 2018-11-08 | 2019-04-12 | 国网湖南省电力有限公司 | The third-generation intelligent substation measurement and control sub-machine test system and its application method |
Also Published As
Publication number | Publication date |
---|---|
CN103885438A (en) | 2014-06-25 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103885438B (en) | The Auto-Test System of a kind of transformer station measuring and controlling equipment and method | |
CN109444566B (en) | An electric vehicle charging facility testing device and method | |
CN105785199B (en) | Multifunctional ligand electric terminals integrated test system and its working method | |
CN103033789B (en) | The quiet dynamic test system of a kind of synchronous phasor measurement unit PMU | |
CN201886095U (en) | Test device of merging unit | |
Vanfretti et al. | A software development toolkit for real-time synchrophasor applications | |
CN103487695B (en) | Based on the checkout gear of analog input merge cells | |
Aghamolki et al. | A hardware-in-the-loop SCADA testbed | |
CN202383278U (en) | Merging unit sampling value time delay measuring system | |
CN106405294B (en) | Portable power distribution product transmission calibrator and implementation test method thereof | |
CN105548948A (en) | Device and method for testing digitalization electric energy metering system | |
CN107942167A (en) | Intelligent substation synchronous phasor measuring device boss, which stands, tests system and method | |
CN204331019U (en) | A kind of digital electricity meter IEC61850 compliance test system | |
CN204256149U (en) | A kind of Performance Test System of merge cells tester | |
CN105353331A (en) | Electronic transformer metering performance detection system and method | |
CN106771599B (en) | Test setup for synchrophasor measurement devices in smart substations | |
CN106054000A (en) | Interval merging unit power factor angle consistency on-site test system and method | |
CN103344937B (en) | Intelligent electric energy meter consumption detection equipment and detection method | |
CN104392603A (en) | Intelligent diagnosis system of on-site power consumption information acquisition device | |
CN104502877A (en) | Automatic detection system and method of synchronous phasor measurement device | |
CN203433064U (en) | Detecting device based on analog quantity input combining unit | |
CN106199489A (en) | Laboratory reproduction type digitalized electric energy measuring equipment remote calibration system and method | |
CN107219492B (en) | High-voltage integrated semi-physical simulation test device for medium-voltage grid electric energy metering | |
CN104502748B (en) | Integrated automation of transformation stations test system | |
CN205643556U (en) | Multi -functional power distribution terminal integrated test system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |