CN107150761B - The water surface of large-scale floating body builds installation method - Google Patents

The water surface of large-scale floating body builds installation method Download PDF

Info

Publication number
CN107150761B
CN107150761B CN201710295013.XA CN201710295013A CN107150761B CN 107150761 B CN107150761 B CN 107150761B CN 201710295013 A CN201710295013 A CN 201710295013A CN 107150761 B CN107150761 B CN 107150761B
Authority
CN
China
Prior art keywords
floating body
water surface
installation method
ontology
connection cable
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710295013.XA
Other languages
Chinese (zh)
Other versions
CN107150761A (en
Inventor
俞麒峰
艾玉忠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SUZHOU YUNYI AVIATION COMPOSITE MATERIAL STRUCTURE Co.,Ltd.
Original Assignee
Shenzhen Blue Ocean Engineering Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Blue Ocean Engineering Development Co Ltd filed Critical Shenzhen Blue Ocean Engineering Development Co Ltd
Priority to CN201710295013.XA priority Critical patent/CN107150761B/en
Publication of CN107150761A publication Critical patent/CN107150761A/en
Application granted granted Critical
Publication of CN107150761B publication Critical patent/CN107150761B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B75/00Building or assembling floating offshore structures, e.g. semi-submersible platforms, SPAR platforms or wind turbine platforms

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Structural Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses a kind of waters surface of large-scale floating body to build installation method, comprising steps of Step 1: in building inflatable mounting platform on the water surface;Step 2: closing up fixed structure object using closing device on the platform that step 1 is formed;Step 3: honeycomb board is installed using mobile device, to form floating body on the works that step 2 is formed.The present invention provides a stabilised platforms, can build superstructure module as land on the platform.

Description

The water surface of large-scale floating body builds installation method
Technical field
The present invention relates to a kind of waters surface of large-scale floating body to build installation method.
Background technique
The construction of large-scale boat structure object usually carries out on land or dock.Each component build permitted by group, middle group, it is big It in the group stage, on the one hand needs to occupy biggish place, further needs exist for often moving, increase process.Closing up on land will receive Road, traffic and the limitation of place size.Land has to pass through the complicated operation that is lauched after the completion of closing up, risk is high.In ship Depressed place closes up, and the occupancy depressed place phase is longer, costly, and dock length and width (especially in terms of width) are by larger limitation.Using normal The large-scale boat structure object that rule method is closed up generally all farther out from target water, is transported by channel width and depth limit.It is logical Often when works closes up, it is fixed using a large amount of temporary components are welded.Welding, sanding operation cause certain journey to structure The injury of degree.Live interim operation is difficult to ensure welding quality, be easy to cause trueness error and accident.
Summary of the invention
The present invention is in order to solve the above technical problems, the water surface for providing a kind of large-scale floating body builds installation method.
In order to achieve the above object, the invention is realized by the following technical scheme:
The water surface of large-scale floating body builds installation method, comprising steps of
Step 1: in building inflatable mounting platform on the water surface;
Step 2: closing up fixed structure object using closing device on the platform that step 1 is formed;
Step 3: honeycomb board is installed using mobile device, to form floating body on the works that step 2 is formed.
An embodiment according to the present invention, the step one is comprising steps of step a, assembling steel structure frame;Step Rapid b, in several air bags are arranged in parallel in steel structure frame and inflate;Step c, in the top of steel structure frame, fixed work is flat Face.
An embodiment according to the present invention, the closing device include: rotor, connection cable, tension equipment and Anchor, wherein rotor is respectively welded on works to be closed up, connection cable is arranged around rotor, and tension equipment is to even Connecing hawser application pretightning force is tensioned connection cable, connection cable of the anchor for fixed tensioning.
An embodiment according to the present invention, the mobile device includes: guide rail and locomotive, wherein guide rail can It is releasably set on works, locomotive is transported to installation site peace in being movably disposed on guide rail, and by honeycomb board Dress.
An embodiment according to the present invention, the locomotive include: ontology, lift mechanism, grabbing device and turn Wheel, wherein the lower section of ontology is equipped with accommodation space for accommodating grabbing device and honeycomb board to be moved, lifts mechanism setting In ontology top and be connected with grabbing device, for providing the power of grabbing device raising and lowering, grabbing device is for grabbing Honeycomb board to be moved is taken, runner is set to the bottom of ontology and is located on guide rail.
The present invention reduces the land transport problem of large structure in building inflatable mounting platform on the water surface, saves land The place lease expenses of ground saves the engineering ships lease expenses such as barge.Close up fixed structure object using closing device, is tying Rotor welding is good, the danger and quality problems for avoiding live temporary weld from may cause when structure object manufactures.The works closed up Saving material can be reused.Pretightning force is applied by mechanical, easy to operate.Only need to control the accurate of rotor mounting location Degree, less rigging error add up factor.Honeycomb board is installed using mobile device, convenient transport is laborsaving time saving, and installation is accurate, Less installation error, less labor intensity of workers.The present invention provides a stabilised platforms, on the platform can be such as land Equally build superstructure module.
Detailed description of the invention
Fig. 1 is the top view of step 1 inflatable mounting platform;
Fig. 2 is the front view of step 1 inflatable mounting platform;
Fig. 3 is the left view of step 1 inflatable mounting platform;
Fig. 4 is step 2 closing device floor plan;
Fig. 5 is step 2 closing device side arrangement figure;
Fig. 6 is step 3 mobile device schematic diagram;
Fig. 7 is locomotive structural schematic diagram.
Specific embodiment
The present invention is described in detail with reference to the accompanying drawing:
The water surface of the present embodiment large-scale floating body builds installation method, comprising steps of
As shown in Figure 1, Figure 2 and Figure 3, Step 1: in building inflatable mounting platform on the water surface:
Comprising steps of step a, assembling steel structure frame 3;Step b, in several air bags 1 are arranged in parallel in steel structure frame 3 And it inflates;Step c, in the fixed working face 2 in the top of steel structure frame 3.
In building inflatable mounting platform on the water surface, the land transport problem of large structure is reduced, land is saved Place lease expenses saves the engineering ships lease expenses such as barge.
As shown in Figure 4 and Figure 5, Step 2: closing up fixed structure object using closing device on the platform that step 1 is formed 4;Closing device includes: rotor 5, connection cable 6, tension equipment 7 and anchor 8, wherein is divided on works 4 to be closed up Other welded disc turbine rotor 5, connection cable 6 are arranged around rotor 5, and tension equipment 7, which applies pretightning force to connection cable 6, makes connection cable 6 Tensioning, connection cable 6 of the anchor 8 for fixed tensioning.Connection cable 6 uses wirerope.
Close up fixed structure object 4 using closing device, rotor 5 is welded when works 4 manufactures, avoids live interim Weld the danger and quality problems that may cause.The works 4 closed up can reuse saving material.Pretightning force passes through machinery Apply, it is easy to operate.Only need to control the accuracy of 5 installation site of rotor, less rigging error adds up factor.
As shown in Figure 6 and Figure 7, Step 3: on the works 4 that step 2 is formed, cellular board is installed using mobile device Material, to form floating body.
Mobile device includes: guide rail 9 and locomotive 10, wherein guide rail 9 is removable installed on works 4, locomotive 10 are movably disposed on guide rail 9, and honeycomb board is transported to installation site installation.
The locomotive 10 includes: ontology 11, lifts mechanism 12, grabbing device 13 and runner 14, wherein ontology 11 Lower section is equipped with accommodation space for accommodating grabbing device 13 and honeycomb board 15 to be moved, lifts mechanism 12 and is set to ontology 11 Top and be connected with grabbing device 13, for providing the power of 13 raising and lowering of grabbing device, grabbing device 13 is for grabbing Honeycomb board 15 to be moved is taken, runner 14 is set to the bottom of ontology 11 and is located on guide rail 9.
In use, grabbing device 13 grabs honeycomb board 15 to be moved in laydown area, lifting mechanism 12 makes grabbing device 13 rise, and for locomotive 10 in being moved to installation site on guide rail 9, lifting mechanism 12 makes the decline release honeycomb board of grabbing device 13 15。
Honeycomb board 15 is installed using mobile device, convenient transport is laborsaving time saving, and installation is accurate, less installation error, compared with Few labor intensity of workers.
Component used in the present embodiment is built in workshop.
Embodiment in the present invention is only used for that the present invention will be described, and is not construed as limiting the scope of claims limitation, Other substantially equivalent substitutions that those skilled in that art are contemplated that, all fall in the scope of protection of the present invention.

Claims (4)

1. a kind of water surface of large-scale floating body builds installation method, which is characterized in that comprising steps of
Step 1: in building inflatable mounting platform on the water surface;
Step 2: closing up fixed structure object using closing device on the platform that step 1 is formed;The closing device packet It includes: rotor, connection cable, tension equipment and anchor, wherein rotor, connecting line are respectively welded on works to be closed up Rope is arranged around rotor, and tension equipment, which applies pretightning force to connection cable, is tensioned connection cable, and anchor is for fixed Tight connection cable;
Step 3: honeycomb board is installed using mobile device, to form floating body on the works that step 2 is formed.
2. the water surface of large-scale floating body according to claim 1 builds installation method, which is characterized in that step one packet It includes step: step a, assembling steel structure frame;Step b, in several air bags are arranged in parallel in steel structure frame and inflate;Step c, In the fixed working face in the top of steel structure frame.
3. the water surface of large-scale floating body according to claim 1 builds installation method, which is characterized in that the mobile device Include: guide rail and locomotive, wherein guide rail is removable installed on works, locomotive in being movably disposed on guide rail, And honeycomb board is transported to installation site installation.
4. the water surface of large-scale floating body according to claim 3 builds installation method, which is characterized in that the locomotive packet Include: ontology lifts mechanism, grabbing device and runner, wherein the lower section of ontology be equipped with accommodation space for accommodate grabbing device and Honeycomb board to be moved lifts mechanism and is set to the top of ontology and is connected with grabbing device, for providing grabbing device It rises and the power of decline, grabbing device is set to the bottom of ontology and is located at and lead for grabbing honeycomb board to be moved, runner On rail.
CN201710295013.XA 2017-04-28 2017-04-28 The water surface of large-scale floating body builds installation method Active CN107150761B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710295013.XA CN107150761B (en) 2017-04-28 2017-04-28 The water surface of large-scale floating body builds installation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710295013.XA CN107150761B (en) 2017-04-28 2017-04-28 The water surface of large-scale floating body builds installation method

Publications (2)

Publication Number Publication Date
CN107150761A CN107150761A (en) 2017-09-12
CN107150761B true CN107150761B (en) 2019-04-12

Family

ID=59793991

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710295013.XA Active CN107150761B (en) 2017-04-28 2017-04-28 The water surface of large-scale floating body builds installation method

Country Status (1)

Country Link
CN (1) CN107150761B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111470001A (en) * 2019-01-22 2020-07-31 中集海洋工程研究院有限公司 Method for building ultra-large ship

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201132590Y (en) * 2007-10-26 2008-10-15 黄锐明 Base for building floating house on water
EP1980486A1 (en) * 2006-02-03 2008-10-15 Open Joint-Stock Company "Central Design Bureau" 'Corall' Method for assembling a waterborne ship hull and a device for carrying out said method
CN102582799A (en) * 2012-04-11 2012-07-18 广新海事重工股份有限公司 Buoyancy tank and afloat buoyancy tank joining process
CN104608887A (en) * 2015-01-20 2015-05-13 上海海事大学 Air bag filling type truss used for large ocean platform
CN205801445U (en) * 2016-07-14 2016-12-14 蔡修坤 In-water foundation carrier module
CN206031709U (en) * 2016-07-11 2017-03-22 中诚国际海洋工程勘察设计有限公司 Gasbag formula platform

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2758130B2 (en) * 1993-12-28 1998-05-28 日立造船株式会社 Offshore structure assembly method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1980486A1 (en) * 2006-02-03 2008-10-15 Open Joint-Stock Company "Central Design Bureau" 'Corall' Method for assembling a waterborne ship hull and a device for carrying out said method
CN201132590Y (en) * 2007-10-26 2008-10-15 黄锐明 Base for building floating house on water
CN102582799A (en) * 2012-04-11 2012-07-18 广新海事重工股份有限公司 Buoyancy tank and afloat buoyancy tank joining process
CN104608887A (en) * 2015-01-20 2015-05-13 上海海事大学 Air bag filling type truss used for large ocean platform
CN206031709U (en) * 2016-07-11 2017-03-22 中诚国际海洋工程勘察设计有限公司 Gasbag formula platform
CN205801445U (en) * 2016-07-14 2016-12-14 蔡修坤 In-water foundation carrier module

Also Published As

Publication number Publication date
CN107150761A (en) 2017-09-12

Similar Documents

Publication Publication Date Title
CN101684639B (en) Process method for construction of steel-structured suspension bridge and light type cable carrying crane specially used in same
CN100537348C (en) Offshore platform integral constructing and hoisting method and special-purpose hoisting machine for the same
CN103057663B (en) Underwater installation process of removable deck of million-ton roll-on-roll-off ship
US6698371B1 (en) Boat with personnel elevator apparatus
US9359047B2 (en) Mobile barge and method of operation of mobile barge
KR100970818B1 (en) Buffer straddle crane
CN213036993U (en) Offshore wind power pile foundation roll-on-roll-off shipment system
CN107150761B (en) The water surface of large-scale floating body builds installation method
CN105523477A (en) Method for carrying out pile leg connection by utilizing 3000t floating crane
CN103967284A (en) Method for installing steel column in butt joint with reserved column head
CN107856819A (en) Floating shipyard and floating type warship maintenance and method of construction
CN204606154U (en) Novel half dives refutes platform
CN104444851B (en) A kind of loop wheel machine installation method peculiar to vessel
CN206583609U (en) Ship draws anchor testing device
CN103171911B (en) Ship loader installation technology
JP4727504B2 (en) Bridge removal method
CN103395478A (en) Special whole set equipment for offshore wind turbine complete transportation and mounting
CN207434899U (en) For the vehicle-carrying lifting of Construction of Civil Engineering and horizontal retractable hoisting mechanism
CN203007843U (en) Variable amplitude deck derrick crane
CN2716342Y (en) Water plate-inserting machine
CN102837978B (en) Shipment method combining large constructional element rolling and floating crane
CN103434992A (en) Hydraulic push type trolley handling system for bridge crane
WO2008085061A1 (en) Tool carrier and method for carrying tools for cutting elongated structures
CN203903939U (en) Transformer pushing system
CN211547335U (en) Bridge maintenance car

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20201013

Address after: 215200, Changan Road, Wujiang economic and Technological Development Zone, Jiangsu, Suzhou province (Science and Technology Pioneer Park)

Patentee after: SUZHOU YUNYI AVIATION COMPOSITE MATERIAL STRUCTURE Co.,Ltd.

Address before: Beike Building No. 1077 Shenzhen Nanshan District City, Guangdong province 518067 merchants Street Nanhai Road 5 layer 502

Patentee before: SHENZHEN BLUE OCEAN ENGINEERING DEVELOPMENT Co.,Ltd.