CN107142829A - 一种横向预应力工字箱梁结构 - Google Patents
一种横向预应力工字箱梁结构 Download PDFInfo
- Publication number
- CN107142829A CN107142829A CN201710547998.0A CN201710547998A CN107142829A CN 107142829 A CN107142829 A CN 107142829A CN 201710547998 A CN201710547998 A CN 201710547998A CN 107142829 A CN107142829 A CN 107142829A
- Authority
- CN
- China
- Prior art keywords
- concrete
- plate
- reserving hole
- diaphragm plate
- mentioned
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 210000003205 muscle Anatomy 0.000 claims abstract description 8
- 230000003014 reinforcing effect Effects 0.000 claims description 11
- 230000002787 reinforcement Effects 0.000 claims description 4
- 239000002689 soil Substances 0.000 claims description 3
- 238000004873 anchoring Methods 0.000 claims description 2
- 229910001294 Reinforcing steel Inorganic materials 0.000 claims 1
- 238000010276 construction Methods 0.000 abstract description 6
- 238000012423 maintenance Methods 0.000 abstract description 4
- 238000005516 engineering process Methods 0.000 description 2
- 238000005336 cracking Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000006641 stabilisation Effects 0.000 description 1
- 238000011105 stabilization Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D2/00—Bridges characterised by the cross-section of their bearing spanning structure
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D19/00—Structural or constructional details of bridges
- E01D19/06—Arrangement, construction or bridging of expansion joints
- E01D19/067—Flat continuous joints cast in situ
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D2101/00—Material constitution of bridges
- E01D2101/20—Concrete, stone or stone-like material
- E01D2101/24—Concrete
- E01D2101/26—Concrete reinforced
- E01D2101/28—Concrete reinforced prestressed
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
一种横向预应力工字箱梁结构,它由多个工字梁(1)组合构成,工字梁沿纵向布置,在两工字梁顶板之间加湿接缝混凝土(2),在每个工字梁中设多个混凝土横隔板(6),在每个工字梁设混凝土横隔板的位置设横向预留孔道(5),在上述预留孔道中设横向预应力筋(3),在两工字梁底板连接处也加湿接缝混凝土(2),工字梁底板对应上述混凝土横隔板连接位置设浇筑预留孔(8)。本装置结构合理,它的横向预应力筋与纵向预应力筋形成了一个预应力的网络框架,增加了桥梁结构的整体刚度,大大的提高了桥梁结构的整体稳定性和耐久性,减少维护成本。施工方便,可在工厂先预制工字梁,再在现场少量现浇,质量容易控制,运输方便,节约建设成本。
Description
技术领域
本发明涉及一种中小跨径的由预制构件组合的桥梁上部结构,具体说是横向预应力工字箱梁结构。
背景技术
目前,中小跨径公路桥梁大多采用纵向预应力空心板梁或非纵向预应力空心板梁,由于空心板梁只有上部通过现浇绞缝连接,而下部没有任何连接。桥面在车辆的作用下非常容易出现纵向裂缝,形成单板受力情况,严重影响了桥梁的正常使用与运营,增加了养护维修成本和难度,缩短了桥梁的使用寿命。因此对现有空心板梁结构进行研究创新非常有意义。
发明内容
本发明的目的在于提供一种施加横向预应力工字箱梁结构,其结构合理、施工方便,且施加横向预应力后桥梁上部结构整体性好,能够有效的预防桥梁结构出现单板受力、新旧混凝土结合面以及湿接缝混凝土自收缩引起的纵向裂缝问题,提高桥梁结构的整体强度和耐久性。
本发明的技术方案如下:
一种横向预应力工字箱梁结构,它由多个工字梁组合构成,工字梁沿纵向布置,在两工字梁顶板之间加湿接缝混凝土,在每个工字梁中设多个混凝土横隔板,在每个工字梁设混凝土横隔板的位置设横向预留孔道,在上述预留孔道中设横向预应力筋,在边梁横向预应力筋的外面设锚具锚固;在两工字梁底板连接处也加湿接缝混凝土,工字梁底板对应上述混凝土横隔板连接位置设浇筑预留孔,在工字梁底板上设多条纵向预应力筋,在工字梁的顶板上设多条纵向普通钢筋,上述工字梁顶板外端设湿接缝连接钢筋。
上述每个工字梁设混凝土横隔板的位置设上、下2个横向预留孔
道,2个横向预留孔道分别设在工字梁的腹板的上部及下部,混凝土横隔板与工字梁对应位置设横向预留孔道。
上述混凝土横隔板两端设混凝土横隔板连接钢筋。
本发明的优点在于:1、结构合理,本装置的横向预应力筋与纵向预应力筋形成了一个预应力的网络框架,起到了调整梁间的不均匀荷载作用, 增加了桥梁结构的整体刚度,减少截面变形。大大的提高了桥梁结构的整体稳定性和耐久性,提高梁体的抗扭稳定性。
2、施工方便,横向预应力工字箱梁结构,可采用在工厂先预制工字梁结构再在现场将其现浇为箱梁结构,因而现浇量小,质量容易控制,运输方便,节约建设成本。
3、降低维护成本,可减少桥梁上部结构在使用年限内的养护维修次数,降低了维修成本,提高了道路的服务水平。
4、提高寿命,能有效的解决桥梁上部结构单板受力问题,新旧混凝土结合面以及湿接缝混凝土自收缩引起的纵向裂缝问题,牢牢地将各片梁连接成一个整体,减小预应力损失,提高桥梁结构的整体稳定性。可有效避免了箱梁单板受力以及桥梁顶板纵向开裂,提高桥梁结构的使用寿命。
附图说明
图1是本发明实施例三维结构示意图;
图2是图1的仰视图;
图3是工字梁作中梁剖面结构示意图;
图4是工字梁作左边梁剖面结构示意图;
图5是工字梁作右边梁剖面结构示意图。
具体实施方式
下面结合附图对本发明作进一步说明。
图1~5中,1、工字梁;2、湿接缝混凝土;3、横向预应力筋;4、锚具;5、预留孔道;6、混凝土横隔板;7、纵向预应力筋;8、浇筑预留孔;9、湿接缝连接钢筋;10、混凝土横隔板连接钢筋;11、纵向普通钢筋。
由图1~图5可以看到,本横向预应力工字箱梁结构,所述结构由多个工字梁1组合构成,工字梁沿纵向布置,在每个工字梁中设多个混凝土横隔板6,在两工字梁顶板之间加湿接缝混凝土2,工字梁顶板外端设湿接缝连接钢筋9;在每个工字梁设混凝土横隔板的位置设横向预留孔道5,在上述预留孔道中设横向预应力筋3,横向预应力筋的两端由锚具4锚固;在两工字梁的底板连接处也加湿接缝混凝土2,在工字梁底板上对应上述混凝土横隔板连接位置设浇筑预留孔8,在工字梁底板上设多条纵向预应力筋7,在工字梁的顶板上设多条纵向普通钢筋11,混凝土横隔板两端设混凝土横隔板连接钢筋10。
由图3~5可以看到,上述每个工字梁设混凝土横隔板的位置设
上、下2个横向预留孔道5,2个横向预留孔道分别设在工字梁的腹板的上部及下部,混凝土横隔板与工字梁对应位置设横向预留孔道。
上述的横向预应力筋3为体内预应力筋,其施工工艺采用后张法张拉预应力筋。
湿接缝连接钢筋9和混凝土横隔板连接钢筋10均为普通螺纹钢筋。
以上所述,仅是本发明的较佳实施例,并非对本发明作任何限制,凡是根据本发明技术实质对以上实施例所作的任何简单修改、变更以及等效结构变化,均仍属于本发明技术方案的保护范围内。
Claims (3)
1.一种横向预应力工字箱梁结构,其特征在于:它由多个工字梁(1)组合构成,工字梁沿纵向布置,在两工字梁顶板之间加湿接缝混凝土(2),在每个工字梁中设多个混凝土横隔板(6),在每个工字梁设混凝土横隔板的位置设横向预留孔道(5),在上述预留孔道中设横向预应力筋(3),在边梁横向预应力筋的外面设锚具(4)锚固;在两工字梁底板连接处也加湿接缝混凝土(2),工字梁底板对应上述混凝土横隔板连接位置设浇筑预留孔(8),在工字梁底板上设多条纵向预应力筋(7),在工字梁的顶板上设多条纵向普通钢筋(11),上述工字梁顶板外端设湿接缝连接钢筋(9)。
2.根据权利要求1所述的横向预应力工字箱梁结构,其特征在于:它的每个工字梁设混凝土横隔板(6)的位置设上、下2个横向预留孔道(5),2个横向预留孔道分别设在工字梁的腹板的上部及下部,混凝土横隔板与工字梁对应位置设横向预留孔道。
3.根据权利要求1所述的横向预应力工字箱梁结构,其特征在于:它的上述混凝土横隔板(6)两端设混凝土横隔板连接钢筋(10) 。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710547998.0A CN107142829A (zh) | 2017-07-06 | 2017-07-06 | 一种横向预应力工字箱梁结构 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710547998.0A CN107142829A (zh) | 2017-07-06 | 2017-07-06 | 一种横向预应力工字箱梁结构 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107142829A true CN107142829A (zh) | 2017-09-08 |
Family
ID=59785159
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710547998.0A Pending CN107142829A (zh) | 2017-07-06 | 2017-07-06 | 一种横向预应力工字箱梁结构 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107142829A (zh) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108951399A (zh) * | 2018-09-05 | 2018-12-07 | 广州市城市规划勘测设计研究院 | 一种单箱多室箱梁桥及其施工方法 |
CN111730738A (zh) * | 2020-06-30 | 2020-10-02 | 中国一冶集团有限公司 | 一种预制箱梁横隔板连接结构及其施工方法 |
CN113356095A (zh) * | 2021-07-14 | 2021-09-07 | 北京工业大学 | 一种t梁桥横向加强装置及施工工艺 |
CN113882273A (zh) * | 2021-11-12 | 2022-01-04 | 王壹帆 | 一种预应力砼桥梁湿接缝砼和桥面铺装砼预应力化的方法 |
CN115976943A (zh) * | 2023-03-22 | 2023-04-18 | 交通运输部公路科学研究所 | 一种装配式空心板结构及施工方法 |
Citations (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20070014315A (ko) * | 2005-07-28 | 2007-02-01 | (주)한맥기술 | 조립식 피시 빔 교량 및 그것의 시공 방법 |
CN101050622A (zh) * | 2007-04-17 | 2007-10-10 | 中铁工程设计咨询集团有限公司 | 一种架设铁路桥的方法及简支t梁桥 |
KR100892163B1 (ko) * | 2008-09-01 | 2009-04-10 | (주)비엔텍아이엔씨 | 가설강재를 이용하여 프리스트레스트 콘크리트 빔에 발생하는 인장응력을 제어하는 방법 |
CN102691257A (zh) * | 2012-06-25 | 2012-09-26 | 河南省交通规划勘察设计院有限责任公司 | 一种波形钢腹板先张法预应力混凝土连续箱梁及施工方法 |
CN203065950U (zh) * | 2012-11-29 | 2013-07-17 | 中铁工程设计咨询集团有限公司 | 一种由简支t梁构成的铁路桥 |
CN103290786A (zh) * | 2013-05-07 | 2013-09-11 | 北京交通大学 | 体外预应力快速加固铁路桥梁系统及方法 |
CN103388303A (zh) * | 2013-08-07 | 2013-11-13 | 河南省交通规划勘察设计院有限责任公司 | 一种横向拼装波形钢腹板组合箱梁及施工方法 |
CN103741583A (zh) * | 2013-12-31 | 2014-04-23 | 郑州大学 | 板梁桥的预制箱梁横向预应力绞线安装结构 |
CN105019350A (zh) * | 2014-04-30 | 2015-11-04 | 郑州大学 | 一种预制t型梁及用其建造连续梁桥的方法 |
CN204825612U (zh) * | 2015-07-30 | 2015-12-02 | 苏交科集团股份有限公司 | 预制装配式波形钢腹板组合箱梁桥 |
CN105484142A (zh) * | 2015-10-30 | 2016-04-13 | 河海大学 | 一种拼装式节段预制混凝土空心板梁结构及其制作方法 |
CN206916603U (zh) * | 2017-07-06 | 2018-01-23 | 内蒙古综合交通科学研究院有限责任公司 | 一种横向预应力工字箱梁结构 |
-
2017
- 2017-07-06 CN CN201710547998.0A patent/CN107142829A/zh active Pending
Patent Citations (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20070014315A (ko) * | 2005-07-28 | 2007-02-01 | (주)한맥기술 | 조립식 피시 빔 교량 및 그것의 시공 방법 |
CN101050622A (zh) * | 2007-04-17 | 2007-10-10 | 中铁工程设计咨询集团有限公司 | 一种架设铁路桥的方法及简支t梁桥 |
KR100892163B1 (ko) * | 2008-09-01 | 2009-04-10 | (주)비엔텍아이엔씨 | 가설강재를 이용하여 프리스트레스트 콘크리트 빔에 발생하는 인장응력을 제어하는 방법 |
CN102691257A (zh) * | 2012-06-25 | 2012-09-26 | 河南省交通规划勘察设计院有限责任公司 | 一种波形钢腹板先张法预应力混凝土连续箱梁及施工方法 |
CN203065950U (zh) * | 2012-11-29 | 2013-07-17 | 中铁工程设计咨询集团有限公司 | 一种由简支t梁构成的铁路桥 |
CN103290786A (zh) * | 2013-05-07 | 2013-09-11 | 北京交通大学 | 体外预应力快速加固铁路桥梁系统及方法 |
CN103388303A (zh) * | 2013-08-07 | 2013-11-13 | 河南省交通规划勘察设计院有限责任公司 | 一种横向拼装波形钢腹板组合箱梁及施工方法 |
CN103741583A (zh) * | 2013-12-31 | 2014-04-23 | 郑州大学 | 板梁桥的预制箱梁横向预应力绞线安装结构 |
CN105019350A (zh) * | 2014-04-30 | 2015-11-04 | 郑州大学 | 一种预制t型梁及用其建造连续梁桥的方法 |
CN204825612U (zh) * | 2015-07-30 | 2015-12-02 | 苏交科集团股份有限公司 | 预制装配式波形钢腹板组合箱梁桥 |
CN105484142A (zh) * | 2015-10-30 | 2016-04-13 | 河海大学 | 一种拼装式节段预制混凝土空心板梁结构及其制作方法 |
CN206916603U (zh) * | 2017-07-06 | 2018-01-23 | 内蒙古综合交通科学研究院有限责任公司 | 一种横向预应力工字箱梁结构 |
Non-Patent Citations (1)
Title |
---|
孙文智等: "预应力混凝土连续箱梁桥加固措施浅析", 《公路交通技术》 * |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108951399A (zh) * | 2018-09-05 | 2018-12-07 | 广州市城市规划勘测设计研究院 | 一种单箱多室箱梁桥及其施工方法 |
CN111730738A (zh) * | 2020-06-30 | 2020-10-02 | 中国一冶集团有限公司 | 一种预制箱梁横隔板连接结构及其施工方法 |
CN113356095A (zh) * | 2021-07-14 | 2021-09-07 | 北京工业大学 | 一种t梁桥横向加强装置及施工工艺 |
CN113882273A (zh) * | 2021-11-12 | 2022-01-04 | 王壹帆 | 一种预应力砼桥梁湿接缝砼和桥面铺装砼预应力化的方法 |
CN115976943A (zh) * | 2023-03-22 | 2023-04-18 | 交通运输部公路科学研究所 | 一种装配式空心板结构及施工方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107142829A (zh) | 一种横向预应力工字箱梁结构 | |
CN106638254B (zh) | 一种采用预制组合桥面板的少主梁组合梁桥及其施工方法 | |
CN206916603U (zh) | 一种横向预应力工字箱梁结构 | |
CN206418384U (zh) | 一种采用预制组合桥面板的少主梁组合梁桥 | |
CN102587267A (zh) | 一种中设横隔张拉装配的预应力空心板梁桥及施工方法 | |
CN202416148U (zh) | 一种预应力混凝土空心板桥梁结构 | |
CN204662235U (zh) | 一种钢板组合t梁桥 | |
CN105862538A (zh) | 装配式斜向缓粘结预应力混凝土路面结构 | |
CN105297641A (zh) | 公路t梁横隔板预应力加固结构及用其进行加固的工法 | |
CN106869012A (zh) | 采用体内预应力系统的预制薄壁盖梁 | |
CN108166372B (zh) | 一种预制t梁及其施工方法 | |
CN110924287A (zh) | 一种半装配式大跨度组合箱梁及其施工方法 | |
CN111455735A (zh) | 用于桥梁的轨道单元及轨道结构 | |
CN111441263A (zh) | 一种保持交通通行的新旧桥拓宽刚性连接施工方法 | |
CN104562944B (zh) | 大跨径叠合梁斜拉桥边钢箱临时锚固体系 | |
CN103075024A (zh) | 钢和预应力混凝土组合空间桁架托换结构及其施工方法 | |
CN209854527U (zh) | 一种装配式空心板桥构造 | |
CN103911948B (zh) | 应用于宽混凝土肋板梁的横向桁式钢结构及其施工方法 | |
CN113123462B (zh) | 一种大跨度预应力混凝土装配式框架连接节点及施工方法 | |
CN215669083U (zh) | 一种t梁横隔板加固结构 | |
CN204530507U (zh) | 大跨径叠合梁斜拉桥边钢箱临时锚固体系 | |
CN209798504U (zh) | 预应力装配式uhpc人行天桥 | |
CN210238317U (zh) | 一种混凝土简支空心板梁提载加固结构 | |
CN109797642B (zh) | 预应力装配式uhpc人行天桥及其施工方法 | |
CN209760027U (zh) | 一种预制空心板结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20170908 |