CN205934988U - Ditch access cover plate structure is warmed up on ground - Google Patents
Ditch access cover plate structure is warmed up on ground Download PDFInfo
- Publication number
- CN205934988U CN205934988U CN201620972093.9U CN201620972093U CN205934988U CN 205934988 U CN205934988 U CN 205934988U CN 201620972093 U CN201620972093 U CN 201620972093U CN 205934988 U CN205934988 U CN 205934988U
- Authority
- CN
- China
- Prior art keywords
- ground
- basic unit
- well lid
- ditch
- glue
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
The utility model provides a ditch access cover plate structure is warmed up on ground, installs on the well head of warm ditch, including the well lid, the well lid overlap joint is on the fixed slot that the well head set up, the well lid includes bottom plate and the perpendicular curb plate that sets up at the bottom plate edge, the basic unit by making from levelling cement sets gradually on the bottom plate, glue in the basic unit with setting up, the basic unit pastes by on the inner wall that reaches the curb plate with the outside edge that glued on ground, top surface and curb plate top surface parallel and level are glued to ground. Ground on the well lid is glued the edge and is lain in the curb plate inboard, does not expose, can not form the limit owing to trampling, prevents to come off, guarantees life. On ground was glued and to be connected to the basic unit that cement made, the expend with heat and contract with cold's of basic unit deformation degree was little, can not glue to receive dragging by a wide margin with the face of being connected of basic unit with making, reduced the gluey risk that the basic unit breaks away from, the assurance life of following in ground. The basic unit is by making from levelling cement, and the roughness is high, guarantees the aesthetic property of well lid.
Description
Technical field
The utility model is related to building decoration field, specifically, is that ditch access panel structure is warmed up on a kind of ground.
Background technology
In order to be overhauled, warm ditch arranges access hole, and access hole needs to cover when not in use.Common warm trench cover one
As adopt steel plate, for the ease of lifting, steel plate is additionally provided with retractable handle.Attractive in appearance in order to ensure, laying ground glue on steel plate, by
In the setting of retractable handle, ground glue needs to cut out opening, and the edge of retractable handle is circular arc, manually cuts on ground glue
The edge of opening cutting out not round and smooth it is difficult to agree with retractable handle perfection, affect aesthetics.And the edge of ground glue is located at steel plate
Top, personnel walk about and trample, and easily make ground glue edge play side, or even depart from.And steel plate is affected by thermal expansion and contraction greatly, steel plate with
Expanding with heat and contract with cold and disconnecting of the faying face easy invar plate of ground glue, causes ground glue to depart from.
Utility model content
It is poor that the utility model is directed to current warm trench cover aesthetic property, the problem that ground glue is easily separated from, propose a kind of newly
Ditch access panel structure is warmed up on ground.
Ditch access panel structure is warmed up on ground of the present utility model, is arranged on the well head of warm ditch, including well lid, described well lid
It is overlapped in the fixing groove of well head setting, described well lid includes base plate and is vertically set on the side plate of bottom edge, described base plate
On be disposed with the basic unit being made up of self-leveling cement, described basic unit is configured to glue, the outer side edges of described basic unit and ground glue
Edge reclines on the inwall reaching side plate, described ground glue top surface and side plate either flush.
Preferably, the side wall of described fixing groove and bottom surface are all coated with protection board.
Preferably, it is downwardly projected in the middle part of described base plate, extend in well head.
Preferably, the protection plate top surface that the top surface of described ground glue and fixing groove sidewall are installed all with well head outside ground
The either flush of the architectural surface of upper installation.
Preferably, described well lid is provided with operation panel, the edge of described operation panel is connected with side plate, described operation panel
Top surface and side plate either flush, described operation panel is provided with lifting eye.
Preferably, described ground glue is located at below operation panel.
The beneficial effects of the utility model are:Ground glue edge on well lid is located at side plate interior sides, does not expose, will not be due to stepping on
Step on and formed side, prevent from coming off it is ensured that service life.Ground gemel connection in the basic unit of cement production systD, the change that basic unit expands with heat and contract with cold
Shape degree is little, ground glue and the joint face of basic unit will not be made significantly to be pullled, reduce the risk that ground glue departs from from basic unit,
Ensure service life.Basic unit is made up of self-leveling cement, flatness high it is ensured that the aesthetic property of well lid.
Fixing groove coats protection board, when well lid opens and closes, prevents well lid from well head wearing and tearing, and improves service life.
The bottom of well lid is downwardly projected, and in insertion well head, improves the fastness that well lid is installed with well head, it is to avoid well lid is in well
Play on mouth.
Ground glue is all concordant with architectural surface with protection board, makes to install Land leveling at the well head of well lid, aesthetic property is strong.
Operation panel on well lid can load suspension hook, so that well lid is sling, open well head, need not on well lid installing handle
Hand, ground glue need not cut, and integrality is strong, and aesthetics is high.
The corner of ground glue is pressed in lower section by operation panel, increased the fastness that ground glue is installed.
Brief description
Accompanying drawing 1 warms up the structural representation of ditch access panel structure for ground;
Accompanying drawing 2 is the structural representation of well lid.
Specific embodiment
In order to be able to further appreciate that structure of the present utility model, feature and other purpose, in conjunction with appended preferred embodiment
Describe in detail as follows, illustrated preferred embodiment is merely to illustrate the technical solution of the utility model, and non-limiting practicality
New.
Specific embodiment of the present utility model is as follows:
As shown in Fig. 1 is to 2, ground is warmed up ditch access panel structure and is arranged on the well head 1 of warm ditch, including well lid 2, well lid 2
It is overlapped in the fixing groove 3 of well head 1 setting.
Well lid 2 includes base plate 21 and the side plate 22 being vertically set on base plate 21 edge, base plate 21 is disposed with by certainly
The basic unit 4 of levelling cement production systD, basic unit 4 is configured to glue 5, and the outer ledge of basic unit 4 and ground glue 5 clings to the inwall of side plate 22
On, ground glue 5 top surface and side plate 22 either flush.
In order to prevent abrasion between well lid 2 and fixing groove 3, the side wall of fixing groove 3 and bottom surface to be all coated with protection board 6, protect
Shield fixing groove 3.
In order to increase firmly installing property, it is downwardly projected in the middle part of base plate 21, extend in well head 1.
In order to ensure flatness, protection board 6 top surface that the top surface of ground glue 5 and fixing groove 3 side wall are installed all with well head 1 outside
The either flush of the architectural surface 7 installed on the ground of side.
For the ease of opening well head 1, well lid 2 is provided with operation panel 8, operation panel 8 is arranged on edge, edge and side plate
22 are connected.Smooth in order to ensure, the either flush of the top surface of operation panel 8 and side plate 22.Lifting eye 9 is provided with operation panel 8, rises
Suspension hook is installed, you can well lid 2 is sling, well head 1 is opened in lifting hole(eyelet) 9.
In order to improve the fastness that ground glue 5 is installed, ground glue 5 is located at below operation panel 8, and the corner of ground glue 5 is tucked into behaviour
Make between plate 8 and basic unit 4, and clamp.
Claims (6)
1. ditch access panel structure is warmed up on a kind of ground, is arranged on the well head (1) of warm ditch it is characterised in that including well lid (2),
Described well lid (2) is overlapped in the fixing groove (3) that well head (1) is arranged, and described well lid (2) includes base plate (21) and is vertically set on
The side plate (22) at base plate (21) edge, described base plate (21) is disposed with the basic unit (4) being made up of self-leveling cement, described
Glue (5) is configured on basic unit (4), the outer ledge on described basic unit (4) and ground glue (5) clings on the inwall of side plate (22), institute
State ground glue (5) top surface and side plate (22) either flush.
2. ditch access panel structure is warmed up it is characterised in that the side wall of described fixing groove (3) in ground according to claim 1
All it is coated with protection board (6) with bottom surface.
3. ditch access panel structure is warmed up it is characterised in that in ground according to claim 1 in the middle part of described base plate (21) downwards
Prominent, it extend in well head (1).
4. ground according to claim 1 warm up ditch access panel structure it is characterised in that described ground glue (5) top surface with
And protection board (6) top surface installed of fixing groove (3) side wall all with well head (1) outside the top of architectural surface (7) installed on ground
Face is concordant.
5. ditch access panel structure is warmed up it is characterised in that being provided with described well lid (2) in ground according to claim 1
Operation panel (8), the edge of described operation panel (8) is connected with side plate (22), the top surface of described operation panel (8) and the top of side plate (22)
Face is concordant, and described operation panel (8) is provided with lifting eye (9).
6. ditch access panel structure is warmed up it is characterised in that described ground glue (5) is located at operation in ground according to claim 5
Below plate (8).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620972093.9U CN205934988U (en) | 2016-08-29 | 2016-08-29 | Ditch access cover plate structure is warmed up on ground |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620972093.9U CN205934988U (en) | 2016-08-29 | 2016-08-29 | Ditch access cover plate structure is warmed up on ground |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205934988U true CN205934988U (en) | 2017-02-08 |
Family
ID=57954835
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620972093.9U Expired - Fee Related CN205934988U (en) | 2016-08-29 | 2016-08-29 | Ditch access cover plate structure is warmed up on ground |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205934988U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112960543A (en) * | 2021-03-16 | 2021-06-15 | 中国长江电力股份有限公司 | Concrete cover plate suitable for outdoor large-scale hanging hole and mounting method thereof |
-
2016
- 2016-08-29 CN CN201620972093.9U patent/CN205934988U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112960543A (en) * | 2021-03-16 | 2021-06-15 | 中国长江电力股份有限公司 | Concrete cover plate suitable for outdoor large-scale hanging hole and mounting method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109138519A (en) | A kind of decoration method of modularization toilet | |
CN207245122U (en) | A kind of wall brick flatness control device | |
CN212715353U (en) | Whole bathroom of assembled convenient to installation | |
CN205934988U (en) | Ditch access cover plate structure is warmed up on ground | |
CN209227950U (en) | A kind of assembling type buildings decorative panel splicing structure | |
CN206964402U (en) | A kind of liftable cabinet top line | |
CN204023978U (en) | A kind of floor ceramic tile installing floor drain | |
CN206956999U (en) | A kind of steel construction curtain wall | |
CN205399853U (en) | Embedded roofing system structure of solar energy | |
CN205351055U (en) | Hidden lamps and lanterns | |
CN203783071U (en) | Angular line structure | |
CN209277444U (en) | A kind of skirting structure | |
CN207905584U (en) | A kind of detachable band exterior window trim aluminium alloy energy-saving auxiliary frame of door and window | |
CN217734712U (en) | Decorative edge for sunlight room | |
CN207003943U (en) | Skirt line mounting structure | |
CN207277740U (en) | Multifunctional heat insulating decorative wall sealing sealing structure | |
CN202064555U (en) | External corner fastener | |
CN209483035U (en) | Assembled exterior wall window frame arc decorative top | |
CN206957000U (en) | A kind of new bright frame steel construction curtain wall | |
CN211008327U (en) | Metal tile grid structure system with ventilation and lighting adjusting function | |
CN205842968U (en) | Embedded top line sending Adjustable air port | |
CN205421783U (en) | Decorative board for wall | |
CN104947893B (en) | A kind of combined decoration plate | |
CN211312847U (en) | Assembled bathroom | |
CN208184285U (en) | A kind of Modularized toilet system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170208 Termination date: 20180829 |