CN110424778A - A kind of assembled integral vacuum toilet and its installation method - Google Patents

A kind of assembled integral vacuum toilet and its installation method Download PDF

Info

Publication number
CN110424778A
CN110424778A CN201910788390.6A CN201910788390A CN110424778A CN 110424778 A CN110424778 A CN 110424778A CN 201910788390 A CN201910788390 A CN 201910788390A CN 110424778 A CN110424778 A CN 110424778A
Authority
CN
China
Prior art keywords
wallboard
keel
chassis
top panel
bottom edge
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910788390.6A
Other languages
Chinese (zh)
Inventor
陈建
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Fuxing Hangxiao Construction Co.,Ltd.
Original Assignee
Chengdu Science And Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengdu Science And Technology Co Ltd filed Critical Chengdu Science And Technology Co Ltd
Priority to CN201910788390.6A priority Critical patent/CN110424778A/en
Publication of CN110424778A publication Critical patent/CN110424778A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/343Structures characterised by movable, separable, or collapsible parts, e.g. for transport
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/66Sealings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H1/00Buildings or groups of buildings for dwelling or office purposes; General layout, e.g. modular co-ordination or staggered storeys
    • E04H1/12Small buildings or other erections for limited occupation, erected in the open air or arranged in buildings, e.g. kiosks, waiting shelters for bus stops or for filling stations, roofs for railway platforms, watchmen's huts or dressing cubicles
    • E04H1/125Small buildings, arranged in other buildings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H1/00Buildings or groups of buildings for dwelling or office purposes; General layout, e.g. modular co-ordination or staggered storeys
    • E04H1/12Small buildings or other erections for limited occupation, erected in the open air or arranged in buildings, e.g. kiosks, waiting shelters for bus stops or for filling stations, roofs for railway platforms, watchmen's huts or dressing cubicles
    • E04H1/125Small buildings, arranged in other buildings
    • E04H1/1266Cubicles for dressing; Toilets

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Residential Or Office Buildings (AREA)

Abstract

The present invention provides a kind of assembled integral vacuum toilet and its installation method, integral vacuum toilet mainly includes whole chassis, bottom edge keel, wallboard, top panel, top margin keel, whole chassis is fixedly installed on ground, bottom edge keel are fixedly installed on the surrounding on whole chassis, wallboard is fixedly installed on the top of bottom edge keel, top margin keel are fixedly installed on the top of wallboard, and top panel is fixedly installed on top margin keel.A kind of assembled integral vacuum toilet and its installation method provided by the invention, by the way that interconnecting piece and protrusion fastener member are arranged on the keel of bottom edge, connect whole chassis and wallboard, while realizing Fast Installation, has effective water-proof function, by the way that integrally formed wallboard interconnecting piece and top panel interconnecting piece is arranged in top margin keel, connect wallboard and top panel, structure is simple, and design is reasonable, install convenient quick distachable.

Description

A kind of assembled integral vacuum toilet and its installation method
Technical field
The present invention relates to decoration technology field, specifically a kind of assembled integral vacuum toilet and its installation method.
Background technique
In the engineering of assembled finishing, assembled integral vacuum toilet is wherein particularly important a part, and toilet is first First need to have waterproof, the use function of humidity, existing integral vacuum toilet generally can standby waterproof function, but its structure It is relative complex, there is no advantage in installation speed and price, for this purpose, to provide a kind of simple structure and reasonable design, installation fast by the present invention Speed matches formula integral vacuum toilet and its installation method.
Summary of the invention
The technical problem to be solved by the present invention is to overcome the existing defects, provides a kind of with formula integral vacuum toilet and its installation Method connects whole chassis and wallboard, realizes Fast Installation by the way that interconnecting piece and protrusion fastener member are arranged on the keel of bottom edge Meanwhile having effective water-proof function, by the way that integrally formed wallboard interconnecting piece and top panel interconnecting piece is arranged in top margin keel, Wallboard and top panel are connected, structure is simple, and design is reasonable, install convenient quick distachable.
In order to solve the above-mentioned technical problems, the present invention provides one kind to match formula integral vacuum toilet and its installation method, described Include: with formula integral vacuum toilet
Whole chassis, the entirety chassis includes chassis frame, and the chassis frame is set to the surrounding on the whole chassis, institute It states and is additionally provided with chassis surface layer and chassis bottom on whole chassis, the chassis bottom, chassis frame, chassis surface layer are successively mutual Connection forms whole chassis;
Bottom edge keel, the bottom edge keel are fixedly installed on the whole chassis, and the bottom edge keel are equipped with support portion, connection Portion is provided with protrusion fastener member on the support portion, and the interconnecting piece is connected with the chassis frame;
Wallboard, the wallboard connect keel by metope and are fixedly installed on metope, and the bottom edge dragon is fallen within below the wallboard The lower section of the support portion of bone, the wallboard is equipped with indent eye-splice slot, and the indent eye-splice slot matches with the protrusion fastener member, By the way that indent eye-splice slot card insertion in protrusion fastener member, is connected the wallboard and the bottom edge keel;
Top panel, the top panel include top panel ontology, and the side of the top panel ontology is provided with top surface board connecting structure, Adjacent two top panels ontology is connected by top surface board connecting structure;
Top margin keel, the top margin keel are provided with wall on the top margin keel for connecting the wallboard and the top panel Plate interconnecting piece and top panel interconnecting piece, the wallboard interconnecting piece and top panel interconnecting piece are metal structure integrated molding.
Further, the chassis frame is elongated, and the surrounding that the whole chassis is arranged in forms carrier frame, Filled layer is provided in the carrier frame, the filled layer is set between the chassis surface layer and the chassis bottom.
Further, the chassis frame is equipped with mounting portion, the interconnecting piece on the mounting portion and the bottom edge keel Match, the bottom edge keel are set to the top of the chassis frame.
Further, the chassis frame is equipped with protrusion flanging part, and the side of the chassis bottom is set to described convex Out in flanging part.
Further, the wallboard is mutually compounded to form by wallboard surface layer with wallboard base, and the wallboard surface layer is ceramic tile, institute State the plate that wallboard base is waterproof, humidity.
Further, the top surface board connecting structure is equipped with bending edge, forms groove, the top surface in the bending edge The side of plate ontology is set in the groove that the bending edge is formed, and the bending edge wraps the side of the top panel ontology It wraps up in.
Further, the top surface board connecting structure includes the first connection structure, the second connection structure, first connection It is provided with card insertion groove in structure, card insertion fastener, the card insertion groove and the card insertion are provided in second connection structure Fastener matches, for connecting adjacent two top panels ontology.
Further, the installation method of the assembled integral vacuum toilet, comprising the following steps:
Step 1: installing whole chassis, first carries out ground levelling, is ready to complete the whole chassis and bottom edge of processing in factory Whole chassis is placed in smooth ground by keel, and bottom edge keel are tipped in the mounting portion on whole chassis by interconnecting piece;
Step 2: installation wallboard first installs metope and connects keel, and installation metope connection keel are opened from metope angle first Begin, after first connection keel is fixed to metope, by one on one side fixed to the connection keel for being installed to metope of wallboard Side, while the indent eye-splice slot card insertion below wallboard connects the wallboard and the bottom edge keel, then exists in protrusion fastener member Second connection keel is installed in the another side of the wallboard, successively installs wallboard;
Step 3: installation top margin keel tip the metope interconnecting piece card insertion of top margin keel in wallboard, successively round wall installation one Circle forms top margin keel frame;
Step 4: first top panel is placed into the top panel interconnecting piece of top margin keel, second top panel by installation top panel First top panel is connected by top surface board connecting structure;
Step 5: finally adjusting the gap of the top panel, repairs the gap of the wallboard and/or the chassis surface layer.
Using assembled integral vacuum toilet of the present invention and its installation method, by the way that interconnecting piece and convex is arranged on the keel of bottom edge Fastener member out, connects whole chassis and wallboard has effective water-proof function, by top margin while realizing Fast Installation Integrally formed wallboard interconnecting piece and top panel interconnecting piece is arranged in keel, connects wallboard and top panel, and structure is simple, and design is closed Reason, install convenient quick distachable.
Detailed description of the invention
Attached drawing is used to provide further understanding of the present invention, and constitutes part of specification, with reality of the invention It applies example to be used to explain the present invention together, not be construed as limiting the invention.In the accompanying drawings:
Fig. 1 is the structural schematic diagram of assembled integral vacuum toilet of the present invention;
Fig. 2 is the structural schematic diagram that whole chassis of the invention connects bottom edge keel, bottom edge keel connection wallboard;
Fig. 3 is the structural schematic diagram of metope connection keel connection wallboard of the present invention;
Fig. 4 is top panel attachment structure schematic diagram of the present invention;
Fig. 5 is the structural schematic diagram of the connection of top margin keel wallboard and top panel of the present invention.
Specific embodiment
Below in conjunction with attached drawing of the invention, technical solution of the present invention is clearly and completely described, it is clear that institute Description is only a part of the embodiment of the present invention, instead of all the embodiments, based on the embodiments of the present invention, this field Those of ordinary skill's every other embodiment obtained without making creative work, belongs to protection of the present invention Range.
Fig. 1 be assembled integral vacuum toilet of the invention, including whole chassis 1, bottom edge keel 2, metope connection keel 4, Wallboard 3, top margin keel 6, top panel 5, the entirety chassis 1 be fixedly installed on it is levelling after original flooring, bottom edge keel 2 are solid Surely it is set to the surrounding on whole chassis 1, metope connection keel 4 are fixedly installed on original metope, and wallboard 3 connects keel by metope 4 are fixedly installed on the top of bottom edge keel 2, and top margin keel 6 are fixedly installed on the top of wallboard 3, and top panel 5 is fixedly installed on top Keelson 6.
As shown in Fig. 2, whole chassis 1 includes chassis frame 11, the chassis frame 11 is set to the whole chassis 1 Surrounding, the chassis frame 11 are cavity structure, and for mitigating self weight and save the cost, the chassis frame 11 is elongated, Its surrounding that the whole chassis 1 is arranged in forms carrier frame, is provided with filled layer 14, the filling in the carrier frame Layer 14 is set between the chassis surface layer 12 and the chassis bottom 13, is additionally provided with chassis surface layer 12 on the entirety chassis 1 With chassis bottom 13, the chassis surface layer 12 is ceramic tile, and chassis bottom 13 is metal plate or plastic plate, under the chassis frame 11 Side is provided with protrusion flanging part 112, and the side of the chassis bottom 13 is set in the protrusion flanging part 112, makes the bottom It tries to get to the heart of a matter the side seals of layer 13, the chassis bottom 13, chassis frame 11, filled layer 14, chassis surface layer 12 are successively connected with each other Whole chassis 1 is formed, the chassis surface layer 12 and the chassis frame 11 are connected by glue;
The bottom edge keel 2 are fixedly installed on the whole chassis 1, and the bottom edge keel 2 are equipped with support portion 21, interconnecting piece 22, protrusion fastener member 211 is provided on the support portion 21, the interconnecting piece 22 is connected with the chassis frame 11, described Chassis frame 11 is equipped with mounting portion 111, and the mounting portion 111 matches with the interconnecting piece 22 on the bottom edge keel 2, described Bottom edge keel 2 are set to the top of the chassis frame 11, and the top of the chassis frame 11 is provided with chassis surface layer 12, described Be provided with sealing strip 7 between bottom edge keel 2 and the chassis surface layer 12, prevent the bottom edge keel 2 and the whole chassis 1 it Between there are gap, seep water, loosen;
Wallboard 3, the wallboard 3 connect keel 4 by metope and are fixedly installed on metope (such as Fig. 3), and the wallboard 3 is by wallboard surface layer 32 are mutually compounded to form with wallboard base 33, and the wallboard surface layer 32 is ceramic tile, and the wallboard base 33 is the plate of waterproof, humidity Material, the plate including cement bases such as cement plate, ice fire plates, the lower section of the wallboard 3 falls within the support portion of the bottom edge keel 2 21, the lower section of the wallboard 3 is equipped with indent eye-splice slot 31, and the indent eye-splice slot 31 matches with the protrusion fastener member 211, By the way that 31 card insertion of indent eye-splice slot in protrusion fastener member 211, is connected the wallboard 3 and the bottom edge keel 2.
As shown in figure 4, the top panel 5 includes top panel ontology 51, the top panel ontology 51 is waterproof humidity Plate, including cement plate, ice fire plate, the low cost of plate bigger than metal, and there is visual attractiveness, the top panel ontology 51 Side be provided with top surface board connecting structure 52, adjacent two top panels ontology 51 is connected by top surface board connecting structure 52, institute Top surface board connecting structure 52 is stated equipped with bending edge 521, the bending edge 521 is interior to form groove, the top panel ontology 51 Side 511 is set in the groove that the bending edge 521 is formed, and the bending edge 521 is by the side of the top panel ontology 51 Package solves the problems such as corner out-of-flatness or breakage;
Preferably, the top surface board connecting structure 52 includes the first connection structure 522, the second connection structure 523, and described first connects It is provided with card insertion groove 5221 on binding structure 522, card insertion fastener 5231, the card are provided in second connection structure 523 It inserts groove 5221 and the card insertion fastener 5231 matches, for connecting adjacent two top panels ontology 51.
As shown in figure 5, the top margin keel 6 are for connecting the wallboard 3 and the top panel 5, on the top margin keel 6 It is provided with wallboard interconnecting piece 61 and top panel interconnecting piece 62, the wallboard interconnecting piece 61 and top panel interconnecting piece 62 are aluminum alloy junction Structure is integrally formed.
The installation method of assembled integral vacuum toilet of the present invention, comprising the following steps:
Step 1: installing whole chassis 1, first carries out ground levelling, is ready to complete the whole chassis 1 and bottom of processing in factory Whole chassis 1 is placed in smooth ground by keelson 2, and bottom edge keel 2 are tipped in the peace on whole chassis 1 by interconnecting piece 22 Dress portion 111;
Step 2: installation wallboard 3 first installs metope and connects keel 4, and installation metope connection keel 4 are first from an angle of metope Start, after first connection keel 4 is fixed to metope, by wallboard 3 on one side fixed to the connection keel 4 for being installed to metope One side, while 31 card insertion of indent eye-splice slot of the lower section of wallboard 3 connects the wallboard 3 and the bottom edge in protrusion fastener member 211 Then keel 2 install second connection keel 4 in the another side of the wallboard 3, successively install wallboard 3;
Step 3: installation top margin keel 6 tip 61 card insertion of metope interconnecting piece of top margin keel 6 in wallboard 3, successively round wall One circle of installation, forms top margin keel frame;
Step 4: first top panel 5 is placed into the top panel interconnecting piece 62 of top margin keel 6 by installation top panel 5, and second Top panel 5 connects first top panel 5 by top surface board connecting structure 52;
Step 5: finally adjusting the gap of the top panel 5, repairs the gap of the wallboard 3 and/or the chassis surface layer 12 i.e. Complete the installation of present invention assembly integral vacuum toilet.
In conclusion a kind of assembled integral vacuum toilet and its installation method, by the way that interconnecting piece is arranged on the keel of bottom edge With protrusion fastener member, connect whole chassis and wallboard, while realizing Fast Installation, have effective water-proof function, by Integrally formed wallboard interconnecting piece and top panel interconnecting piece is arranged in top margin keel, connects wallboard and top panel, and structure is simple, design Rationally, install convenient quick distachable.
In the present invention unless specifically defined or limited otherwise, term " installation ", " setting ", " connection ", " fixation ", Equal terms shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, or integral;It can be machinery Connection, is also possible to be electrically connected;It can be directly connected, two elements can also be can be indirectly connected through an intermediary The interaction relationship of internal connection or two elements, unless otherwise restricted clearly, for the ordinary skill people of this field For member, the specific meanings of the above terms in the present invention can be understood according to specific conditions.
It although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with A variety of variations, modification, replacement can be carried out to these embodiments without departing from the principles and spirit of the present invention by understanding And modification, the scope of the present invention is defined by the appended.

Claims (8)

1. a kind of assembled integral vacuum toilet characterized by comprising
Whole chassis (1), the entirety chassis (1) includes chassis frame (11), and the chassis frame (11) is set to described whole The surrounding on body chassis (1) is additionally provided with chassis surface layer (12) and chassis bottom (13), the chassis on entirety chassis (1) Bottom (13), chassis frame (11), chassis surface layer (12) are successively interconnected to form whole chassis (1);
Bottom edge keel (2), the bottom edge keel (2) are fixedly installed on the whole chassis (1), set on the bottom edge keel (2) There are support portion (21), interconnecting piece (22), protrusion fastener member (211), the interconnecting piece (22) are provided on the support portion (21) It is connected with the chassis frame (11);
Wallboard (3), the wallboard (3) are fixedly installed on metope by metope connection keel (4), fall below the wallboard (3) In the support portion (21) of the bottom edge keel (2), the lower section of the wallboard (3) is equipped with indent eye-splice slot (31), and the indent is inserted Catching groove (31) matches with the protrusion fastener member (211), by the way that indent eye-splice slot (31) card insertion is being protruded fastener member (211), the wallboard (3) and the bottom edge keel (2) are connected;
Top panel (5), the top panel (5) include top panel ontology (51), and the side of the top panel ontology (51) is provided with Top surface board connecting structure (52), adjacent two top panels ontology (51) are connected by top surface board connecting structure (52);
Top margin keel (6), the top margin keel (6) are for connecting the wallboard (3) and the top panel (5), the top margin dragon Wallboard interconnecting piece (61) and top panel interconnecting piece (62) are provided on bone (6), the wallboard interconnecting piece (61) connects with top panel Portion (62) is metal structure integrated molding.
2. assembled integral vacuum toilet according to claim 1, which is characterized in that the chassis frame (11) is in strip Shape, the surrounding being arranged in the whole chassis (1) form carrier frame, are provided with filled layer (14) in the carrier frame, The filled layer (14) is set between the chassis surface layer (12) and the chassis bottom (13).
3. assembled integral vacuum toilet according to claim 1, which is characterized in that the chassis frame (11) is equipped with peace Dress portion (111), the mounting portion (111) match with the interconnecting piece (22) on the bottom edge keel (2), the bottom edge keel (2) it is set to the top of the chassis frame (11).
4. assembled integral vacuum toilet according to claim 1, which is characterized in that the chassis frame (11) is equipped with convex Flanging part (112) out, the side of the chassis bottom (13) are set in the protrusion flanging part (112).
5. assembled integral vacuum toilet according to claim 1, which is characterized in that the wallboard (3) is by wallboard surface layer (32) it is mutually compounded to form with wallboard base (33), the wallboard surface layer (32) is ceramic tile, and the wallboard base (33) is waterproof, resistance to Moist plate.
6. assembled integral vacuum toilet according to claim 1, which is characterized in that on the top surface board connecting structure (52) Equipped with bending edge (521), groove is formed in the bending edge (521), the side (511) of the top panel ontology (51) is set to In the groove that the bending edge (521) is formed, the bending edge (521) wraps up the side of the top panel ontology (51).
7. assembled integral vacuum toilet according to claim 1 or 6, which is characterized in that the top surface board connecting structure (52) include the first connection structure (522), the second connection structure (523), be provided with card insertion on first connection structure (522) Groove (5221) is provided with card insertion fastener (5231) on second connection structure (523), the card insertion groove (5221) and institute It states card insertion fastener (5231) to match, for connecting adjacent two top panels ontology (51).
8. the installation method of assembled integral vacuum toilet described in -7 according to claim 1, which is characterized in that including following step It is rapid:
Step 1: installing whole chassis (1), first carries out ground levelling, is ready to complete the whole chassis (1) of processing in factory With bottom edge keel (2), whole chassis (1) is placed in smooth ground, by bottom edge keel (2) by interconnecting piece (22) tip in it is whole The mounting portion (111) on body chassis (1);
Step 2: metope connection keel (4) is first installed in installation wallboard (3), and installation metope connection keel (4) is first from metope One angle starts, and after first connection keel (4) is fixed to metope, being fixed on one side for wallboard (3) has been installed to metope Connection keel (4) one side, while indent eye-splice slot (31) card insertion below wallboard (3) protrusion fastener member (211), connection The wallboard (3) and the bottom edge keel (2) then install second connection keel (4) in the another side of the wallboard (3), Wallboard (3) successively are installed;
Step 3: installation top margin keel (6) tips metope interconnecting piece (61) card insertion of top margin keel (6) in wallboard (3), successively Round one circle of wall installation, top margin keel frame is formed;
Step 4: first top panel (5) is placed into the top panel interconnecting piece of top margin keel (6) by installation top panel (5) (62), second top panel (5) connects first top panel (5) by top surface board connecting structure (52);
Step 5: finally adjusting the gap of the top panel (5), repairs the wallboard (3) and/or the chassis surface layer (12) Gap.
CN201910788390.6A 2019-08-26 2019-08-26 A kind of assembled integral vacuum toilet and its installation method Pending CN110424778A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910788390.6A CN110424778A (en) 2019-08-26 2019-08-26 A kind of assembled integral vacuum toilet and its installation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910788390.6A CN110424778A (en) 2019-08-26 2019-08-26 A kind of assembled integral vacuum toilet and its installation method

Publications (1)

Publication Number Publication Date
CN110424778A true CN110424778A (en) 2019-11-08

Family

ID=68417458

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910788390.6A Pending CN110424778A (en) 2019-08-26 2019-08-26 A kind of assembled integral vacuum toilet and its installation method

Country Status (1)

Country Link
CN (1) CN110424778A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112144799A (en) * 2020-09-21 2020-12-29 浙江亚厦装饰股份有限公司 Assembly type ceramic tile toilet assembly and installation method
CN112392294A (en) * 2020-10-11 2021-02-23 深圳华筑人居科技有限公司 Assembled integral waterproof bathroom, adjusting device and construction method
CN112401711A (en) * 2020-10-27 2021-02-26 河南德田卫浴有限公司 Assembled integrated shower room tray and construction method thereof
CN112554384A (en) * 2020-12-23 2021-03-26 浙江亚厦装饰股份有限公司 Toilet frame assembly
CN112878739A (en) * 2019-11-29 2021-06-01 北京维石住工科技有限公司 Toilet device

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2016003449A (en) * 2014-06-13 2016-01-12 積水ホームテクノ株式会社 Waterproof floor, and sanitary room using waterproof floor
CN206034725U (en) * 2016-08-25 2017-03-22 广州康普顿至高建材有限公司 Sheet metal shaping fossil fragments
CN107178170A (en) * 2017-04-19 2017-09-19 浙江亚厦装饰股份有限公司 A kind of integral vacuum toilet keel facing integral type Integral ceiling and construction method
CN107747406A (en) * 2017-12-13 2018-03-02 珠海兴业绿色建筑科技有限公司 A kind of water-proof chassis of assembled integral bathroom
CN207700756U (en) * 2017-05-03 2018-08-07 上海开装建筑科技有限公司 A kind of perpendicular dress stowing Toilet system of quick assemblingization
CN208220262U (en) * 2017-05-03 2018-12-11 上海开装建筑科技有限公司 A kind of flexibility horizontally loaded type integral vacuum toilet system
CN109057250A (en) * 2018-08-17 2018-12-21 上海宝冶建筑装饰有限公司 Assembled toilet construction method
CN109124430A (en) * 2018-08-31 2019-01-04 宁波联城住工科技有限公司 Integral bathroom water-proof chassis and preparation method thereof
CN209053305U (en) * 2018-09-25 2019-07-02 浙江今顶集成吊顶有限公司 Suspended ceiling structure combining flat plate and buckle plate
CN210563593U (en) * 2019-08-26 2020-05-19 中科住创成都科技有限公司 Assembled integral toilet

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2016003449A (en) * 2014-06-13 2016-01-12 積水ホームテクノ株式会社 Waterproof floor, and sanitary room using waterproof floor
CN206034725U (en) * 2016-08-25 2017-03-22 广州康普顿至高建材有限公司 Sheet metal shaping fossil fragments
CN107178170A (en) * 2017-04-19 2017-09-19 浙江亚厦装饰股份有限公司 A kind of integral vacuum toilet keel facing integral type Integral ceiling and construction method
CN207700756U (en) * 2017-05-03 2018-08-07 上海开装建筑科技有限公司 A kind of perpendicular dress stowing Toilet system of quick assemblingization
CN208220262U (en) * 2017-05-03 2018-12-11 上海开装建筑科技有限公司 A kind of flexibility horizontally loaded type integral vacuum toilet system
CN107747406A (en) * 2017-12-13 2018-03-02 珠海兴业绿色建筑科技有限公司 A kind of water-proof chassis of assembled integral bathroom
CN109057250A (en) * 2018-08-17 2018-12-21 上海宝冶建筑装饰有限公司 Assembled toilet construction method
CN109124430A (en) * 2018-08-31 2019-01-04 宁波联城住工科技有限公司 Integral bathroom water-proof chassis and preparation method thereof
CN209053305U (en) * 2018-09-25 2019-07-02 浙江今顶集成吊顶有限公司 Suspended ceiling structure combining flat plate and buckle plate
CN210563593U (en) * 2019-08-26 2020-05-19 中科住创成都科技有限公司 Assembled integral toilet

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112878739A (en) * 2019-11-29 2021-06-01 北京维石住工科技有限公司 Toilet device
CN112144799A (en) * 2020-09-21 2020-12-29 浙江亚厦装饰股份有限公司 Assembly type ceramic tile toilet assembly and installation method
CN112392294A (en) * 2020-10-11 2021-02-23 深圳华筑人居科技有限公司 Assembled integral waterproof bathroom, adjusting device and construction method
CN112392294B (en) * 2020-10-11 2022-02-18 深圳华筑人居科技有限公司 Assembled integral waterproof bathroom, adjusting device and construction method
CN112401711A (en) * 2020-10-27 2021-02-26 河南德田卫浴有限公司 Assembled integrated shower room tray and construction method thereof
CN112554384A (en) * 2020-12-23 2021-03-26 浙江亚厦装饰股份有限公司 Toilet frame assembly

Similar Documents

Publication Publication Date Title
CN110424778A (en) A kind of assembled integral vacuum toilet and its installation method
CN110424664B (en) Wall decoration plate assembly and wall decoration plate installation method
CN103243890B (en) Heat insulating decorative board hanging fastener component and mounting process thereof
CN110805220B (en) Wall panel assembly and installation method
CN109610766A (en) Metope assembly and installation method
CN210563593U (en) Assembled integral toilet
CN109235724A (en) Open stone curtain wall structure
CN112302279A (en) Firmly-installed artificial stone dry hanging design structure and installation method thereof
CN211341531U (en) Wall panel installation assembly
CN209066676U (en) Open stone curtain wall structure
CN102409861B (en) Heat preservation process method for building exterior wall by hanging compound heat preservation plates outside
CN206396888U (en) The integrated house system that a kind of lightgage steel joist is combined with Light trabses
CN211058187U (en) Assembling structure for decorative plate
CN211201020U (en) Wall block material assembled decoration installation structure
CN208996360U (en) A kind of wall surface wall board splicing construction
CN208633375U (en) A kind of concrete pillar composite plate
CN201695625U (en) Connecting fastener for heat-preserving, thermal-insulating and decorative integral plate
CN202214861U (en) Outer wall decorative rib of frame-exposed curtain wall
CN208884901U (en) A kind of concealed keel for wall corner connection decorative panel
CN209742626U (en) Aluminum-wood door pocket
CN215716612U (en) Tile hanging structure of corrugated waterproof board
CN214364573U (en) Keel overhead leveling hanging panel system
CN205934988U (en) Ditch access cover plate structure is warmed up on ground
CN214461980U (en) Decoration dry hanging rack for protecting wall
CN110331830A (en) A kind of building exterior wall heat preserving decorative system rapid constructing method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: No.44 and No.42, building 2, Fuxing Tianchi mansion, 132 Jiancai Road, Tianchi Avenue, Tianchi town, Lezhi county, Ziyang City, Sichuan Province, 641500

Applicant after: Zhongke Zhuchuang (Sichuan) Technology Co.,Ltd.

Address before: NO.201, 2nd floor, building 1, Huadu, Xinyi, no.6, Section 1, Huayang Avenue, Tianfu New District, Chengdu, Sichuan 610000

Applicant before: Chengdu Science and Technology Co.,Ltd.

TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20210811

Address after: 641500 stores 48 and 46, building 2, Fuxing Tianchi mansion, No. 132, Jiancai Road, Tianchi Avenue, Tianchi town, Lezhi county, Ziyang City, Sichuan Province

Applicant after: Sichuan Fuxing Hangxiao Construction Co.,Ltd.

Address before: No.44 and No.42, building 2, Fuxing Tianchi mansion, 132 Jiancai Road, Tianchi Avenue, Tianchi town, Lezhi county, Ziyang City, Sichuan Province, 641500

Applicant before: Zhongke Zhuchuang (Sichuan) Technology Co.,Ltd.