A kind of anti-bank one-shot forming formwork erection method in toilet Download PDF

Info

Publication number
CN107083840A
CN107083840A CN201710267331.5A CN201710267331A CN107083840A CN 107083840 A CN107083840 A CN 107083840A CN 201710267331 A CN201710267331 A CN 201710267331A CN 107083840 A CN107083840 A CN 107083840A
Authority
CN
China
Prior art keywords
bank
bar support
toilet
support skeleton
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710267331.5A
Other languages
Chinese (zh)
Inventor
秦亮
荆汉秋
孟凡勇
张东
周放
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Shougang Construction Group Co Ltd
Original Assignee
Beijing Shougang Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Shougang Construction Group Co Ltd filed Critical Beijing Shougang Construction Group Co Ltd
Priority to CN201710267331.5A priority Critical patent/CN107083840A/en
Publication of CN107083840A publication Critical patent/CN107083840A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G13/00Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

A kind of anti-bank one-shot forming formwork erection method in toilet, belongs to the anti-bank technical field of construction in toilet.Reinforced bar support skeleton (1) is vertically fixed with primary structure beam stirrup and cage bar colligation first, then anti-bank Side shuttering (2) is installed according to relevant position, anti- bank bottom flitch (4) is arranged between anti-bank Side shuttering (2) and reinforced bar support skeleton (1) again, make its reinforced bar support skeleton (1) and anti-bank Side shuttering (2) fixed, it is ensured that its bottom size;Finally reinforced using fixed anti-bank lath (3) suitable for reading with anti-bank top flitch (4), fixing side template (2) size suitable for reading plays formwork reinforcement effect;So anti-bank template has obtained fixation, can guarantee that anti-bank sectional dimension.Advantage is, is not take up place, reuses waste steel bar.Both caking ability, the accelerating construction progress of anti-bank concrete beam and board had been can guarantee that, and can economy cost.

Description

A kind of anti-bank one-shot forming formwork erection method in toilet
Patent of the present invention belongs to the anti-bank technical field of construction in toilet, in particular, provide a kind of anti-bank in toilet once into Pattern plate erection method, it is adaptable to the construction of various anti-banks.The stability of structure connection is ensure that, quality is improved, material is saved, Accelerating construction progress.
Background technology
At present, in the anti-bank structure construction in toilet, in the secondary anti-bank of making in floor top after having been constructed using primary structure Structure.It can not guarantee the connectivity of structure.Such as make to use secondary preparation method, increase difficulty of construction, delay construction speed, no Beneficial to production and construction.
The content of the invention
The purpose of patent of the present invention is to provide a kind of toilet anti-bank one-shot forming formwork erection method, and solving makes to adopt Secondary preparation method is used, these problems of increasing difficulty of construction can make structure one-shot forming, it is ensured that the connectivity of structure.
The present invention includes reinforced bar support skeleton 1, anti-bank Side shuttering 2, fixed anti-bank lath 3 suitable for reading, flitch 4.
Reinforced bar support skeleton 1 is vertically fixed with primary structure beam stirrup and cage bar colligation first, then according to relevant position Anti- bank Side shuttering 2 is installed, then anti-bank bottom flitch 4 is arranged between anti-bank Side shuttering 2 and reinforced bar support skeleton 1, is made Its reinforced bar support skeleton 1 and anti-bank Side shuttering 2 are fixed, it is ensured that its bottom size;It is finally suitable for reading using fixed anti-bank Lath 3 is reinforced with anti-bank top flitch 4, the size suitable for reading of fixing side template 2, plays formwork reinforcement effect.So anti-bank template Fixation has been obtained, anti-bank sectional dimension is can guarantee that.
Reinforced bar support skeleton uses the waste steel bar welding productions of Φ 12-- Φ 18, the lower rebar opening size of framework of steel reinforcement Slightly larger than beams of concrete cage bar spacing.Upper reinforcement is parallel, and opening size subtracts protective layer thickness equal to anti-bank width.Construction When, treat to be supported the installation of bone after the completion of beam steel, slab muscle colligation, then carrying out installing for anti-bank Side shuttering, pouring Build concrete.The secondary construction of anti-bank is not needed, operation is simplified, the expense that mould is hung at drop plate is saved, when shortening construction Between, the good bottom beam main tendon spacing of in-site measurement, anti-bank width, it is necessary to quantity, cost of labor and engineering time can be saved.
Advantage is, makes simple, easy for installation, efficiency of construction, cost-effective.It is particularly suitable for use in the anti-bank structure of concrete One-shot forming is constructed, and both can guarantee that connectivity, the accelerating construction progress of structure, and can economy cost.With pushing away well Wide value.
Brief description of the drawings
Fig. 1 is the construction first step, makes anti-bank reinforced bar support skeleton schematic diagram.
Fig. 2 is construction second step, carries out the colligation construction drawing of concrete beam and board cage bar and stirrup.
Fig. 3 is the 3rd step of construction, installs reinforced bar support skeleton drawing.
Fig. 4 is the 4th step of construction, installs the template and strengthening construction figure of anti-bank.
Fig. 5 is the 5th step of construction, after concealment acceptance is qualified, casting concrete schematic diagram.
Fig. 6 is the 6th step of construction, after concrete reaches intensity, form removal, by the anti-exposed steel of bank reinforced bar support skeleton The schematic diagram that muscle is cut away.
In figure, reinforced bar support skeleton 1, anti-bank Side shuttering 2, fixed anti-bank lath 3 suitable for reading, flitch 4.
Embodiment
Fig. 1~Fig. 6 is a kind of embodiment of patent of the present invention.It is further to patent of the present invention below in conjunction with the accompanying drawings Explanation.
Fig. 1 is the construction first step, the use material of this method.Wherein support frame 1 is used for reinforcement fabrication, under skeleton Portion's parallel reinforced steel bar, and opening size is slightly larger than beams of concrete cage bar spacing.Upper reinforcement is parallel, and opening size is wide equal to anti-bank Degree subtracts thickness of protection tier.During construction, treat after the completion of beam steel, slab muscle colligation by support frame colligation beam cage bar And stirrup position is reinforced, then installing for template, casting concrete are being carried out.
Fig. 2 is construction second step, and the colligation construction into cross girders, slab muscle is required in strict accordance with drawing and related specifications.
Fig. 3 is the 3rd step of construction, treats to be supported skeleton installation after the completion of reinforcing bar colligation construction.Under support frame Portion's opening makes support frame clamp reinforcing bar towards cage bar.Constructed according to 1.2 meters of the direction arrangement one of beam.Simplify and apply Work, shortens the duration.
Fig. 4 is the 4th step of construction, after support keel is installed, and template construction is carried out after acceptance of concealed work is qualified, will Formwork erection prolongs the installation of template bottom to top skeleton outside, and by flitch, then template top is assembled;Use lath interval 0.5 meter is fixed on the flitch of top, plays a part of drawknot, reinforcing template.
Fig. 5 is the 5th step of construction, after after template acceptance(check), carries out concreting,
Fig. 6 is the 6th step of construction, after concrete reaches intensity, template, flitch is removed, by anti-bank reinforced bar support skeleton Exposed steel bar is cut away.

Claims (2)

1. a kind of anti-bank one-shot forming formwork erection method in toilet, it is characterised in that:First reinforced bar support skeleton (1) vertically with Primary structure beam stirrup and cage bar colligation are fixed, and then install anti-bank Side shuttering (2) according to relevant position, then by anti-bank bottom Flitch (4) is arranged between anti-bank Side shuttering (2) and reinforced bar support skeleton (1), makes its reinforced bar support skeleton (1) and anti-bank side Face die plate (2) is fixed, it is ensured that its bottom size;Finally using fixed anti-bank lath (3) and anti-bank top flitch suitable for reading (4) reinforce, fixing side template (2) size suitable for reading, play formwork reinforcement effect;So anti-bank template has obtained fixation, can protect Demonstrate,prove anti-bank sectional dimension.
2. the anti-bank one-shot forming formwork erection method in toilet according to claim 1, it is characterised in that:Reinforcement bar support support bone Frame uses the waste steel bar welding productions of Φ 12-- Φ 18, and the lower rebar opening size of framework of steel reinforcement is slightly larger than beams of concrete cage bar Spacing;Upper reinforcement is parallel, and opening size subtracts protective layer thickness equal to anti-bank width;During construction, beam steel, slab muscle are treated The installation of bone is supported after the completion of colligation, then installing for anti-bank Side shuttering, casting concrete is being carried out.
CN201710267331.5A 2017-04-21 2017-04-21 A kind of anti-bank one-shot forming formwork erection method in toilet Pending CN107083840A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710267331.5A CN107083840A (en) 2017-04-21 2017-04-21 A kind of anti-bank one-shot forming formwork erection method in toilet

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710267331.5A CN107083840A (en) 2017-04-21 2017-04-21 A kind of anti-bank one-shot forming formwork erection method in toilet

Publications (1)

Publication Number Publication Date
CN107083840A true CN107083840A (en) 2017-08-22

Family

ID=59613042

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710267331.5A Pending CN107083840A (en) 2017-04-21 2017-04-21 A kind of anti-bank one-shot forming formwork erection method in toilet

Country Status (1)

Country Link
CN (1) CN107083840A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108952159A (en) * 2018-09-19 2018-12-07 潘小洪 Hang the support device and construction method of mould
CN109025273A (en) * 2018-07-30 2018-12-18 北京首钢建设集团有限公司 A kind of concrete beam mould board fixing clamp construction method
CN110230400A (en) * 2019-06-21 2019-09-13 中建八局第四建设有限公司 It is a kind of for improving the construction method of the anti-platform intersection waterproof effect in toilet
CN111958857A (en) * 2020-07-16 2020-11-20 安徽同济建设集团有限责任公司 Construction method for reverse ridge of toilet

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4723752A (en) * 1986-02-06 1988-02-09 Thomas Ward H Form brace
CN101158236A (en) * 2007-10-30 2008-04-09 山东天齐置业集团股份有限公司 Kitchen toilet water-stopping platform formwork controlling device and construction method
CN203924704U (en) * 2014-06-19 2014-11-05 晟通科技集团有限公司 Aluminum alloy pattern plate system
CN104652815A (en) * 2015-02-10 2015-05-27 中国十七冶集团有限公司 Construction method for pouring water-stopping upstanding beams in kitchens and toilets
CN204456870U (en) * 2015-02-06 2015-07-08 新疆石河子天筑建设(集团)有限责任公司 For the formwork fastening clips tool of washroom concrete flanging
CN204876558U (en) * 2015-08-21 2015-12-16 广西建工集团第四建筑工程有限责任公司 A locating support that is used for cast -in -place reversed beam side form board of going up
CN205804949U (en) * 2016-06-12 2016-12-14 中国十七冶集团有限公司 A kind of sealing reversed beam model sheetinstallat fixing device

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4723752A (en) * 1986-02-06 1988-02-09 Thomas Ward H Form brace
CN101158236A (en) * 2007-10-30 2008-04-09 山东天齐置业集团股份有限公司 Kitchen toilet water-stopping platform formwork controlling device and construction method
CN203924704U (en) * 2014-06-19 2014-11-05 晟通科技集团有限公司 Aluminum alloy pattern plate system
CN204456870U (en) * 2015-02-06 2015-07-08 新疆石河子天筑建设(集团)有限责任公司 For the formwork fastening clips tool of washroom concrete flanging
CN104652815A (en) * 2015-02-10 2015-05-27 中国十七冶集团有限公司 Construction method for pouring water-stopping upstanding beams in kitchens and toilets
CN204876558U (en) * 2015-08-21 2015-12-16 广西建工集团第四建筑工程有限责任公司 A locating support that is used for cast -in -place reversed beam side form board of going up
CN205804949U (en) * 2016-06-12 2016-12-14 中国十七冶集团有限公司 A kind of sealing reversed beam model sheetinstallat fixing device

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109025273A (en) * 2018-07-30 2018-12-18 北京首钢建设集团有限公司 A kind of concrete beam mould board fixing clamp construction method
CN108952159A (en) * 2018-09-19 2018-12-07 潘小洪 Hang the support device and construction method of mould
CN110230400A (en) * 2019-06-21 2019-09-13 中建八局第四建设有限公司 It is a kind of for improving the construction method of the anti-platform intersection waterproof effect in toilet
CN111958857A (en) * 2020-07-16 2020-11-20 安徽同济建设集团有限责任公司 Construction method for reverse ridge of toilet

Similar Documents

Publication Publication Date Title
CN101748681B (en) Pretensioning method construction technology of 50m broken line reinforced concrete T-shaped beam
CN105714684B (en) Prestress concrete variable cross-section fish-belly continuous box beam construction method
CN107083840A (en) A kind of anti-bank one-shot forming formwork erection method in toilet
CN105863253B (en) Integral formwork support is asynchronous to pour staircase wall column formwork system and construction method
CN108755984A (en) Late poured band support construction method based on concrete square column
CN105804395B (en) Stair continuously poured in one molding construction method based on monoblock type typified form
CN103615053A (en) Construction method for post-cast belt of cast-in-place reinforced concrete structure
CN218508722U (en) Shock insulation buttress positioning pouring structure
CN110965474A (en) Construction method of cable tower cross beam
CN107299773B (en) Load bearing wall reinforcing construction method
CN104831932A (en) Construction technology for high-grade concrete column base
CN107083804B (en) A kind of wall structure column joint bar construction method
CN104831639A (en) Consolidation and release construction method for 0# blocks of ultra-wide non-uniform continuous beam
CN206438529U (en) Beam and slab type raft foundation formwork support structure
CN108104284B (en) Wallboard connecting structure of shear wall steel arm embedded floor slab and assembly method
CN207812307U (en) The construction system of Cable stayed Bridge Main Tower and steel anchor beam
CN101666069B (en) Construction technology for stretching notch by cast-in-situ prestress box beam
CN204960084U (en) Adopt cast -in -place hollow floor slab of big cross -section BDF box
CN108316150A (en) The construction system and construction method of Cable stayed Bridge Main Tower and steel anchor beam
CN107152112A (en) A kind of modularization Prefabricated stacking floor and its construction method for being used to drop plate region
CN103758040A (en) Special hanging frame for construction of post-casting flange plate of sound barrier T beam and using method thereof
CN107160542B (en) Bracket type inner form support system construction method
CN106836641A (en) Side sticking steel plate formula Combined concrete coupling beam
CN208858150U (en) A kind of close rib building roof mold
CN102936953A (en) Construction method of bridging-arm stiffened steel structure template

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20170822