CN2863892Y - Self-lifting riprap levelling platform boat - Google Patents

Self-lifting riprap levelling platform boat Download PDF

Info

Publication number
CN2863892Y
CN2863892Y CN 200620094995 CN200620094995U CN2863892Y CN 2863892 Y CN2863892 Y CN 2863892Y CN 200620094995 CN200620094995 CN 200620094995 CN 200620094995 U CN200620094995 U CN 200620094995U CN 2863892 Y CN2863892 Y CN 2863892Y
Authority
CN
China
Prior art keywords
self
lifting
platform
jackstone
boat
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 200620094995
Other languages
Chinese (zh)
Inventor
李明
刘榕
罗农
涂梦生
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC Second Harbor Engineering Co
China Harbour Engineering Co Ltd
Original Assignee
CCCC Second Harbor Engineering Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC Second Harbor Engineering Co filed Critical CCCC Second Harbor Engineering Co
Priority to CN 200620094995 priority Critical patent/CN2863892Y/en
Application granted granted Critical
Publication of CN2863892Y publication Critical patent/CN2863892Y/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Underground Or Underwater Handling Of Building Materials (AREA)

Abstract

The utility model discloses a self-lifting riprap levelling platform boat, including a working platform connected with a self-lifting end frame, and a guide rail is arranged thereon; a riprap levelling device fixing leading block is arranged on the guide rail to connect the guide rail; also a draw gear is connected with the fixing leading block. When the self-lifting riprap levelling platform boat is working, the self-lifting end frame stands on the river bed giant clam row, wherein the working platform can be supported by the self-lifting end frame to lift off the water surface, after the riprap levelling device completes the riprap levelling construction, self-lifting end frame retracts, to make the working platform float on the water surface convenient for dragging away. The boat has good stabilization, which can construct under the severe environmental condition, such as greater wind wave and water velocity. The boat can resist wind to live under the condition with the maximum wind 36 m/s, maxima of wave height 6.0 m and maximum rate 3.2 m/s.

Description

Self-lifting jackstone platform boat
Technical field
The utility model belongs to the operation at sea construction equipment, is specifically related to a kind of job execution platform boat that can avoid the river sea bed rubble leveling of wind, wave, flow disturbance.
Background technology
Water surface operation ship or platform all swim on the water surface at present, and during job execution, the influence of wind-engaging, wave, current is big, big and water velocity is greatly the time at stormy waves, above-mentioned water surface operation ship or platform all can not the normal construction operations, influence construction speed like this, prolong construction period.
Summary of the invention
The purpose of this utility model is to provide the self-lifting jackstone platform boat of a kind of not wind-engaging, wave, flow disturbance.
The technical solution of the utility model is: self-lifting jackstone platform boat, it comprises job platform, connecting on the job platform can be from the supporting leg that rises, establish guide rail on the job platform, connect the jackstone paperback on the guide rail and put the fixed guide slide block, the fixed guide slide block is connected with the rubble leveling device, and the fixed guide slide block also connects draw-gear and connects.
Described rubble leveling device comprises the doctor blade holder that is connected with the fixed guide slide block, connects movably building stones chute on the doctor blade holder, and the doctor blade holder lower end connects scraper plate.
Described building stones chute is connected with the winch draw-gear.
Also establish lifting gear on the described job platform.
During this self-lifting jackstone platform boat operation, can stand on the riverbed soft raft from the supporting leg that rises, job platform can be supported from the supporting leg that rises lifts away from the water surface, and the rubble leveling device is after finishing the rubble leveling construction, can pack up from the supporting leg that rises, job platform be bubbled through the water column be convenient to hold in the palm.This ship is stablized, can be at stormy waves construction operation under the severe environmental conditions such as big and water velocity is bigger.This platform boat can be deposited by wind resistance under the sea conditions of 36m/s maximum wind power, 6.0m maximum wave height, 3.2m/s Peak Flow Rate certainly.
Description of drawings
Fig. 1 self-lifting jackstone platform boat elevational schematic view
Fig. 2 self-lifting jackstone platform boat schematic top plan view
Fig. 3 supporting leg hydraulic lift schematic diagram
Fig. 4 doctor blade holder building stones chute elevational schematic view
Fig. 5 doctor blade holder building stones chute schematic top plan view
Fig. 6 doctor blade holder building stones chute schematic side view
Fig. 7 trailer system schematic diagram
The specific embodiment
As shown in Figure 1, the job platform 15 of self-lifting jackstone platform boat connects and can establish lifting gear 17 on the job platform 15 from the supporting leg 16 that rises, and job platform 15 is provided with and connects the rubble leveling device, the rubble leveling device comprises doctor blade holder 6, connects movably building stones chute 5 (Fig. 4) on the doctor blade holder 6.
As shown in Figure 2, job platform 7 is a hollow, establishes guide rail 4 and pulling winch device 3 on the job platform 7, connects the jackstone paperback on the guide rail 4 and puts fixed guide slide block 2, and fixed guide slide block 2 is connected with the doctor blade holder 6 of rubble leveling device.The traction of pulling winch device 3 is terminal to be connected with fixed guide slide block 2.Doctor blade holder 6 and building stones chute 5 are in the hollow part of job platform 7.
As shown in Figure 3, establish fixed mount 13 on the job platform 15, supporting leg 16 passes fixed mount 13, connect on the supporting leg 16 and encircle 8 and rotating ring 10 surely, surely encircle 8 and rotating ring 10 between connect hoist cylinder 9, surely encircle 8 with fixed mount 13 between be connected suspension arrangement 7, supporting leg 16 be axially arranged with several pin holes 11, encircle 8 surely and establish hydraulic bolt 14 with rotating ring 10 and be connected with pin hole 11.
As shown in Figure 6, divide into the guide rail 19,20 that is slidingly connected on the doctor blade holder 6, establish lower draw-bar 21,22 on the building stones chute 5 and divide into the guide rail 19,20 that is slidingly connected and be connected respectively with on the doctor blade holder 6, doctor blade holder 6 lower ends connect scraper plate 18.
As shown in Figure 4, fixed guide slide block 2 is formed by connecting by upper box 201, middle girder 202 and lower box 203; The cross section of fixed guide slide block 2 is in the form of slot, and the two ends of doctor blade holder 6 are located at the groove interior (shown in Figure 5) of two fixed guide slide blocks 2.
As shown in Figure 7, winch draw-gear 3 comprises pulling winch 301, the pull rope 302 that pulling winch 301 connects, the angle pulley group that pull rope 302 is walked around.Having one in the angle pulley group at least is located on the fixed guide slide block 2.
The operating principle of this platform boat is:
Platform stand on the riverbed soft raft by the supporting leg at four angles, and supporting leg peace interstation connects with hydraulic lift, and supporting leg was packed up when platform moved, and it is floating to leave the riverbed.The ground jack plate is sat the end during platform operation, and hydraulic lift lifts away from the water surface with platform, is horizontally fixed on the height that needs.The platform middle part is the sky frame, and edge is installed slide rail and slide block.The leveling doctor blade holder places slide block, can up-down adjustment location height.Traction slide block during operation, scraper promote the purpose that bedding face piece stone reaches leveling.Jackstone carries out with the crane that is installed in the platform both sides.Motor grab is grabbed the stone input from the stone transporting ship can be tube be slipped in the blanking that doctor blade holder moves, and building stones fix a point to throw on the bedding on demand.Once sitting the end in placely can flatten 20 meters, receives leg after finishing and moves to next accommodation.
The building stones chute is suspended on the doctor blade holder front, can move along slide rail on the doctor blade holder is left and right, so that jackstone.Building stones chute move left and right adopts 5 tons of electric winches, and winch can rotating, and reel is a double-rope, and two rope stretchings should be serially connected in the chute both sides respectively, and winch drives chute and comes and goes mobile by rotating.
Doctor blade holder can oscilaltion in fixed guide slide block 2, is finished by two cranes on the platform.

Claims (6)

1, a kind of self-lifting jackstone platform boat, it comprises job platform, what connect on the job platform can be from the supporting leg that rises, it is characterized in that establishing on the job platform guide rail, connect jackstone dress horizontal fixed guide slide block on the guide rail, the fixed guide slide block is connected with the rubble leveling device, and the fixed guide slide block also connects draw-gear and connects.
2, self-lifting jackstone platform boat according to claim 1 is characterized in that described rubble leveling device comprises the doctor blade holder that is connected with the fixed guide slide block, connects movably building stones chute on the doctor blade holder, and the doctor blade holder lower end connects scraper plate.
3, as self-lifting jackstone platform boat as described in the claim 2, it is characterized in that the fixed guide slide block is formed by connecting by upper box, middle girder and lower box; The cross section of fixed guide slide block is in the form of slot, and the two ends of doctor blade holder are located in the groove of two fixed guide slide blocks.
4, as self-lifting jackstone platform boat as described in the claim 2, it is characterized in that the building stones chute is connected with the winch draw-gear.
5, self-lifting jackstone platform boat according to claim 1 is characterized in that also establishing on the job platform lifting gear.
6, self-lifting jackstone platform boat according to claim 1, it is characterized in that establishing on the job platform fixed mount, supporting leg passes fixed mount, connect fixed ring and rotating ring on the supporting leg, connect hoist cylinder between fixed ring and the rotating ring, be connected suspension arrangement between fixed ring and the fixed mount, supporting leg be axially arranged with several pin holes, fixed ring is established hydraulic bolt with rotating ring and is connected with pin hole.
CN 200620094995 2006-01-12 2006-01-12 Self-lifting riprap levelling platform boat Expired - Lifetime CN2863892Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200620094995 CN2863892Y (en) 2006-01-12 2006-01-12 Self-lifting riprap levelling platform boat

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200620094995 CN2863892Y (en) 2006-01-12 2006-01-12 Self-lifting riprap levelling platform boat

Publications (1)

Publication Number Publication Date
CN2863892Y true CN2863892Y (en) 2007-01-31

Family

ID=37676345

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200620094995 Expired - Lifetime CN2863892Y (en) 2006-01-12 2006-01-12 Self-lifting riprap levelling platform boat

Country Status (1)

Country Link
CN (1) CN2863892Y (en)

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102116017A (en) * 2011-01-04 2011-07-06 广西电力工业勘察设计研究院 Foam platform for drilling on waterways
CN102191767A (en) * 2010-03-04 2011-09-21 第一建设机工股份有限公司 Deck-liftable operation platform and construction method for marine wind power generation facility
CN102712350A (en) * 2009-09-04 2012-10-03 伊特雷科公司 Offshore wind turbine installation
CN103161401A (en) * 2013-03-07 2013-06-19 三一集团有限公司 Ship for offshore operation
CN103196422A (en) * 2013-03-19 2013-07-10 中交一航局第二工程有限公司 Roller wheel contact-type device and roller wheel contact-type method for detecting leveling elevation of rubble bed
CN103924597A (en) * 2013-01-10 2014-07-16 中交第一航务工程局有限公司 Platform type riprap leveling barge and construction method thereof
CN103924574A (en) * 2013-01-10 2014-07-16 中交第一航务工程局有限公司 Riprap leveling device
WO2014121684A1 (en) * 2013-02-05 2014-08-14 广州中国科学院工业技术研究院 Pre-formed marine fixed platform and method of installation
CN104401450A (en) * 2014-11-13 2015-03-11 广州打捞局 Hull of pile driving barge
CN105216976A (en) * 2015-10-21 2016-01-06 中国水电建设集团港航建设有限公司 A kind of deep water environmental protection jackstone leveling ship
CN105625425A (en) * 2015-12-31 2016-06-01 中交第二航务工程局有限公司 Construction method for carrying out pile sinking based on floating walking platform
CN105672186A (en) * 2014-11-19 2016-06-15 上海勘测设计研究院有限公司 Deepwater riprapping method and equipment
CN107829433A (en) * 2017-11-03 2018-03-23 中交第二航务工程局有限公司 Integrate the multi-functional leveling ship of chute jackstone and base bed flattening
CN107938594A (en) * 2017-12-01 2018-04-20 中交第二航务工程局有限公司 Deep water mixing dike construction method
CN108454790A (en) * 2017-07-20 2018-08-28 上海振华重工(集团)股份有限公司 Sit bottom jack up wind-powered electricity generation pile driving barge
CN110844008A (en) * 2019-10-31 2020-02-28 中船华南船舶机械有限公司 Stone throwing device for throwing and tamping integrated ship

Cited By (21)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102712350A (en) * 2009-09-04 2012-10-03 伊特雷科公司 Offshore wind turbine installation
CN105366009A (en) * 2009-09-04 2016-03-02 伊特雷科公司 Offshore wind turbine installation
CN102712350B (en) * 2009-09-04 2015-11-25 伊特雷科公司 Offshore wind turbines is installed
CN102191767A (en) * 2010-03-04 2011-09-21 第一建设机工股份有限公司 Deck-liftable operation platform and construction method for marine wind power generation facility
CN102116017B (en) * 2011-01-04 2012-08-15 广西电力工业勘察设计研究院 Foam platform for drilling on waterways
CN102116017A (en) * 2011-01-04 2011-07-06 广西电力工业勘察设计研究院 Foam platform for drilling on waterways
CN103924597B (en) * 2013-01-10 2016-02-03 中交第一航务工程局有限公司 Platform-type jackstone leveling ship and construction method thereof
CN103924597A (en) * 2013-01-10 2014-07-16 中交第一航务工程局有限公司 Platform type riprap leveling barge and construction method thereof
CN103924574A (en) * 2013-01-10 2014-07-16 中交第一航务工程局有限公司 Riprap leveling device
CN103924574B (en) * 2013-01-10 2016-02-03 中交第一航务工程局有限公司 Rubble leveling device
WO2014121684A1 (en) * 2013-02-05 2014-08-14 广州中国科学院工业技术研究院 Pre-formed marine fixed platform and method of installation
CN103161401A (en) * 2013-03-07 2013-06-19 三一集团有限公司 Ship for offshore operation
CN103196422A (en) * 2013-03-19 2013-07-10 中交一航局第二工程有限公司 Roller wheel contact-type device and roller wheel contact-type method for detecting leveling elevation of rubble bed
CN104401450A (en) * 2014-11-13 2015-03-11 广州打捞局 Hull of pile driving barge
CN105672186A (en) * 2014-11-19 2016-06-15 上海勘测设计研究院有限公司 Deepwater riprapping method and equipment
CN105216976A (en) * 2015-10-21 2016-01-06 中国水电建设集团港航建设有限公司 A kind of deep water environmental protection jackstone leveling ship
CN105625425A (en) * 2015-12-31 2016-06-01 中交第二航务工程局有限公司 Construction method for carrying out pile sinking based on floating walking platform
CN108454790A (en) * 2017-07-20 2018-08-28 上海振华重工(集团)股份有限公司 Sit bottom jack up wind-powered electricity generation pile driving barge
CN107829433A (en) * 2017-11-03 2018-03-23 中交第二航务工程局有限公司 Integrate the multi-functional leveling ship of chute jackstone and base bed flattening
CN107938594A (en) * 2017-12-01 2018-04-20 中交第二航务工程局有限公司 Deep water mixing dike construction method
CN110844008A (en) * 2019-10-31 2020-02-28 中船华南船舶机械有限公司 Stone throwing device for throwing and tamping integrated ship

Similar Documents

Publication Publication Date Title
CN2863892Y (en) Self-lifting riprap levelling platform boat
EP2327838A2 (en) A foundation construction platform used in a beach or offshore areas
CN204675691U (en) A kind of big sea buoy lowering equipment
CN201756173U (en) Water surface hoisting construction ship with buoyant boxes
CN202415021U (en) Irrotational foldable variable-amplitude large-scale crane ship
CN203112376U (en) Hoisting equipment achieving inversion of A-shaped support through pay-off and take-up of steel wire rope
CN101811563A (en) Salvage method of sinking ship on the sea
CN111661246A (en) Ocean platform propulsion device with automatic parking positioning structure
CN202911923U (en) Combined energy source boat
CN201047065Y (en) Large-span structural component floating pier hoisting apparatus
CN107663859B (en) pile driver
CN212609107U (en) Cable wind device of single-blade hoisting machinery of square barge crane unit
CN211113627U (en) Unsettled self-supporting formula pile driver
CN203007843U (en) Variable amplitude deck derrick crane
CN218114848U (en) Installation device for seaworthy berthing component
CN111204666A (en) Hoisting device for ocean wind power equipment
KR101068012B1 (en) Yacht Crane
CN211898381U (en) Equipment for pulling out steel pipe pile under underwater concrete beam
CN213625592U (en) Lifting, placing and anchoring device for leveling frame in riprap leveling ship
CN107487724A (en) A kind of the large-scale floating crane arm support erecting device and installation method of non-loop wheel machine auxiliary
CN207049436U (en) Siphon piping slideway platform for lining
CN207257907U (en) A kind of guide pile ship for over-water construction
CN209778121U (en) Crane vessel
CN210480580U (en) GRP pipeline is installation gallows under water
CN103058051B (en) Crossbeam structure of quay cranes

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C53 Correction of patent for invention or patent application
CB03 Change of inventor or designer information

Inventor after: Wang Xiang

Inventor after: Li Ming

Inventor after: Liu Rong

Inventor after: Luo Nong

Inventor after: Tu Mengsheng

Inventor before: Li Ming

Inventor before: Liu Rong

Inventor before: Luo Nong

Inventor before: Tu Mengsheng

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: LI MING; LIU RONG; LUO NONG; TU MENGSHENG TO: WANG XIANG; LI MING; LIU RONG; LUO NONG; TU MENGSHENG

ASS Succession or assignment of patent right

Owner name: CHINA HARBOR ENGINEERING CO., LTD.

Free format text: FORMER OWNER: CHINA COMMUNICATIONS 2ND NAVIGATIONAL BUREAU ENGINEERING CO., LTD.

Effective date: 20090807

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20090807

Address after: No. nine, Chun Xiu Road, Dongzhi, Beijing, zip code: 100027

Co-patentee after: China Communications 2nd Navigational Bureau

Patentee after: China Harbour Engineering Company Limited

Address before: No. 16, Nanjing Road, Jianghan District, Hubei, Wuhan Province: 430014

Patentee before: China Communications 2nd Navigational Bureau

CX01 Expiry of patent term

Granted publication date: 20070131

EXPY Termination of patent right or utility model