CN203007843U - Variable amplitude deck derrick crane - Google Patents

Variable amplitude deck derrick crane Download PDF

Info

Publication number
CN203007843U
CN203007843U CN 201220574753 CN201220574753U CN203007843U CN 203007843 U CN203007843 U CN 203007843U CN 201220574753 CN201220574753 CN 201220574753 CN 201220574753 U CN201220574753 U CN 201220574753U CN 203007843 U CN203007843 U CN 203007843U
Authority
CN
China
Prior art keywords
arm
chassis
luffing
underframe
amplitude
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220574753
Other languages
Chinese (zh)
Inventor
陈敏兆
赵理郁
张长城
刘子峰
易佳佳
肖浩
李海松
邬旋
白洪余
李乃岳
左家路
黄昌年
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
WUHU HEJIAN ROADS AND BRIDGES MACHINERY CO Ltd
Original Assignee
WUHU HEJIAN ROADS AND BRIDGES MACHINERY CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by WUHU HEJIAN ROADS AND BRIDGES MACHINERY CO Ltd filed Critical WUHU HEJIAN ROADS AND BRIDGES MACHINERY CO Ltd
Priority to CN 201220574753 priority Critical patent/CN203007843U/en
Application granted granted Critical
Publication of CN203007843U publication Critical patent/CN203007843U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Jib Cranes (AREA)

Abstract

The utility model discloses a variable amplitude deck derrick crane which comprises a chassis, two lower sliding rail, four transverse shifting devices, two post-installed fastenings, a crane arm, an inclined support, two stand columns, a lifting winch and a variable amplitude winch, wherein the chassis is a rectangular frame, the two lower sliding rails are arranged on two lateral sides of the chassis, the four transverse shifting devices are installed on four corners of the chassis, two post-installed fastenings are installed on two corners of the rear portion of the chassis, one end of the crane arm is hinged to the front portion of the chassis, the other end of the crane arm is connected with a lifting tool, one end of the inclined support is hinged to the front portion of the chassis, the other end of the inclined support is connected with the crane arm through steel cable, one ends of the two columns are hinged to post-installed fastening counter pressure beams fixed on the post-installed fastenings, the other ends of the two columns are connected with the inclined support, the lifting winch is installed on the chassis, the lifting winch lifts up the lifting tool or lays down the lifting tool through a pulley at the top end of the crane arm, the variable amplitude winch is installed on the chassis, and the variable amplitude winch pulls the crane arm through a pulley at the top end of the inclined support and enables the amplitude of the crane arm to change. The variable amplitude deck derrick crane facilitates walking, locating, anchoring, varying of amplitude of the lifting tool, and improves working efficiency.

Description

A kind of luffing erection crane
Technical field
The utility model relates to a kind of luffing erection crane.
Background technology
Along with the continuous propelling of modernization construction, the various places that spread all over the country such as expressway, through street, new across Jiang Daqiao, cross a river bridge, viaduct, even bridge spanning the sea also constantly builds up.These bridges usually use ready-made segmented bridge floor to carry out the scene and build assembling at present, have improved efficient and quality.In build at the scene of bridge, the erection crane large lifting equipment that is absolutely necessary, a section bridge section of can slinging is placed into assigned address and assembles.Yet, the about hundreds of ton of every joint of segmented bridge floor, hoisting depth surpasses 50 meters, because the bridge floor volume and weight is all very large, the design and installation of suspender are very difficult, the walking, location, anchoring, luffing that causes suspender to and difficulty, demand urgently improving.
The utility model content
For the problem that prior art exists, the purpose of this utility model is to propose a kind of luffing erection crane, by enforcement of the present utility model, is convenient to walking, location, anchoring, the luffing of suspender, has improved operating efficiency.
For reaching this purpose, the utility model by the following technical solutions:
A kind of luffing erection crane comprises:
Underframe is rectangular frame;
Two glide paths are arranged on the dual-side of described underframe;
Four Traverse Displacement Units are arranged on respectively four jiaos of described underframe.
Anchoring after two is arranged on respectively two jiaos of described underframe rear portion;
Arm, an end and described underframe anterior hinged, the other end is connected with suspender;
Bearing diagonal, an end and described underframe anterior hinged, the other end and being connected with described arm by wirerope;
Two columns, an end is hinged with the rear anchoring back-pressure crossbeam that is fixed in described rear anchoring, and the other end is connected with described bearing diagonal;
The hoist engine that hoists is arranged on described underframe, is driven wirerope by the pulley pull-up on described arm top or is put down suspender by electric system and hydraulic system;
The luffing hoist engine is arranged on described underframe, drives the pulley of wirerope by the bearing diagonal top by electric system and hydraulic system and pulls arm, makes the changes in amplitude of arm.
Preferably, also comprise landing 8, be arranged on the end that described bearing diagonal is connected with column.
Preferably, also comprise the steel cushion block, between described one of them glide path and ground.
Preferably, also comprise arm amplitude stopping means, be arranged on described underframe, and between described arm and bearing diagonal.
Preferably, also comprise the boom angle direction board, be arranged on described underframe, and between described arm and arm amplitude stopping means.
Based on disclosing of above technical scheme, the utility model possesses following beneficial effect:
The utility model adopts all-hydraulic vertical shift mode, in advance the vertical shift beam is placed one section in advance during installation, during the complete machine vertical shift, the vertical shift cylinder ejector, complete machine reach, then jacking cylinder jack-up top complete machine, vertical shift oil cylinder retraction is with the reach of vertical shift beam, and jacking cylinder puts down, and complete machine can repeat again reach.This kind working method is convenient to walking, location, anchoring, the luffing of suspender, has improved operating efficiency.
Description of drawings
Fig. 1 is a kind of luffing erection crane elevation of the utility model embodiment 1;
Fig. 2 is a kind of luffing erection crane top view of the utility model embodiment 1;
Fig. 3 is the front fulcrum schematic diagram of a kind of luffing erection crane of the utility model embodiment 1;
Fig. 4 is the rear anchoring schematic diagram of a kind of luffing erection crane of the utility model embodiment 1.
Reference numeral:
1, arm; 2, bearing diagonal; 3, column; 4, underframe; 5, rear anchoring; 6, glide path; 7, suspender; 8, landing; 9, the hoist engine that hoists; 10, luffing hoist engine; 11, electric system; 12, hydraulic system; 13, boom angle direction board; 14, arm amplitude stopping means; 15, Traverse Displacement Unit; 16, rear anchoring back-pressure crossbeam; 20, steel cushion block.
The specific embodiment
The utility model embodiment 1 provides a kind of luffing erection crane, as shown in Figures 1 to 4, comprising: underframe 4 is rectangular frame; Two glide paths 6 are arranged on the dual-side of described underframe 4, are used for loop wheel machine is vertically moved; Four Traverse Displacement Units 15 are arranged on respectively four jiaos of described underframe 4, are used for making the loop wheel machine transverse shifting; After two, anchoring 5, are arranged on respectively two jiaos of described underframe 4 rear portions (rear portion of indication refers to the part away from suspender) here, are used for loop wheel machine and bottom surface are fixed; Arm 1, one end and described underframe 4 anterior hinged, the other end is connected with suspender 7; Bearing diagonal 2, one ends and described underframe 4 anterior hinged, the other end is connected with described arm 1 by wirerope; Two column 3, one ends are hinged with the rear anchoring back-pressure crossbeam 16 that is fixed in described rear anchoring 5, and the other end is connected with described bearing diagonal 2; The hoist engine 9 that hoists is arranged on described underframe 4, is driven wireropes by the pulley pull-up on described arm 1 top or is put down suspender 7 by electric system 11 and hydraulic system 12; Luffing hoist engine 10, be arranged on described underframe 4, drive the pulley of wireropes by bearing diagonal 2 tops by electric system 11 and hydraulic system 12 and pull arm 1, make the changes in amplitude of arm 1, length of boom can be adjusted into 25 meters by 30 meters, and during unloaded traveling, the arm elevation angle need reach 60 ° of left and right.Hoist hoist engine 9 and luffing hoist engine 10 can be two, and its installation form is for vertically rotating 1.5 °, the symmetrical installation.
For the ease of the manually-operated maintenance, landing 8 can also be set, be arranged on the end that described bearing diagonal 2 is connected with column 3.In order to adapt to the different terrain situation, steel cushion block 20 can be set, between described one of them glide path 6 and ground, make underframe be certain inclination angle.
Amplitude of variation for the restriction arm can arrange arm amplitude stopping means 14, is arranged on described underframe 4, and between described arm 1 and bearing diagonal 2.In order further to understand the arm angle changing, can boom angle direction board 13, be arranged on described underframe 4, and between described arm 1 and arm amplitude stopping means 14.
The utility model adopts all-hydraulic vertical shift mode, in advance the vertical shift beam is placed one section in advance during installation, during the complete machine vertical shift, the vertical shift cylinder ejector, complete machine reach, then jacking cylinder jack-up top complete machine, vertical shift oil cylinder retraction is with the reach of vertical shift beam, and jacking cylinder puts down, and complete machine can repeat again reach.
The above; it is only the better specific embodiment of the utility model; but protection domain of the present utility model is not limited to this; anyly be familiar with those skilled in the art in the technical scope that the utility model discloses; be equal to replacement or changed according to the technical solution of the utility model and utility model design thereof, within all should being encompassed in protection domain of the present utility model.

Claims (5)

1. a luffing erection crane, is characterized in that, comprising:
Underframe is rectangular frame;
Two glide paths are arranged on the dual-side of described underframe;
Four Traverse Displacement Units are arranged on respectively four jiaos of described underframe;
Anchoring after two is arranged on respectively two jiaos of described underframe rear portion;
Arm, an end and described underframe anterior hinged, the other end is connected with suspender;
Bearing diagonal, an end and described underframe anterior hinged, the other end and being connected with described arm by wirerope;
Two columns, an end is hinged with the rear anchoring back-pressure crossbeam that is fixed in described rear anchoring, and the other end is connected with described bearing diagonal;
The hoist engine that hoists is arranged on described underframe, is driven wirerope by the pulley pull-up on described arm top or is put down suspender by electric system and hydraulic system;
The luffing hoist engine is arranged on described underframe, drives the pulley of wirerope by the bearing diagonal top by electric system and hydraulic system and pulls arm, makes the changes in amplitude of arm.
2. luffing erection crane according to claim 1, is characterized in that, also comprises landing (8), is arranged on the end that described bearing diagonal is connected with column.
3. luffing erection crane according to claim 1, is characterized in that, also comprises the steel cushion block, between described one of them glide path and ground.
4. luffing erection crane according to claim 1, is characterized in that, also comprises arm amplitude stopping means, be arranged on described underframe, and between described arm and bearing diagonal.
5. luffing erection crane according to claim 4, is characterized in that, also comprises the boom angle direction board, be arranged on described underframe, and between described arm and arm amplitude stopping means.
CN 201220574753 2012-11-03 2012-11-03 Variable amplitude deck derrick crane Expired - Fee Related CN203007843U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220574753 CN203007843U (en) 2012-11-03 2012-11-03 Variable amplitude deck derrick crane

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220574753 CN203007843U (en) 2012-11-03 2012-11-03 Variable amplitude deck derrick crane

Publications (1)

Publication Number Publication Date
CN203007843U true CN203007843U (en) 2013-06-19

Family

ID=48599452

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220574753 Expired - Fee Related CN203007843U (en) 2012-11-03 2012-11-03 Variable amplitude deck derrick crane

Country Status (1)

Country Link
CN (1) CN203007843U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103669211A (en) * 2013-08-22 2014-03-26 中铁四局集团有限公司 Hydraulic type multifunctional suspension-assembling girder lifting machine and steel box girder assembling method
CN107826986A (en) * 2017-11-27 2018-03-23 中交第二航务工程局有限公司 A kind of amplitude variation type erection crane with A type structure arms
CN109914265A (en) * 2019-04-16 2019-06-21 合建卡特工业股份有限公司 A kind of erection crane

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103669211A (en) * 2013-08-22 2014-03-26 中铁四局集团有限公司 Hydraulic type multifunctional suspension-assembling girder lifting machine and steel box girder assembling method
CN103669211B (en) * 2013-08-22 2015-11-18 中国铁路总公司 Hydraulic multi-function cantilever lifting beam machine and steel box girder assembling method
CN107826986A (en) * 2017-11-27 2018-03-23 中交第二航务工程局有限公司 A kind of amplitude variation type erection crane with A type structure arms
CN109914265A (en) * 2019-04-16 2019-06-21 合建卡特工业股份有限公司 A kind of erection crane

Similar Documents

Publication Publication Date Title
CN106978784B (en) A kind of Long span highway suspension bridge Demolition Construction method
CN2863892Y (en) Self-lifting riprap levelling platform boat
CN103243663B (en) Construction process for using bridge girder erection machine to remove T-shaped cantilever continuous rigid frame box girders
CN102139832B (en) Gantry crane device with lengthways and transverse traveling functions and hoisting method
CN101309850A (en) Modular counterweight carriage for cranes, in particular for large cranes
CN109653105B (en) Main truss system of box girder bridge cantilever construction hanging basket and use method thereof
CN201635020U (en) Bridge floor dismantling crane for large and medium concrete bridges
CN105484162B (en) Suspension bridge construction stiff girder secondary on the bank swings moving device and method
CN106120787A (en) A kind of construction method carrying out pile sinking based on pushing tow travelling platform
CN108639968A (en) Whole lateral moving formula cable crane
CN207361651U (en) Aircushion vehicle jack up unit
CN203007843U (en) Variable amplitude deck derrick crane
CN105714829B (en) The constructing device and use its construction method that deep pit digging is built with underground station
CN102071646A (en) Large-tonnage box girder sea system and construction method
CN107663859B (en) pile driver
CN103306218A (en) Bottom width overhaul hanging basket of bridge
CN210366808U (en) Lifting and dismantling device for rail walking
CN211113627U (en) Unsettled self-supporting formula pile driver
CN103174093A (en) Mounting device and mounting method of steel box girder in support zone
CN107460876B (en) Improved pile driver platform
CN207434899U (en) For the vehicle-carrying lifting of Construction of Civil Engineering and horizontal retractable hoisting mechanism
CN102535277B (en) Device for completely moving railway turnout
CN202809475U (en) Full hydraulic full-automatic control tunnel invert trestle
CN105317031B (en) A kind of ship lift main equipment room bridge main beam hanging method
CN205369040U (en) Suspension bridge is under construction on bank stiffening beam secondary and is swung and move device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130619

Termination date: 20181103