CN107169747A - A kind of management system of various engineering of civil construction - Google Patents

A kind of management system of various engineering of civil construction Download PDF

Info

Publication number
CN107169747A
CN107169747A CN201710462127.9A CN201710462127A CN107169747A CN 107169747 A CN107169747 A CN 107169747A CN 201710462127 A CN201710462127 A CN 201710462127A CN 107169747 A CN107169747 A CN 107169747A
Authority
CN
China
Prior art keywords
construction
module
building
workman
budget
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201710462127.9A
Other languages
Chinese (zh)
Inventor
岳鹏威
杨玲
李福恩
何盛东
史科
赵瑞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhengzhou University of Aeronautics
Original Assignee
Zhengzhou University of Aeronautics
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhengzhou University of Aeronautics filed Critical Zhengzhou University of Aeronautics
Priority to CN201710462127.9A priority Critical patent/CN107169747A/en
Publication of CN107169747A publication Critical patent/CN107169747A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/04Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06313Resource planning in a project environment
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • G06Q10/06395Quality analysis or management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q40/00Finance; Insurance; Tax strategies; Processing of corporate or income taxes
    • G06Q40/12Accounting
    • G06Q40/125Finance or payroll
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Economics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Theoretical Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • Marketing (AREA)
  • Physics & Mathematics (AREA)
  • Tourism & Hospitality (AREA)
  • Development Economics (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Accounting & Taxation (AREA)
  • Game Theory and Decision Science (AREA)
  • Educational Administration (AREA)
  • Finance (AREA)
  • Biodiversity & Conservation Biology (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Data Mining & Analysis (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Technology Law (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a kind of management system of various engineering of civil construction, it is related to construction management field.The system includes:Construction material estimates module, for estimating all types of construction material aequums;Construction material budget module, the total price scope of construction material needed for for obtaining;Workman estimates module, the number of workers of each work post needed for for estimating building;Workman's budget module, the total price scope of workman needed for for obtaining;Construction budget module, for obtaining building master budget;Construction period administration module, for stage practice of construction amount and stage estimated construction volume to be contrasted;Construction safety administration module, for monitoring building construction situation and workman's working condition in real time;Construction quality administration module, for entering line quality monitoring to construction building.The present invention is logical to carry out integration coordinated management to construction material management, builder's management, building safety management and construction management, adds the function of management system of the present invention, improves management effect.

Description

A kind of management system of various engineering of civil construction
Technical field
The present invention relates to construction management field, a kind of management system of various engineering of civil construction is more particularly related to System.
Background technology
Civil construction project refers to by the construction to all kinds of building constructions and its affiliated facility and the circuit supporting with it, pipe The engineering entity that road, the installation activity of equipment are formed.With expanding economy, the domestic civil construction project of China is not Disconnected construction.In civil construction project items operation, by overseer empirically, the basis of workload and duration is being considered Upper planning job engineering is, it is necessary to take a significant amount of time and labor service, and be easily caused the careless omission on arranging and delay operation expansion.Together When, it is also easy to cause operation quality understable, reduces engineering credit rating.
At present, by intelligentized civil construction project management system can quickly, conveniently, accurately manage civil construction Item in engineering, but existing management system often only manages an item in civil construction project, it is impossible to integrated pipe Multiple items are managed, its management system function is single, and management effect is not good.
In summary, civil construction project management system of the prior art, it is single to there is management system function, management effect The problem of fruit is not good.
The content of the invention
The embodiment of the present invention provides a kind of management system of various engineering of civil construction, to solve to exist in the prior art Management system function is single, the problem of management effect is not good.
The embodiment of the present invention provides a kind of management system of various engineering of civil construction, including:
Data acquisition module, for obtaining BUILDINGS MODELS information;
Construction material estimates module, for according to BUILDINGS MODELS information, estimating all types of construction material aequums, and according to Construction material type stores required construction material type and the corresponding aequum of required construction material type to cloud database;
Construction material budget module, for according to needed for required construction material type and required construction material type are corresponding Amount, with reference to the market price scope of each required construction material, the total price scope of construction material needed for obtaining;
Workman estimates module, for according to BUILDINGS MODELS information, with reference to building total lever factor, each work post needed for estimation building Number of workers, and store required workman workman and the corresponding quantity of required workman's work post to cloud database according to work post;
Workman's budget module, for the number of workers according to each work post, with reference to the market price scope of each work post workman, is obtained The total price scope of workman needed for taking;
Construction budget module, for the total price scope and the total price scope of required workman according to required construction material, Obtain building master budget;If building master budget exceeds default budget space, adjustment construction material species or number of workers or Total lever factor is built, makes building master budget in default budget limitations;If building master budget in default budget limitations, normally apply Work;
Construction period administration module, for by stage practice of construction amount and stage estimated construction volume contrast, if the stage is real Border construction volume is less than stage estimated construction volume, then analyzes reason;If stage practice of construction amount is more than or equal to the stage and is expected to apply Work amount, then normal construction;
Construction safety administration module, for monitoring building in real time by being arranged at the camera at the diverse location of construction site Construction situation and workman's working condition;For according to building construction situation and workman's working condition, predicting construction safety situation;
Construction quality administration module, for entering line quality monitoring to construction building by quality detection module;If matter Amount detection is unqualified, then constructs again;If quality testing is qualified, normal construction;
Wage settlement module, for the working time according to different work post workmans, workload and performance achievement, calculates workman Wage, and the payroll of workman is printed by module of transferring accounts;
Data processing module, for coordinating above-mentioned module work.
It is preferred that the BUILDINGS MODELS information includes:Building size structural information and required construction material title and requirement.
It is preferred that the embodiment of the present invention provides a kind of management system of various engineering of civil construction, in addition to, practice of construction Acquisition module is measured, is measured or the estimation acquisition practice of construction amount information by actual.
It is preferred that the embodiment of the present invention provides a kind of management system of various engineering of civil construction, in addition to, construction budget Print module, for all types of required construction material titles and price, number of workers and price needed for each work post, and building Master budget is printed.
It is preferred that the cloud database, is additionally operable to storage information of building project, building constructor's essential information and workman's base This information.
It is preferred that the quality detection module, including:Construction material wood properly test module and building structure inspection module.
It is preferred that the data processing module uses microprocessor, computer or server.
There is provided a kind of management system of various engineering of civil construction in the embodiment of the present invention, compared with prior art, it has Beneficial effect is:The present invention is logical to construction material management, builder's management, building safety management, construction management and wage Integration coordinated management is carried out in management, is added the function of management system of the present invention, is improved management effect.
Brief description of the drawings
Fig. 1 is a kind of management system high-level schematic functional block diagram of various engineering of civil construction provided in an embodiment of the present invention.
Embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete Site preparation is described, it is clear that described embodiment is only a part of embodiment of the invention, rather than whole embodiments.It is based on Embodiment in the present invention, it is every other that those of ordinary skill in the art are obtained under the premise of creative work is not made Embodiment, belongs to the scope of protection of the invention.
Fig. 1 is a kind of management system high-level schematic functional block diagram of various engineering of civil construction provided in an embodiment of the present invention. As shown in figure 1, the system includes:
Data acquisition module 1, for obtaining BUILDINGS MODELS information.
It should be noted that BUILDINGS MODELS information includes:Building size structural information and required construction material title and will Ask.
Construction material estimates module 2, for according to BUILDINGS MODELS information, estimating all types of construction material aequums, and press Required construction material type and the corresponding aequum of required construction material type are stored to high in the clouds data according to construction material type Storehouse.
Construction material budget module 3, for according to required construction material type and the corresponding institute of required construction material type Requirement, with reference to the market price scope of each required construction material, the total price scope of construction material needed for obtaining.
Workman estimates module 4, for according to BUILDINGS MODELS information, with reference to building total lever factor, each work post needed for estimation building Number of workers, and required workman workman and the corresponding quantity of required workman's work post are stored to cloud database according to work post.
Workman's budget module 5, for the number of workers according to each work post, with reference to the market price scope of each work post workman, The total price scope of workman needed for obtaining.
Construction budget module 6, for the total price scope and the total price scope of required workman according to required construction material, Obtain building master budget;If building master budget exceeds default budget space, adjustment construction material species or number of workers or Total lever factor is built, makes building master budget in default budget limitations;If building master budget in default budget limitations, normally apply Work.
It should be noted that the embodiment of the present invention provides a kind of management system of various engineering of civil construction, in addition to, build Budget print module is built, for all types of required construction material titles and price, number of workers and price needed for each work post, with And building master budget is printed.
Construction period administration module 7, for by stage practice of construction amount and stage estimated construction volume contrast, if the stage is real Border construction volume is less than stage estimated construction volume, then analyzes reason;If stage practice of construction amount is more than or equal to the stage and is expected to apply Work amount, then normal construction.
It should be noted that the embodiment of the present invention provides a kind of management system of various engineering of civil construction, in addition to, it is real Border construction volume acquisition module, is measured or estimation acquisition practice of construction amount information by actual.
Construction safety administration module 8, for monitoring to be built in real time by being arranged at the camera at the diverse location of construction site Build construction situation and workman's working condition;For according to building construction situation and workman's working condition, predicting construction safety situation.
Construction quality administration module 9, for entering line quality monitoring to construction building by quality detection module;If matter Amount detection is unqualified, then constructs again;If quality testing is qualified, normal construction.
It should be noted that quality detection module, including:Construction material wood properly test module and building structure inspection mould Block.
Wage settlement module 10, for the working time according to different work post workmans, workload and performance achievement, calculates work The wage of people, and the payroll of workman is printed by module of transferring accounts.
Data processing module 11, for coordinating above-mentioned module work.
It should be noted that data processing module uses microprocessor, computer or server.
It is preferred that cloud database, is additionally operable to storage information of building project, building constructor's essential information and workman and believes substantially Breath.
Construction material management, builder's management, building safety management, building are applied it should be noted that the present invention is logical Work is managed and salary management carries out integration coordinated management, is added the function of management system of the present invention, is improved management effect.
Disclosed above is only several specific embodiments of the present invention, and those skilled in the art can be to present invention progress It is various to change with modification without departing from the spirit and scope of the present invention, if these modifications and variations of the present invention belong to the present invention Within the scope of claim and its equivalent technologies, then the present invention is also intended to comprising including these changes and modification.

Claims (7)

1. a kind of management system of various engineering of civil construction, it is characterised in that including:
Data acquisition module, for obtaining BUILDINGS MODELS information;
Construction material estimates module, for according to BUILDINGS MODELS information, estimating all types of construction material aequums, and according to building Material type stores required construction material type and the corresponding aequum of required construction material type to cloud database;
Construction material budget module, for construction material type and the corresponding aequum of required construction material type needed for, With reference to the market price scope of each required construction material, the total price scope of construction material needed for obtaining;
Workman estimates module, for according to BUILDINGS MODELS information, with reference to building total lever factor, the workman of each work post needed for estimation building Quantity, and store required workman workman and the corresponding quantity of required workman's work post to cloud database according to work post;
Workman's budget module, for the number of workers according to each work post, with reference to the market price scope of each work post workman, obtains institute Need the total price scope of workman;
Construction budget module, for the total price scope and the total price scope of required workman according to required construction material, is obtained Build master budget;If building master budget exceeds default budget space, adjustment construction material species or number of workers or building Total lever factor, makes building master budget in default budget limitations;If building master budget in default budget limitations, normal construction;
Construction period administration module, for by the estimated construction volume contrast of stage practice of construction amount and stage, if the stage actual applies Work amount is less than stage estimated construction volume, then analyzes reason;If stage practice of construction amount is more than or equal to stage estimated construction volume, Then normal construction;
Construction safety administration module, for monitoring building construction in real time by being arranged at the camera at the diverse location of construction site Situation and workman's working condition;For according to building construction situation and workman's working condition, predicting construction safety situation;
Construction quality administration module, for entering line quality monitoring to construction building by quality detection module;If quality is examined Survey unqualified, then construct again;If quality testing is qualified, normal construction;
Wage settlement module, for the working time according to different work post workmans, workload and performance achievement, calculates the work of workman Money, and the payroll of workman is printed by module of transferring accounts;
Data processing module, for coordinating above-mentioned module work.
2. the management system of various engineering of civil construction as claimed in claim 1, it is characterised in that the BUILDINGS MODELS information Including:Building size structural information and required construction material title and requirement.
3. the management system of various engineering of civil construction as claimed in claim 1, it is characterised in that also include, practice of construction Acquisition module is measured, is measured or the estimation acquisition practice of construction amount information by actual.
4. the management system of various engineering of civil construction as claimed in claim 1, it is characterised in that also include, construction budget Print module, for all types of required construction material titles and price, number of workers and price needed for each work post, and building Master budget is printed.
5. the management system of various engineering of civil construction as claimed in claim 1, it is characterised in that the cloud database, It is additionally operable to storage information of building project, building constructor's essential information and workman's essential information.
6. the management system of various engineering of civil construction as claimed in claim 1, it is characterised in that the quality testing mould Block, including:Construction material wood properly test module and building structure inspection module.
7. the management system of various engineering of civil construction as claimed in claim 1, it is characterised in that the data processing module Using microprocessor, computer or server.
CN201710462127.9A 2017-06-19 2017-06-19 A kind of management system of various engineering of civil construction Withdrawn CN107169747A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710462127.9A CN107169747A (en) 2017-06-19 2017-06-19 A kind of management system of various engineering of civil construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710462127.9A CN107169747A (en) 2017-06-19 2017-06-19 A kind of management system of various engineering of civil construction

Publications (1)

Publication Number Publication Date
CN107169747A true CN107169747A (en) 2017-09-15

Family

ID=59820272

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710462127.9A Withdrawn CN107169747A (en) 2017-06-19 2017-06-19 A kind of management system of various engineering of civil construction

Country Status (1)

Country Link
CN (1) CN107169747A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109636675A (en) * 2018-12-12 2019-04-16 上海荷福人工智能科技(集团)有限公司 A kind of management method and system of the construction site based on artificial intelligence
CN109977159A (en) * 2019-03-27 2019-07-05 新疆畺路交通科技有限公司 A kind of civil engineering test detection system based on cloud computing technology
CN110070343A (en) * 2019-04-24 2019-07-30 广州市城市规划勘测设计研究院 A kind of prospecting project management system and method
CN112348478A (en) * 2020-11-16 2021-02-09 尹继强 Visual building decoration monitoring system and method based on Internet of things
CN112801615A (en) * 2021-01-27 2021-05-14 太仓市路桥工程有限公司 Road and bridge engineering equipment safety monitoring system and method
CN112978529A (en) * 2019-12-02 2021-06-18 株式会社日立大厦系统 Congestion degree prediction display system, congestion degree prediction display method, and computer-readable medium

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104123604A (en) * 2014-06-09 2014-10-29 湖北福泰建筑装饰工程有限公司 Engineering management information processing system
CN104329120A (en) * 2014-10-17 2015-02-04 成都四为电子信息股份有限公司 Tunnel construction safety monitoring and management system and tunnel construction safety monitoring and management method
CN104732034A (en) * 2015-04-01 2015-06-24 中铁隆工程集团有限公司 Constructional engineering budgeting system and working mechanism thereof
CN105696467A (en) * 2016-02-04 2016-06-22 广厦建设集团有限责任公司 Formwork support construction method based on P-BIM technology
CN105825331A (en) * 2016-03-08 2016-08-03 河南理工大学 Management system for different projects of civil construction
CN105912909A (en) * 2016-04-20 2016-08-31 孙雨 Monitoring and management system and method for construction project quality detection
CN106096909A (en) * 2016-06-03 2016-11-09 绵阳九鼎智远知识产权运营有限公司 A kind of architectural engineering whole process monitoring system
CN106408157A (en) * 2016-08-26 2017-02-15 成都晨越造价咨询有限公司 Building project progress and cost management system
CN106446358A (en) * 2016-09-08 2017-02-22 黄川东 Basic building data module system
CN107169546A (en) * 2017-07-03 2017-09-15 国网冀北电力有限公司唐山供电公司 A kind of power construction managing security tools and instruments management method and system based on Quick Response Code

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104123604A (en) * 2014-06-09 2014-10-29 湖北福泰建筑装饰工程有限公司 Engineering management information processing system
CN104329120A (en) * 2014-10-17 2015-02-04 成都四为电子信息股份有限公司 Tunnel construction safety monitoring and management system and tunnel construction safety monitoring and management method
CN104732034A (en) * 2015-04-01 2015-06-24 中铁隆工程集团有限公司 Constructional engineering budgeting system and working mechanism thereof
CN105696467A (en) * 2016-02-04 2016-06-22 广厦建设集团有限责任公司 Formwork support construction method based on P-BIM technology
CN105825331A (en) * 2016-03-08 2016-08-03 河南理工大学 Management system for different projects of civil construction
CN105912909A (en) * 2016-04-20 2016-08-31 孙雨 Monitoring and management system and method for construction project quality detection
CN106096909A (en) * 2016-06-03 2016-11-09 绵阳九鼎智远知识产权运营有限公司 A kind of architectural engineering whole process monitoring system
CN106408157A (en) * 2016-08-26 2017-02-15 成都晨越造价咨询有限公司 Building project progress and cost management system
CN106446358A (en) * 2016-09-08 2017-02-22 黄川东 Basic building data module system
CN107169546A (en) * 2017-07-03 2017-09-15 国网冀北电力有限公司唐山供电公司 A kind of power construction managing security tools and instruments management method and system based on Quick Response Code

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109636675A (en) * 2018-12-12 2019-04-16 上海荷福人工智能科技(集团)有限公司 A kind of management method and system of the construction site based on artificial intelligence
CN109977159A (en) * 2019-03-27 2019-07-05 新疆畺路交通科技有限公司 A kind of civil engineering test detection system based on cloud computing technology
CN110070343A (en) * 2019-04-24 2019-07-30 广州市城市规划勘测设计研究院 A kind of prospecting project management system and method
CN112978529A (en) * 2019-12-02 2021-06-18 株式会社日立大厦系统 Congestion degree prediction display system, congestion degree prediction display method, and computer-readable medium
CN112978529B (en) * 2019-12-02 2022-06-28 株式会社日立大厦系统 Congestion degree prediction display system, congestion degree prediction display method, and computer-readable medium
CN112348478A (en) * 2020-11-16 2021-02-09 尹继强 Visual building decoration monitoring system and method based on Internet of things
CN112801615A (en) * 2021-01-27 2021-05-14 太仓市路桥工程有限公司 Road and bridge engineering equipment safety monitoring system and method

Similar Documents

Publication Publication Date Title
CN107169747A (en) A kind of management system of various engineering of civil construction
CN106447171B (en) Power demand side schedulable resource potential modeling method and system
Nguyen et al. Application of BIM and 3D laser scanning for quantity management in construction projects
KR101379407B1 (en) Stochastic Estimating Model for Calculating Duration of Super-tall Building Project using Vertical Climate Factors
US20080004844A1 (en) Method and System for Estimating Project Costs
CN113626914A (en) Engineering project management method, device and system based on digital twins
CN109214679B (en) Project engineering management system based on building information model
CN204288281U (en) Industrial enterprise's electric energy management system
CN104407688A (en) Virtualized cloud platform energy consumption measurement method and system based on tree regression
CN205283824U (en) Airport stream of people early warning system based on wifi
CN104063753A (en) Comprehensive evaluation method for intelligent traffic operation and maintenance performance
CN105590239A (en) Real estate price calculating method and system
CN109324978A (en) A kind of software testing management system of multi-person synergy
CN105869028A (en) Order rollback processing system and method, and business support system
CN113011832A (en) Engineering cost system based on BIM
CN110991886A (en) Community task processing method, device, equipment and medium
CN102609874A (en) Tax-involved risk assessment method for real-estate project
Bakis et al. An integrated environment for life cycle costing in construction
CN112085220A (en) Intelligent system for detecting technical conditions of highway bridges
CN102184582A (en) Communication base station energy-saving measurement system
CN104404858B (en) A kind of testing arrangement of flexible pavement Effective Compaction state and using method thereof
CN113506133A (en) Engineering consultation system based on big data analysis
CN110567389A (en) Ancient building structure deformation monitoring and analyzing system and method
CN105488302A (en) Energy saving amount measuring method for energy saving reconstruction of public building
KR101927273B1 (en) Risk value evaluating system for unclaimed construction and risk value evaluating apparatus for unclaimed construction

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication
WW01 Invention patent application withdrawn after publication

Application publication date: 20170915