CN1366264A - Project management method of constructional engineering - Google Patents
Project management method of constructional engineering Download PDFInfo
- Publication number
- CN1366264A CN1366264A CN 01121144 CN01121144A CN1366264A CN 1366264 A CN1366264 A CN 1366264A CN 01121144 CN01121144 CN 01121144 CN 01121144 A CN01121144 A CN 01121144A CN 1366264 A CN1366264 A CN 1366264A
- Authority
- CN
- China
- Prior art keywords
- engineering
- data
- during
- database
- process chart
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
To provide a work management method for construction work. In this work management method for construction work, the work information related to the construction work is divisionally held in a work daily report database, a work photographic database and a work drawing database, and the data concerned is stored in each database or divisionally for a plurality of work periods. All daily report data concerned, all photographic data, or all drawing data are read from each database and grasped, and any one of the daily report data, any one of the photographic data, and any one of the drawing data within a specified work period are read from the databases, respectively, and grasped.
Description
The present invention relates to engineering information with construction work distinguishes during according to engineering and is made into e-file, the project management method of reading, managing.
Past, the engineering information of construction work is made into e-file, the method of reading and managing, be to utilize computer, with day's work daily paper data and project photograph data, process chart data, be delivered to server from engineering site, then in this server with these engineering daily paper data and project photograph data, process chart data, according to engineering daily paper database and project photograph database, process chart database, preserve with chronological order (order of delivering letters).Utilize computer at engineering site, specify in these engineering daily paper databases and project photograph database, the process chart database each, from this database, access each of the engineering daily paper data of specific date and project photograph data, process chart data again, read and engineering management.
Yet, in construction begins during be completed, engineering daily paper data, project photograph data or the process chart data of a certain particular day of can only reading.And, can not the appointed day, but after must accessing all-work daily paper data, project photograph data and process chart data during the engineering, from total data, check and seek out required data.Like this, just be difficult to the comprehensive project progress state of managing between a certain given period of constructing in being completed of holding.
The present invention is the correlation engineering information with construction work about the project management method of construction work, preserves respectively by engineering daily paper database, project photograph database, process chart database.
In above-mentioned engineering daily paper database, during the engineering daily paper data and the 2nd, the 3rd during the 1st engineering ... preserve engineering daily paper data respectively.
Equally, in above-mentioned project photograph database, also according to during the 1st engineering and during the 2nd, the 3rd ... the project photograph data are preserved respectively.
Equally, in above-mentioned process chart database, according to during the 1st engineering and during the 2nd, the 3rd ... the process chart data are preserved respectively.
First kind of information assurance method is: from above-mentioned engineering daily paper database, during the unified engineering daily paper data and the 2nd, the 3rd that access during the 1st engineering or the like, hold the engineering daily paper data during the above-mentioned all-work.
Equally, from above-mentioned project photograph database, during the unified project photograph data and the 2nd, the 3rd that access during the 1st engineering or the like, hold the project photograph data during the above-mentioned all-work.
Equally, from above-mentioned process chart database, during the unified process chart data and the 2nd, the 3rd that access during the 1st engineering or the like, hold the process chart data during the above-mentioned all-work.
Second kind of information assurance method is: from above-mentioned engineering daily paper database, project photograph database, process chart database, engineering daily paper data, the project photograph data during the 1st engineering and the process chart data during the 1st engineering during the 1st engineering be can access, thereby all-work daily paper data, project photograph data and process chart data during the 1st engineering held.
Equally, from above-mentioned engineering daily paper database, project photograph database, process chart database, engineering daily paper data, the project photograph data during the 2nd engineering and the process chart data during the 1st engineering during the 2nd engineering be can access, thereby all-work daily paper data, project photograph data and process chart data during the 2nd engineering held.
Equally, from above-mentioned engineering daily paper database, project photograph database, process chart database, engineering daily paper data, the project photograph data during the 3rd engineering and the process chart data during the 3rd engineering during the 3rd engineering be can access, thereby all-work daily paper data, project photograph data and process chart data during the 3rd engineering held.
First kind of information assurance method according to the invention described above implemented, construction can be begun during the whole engineering of being completed, to be divided between each given period, reading engineering daily paper data, project photograph data or process chart data, thus the progress situation of holding engineering conscientiously with go wrong.
Second kind of information assurance method according to the invention described above implemented, and construction can be begun to be divided between each given period during the whole engineering of being completed reading engineering daily paper data and corresponding engineering picture data and process chart data.Thereby hold the relevance between engineering daily paper data and project photograph data, the process chart data conscientiously, and on the system clear and definite problem place.
Following according to Fig. 1-Fig. 5, the working of an invention form is described.
Fig. 1 is in the project management method of construction work, the presentation graphs of server and terminal relation.
The pie graph of Fig. 2 server memory.
In the project management method of Fig. 3 construction work, the frame diagram of the disposal route of server and terminal.
Fig. 4 A, what B, C represented is to utilize first kind of information assurance method picture displayed.
Fig. 5 A, what B, C represented is to utilize second kind of information assurance method picture displayed.
S among Fig. 1 is a server.In the storer 1 of this server S, as shown in Figure 2, the correlation engineering information of construction work is preserved respectively by engineering daily paper database 2, project photograph database 3, process chart database 4.And preserve edit routine 5 and terminal supervisory program 7.
Progress along with engineering, almost all can pass through communication line every day, with above-mentioned engineering daily paper data 21,22,23 ... with project photograph data 31,32,33 ... and process chart data 41,42,43 ... etc. information, pass to above-mentioned server S from the terminal 10 of the machineries such as computer of engineering site.These data 21,22,23,31,32,33,41,42,43 ...,, processed in master controller (CPU) by external interface 9.Judge these data 21,22,23,31,32,33,41,42,43 by edit routine 5 ... which belongs in engineering daily paper database 2, project photograph database 3, the process chart database 4.And, judge to belong to during which engineering of each database 2,3,4, and be stored in and deserve part.
As shown in Figure 3, in above-mentioned engineering daily paper database 2, with engineering daily paper data 23 during engineering daily paper data the 22, the 3rd engineering during engineering daily paper data the 21, the 2nd engineering during the 1st engineering ... preserve respectively.
Suppose to go into operation, construct, be completed during three with being divided into during the whole engineering.Engineering daily paper data when at this moment, going into operation just are equivalent to engineering daily paper data 21 during above-mentioned the 1st engineering.Engineering daily paper data during construction just are equivalent to engineering daily paper data 22 during above-mentioned the 2nd engineering.Engineering daily paper data during completion just are equivalent to engineering daily paper data 23 during above-mentioned the 3rd engineering.
Equally, in above-mentioned project photograph database 3, with project photograph data 33 during project photograph data the 32, the 3rd engineering during the 31, the 2nd engineering of project photograph data during the 1st engineering ... preserve respectively.
Suppose be divided into during the whole engineering go into operation, construct, be completed during.Project photograph data when at this moment, going into operation just are equivalent to project photograph data 31 during above-mentioned the 1st engineering.Project photograph data during construction just are equivalent to project photograph data 32 during above-mentioned the 2nd engineering.Project photograph data during completion just are equivalent to project photograph data 33 during above-mentioned the 3rd engineering.
Equally, in above-mentioned process chart database 4, with process chart data 43 during process chart data the 42, the 3rd engineering during the 41, the 2nd engineering of process chart data during the 1st engineering ... preserve respectively.
Suppose be divided into during the whole engineering go into operation, construct, be completed during.Process chart data when at this moment, going into operation just are equivalent to process chart data 41 during above-mentioned the 1st engineering.Process chart data during construction just are equivalent to process chart data 42 during above-mentioned the 2nd engineering.Process chart data during completion just are equivalent to process chart data 43 during above-mentioned the 3rd engineering.
As shown in Figure 3, adopt first kind of information assurance method: utilize terminal 10 to select the 1st menu 11, in the above-mentioned engineering daily paper database 2 from server S, unified access the engineering daily paper data 23 during the engineering during engineering daily paper data 21 during the 1st engineering and the engineering daily paper data the 22, the 3rd during the 2nd engineering ...Shown in Fig. 4 A, on the picture 8 of terminal 10, these data presentation are the 1st expression 11 '.By this information of reading, hold the engineering daily paper data 21,22,23 during above-mentioned whole specific engineering
As shown in Figure 2, if above-mentioned the 1st menu 11, and following the 2nd to the 6th menu 12,13,14 that will narrate, 15,16 have visit, and terminal supervisory program 7 just can be as requested, on terminal 10, from engineering daily paper database 2, project photograph database 3 or process chart database 4, select the corresponding data of reading.
Equally, as shown in Figure 3, utilize terminal 10 to select the 2nd menu 12, in the above-mentioned project photograph database 3 from server S, unifiedly access the project photograph data 33 during the engineering during project photograph data 31 during the 1st engineering and the project photograph data during the 2nd engineering the 32, the 3rd ...Shown in Fig. 4 B, on the picture 8 of terminal 10, these data presentation are the 2nd expression 12 '.By this information of reading, hold the project photograph data 31,32,33 during above-mentioned whole specific engineering
Equally, as shown in Figure 3, utilize terminal 10 to select the 3rd menu 13, in the above-mentioned process chart database 4 from server S, unifiedly access the process chart data 43 during the engineering during process chart data 41 during the 1st engineering and the process chart data during the 2nd engineering the 42, the 3rd ...Shown in Fig. 4 C, on the picture 8 of terminal 10, these data presentation are the 3rd expression 13 '.By this information of reading, hold the process chart data 31,32,33 during above-mentioned whole specific engineering
As shown in Figure 3, adopt second kind of information assurance method: utilize terminal 10 to select the 4th menu 14, in above-mentioned engineering daily paper database 2 from server S, project photograph database 3, the process chart database 4, access the process chart data 41 during the engineering during engineering daily paper data 21 during the 1st engineering and the project photograph data the 31, the 1st during the 1st engineering.Shown in Fig. 5 A, on the picture 8 of terminal 10, these data presentation are the 4th expression 14 '.By this information of reading, hold all-work daily paper data 21 during the 1st engineering, project photograph data 31, process chart data 41.
Equally, utilize terminal 10 to select the 5th menu 15, in above-mentioned engineering daily paper database 2 from server S, project photograph database 3, the process chart database 4, access the process chart data 42 during the engineering during engineering daily paper data 22 during the 2nd engineering and the project photograph data the 32, the 2nd during the 2nd engineering.Shown in Fig. 5 B, on the picture 8 of terminal 10, these data presentation are the 5th expression 15 '.By this information of reading, hold all-work daily paper data 22 during the 2nd engineering, project photograph data 32, process chart data 42.
Equally, utilize terminal 10 to select the 6th menu 16, in above-mentioned engineering daily paper database 2 from server S, project photograph database 3, the process chart database 4, access the process chart data 43 during the engineering during engineering daily paper data 23 during the 3rd engineering and the project photograph data the 33, the 3rd during the 3rd engineering.Shown in Fig. 5 C, on the picture 8 of terminal 10, these data presentation are the 6th expression 16 '.By this information of reading, hold all-work daily paper data 23 during the 3rd engineering, project photograph data 33, process chart data 43.
First kind of information assurance method according to the invention described above implemented, and can be divided between each given period reading engineering daily paper data 21,22 with going into operation during the whole engineering of being completed, 23 ..., and project photograph data 31,32,33 ... process chart data 41,42,43 ...Thereby the progress situation of holding engineering conscientiously with go wrong.
Implement second kind of information assurance method of the invention described above, can during the whole engineering of being completed, be divided between each given period, reading engineering daily paper data 21,22 going into operation, 23 ..., and corresponding engineering picture data 31,32,33 ... with process chart data 41,42,43 ...Thereby hold the relevance between engineering daily paper data and project photograph data, the process chart data conscientiously, and on the system clear and definite problem place.
Claims (1)
1, a kind of project management method of construction work is characterized in that: will preserve respectively by engineering daily paper database, project photograph database, process chart database about the engineering information of construction work; And, in above-mentioned engineering daily paper database, during the engineering daily paper data and the 2nd, the 3rd during the 1st engineering ... engineering daily paper data preserve respectively; Equally, above-mentioned project photograph database is also according to during the 1st engineering and during the 2nd, the 3rd ... the project photograph data are preserved respectively; Above-mentioned process chart database is according to during the 1st engineering and during the 2nd, the 3rd ... the process chart data are preserved respectively; Like this, just can be from above-mentioned engineering daily paper database, access respectively during the engineering daily paper data and the 2nd, the 3rd during the 1st engineering or the like, hold the engineering daily paper data during the above-mentioned all-work.Equally, from above-mentioned project photograph database, access respectively during the project photograph data and the 2nd, the 3rd during the 1st engineering or the like, hold the project photograph data during the above-mentioned all-work; From above-mentioned process chart database, access respectively during the process chart data and the 2nd, the 3rd during the 1st engineering or the like, hold the process chart data during the above-mentioned all-work; And, from above-mentioned engineering daily paper database, project photograph database, process chart database, engineering daily paper data, the project photograph data during the 1st engineering and the process chart data during the 1st engineering during the 1st engineering be can access, thereby all-work daily paper data, project photograph data and process chart data during the 1st engineering held; Equally, from above-mentioned engineering daily paper database, project photograph database, process chart database, access engineering daily paper data, the project photograph data during the 2nd engineering and the process chart data during the 2nd engineering during the 2nd engineering, thereby hold all-work daily paper data, project photograph data and process chart data during the 2nd engineering; From engineering daily paper database, project photograph database, process chart database, access engineering daily paper data, the project photograph data during the 3rd engineering and the process chart data during the 3rd engineering during the 3rd engineering, thereby hold all-work daily paper data, project photograph data and process chart data during the 3rd engineering.
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2001007474A JP3715534B2 (en) | 2001-01-16 | 2001-01-16 | Construction management method in construction work |
JP007474/01 | 2001-01-16 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN1366264A true CN1366264A (en) | 2002-08-28 |
Family
ID=18875220
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 01121144 Pending CN1366264A (en) | 2001-01-16 | 2001-06-05 | Project management method of constructional engineering |
Country Status (2)
Country | Link |
---|---|
JP (1) | JP3715534B2 (en) |
CN (1) | CN1366264A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105144208A (en) * | 2013-04-19 | 2015-12-09 | 阿科尼克斯有限公司 | Social project management |
CN105825331A (en) * | 2016-03-08 | 2016-08-03 | 河南理工大学 | Management system for different projects of civil construction |
TWI576777B (en) * | 2016-04-01 | 2017-04-01 | zhi-da Luo | Engineering management system |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100844467B1 (en) | 2007-10-22 | 2008-07-07 | 주식회사 디디알소프트 | A simulation system and method for construction progression state with 3d |
Family Cites Families (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH08263336A (en) * | 1995-03-24 | 1996-10-11 | Babcock Hitachi Kk | Design job support system and data base processor for the support system |
JPH08314954A (en) * | 1995-05-16 | 1996-11-29 | Canon Inc | Method and device for processing information |
JP3285734B2 (en) * | 1995-04-21 | 2002-05-27 | 株式会社イトーキクレビオ | Sales management system |
JP2816950B2 (en) * | 1995-06-13 | 1998-10-27 | 中国電力株式会社 | Transmission line construction site management system and site photo transmission method |
JP3471526B2 (en) * | 1995-07-28 | 2003-12-02 | 松下電器産業株式会社 | Information provision device |
JPH09138823A (en) * | 1995-09-11 | 1997-05-27 | Hitachi Ltd | Progress control method for design and development and its system, control method for designing and developing project and its system |
JPH09330117A (en) * | 1996-06-10 | 1997-12-22 | Yokogawa Electric Corp | Batch plant control system |
JP3445470B2 (en) * | 1997-07-09 | 2003-09-08 | 株式会社東芝 | Maintenance information management support apparatus and method |
JP2000001986A (en) * | 1998-06-15 | 2000-01-07 | Fujita Corp | Construction control system |
-
2001
- 2001-01-16 JP JP2001007474A patent/JP3715534B2/en not_active Expired - Lifetime
- 2001-06-05 CN CN 01121144 patent/CN1366264A/en active Pending
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105144208A (en) * | 2013-04-19 | 2015-12-09 | 阿科尼克斯有限公司 | Social project management |
CN105825331A (en) * | 2016-03-08 | 2016-08-03 | 河南理工大学 | Management system for different projects of civil construction |
TWI576777B (en) * | 2016-04-01 | 2017-04-01 | zhi-da Luo | Engineering management system |
Also Published As
Publication number | Publication date |
---|---|
JP2002213080A (en) | 2002-07-31 |
JP3715534B2 (en) | 2005-11-09 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US9384174B1 (en) | Automated system for assisting the architectural process | |
CN1213379C (en) | Real-time detabase object statistics collection | |
EP1979844A2 (en) | A portable dataport device and method for retrieving, inter-relating, annotating and managing electronic documents at a point of need | |
WO2004053635A2 (en) | Method and system for managing metadata | |
CN1721143A (en) | Robot system provided with robot controller | |
US20050159990A1 (en) | Systems and methods for managing projects | |
US20170228346A9 (en) | Portable dataport device and method for retrieving, interrelating, annotating and managing electronic documents at a point of need | |
CN101064027A (en) | Architectural engineering construction technique normalizing knowledge base data structure | |
CN1624702A (en) | Method and system for enterprise-wide migration | |
US20050171963A1 (en) | Systems and methods for managing projects | |
Fruchter et al. | Knowledge management for reuse | |
CN1366264A (en) | Project management method of constructional engineering | |
CN1475950A (en) | Item management system and method | |
CN1680931A (en) | Method for automatic modeling a process control system and corresponding process control system | |
CN1311338C (en) | Method for reducing holding of internal memory in using table | |
CN1315070C (en) | Data base access method and system in management information base of network management protocol | |
US20080313175A1 (en) | Method and system for interaction-based expertise reporting | |
CN1485775A (en) | Display processing system and method for node data of tree structure | |
US20100146002A1 (en) | Capturing enterprise architectures | |
CN1423217A (en) | Patent fee managenment system and method | |
US7574329B1 (en) | Object model for decision and issue tracking | |
CN1521669A (en) | Document management system and method | |
CN1828579A (en) | Patent analyzing system | |
US8880988B2 (en) | System and method for dynamic creation of images | |
CN1393771A (en) | Method for quickly eliminating different information in database |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |