CN107178170A - A kind of integral vacuum toilet keel facing integral type Integral ceiling and construction method - Google Patents

A kind of integral vacuum toilet keel facing integral type Integral ceiling and construction method Download PDF

Info

Publication number
CN107178170A
CN107178170A CN201710256428.6A CN201710256428A CN107178170A CN 107178170 A CN107178170 A CN 107178170A CN 201710256428 A CN201710256428 A CN 201710256428A CN 107178170 A CN107178170 A CN 107178170A
Authority
CN
China
Prior art keywords
integral
keel
plate
fastener
plates
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710256428.6A
Other languages
Chinese (zh)
Other versions
CN107178170B (en
Inventor
王骝
周东珊
余广
尤陈刚
黄慧
潘�清
王金泉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Yasha Decoration Co Ltd
Original Assignee
Zhejiang Yasha Decoration Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Yasha Decoration Co Ltd filed Critical Zhejiang Yasha Decoration Co Ltd
Priority to CN201710256428.6A priority Critical patent/CN107178170B/en
Publication of CN107178170A publication Critical patent/CN107178170A/en
Application granted granted Critical
Publication of CN107178170B publication Critical patent/CN107178170B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B9/00Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
    • E04B9/06Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation characterised by constructional features of the supporting construction, e.g. cross section or material of framework members
    • E04B9/065Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation characterised by constructional features of the supporting construction, e.g. cross section or material of framework members comprising supporting beams having a folded cross-section
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B9/00Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
    • E04B9/18Means for suspending the supporting construction
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B9/00Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
    • E04B9/22Connection of slabs, panels, sheets or the like to the supporting construction
    • E04B9/24Connection of slabs, panels, sheets or the like to the supporting construction with the slabs, panels, sheets or the like positioned on the upperside of, or held against the underside of the horizontal flanges of the supporting construction or accessory means connected thereto
    • E04B9/241Connection of slabs, panels, sheets or the like to the supporting construction with the slabs, panels, sheets or the like positioned on the upperside of, or held against the underside of the horizontal flanges of the supporting construction or accessory means connected thereto with the slabs, panels, sheets or the like positioned on the upperside of the horizontal flanges of the supporting construction

Abstract

The invention discloses a kind of integral vacuum toilet keel facing integral type Integral ceiling and construction method, the integral type Integral ceiling includes bending part, fastener, fastener, NP plates, receive side plate, keel, wall facing plate and frame section bar, NP plates constitute furred ceiling face along long side direction overlap joint, NP backs edge is provided with receipts side plate, keel installation is at the back side of NP plates, with the equidirectional installation in long side, furred ceiling face is surrounded by frame section bar, frame section bar is connected with wall facing plate by bending part, frame section bar is connected with the receipts side plate of NP plate short side directions by fastener, frame section bar and NP plates, the receipts side plate and keel of NP plate short side directions are connected by fastener.Connection of the invention by using bending part, fastener, fastener and existing integral vacuum toilet metope framework, aid in installing without miscellaneous parts such as suspension rods, by keel and the integrated macroplate facing of NP plate decoration panel integral types, realize and simplify technique, shorten the duration, reduce dust pollution, improve the series of advantages such as recycling rate of waterused, rapid construction.

Description

A kind of integral vacuum toilet keel facing integral type Integral ceiling and construction method
Technical field
The invention belongs to building decoration technology field, be related to a kind of furred ceiling, be in particular one kind need not install suspension rod, Integral vacuum toilet keel facing integral type integrated suspended ceiling device easy for installation and construction method.
Background technology
Aluminum-pinch Integral ceiling being used between conventional sanitation furred ceiling, its industrialization degree is higher more, need to be advanced but install Row hanger erection, then major-minor keel installation, its complicated construction technique are carried out, while causing dust pollution, its mounting process can not Meet the industrialized requirement of building decoration.In addition, integrated ceiling decoration panel is of single specification, generally all it is small plate, without big The decorative effect of plate;And installed more than existing integral vacuum toilet furred ceiling using integral type molding SMC material whole plate, it installs shape Formula can not adapt to the toilet of existing enclosure wall building.
The content of the invention
For above-mentioned situation present in prior art, the problem of present invention is solved be to provide one kind need not install suspension rod, Integral vacuum toilet keel facing integral type integrated suspended ceiling device easy for installation and construction method.
A kind of described integral vacuum toilet keel facing integral type Integral ceiling, including bending part, fastener, fastener, NP plates, Receive side plate, keel, wall facing plate and frame section bar, it is characterised in that one group of NP plate constitutes furred ceiling along its long side direction overlap joint Face, NP backs edge is provided with side plate is received, and keel installation is at the back side of NP plates, and with the equidirectional installation in long side, furred ceiling face surrounding is set There is frame section bar, wall facing plate is vertical with furred ceiling top surface to be connected, and frame section bar is connected with wall facing plate by bending part, framework Section bar is connected with the receipts side plate of NP plate short side directions by fastener, frame section bar and NP plates, the receipts side plate of NP plate short side directions and dragon Bone is connected by fastener.
Described a kind of integral vacuum toilet keel facing integral type Integral ceiling, it is characterised in that bending part is Z-type structure, By transition while and the long side of the perpendicular connection in both sides and short side are constituted when being arranged on transition, long side, which is provided with, to be used to install screw Hole, long side is fixed on wall facing plate by screw, and short side is connected with frame section bar clasp joint, wall facing plate is installed more It is firm.
A kind of described integral vacuum toilet keel facing integral type Integral ceiling, it is characterised in that fastener by large U type groove and Small U-type groove is constituted in Opposite direction connection, and large U type groove and small U-type groove share side plate, and the large U type groove, which is provided with, to be used to install spiral shell After being tipped on the hole of silk, large U type groove on frame section bar, it is screwed, small U-type groove is with receiving side plate socket connection.
A kind of described integral vacuum toilet keel facing integral type Integral ceiling, it is characterised in that the outer panel of small U-type groove Angle between bottom plate is 120-130 °.
Described a kind of integral vacuum toilet keel facing integral type Integral ceiling, it is characterised in that fastener includes U-type groove body And the fixed mechanism being connected with U-type groove body side plate, U-type groove body is provided with the hole for installing screw, U-type groove body and frame section bar Snapping is connected, and frame section bar is fixed after tipping U-type groove body in by screw;Fixed mechanism is provided with the hole for installing screw, fixed machine Structure is connected with receiving side plate, NP plates, is fixed by simultaneously screw.
Described a kind of integral vacuum toilet keel facing integral type Integral ceiling, it is characterised in that fixed mechanism is Z-type knot Structure, connects and composes Z-type ledge structure, fixed mechanism is provided with the hole of one group of installation screw by two fixed edges and connection side, One of fixed edge, which is arranged on, to be received on side plate, and another fixed edge is arranged on NP plates, and the fixed edge on NP plates claims For outer side edges, it is referred to as inner side edge installed in the fixed edge received on side plate.
A kind of described integral vacuum toilet keel facing integral type Integral ceiling, it is characterised in that another side plate of U-type groove body It is provided with inwardly protruded tongue.
Described a kind of integral vacuum toilet keel facing integral type Integral ceiling, it is characterised in that on a long side of NP plates Provided with upper bonding jumper, another long side is provided with lower bonding jumper, and two neighboring NP plates are overlapped by upper bonding jumper and lower bonding jumper Connection, forms furred ceiling face.
The construction method of described integral vacuum toilet keel facing integral type Integral ceiling, it is characterised in that including following step Suddenly:
1)Bending part is first fixed on to the back side upper end of wall facing plate with screw, then adornd neighboring walls by design size Panel connects and composes wallboard;
2)After the whole installations of wall facing plate, frame section bar is caught in the large U type of fastener by mounting clip pieces and frame section bar In groove, and it is fixed by screw through the hole on large U type groove, the small U-type groove on fastener is standby;
3)The installation of keel facing circuit board:Side plate screw will be received to interlock and be fixed on the short side of NP backs, then by fastener Inner side fixed edge be screwed in receive side plate on, finally keel are screwed in the back side of NP plates, the installation of keel Direction is parallel with the long side of NP plates, while keel end is screwed on NP plates by the outside fixed edge of fastener, the U on fastener Type groove body is standby;
4)The installation of first piece of keel facing circuit board:The fastener at first piece of NP plate short sides two ends is first buckled into framework from top to bottom On section bar, then push first block of NP plate to the metope parallel with the long side of NP plates, until by the edge closing bar card on first block of NP plate Enter step 2)In pre-packed fastener small U-type groove below, then by the U-type groove body screw of the fastener at hanging two ends with it is corresponding Frame section bar locking;
5)By step 4)The step of install with step 4)Relative opposite side leans on wall keel facing circuit board;
6)By step 4)The step of keel facing circuit board is installed successively, by keel facing circuit board horizontal sliding to previous step install On good keel facing circuit board, and overlap joint installation is carried out by the upper bonding jumper on adjacent NP plates and lower bonding jumper, then locked; Left and right the like installation;
7)Middle keel facing circuit board is reserved access panel, is finally installed, and first carries out the long side side of NP plates during installation Embedded overlap joint, then put down in snapping, adjustment gap to design requirement after opposite side cant is got on, complete to install, the gap Adjustment can be adjusted by the overlap joint size of upper and lower overlap edge.
The construction method of described integral vacuum toilet keel facing integral type Integral ceiling, it is characterised in that fastener is only installed at NP On the both sides metope of plate long side direction, fastener interval is arranged on wall facing plate, the wall facing plate end positioned at metope two ends Fastener is installed on head.
By using above-mentioned technology, compared with prior art, beneficial effects of the present invention are as follows:
1)The present invention is by using bending part, fastener, fastener and existing integral vacuum toilet metope framework(Such as furred ceiling and wall)'s Connection, without other accessories such as suspension rod, you can by keel and the integrated macroplate facing of NP plate decoration panel integral types, to realize Simplify technique, shorten the duration, reduce dust pollution, improve the series of advantages such as recycling rate of waterused, rapid construction, and its cost Substantially reduce, improve the market competitiveness of manufacturer, be conducive to the existence of enterprise;
2)The present invention makes the easy to connect of two neighboring NP plates by setting upper and lower bonding jumper on the long side of NP plates, and can root Needed according to different gaps, upper and lower bonding jumper is designed to different sizes, its flexibility and operability is substantially increased.
Brief description of the drawings
Fig. 1 is the integral vacuum toilet structural representation comprising furred ceiling of the present invention;
Fig. 2 is the installment state structural representation of furred ceiling of the present invention;
Fig. 3 is bending part structural representation of the invention;
Fig. 4 is fastener structural representation of the invention;
Fig. 5 is fastener structures schematic diagram of the invention;
Fig. 6 is bending part of the invention and wall facing board connecting structure schematic diagram;
Fig. 7 is bending part, fastener and wall facing plate of the invention, the attachment structure schematic diagram of frame section bar;
Fig. 8 is the NP plates of the present invention, keel, the attachment structure schematic diagram for receiving side plate;
Fig. 9 is the attachment structure schematic diagram of the adjacent two NP plates of the present invention;
Figure 10 is enlarged drawing at A in Fig. 9;
Figure 11 is enlarged drawing at B in Fig. 2.
In figure:1- bending parts, 2- fasteners, 3- fasteners, 4- wall facing plates, 5-NP plates, 6- receives side plate, 7- keel, 8- frames Frame section, 9- screws, 101- transition side, the long sides of 10-, 11- short sides, 12- large U type grooves, the small U-type grooves of 13-, 1301- outer panels, Overlapped on 1302- bottom plates, 14-U type groove bodies, 1401- tongues, 15- fixed mechanisms, 1501- fixed edges, 1502 connection sides, 16- Bonding jumper under bar, 17-.
Embodiment
Below in conjunction with Figure of description, the invention will be further described, but protection scope of the present invention is not limited in This:
As shown in figs. 1-11, a kind of integral vacuum toilet keel facing integral type Integral ceiling of the invention, including bending part 1, card Part 2, fastener 3, NP plates 5, receipts side plate 6, keel 7, wall facing plate 4 and frame section bar 8, a long side of NP plates 5 is provided with upper Bonding jumper 16, another long side is provided with lower bonding jumper 17, and two neighboring NP plates 5 are taken by upper bonding jumper 16 with lower bonding jumper 17 Connect in succession, form furred ceiling face, the back side edge of NP plates 5 is arranged on the back side of NP plates 5, the length with NP plates 5 provided with side plate 6, keel 7 are received Side is equidirectional to install, and furred ceiling face is surrounded by frame section bar 8, and wall facing plate 4 is vertical with furred ceiling top surface to be connected, frame section bar 8 It is connected, as shown in figure 3, the bending part 1 of the present invention is Z-type structure, by transition side 101 and is set by bending part 1 with wall facing plate 4 Put transition while the perpendicular connection in 101 both sides it is long while 10 and short side 11 constitute, long side 10 be provided be used for screw 9 is installed Hole, long side 10 is fixed on wall facing plate 4 by screw 9, and short side 11 is connected with the clasp joint of frame section bar 8, makes wall facing plate 4 Install more firm;As shown in figure 4, the fastener 2 of the present invention is made up of large U type groove 12 and small U-type groove 13 in Opposite direction connection, large U type Groove 12 and small U-type groove 13 share side plate, and the large U type groove 12 is provided with the hole for being used for installing screw 9, large U type groove 12 After tipping on frame section bar 8, fixed with screw 9, small U-type groove 13 is installed more with receiving the socket connection of side plate 6 in order that receiving side plate 6 Firmly, the angle between the outer panel 1301 and bottom plate 1302 of small U-type groove 13 is 120-130 ° by the present invention, and preferably angle is 125 °, frame section bar 8 is connected with the receipts side plate 6 of the short side direction of NP plates 5 by fastener 2;Frame section bar 8 and NP plates 5, the short side of NP plates 5 The receipts side plate 6 and keel 7 in direction are connected by fastener 3, specific as shown in figure 5, the fastener 3 of the present invention includes U-type groove body 14 and and U The fixed mechanism 15 of the side plate of type groove body 14 connection, the fixed mechanism 15 is Z-type structure, by two fixed edges 1501 and connection Side 1502 connects and composes Z-type ledge structure, hole of the fixed mechanism 15 provided with one group of installation screw 9, one of fixed edge 1501 are arranged on receipts side plate 6, and another fixed edge 1501 is arranged on NP plates 5;U-type groove body 14 is provided with installation screw 9 Hole, U-type groove body 14 is connected with the snapping of frame section bar 8, and frame section bar 8 is tipped in after U-type groove body 14 and fixed by screw 9;Fixed edge 1501 provided with the hole for installing screw 9, and fixed edge 1501 is connected with receiving side plate 6, NP plates 5, is fixed by simultaneously screw 9, in order that Frame section bar 8 is connected closer with fastener 3, and the present invention is provided with inwardly protruded tongue 1401 on another side plate of U-type groove body 14, The tongue 1402 props up frame section bar 8, improves the fastness of its fixation.
In material used in the present invention, wall facing plate 4 is that market current material is composited, cleavable into different chis It is very little;NP plates 5 are also market current material, and it is PVC foam plate, and two long sides have in bonding jumper, two neighboring NP plates 5 respectively, its In a side of NP plates 5 upper bonding jumper 16 and another NP plate 5 opposite side lower bonding jumper 17 overlap after just form institute Need the Ornamental Stitching of size;Receipts side plate 6 is bevelling strip;Keel 7 are market current material;Frame section bar 8 is taken for general frame The main material built;Screw 9 is existing accessory on the market, and size is ST4.2*1.8.
As illustrated, the construction method of the integral vacuum toilet keel facing integral type Integral ceiling of the present invention, including it is as follows Step:
1)Bending part 1 is first fixed on to the back side upper end of wall facing plate 4 with screw 9, then by design size by neighboring walls Decoration panel 4 connects and composes wallboard;
2)After the whole installations of wall facing plate 4, frame section bar 8 is caught in fastener 2 by mounting clip pieces 2 and frame section bar 8 In large U type groove 12, and it is fixed by screw 9 through the hole on large U type groove 12, the small U-type groove 13 on fastener 2 is standby;
3)The installation of keel facing circuit board:The screw 9 of side plate 6 will be received staggeredly to be fixed on the short side at the back side of NP plates 5, then will button The inner side fixed edge 1501 of part 3 screw 9 is fixed on receipts side plate 6, and keel 7 are finally fixed on to the back of the body of NP plates 8 with screw 9 Face, the installation direction of keel 7 is parallel with the long side of NP plates 5, while outside fixed edge 1501 screw 9 of the end of keel 7 by fastener 3 It is fixed on NP plates 5, the U-type groove body 14 on fastener 3 is standby;
4)The installation of first piece of keel facing circuit board:The fastener 3 at first piece of short side two ends of NP plates 5 is first buckled into frame from top to bottom On frame section 8 to, then first block of NP plate 5 pushed to the metope parallel with the long side of NP plates 5, until by the receipts on first block of NP plate 5 Edge strip 6 is caught in step 2)In pre-packed fastener 2 small U-type groove 13 below, then by the U-type groove body of the fastener 3 at hanging two ends 14 are locked with screw with corresponding frame section bar 8, and fastener 2 is only installed on the both sides metope of the long side direction of NP plates 5, between fastener 2 Every on wall facing plate 4, fastener 2 is installed on the termination of wall facing plate 4 at metope two ends;
5)By step 4)The step of install with step 4)Relative opposite side leans on wall keel facing circuit board;
6)By step 4)The step of keel facing circuit board is installed successively, by keel facing circuit board horizontal sliding to previous step install On good keel facing circuit board, and overlap joint installation is carried out by the upper bonding jumper 16 on adjacent NP plates 5 and lower bonding jumper 17, then Locking;Left and right the like installation;
7)Middle keel facing circuit board is reserved access panel, is finally installed, and first carries out the long side side of NP plates 5 during installation Embedded overlap joint, then put down in snapping, adjustment gap to design requirement after opposite side cant is got on, complete to install.
Originally by using each accessory by furred ceiling and wall connecting, no hanger erection, by keel and the integrated big plate of decoration panel integral type Block facing, the construction method can be used for the toilet furred ceiling of different size and house type;Its component and fitting can be according to different size house type Use varying number;Its integrated decoration panel also can be according to different size house type customized module;The design of bonding jumper above and below its long side It can be needed to be designed to different sizes according to different gaps;By using such scheme, it by the connection with metope frame system, And keel and finishing material is integrated, realize simplify technique, shorten the duration, reduce dust pollution, improve recycling rate of waterused, it is fast The series of advantages such as speed construction.

Claims (10)

1. a kind of integral vacuum toilet keel facing integral type Integral ceiling, including bending part(1), fastener(2), fastener(3), NP plates (5), receive side plate(6), keel(7), wall facing plate(4)And frame section bar(8), it is characterised in that one group of NP plate(5)Along its length Edge direction overlap joint constitutes furred ceiling face, NP plates(5)Back side edge is provided with receipts side plate(6), keel(7)Installed in NP plates(5)The back side, With the equidirectional installation in long side, furred ceiling face is surrounded by frame section bar(8), wall facing plate(4)It is vertical with furred ceiling top surface to be connected, frame Frame section(8)With wall facing plate(4)By bending part(1)Connection, frame section bar(8)With NP plates(5)The receipts side plate of short side direction (6)By fastener(2)Connection, frame section bar(8)With NP plates(5), NP plates(5)The receipts side plate of short side direction(6)And keel(7)By detaining Part(3)Connection.
2. a kind of integral vacuum toilet keel facing integral type Integral ceiling according to claim 1, it is characterised in that bending Part(1)For Z-type structure, by transition side(101)And it is arranged on transition side(101)The long side of the perpendicular connection in both sides(10)With it is short Side(11)Constitute, long side(10)Being provided with is used to install screw(9)Hole, long side(10)By screw(9)It is fixed on wall decorations Panel(4)On, short side(11)With frame section bar(8)Clasp joint is connected, and makes wall facing plate(4)Install more firm.
3. a kind of integral vacuum toilet keel facing integral type Integral ceiling according to claim 1, it is characterised in that fastener (2)By large U type groove(12)With small U-type groove(13)Constituted in Opposite direction connection, large U type groove(12)With small U-type groove(13)Share side Plate, the large U type groove(12)Being provided with is used to install screw(9)Hole, large U type groove(12)On tip frame section bar in(8)On Afterwards, screw is used(9)It is fixed, small U-type groove(13)With receiving side plate(6)Socket connection.
4. a kind of integral vacuum toilet keel facing integral type Integral ceiling according to claim 3, it is characterised in that small U-shaped Groove(13)Outer panel(1301)With bottom plate(1302)Between angle be 120-130 °.
5. a kind of integral vacuum toilet keel facing integral type Integral ceiling according to claim 1, it is characterised in that fastener (3)Including U-type groove body(14)And with U-type groove body(14)The fixed mechanism of side plate connection(15), U-type groove body(14)Provided with peace Fill screw(9)Hole, U-type groove body(14)With frame section bar(8)Snapping is connected, frame section bar(8)Tip U-type groove body in(14)Afterwards By screw(9)It is fixed;Fixed mechanism(15)Provided with installation screw(9)Hole, fixed mechanism(15)With receiving side plate(6)、NP Plate(5)Connection, by simultaneously screw(9)It is fixed.
6. a kind of integral vacuum toilet keel facing integral type Integral ceiling according to claim 5, it is characterised in that fixed Mechanism(15)For Z-type structure, by two fixed edges(1501)And connection side(1502)Connect and compose Z-type ledge structure, fixed machine Structure(15)Provided with one group of installation screw(9)Hole, one of fixed edge(1501)Installed in receipts side plate(6)On, it is another Individual fixed edge(1501)Installed in NP plates(5)On.
7. a kind of integral vacuum toilet keel facing integral type Integral ceiling according to claim 5, it is characterised in that U-type groove Body(14)Another side plate is provided with inwardly protruded tongue(1401).
8. a kind of integral vacuum toilet keel facing integral type Integral ceiling according to claim 5, it is characterised in that NP plates (5)A long side be provided with upper bonding jumper(16), another long side is provided with lower bonding jumper(17), two neighboring NP plates(5) Pass through upper bonding jumper(16)With lower bonding jumper(17)Overlap joint connection, forms furred ceiling face.
9. a kind of construction method of integral vacuum toilet keel facing integral type Integral ceiling according to claim 1, it is special Levy and be to comprise the following steps:
1)First use screw(9)By bending part(1)It is fixed on wall facing plate(4)Back side upper end, then by design size by phase Adjacent wall facing plate(4)Connect and compose wallboard;
2)In wall facing plate(4)After whole installations, mounting clip pieces(2)With frame section bar(8), by frame section bar(8)Card Enter fastener(2)Large U type groove(12)It is interior, and by screw(9)Through large U type groove(12)On hole be fixed, fastener(2)On Small U-type groove(13)It is standby;
3)The installation of keel facing circuit board:Side plate will be received(6)Use screw(9)Staggeredly it is fixed on NP plates(5)On the short side at the back side, Again by fastener(3)Inner side fixed edge(1501)Use screw(9)It is fixed on receipts side plate(6)On, finally by keel(7)Use screw (9)It is fixed on NP plates(8)The back side, keel(7)Installation direction and NP plates(5)Long side is parallel, while keel(7)End is by detaining Part(3)Outside fixed edge(1501)Use screw(9)It is fixed on NP plates(5)On, fastener(3)On U-type groove body(14)It is standby;
4)The installation of first piece of keel facing circuit board:First by first block of NP plate(5)The fastener at short side two ends(3)Detain from top to bottom Enter frame section bar(8)On, then by first block of NP plate(5)Push to and NP plates(5)The parallel metope in long side, until by first piece of NP Plate(5)On edge closing bar(6)It is caught in step 2)In pre-packed fastener(2)Small U-type groove(13)Below, then by hanging two ends Fastener(3)U-type groove body(14)With screw and corresponding frame section bar(8)Locking;
5)By step 4)The step of install with step 4)Relative opposite side leans on wall keel facing circuit board;
6)By step 4)The step of keel facing circuit board is installed successively, by keel facing circuit board horizontal sliding to previous step install On good keel facing circuit board, and pass through adjacent NP plates(5)On upper bonding jumper(16)With lower bonding jumper(17)Overlapped Install, then lock;Left and right the like installation;
7)Middle keel facing circuit board is reserved access panel, is finally installed, first by NP plates during installation(5)Long side side enter The embedded overlap joint of row, then put down in snapping, adjustment gap to design requirement after opposite side cant is got on, complete to install.
10. the construction method of integral vacuum toilet keel facing integral type Integral ceiling according to claim 9, its feature exists In fastener(2)It is only installed at NP plates(5)On the both sides metope of long side direction, fastener(2)Interval is arranged on wall facing plate(4) On, the wall facing plate positioned at metope two ends(4)Fastener is installed on termination(2).
CN201710256428.6A 2017-04-19 2017-04-19 Integrated ceiling with integral toilet keel and veneer and construction method Active CN107178170B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710256428.6A CN107178170B (en) 2017-04-19 2017-04-19 Integrated ceiling with integral toilet keel and veneer and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710256428.6A CN107178170B (en) 2017-04-19 2017-04-19 Integrated ceiling with integral toilet keel and veneer and construction method

Publications (2)

Publication Number Publication Date
CN107178170A true CN107178170A (en) 2017-09-19
CN107178170B CN107178170B (en) 2023-02-28

Family

ID=59832465

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710256428.6A Active CN107178170B (en) 2017-04-19 2017-04-19 Integrated ceiling with integral toilet keel and veneer and construction method

Country Status (1)

Country Link
CN (1) CN107178170B (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108049551A (en) * 2017-12-30 2018-05-18 浙江亚厦装饰股份有限公司 Pendant, ceiling joist component and assembly method
CN108049555A (en) * 2017-12-30 2018-05-18 浙江亚厦装饰股份有限公司 Cantilever furred ceiling and installation method
CN108060736A (en) * 2017-12-30 2018-05-22 浙江亚厦装饰股份有限公司 NP plates Integral ceiling and its installation method
CN108086719A (en) * 2017-12-30 2018-05-29 浙江亚厦装饰股份有限公司 Assembled toilet and its installation method
CN108104357A (en) * 2017-12-30 2018-06-01 浙江亚厦装饰股份有限公司 Toilet furred ceiling component and its assembly method
CN108149879A (en) * 2017-12-30 2018-06-12 浙江亚厦装饰股份有限公司 Overhead type wall panel assembly and its installation method
CN110424778A (en) * 2019-08-26 2019-11-08 中科住创成都科技有限公司 A kind of assembled integral vacuum toilet and its installation method
US11787664B1 (en) * 2022-09-02 2023-10-17 Inpro Corporation Elevator mounting assembly with side mount hanger

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203654577U (en) * 2013-11-25 2014-06-18 查子庭 Suspended ceiling capable of being formed by freely combining wooden modules in staggered layer mode
CN203684465U (en) * 2013-12-16 2014-07-02 上海形家广告设计有限公司 Modularized assembled board wall
CN105201121A (en) * 2015-09-30 2015-12-30 浙江亚厦装饰股份有限公司 Integrated ceiling veneer installing structure
CN205171879U (en) * 2015-11-05 2016-04-20 浙江亚厦装饰股份有限公司 Formula windowsill is installed fast to modularization
CN205822833U (en) * 2016-06-20 2016-12-21 汉尔姆(杭州)家具有限公司 Mobile office cuts off
CN206903030U (en) * 2017-04-19 2018-01-19 浙江亚厦装饰股份有限公司 A kind of integral vacuum toilet keel facing integral type Integral ceiling

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203654577U (en) * 2013-11-25 2014-06-18 查子庭 Suspended ceiling capable of being formed by freely combining wooden modules in staggered layer mode
CN203684465U (en) * 2013-12-16 2014-07-02 上海形家广告设计有限公司 Modularized assembled board wall
CN105201121A (en) * 2015-09-30 2015-12-30 浙江亚厦装饰股份有限公司 Integrated ceiling veneer installing structure
CN205171879U (en) * 2015-11-05 2016-04-20 浙江亚厦装饰股份有限公司 Formula windowsill is installed fast to modularization
CN205822833U (en) * 2016-06-20 2016-12-21 汉尔姆(杭州)家具有限公司 Mobile office cuts off
CN206903030U (en) * 2017-04-19 2018-01-19 浙江亚厦装饰股份有限公司 A kind of integral vacuum toilet keel facing integral type Integral ceiling

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108086719B (en) * 2017-12-30 2019-03-29 浙江亚厦装饰股份有限公司 Assembled toilet and its installation method
CN108049555A (en) * 2017-12-30 2018-05-18 浙江亚厦装饰股份有限公司 Cantilever furred ceiling and installation method
CN108060736A (en) * 2017-12-30 2018-05-22 浙江亚厦装饰股份有限公司 NP plates Integral ceiling and its installation method
CN108086719A (en) * 2017-12-30 2018-05-29 浙江亚厦装饰股份有限公司 Assembled toilet and its installation method
CN108104357A (en) * 2017-12-30 2018-06-01 浙江亚厦装饰股份有限公司 Toilet furred ceiling component and its assembly method
CN108149879A (en) * 2017-12-30 2018-06-12 浙江亚厦装饰股份有限公司 Overhead type wall panel assembly and its installation method
CN108049551A (en) * 2017-12-30 2018-05-18 浙江亚厦装饰股份有限公司 Pendant, ceiling joist component and assembly method
WO2019128242A1 (en) * 2017-12-30 2019-07-04 王文广 Fabricated toilet and mounting method therefor
CN108104357B (en) * 2017-12-30 2023-05-26 浙江亚厦装饰股份有限公司 Toilet ceiling assembly and assembly method thereof
CN108049555B (en) * 2017-12-30 2023-08-22 浙江亚厦装饰股份有限公司 Cantilever suspended ceiling and installation method
CN108060736B (en) * 2017-12-30 2024-04-12 浙江亚厦装饰股份有限公司 NP board integrated ceiling and installation method thereof
CN110424778A (en) * 2019-08-26 2019-11-08 中科住创成都科技有限公司 A kind of assembled integral vacuum toilet and its installation method
US11787664B1 (en) * 2022-09-02 2023-10-17 Inpro Corporation Elevator mounting assembly with side mount hanger

Also Published As

Publication number Publication date
CN107178170B (en) 2023-02-28

Similar Documents

Publication Publication Date Title
CN107178170A (en) A kind of integral vacuum toilet keel facing integral type Integral ceiling and construction method
CN205444781U (en) Pendant and pendant combination
CN104164937B (en) A kind of suspended ceiling
CN108005280A (en) The close splicing seams of aluminium veneer curtain wall and its joining method
CN206903030U (en) A kind of integral vacuum toilet keel facing integral type Integral ceiling
CN103255863B (en) Curtain wall
CN210482671U (en) Zigzag curtain wall system
CN108086627A (en) A kind of combined wall board Fast Installation structure and its installation method
CN111188437A (en) Assembled and movable metal keel partition wall system
US20040154245A1 (en) Structure of a combinative interlocking board enclosing vertical and horizontal pipes
CN205422339U (en) Door and window for attaches frame installation through spring pin formula
CN110512821A (en) A kind of no substrate ceramic tile mounting structure and its installation method
CN107514088A (en) Integrated modular flat-top and its construction method
CN201835481U (en) Device for supporting and anchoring for insulation decorative panel
CN211341212U (en) Wall buttress structure
CN103452223A (en) Suspended ceiling pendant and stone panel mounting process utilizing same
CN207363148U (en) A kind of suspended ceiling mounting structure
CN207609061U (en) The close splicing crack structure of aluminium veneer curtain wall
CN215889231U (en) Combined wall top closing-in line
CN110284630A (en) A kind of assembled architecture and internal tension wall
CN206396888U (en) The integrated house system that a kind of lightgage steel joist is combined with Light trabses
CN103572918B (en) A kind of three-dimensional vertical thermal insulation decorative pinch plate
CN204781492U (en) Open curtain
CN207405849U (en) Integrated modular flat-top
CN217680282U (en) Steel wire or steel rope dragline device for building decoration moulding line

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant