- CN105825331A CN105825331A CN201610143929.9A CN201610143929A CN105825331A CN 105825331 A CN105825331 A CN 105825331A CN 201610143929 A CN201610143929 A CN 201610143929A CN 105825331 A CN105825331 A CN 105825331A
- Authority
- CN
- China
- Prior art keywords
- module
- data
- sent
- management system
- human
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000010276 construction Methods 0.000 title claims abstract description 17
- 238000007726 management method Methods 0.000 claims abstract description 17
- 239000000463 material Substances 0.000 claims abstract description 14
- 238000013439 planning Methods 0.000 claims abstract description 14
- 238000007418 data mining Methods 0.000 claims abstract description 10
- 238000005457 optimization Methods 0.000 claims description 6
- 238000000034 method Methods 0.000 claims description 5
- 239000004566 building material Substances 0.000 claims description 3
- 238000004364 calculation method Methods 0.000 claims description 3
- 238000013461 design Methods 0.000 claims description 3
- 238000012545 processing Methods 0.000 claims description 3
- 238000012795 verification Methods 0.000 claims description 3
- 238000013480 data collection Methods 0.000 abstract 1
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 238000012550 audit Methods 0.000 description 1
- 238000009430 construction management Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06311—Scheduling, planning or task assignment for a person or group
- G06Q10/063112—Skill-based matching of a person or a group to a task
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F16/00—Information retrieval; Database structures therefor; File system structures therefor
- G06F16/90—Details of database functions independent of the retrieved data types
- G06F16/95—Retrieval from the web
- G06F16/951—Indexing; Web crawling techniques
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06311—Scheduling, planning or task assignment for a person or group
- G06Q10/063118—Staff planning in a project environment
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/08—Construction
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Theoretical Computer Science (AREA)
- Economics (AREA)
- Strategic Management (AREA)
- General Physics & Mathematics (AREA)
- Entrepreneurship & Innovation (AREA)
- Physics & Mathematics (AREA)
- Tourism & Hospitality (AREA)
- General Business, Economics & Management (AREA)
- Educational Administration (AREA)
- Marketing (AREA)
- Game Theory and Decision Science (AREA)
- Operations Research (AREA)
- Development Economics (AREA)
- Quality & Reliability (AREA)
- Databases & Information Systems (AREA)
- Health & Medical Sciences (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Data Mining & Analysis (AREA)
- General Engineering & Computer Science (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses a management system for different projects of civil construction. The system comprises a man-machine operation module, a data mining module, a base station of different large shopping websites, a web crawler module, a data collection module, a budget output module for different project materials, an output module of different project planning schemes, an artificial expert module and a central processor. The different project planning schemes can be generated according to different projection conditions and requirements, strong points of each worker are used as possible, the working efficiency and project quality are greatly improved, the management system is capable of cost budgeting, the workload of workers is greatly reduced, and each generated scheme is checked by artificial experts, and the reasonableness of the schemes is further improved.
Description
Technical field
The present invention relates to construction management field, be specifically related to the management system of a kind of various engineering of civil construction.
Background technology
In the every operation of civil construction project, by overseer empirically, on the basis of considering workload and duration, plan job engineering, arrange goods, materials and equipments and power tool, personnel needed for each job engineering.In general, this engineer operation step is arranged according to its experience by field surveillance person, and only planning operation process is accomplished by taking a significant amount of time and labor service, and the careless omission and the delay operation that are easily caused in arrangement launch.Meanwhile, it is also easy to cause operation quality understable, reduces engineering credit rating.
Summary of the invention
For solving the problems referred to above, the invention provides the management system of a kind of various engineering of civil construction, different project planning schemes can be generated with engine request according to different project situation, the simultaneously the most maximum speciality that may play each workman, substantially increase work efficiency and construction quality, and there is cost budgeting function, significantly reduce the workload of staff.
For achieving the above object, the technical scheme that the present invention takes is:
The management system of various engineering of civil construction, including
These data for basic condition, project basic demand, Project design figure and the title of project material requested and the requirement of cuit, and are sent to data-mining module and every project planning scheme output module by human-machine operation module;For inputting data call order;
These characteristics for excavating the characteristic of the data that the human-machine operation module received is inputted, and are sent to webcrawler module by data-mining module;
Each big shopping network base station, for providing the picture of various building materials, price and manufacturer's information;
Webcrawler module, for inquiring about similar data on each big shopping network base station according to received characteristic, and is sent to every engineering material budget output module and display screen after the data collected being arranged from high to low according to similarity;
Data acquisition module, for gathering member's basic condition of each crew and bearing data that each staff is good at being stored in data base;
Every engineering material budget output module, the data for being sent according to webcrawler module carry out the budget of every engineering material and adjust, and calculation process and accounting result are transported to display screen;
Every project planning scheme output module, the data for being inputted according to human-machine operation module carry out the inquiry of data in data base, and Query Result are combined optimization output to human expert module by the algorithm set;
Human expert module, for by human expert the programme of every engineering being carried out manual examination and verification and manually adjusting optimization, and is sent to display screen by last optimum results by project planning output module and shows;
Central processing unit, is used for coordinating the work of above-mentioned module;Corresponding data are called in call instruction for being inputted according to human-machine operation module in data base, and are sent to display screen and show;For adding user, deleting user, password amendment, rights management.
Preferably, also include a data sharing module, for the data in data base being shared by the way of download.
Preferably, described human-machine operation module includes picture input module, voice input module and word input module.
Preferably, described voice input module uses mike, and word input module uses handwriting pad and keyboard.
Preferably, described picture input module uses scanner and photographic head.
Preferably, described data-mining module, for receiving the image data of input, lteral data and speech data, remove the speckle noise in image, the eigenvalue extracted in picture is sent to webcrawler module;The keyword extracted in lteral data is sent to webcrawler module;Convert voice data to text data, and extract keyword and be sent to webcrawler module.
The method have the advantages that
Different project planning schemes can be generated with engine request according to different project situation, the simultaneously the most maximum speciality that may play each workman, substantially increase work efficiency and construction quality, and there is cost budgeting function, significantly reduce the workload of staff, the generation of each scheme all uses human expert to audit, and further increases the reasonability of scheme.
Accompanying drawing explanation
Fig. 1 is the structural representation of the management system of embodiment of the present invention various engineering of civil construction.
Detailed description of the invention
In order to make objects and advantages of the present invention clearer, below in conjunction with embodiment, the present invention is further elaborated.Should be appreciated that specific embodiment described herein, only in order to explain the present invention, is not intended to limit the present invention.
As it is shown in figure 1, embodiments provide the management system of a kind of various engineering of civil construction, including
These data for basic condition, project basic demand, Project design figure and the title of project material requested and the requirement of cuit, and are sent to data-mining module and every project planning scheme output module by human-machine operation module;For inputting data call order;
These characteristics for excavating the characteristic of the data that the human-machine operation module received is inputted, and are sent to webcrawler module by data-mining module;
Each big shopping network base station, for providing the picture of various building materials, price and manufacturer's information;
Webcrawler module, for inquiring about similar data on each big shopping network base station according to received characteristic, and is sent to every engineering material budget output module and display screen after the data collected being arranged from high to low according to similarity;
Data acquisition module, for gathering member's basic condition of each crew and bearing data that each staff is good at being stored in data base;
Every engineering material budget output module, the data for being sent according to webcrawler module carry out the budget of every engineering material and adjust, and calculation process and accounting result are transported to display screen;
Every project planning scheme output module, the data for being inputted according to human-machine operation module carry out the inquiry of data in data base, and Query Result are combined optimization output to human expert module by the algorithm set;
Human expert module, for by human expert the programme of every engineering being carried out manual examination and verification and manually adjusting optimization, and is sent to display screen by last optimum results by project planning output module and shows;
Central processing unit, is used for coordinating the work of above-mentioned module;Corresponding data are called in call instruction for being inputted according to human-machine operation module in data base, and are sent to display screen and show;For adding user, deleting user, password amendment, rights management.
Also include a data sharing module, for the data in data base being shared by the way of download.
Described human-machine operation module includes picture input module, voice input module and word input module.
Described voice input module uses mike, and word input module uses handwriting pad and keyboard.
Described picture input module uses scanner and photographic head.
Described data-mining module, for receiving the image data of input, lteral data and speech data, removes the speckle noise in image, and the eigenvalue extracted in picture is sent to webcrawler module;The keyword extracted in lteral data is sent to webcrawler module;Convert voice data to text data, and extract keyword and be sent to webcrawler module.
The above is only the preferred embodiment of the present invention; it should be pointed out that, for those skilled in the art, under the premise without departing from the principles of the invention; can also make some improvements and modifications, these improvements and modifications also should be regarded as protection scope of the present invention.
Claims (6)
1. the management system of various engineering of civil construction, it is characterised in that include
These data for basic condition, project basic demand, Project design figure and the title of project material requested and the requirement of cuit, and are sent to data-mining module and every project planning scheme output module by human-machine operation module;For inputting data call order;
These characteristics for excavating the characteristic of the data that the human-machine operation module received is inputted, and are sent to webcrawler module by data-mining module;
Each big shopping network base station, for providing the picture of various building materials, price and manufacturer's information;
Webcrawler module, for inquiring about similar data on each big shopping network base station according to received characteristic, and is sent to every engineering material budget output module and display screen after the data collected being arranged from high to low according to similarity;
Data acquisition module, for gathering member's basic condition of each crew and bearing data that each staff is good at being stored in data base;
Every engineering material budget output module, the data for being sent according to webcrawler module carry out the budget of every engineering material and adjust, and calculation process and accounting result are transported to display screen;
Every project planning scheme output module, the data for being inputted according to human-machine operation module carry out the inquiry of data in data base, and Query Result are combined optimization output to human expert module by the algorithm set;
Human expert module, for by human expert the programme of every engineering being carried out manual examination and verification and manually adjusting optimization, and is sent to display screen by last optimum results by project planning output module and shows;
Central processing unit, is used for coordinating the work of above-mentioned module;Corresponding data are called in call instruction for being inputted according to human-machine operation module in data base, and are sent to display screen and show;For adding user, deleting user, password amendment, rights management.
The management system of various engineering of civil construction the most according to claim 1, it is characterised in that also include a data sharing module, for sharing the data in data base by the way of download.
The management system of various engineering of civil construction the most according to claim 1, it is characterised in that described human-machine operation module includes picture input module, voice input module and word input module.
The management system of various engineering of civil construction the most according to claim 3, it is characterised in that described voice input module uses mike, word input module uses handwriting pad and keyboard.
The management system of various engineering of civil construction the most according to claim 3, it is characterised in that described picture input module uses scanner and photographic head.
The management system of various engineering of civil construction the most according to claim 1, it is characterized in that, described data-mining module, for receiving the image data of input, lteral data and speech data, removing the speckle noise in image, the eigenvalue extracted in picture is sent to webcrawler module;The keyword extracted in lteral data is sent to webcrawler module;Convert voice data to text data, and extract keyword and be sent to webcrawler module.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610143929.9A CN105825331A (en) | 2016-03-08 | 2016-03-08 | Management system for different projects of civil construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610143929.9A CN105825331A (en) | 2016-03-08 | 2016-03-08 | Management system for different projects of civil construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105825331A true CN105825331A (en) | 2016-08-03 |
Family
ID=56987827
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610143929.9A Pending CN105825331A (en) | 2016-03-08 | 2016-03-08 | Management system for different projects of civil construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105825331A (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106897861A (en) * | 2017-02-16 | 2017-06-27 | 龙岩学院 | A kind of project management system |
CN107169747A (en) * | 2017-06-19 | 2017-09-15 | 郑州航空工业管理学院 | A kind of management system of various engineering of civil construction |
CN107273484A (en) * | 2017-06-13 | 2017-10-20 | 广东中建普联科技股份有限公司 | Construction industry engineering project XML file purpose data classifying method and system |
CN108830662A (en) * | 2018-07-18 | 2018-11-16 | 贵州汇杰兴邦电力工程有限公司 | A kind of power engineering budget device and method |
CN109325711A (en) * | 2018-11-07 | 2019-02-12 | 北京环安工程检测有限责任公司 | Urban track traffic civil engineering structure Defect inspection management system and its workflow |
CN109934565A (en) * | 2019-03-21 | 2019-06-25 | 兰州工业学院 | A kind of Construction Cost Data management system based on BIM |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1366264A (en) * | 2001-01-16 | 2002-08-28 | Pc网络大厦株式会社 | Project management method of constructional engineering |
CN103295104A (en) * | 2013-06-13 | 2013-09-11 | 深圳市加斯特工程咨询有限公司 | Quota design management method and project investment service platform for cost accounting |
CN105260954A (en) * | 2015-10-09 | 2016-01-20 | 重庆工商职业学院 | Construction cost list service system based on Internet-of-things technology |
-
2016
- 2016-03-08 CN CN201610143929.9A patent/CN105825331A/en active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1366264A (en) * | 2001-01-16 | 2002-08-28 | Pc网络大厦株式会社 | Project management method of constructional engineering |
CN103295104A (en) * | 2013-06-13 | 2013-09-11 | 深圳市加斯特工程咨询有限公司 | Quota design management method and project investment service platform for cost accounting |
CN105260954A (en) * | 2015-10-09 | 2016-01-20 | 重庆工商职业学院 | Construction cost list service system based on Internet-of-things technology |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106897861A (en) * | 2017-02-16 | 2017-06-27 | 龙岩学院 | A kind of project management system |
CN107273484A (en) * | 2017-06-13 | 2017-10-20 | 广东中建普联科技股份有限公司 | Construction industry engineering project XML file purpose data classifying method and system |
CN107169747A (en) * | 2017-06-19 | 2017-09-15 | 郑州航空工业管理学院 | A kind of management system of various engineering of civil construction |
CN108830662A (en) * | 2018-07-18 | 2018-11-16 | 贵州汇杰兴邦电力工程有限公司 | A kind of power engineering budget device and method |
CN109325711A (en) * | 2018-11-07 | 2019-02-12 | 北京环安工程检测有限责任公司 | Urban track traffic civil engineering structure Defect inspection management system and its workflow |
CN109934565A (en) * | 2019-03-21 | 2019-06-25 | 兰州工业学院 | A kind of Construction Cost Data management system based on BIM |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105825331A (en) | Management system for different projects of civil construction | |
KR20200098875A (en) | System and method for providing 3D face recognition | |
US20140137110A1 (en) | Capacity reclamation and resource adjustment | |
MY202337A (en) | Terminal rule engine device and terminal rule operation method | |
CN108628607B (en) | Method, system and storage medium for assisting software development based on artificial intelligence | |
CN105786968B (en) | A kind of multimedia advertising designing system | |
CN105260954A (en) | Construction cost list service system based on Internet-of-things technology | |
CN104657650A (en) | Method and device for data input or authentication | |
CN106648589A (en) | svn source code online management and shared viewing system and method | |
CN105468787A (en) | Method, apparatus and system for setting parameters of industrial equipment | |
CN102103505A (en) | Method and equipment for generating workflow interface | |
CN103685517A (en) | Storage hierarchical scheduling method and system based on service class characteristics | |
CN102298738A (en) | intelligent audit management system | |
CN110414865A (en) | A kind of distribution method, device, computer equipment and the storage medium of audit task | |
CN104717197A (en) | Session management system, session management apparatus, and session management method | |
CN106295954A (en) | Flood control personnel and the intelligent dispatching method of pumping plant and intelligent dispatching system | |
CN109034254B (en) | Method, system and storage medium for customizing artificial intelligence online service | |
CN104021497A (en) | Train fault overhaul terminal system based on mobile terminal | |
CN106648964A (en) | Database backup method and system | |
CN103970667A (en) | Defect management platform based defect assigning method and system | |
CN116757855A (en) | Intelligent insurance service method, device, equipment and storage medium | |
CN104735134B (en) | A kind of method and apparatus serviced for providing calculating | |
CN105426431A (en) | Search system for distributed resource site and implementation method thereof | |
KR20100135047A (en) | United building management system | |
KR20170022239A (en) | System and method for offshore construction data management on sites |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20160803 |
|
RJ01 | Rejection of invention patent application after publication |