CN107059799A - A kind of earth dam widens construction technology - Google Patents

A kind of earth dam widens construction technology Download PDF

Info

Publication number
CN107059799A
CN107059799A CN201710234199.8A CN201710234199A CN107059799A CN 107059799 A CN107059799 A CN 107059799A CN 201710234199 A CN201710234199 A CN 201710234199A CN 107059799 A CN107059799 A CN 107059799A
Authority
CN
China
Prior art keywords
matrix
widens
earth
construction
layer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710234199.8A
Other languages
Chinese (zh)
Inventor
魏丹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xiaogan Qisi Miaoxiang Culture Media Co Ltd
Original Assignee
Xiaogan Qisi Miaoxiang Culture Media Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xiaogan Qisi Miaoxiang Culture Media Co Ltd filed Critical Xiaogan Qisi Miaoxiang Culture Media Co Ltd
Priority to CN201710234199.8A priority Critical patent/CN107059799A/en
Publication of CN107059799A publication Critical patent/CN107059799A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B7/00Barrages or weirs; Layout, construction, methods of, or devices for, making same
    • E02B7/02Fixed barrages
    • E02B7/04Dams across valleys
    • E02B7/06Earth-fill dams; Rock-fill dams

Abstract

Widen construction technology the invention discloses a kind of earth dam, the earth dam is widened construction technology and comprised the following steps that:S1:Cleaning to earth dam matrix slope top layer, S2:The construction of first rammed earth step layer, S2:The processing of salt-soda soil topsoil, S3:First widens the construction of matrix, S4:The construction of second rammed earth step layer, S5:Second widens the construction of matrix, S6:The maintenance on earth dam top layer.Rammed earth step layer of the present invention is with widening the mode at matrix interval to widen earth dam, the setting of rammed earth step layer can make it that widening matrix is preferably attached on dam body, avoid widening matrix landslide, preventing from widening matrix level, to widen width excessive, cause the generation of landslide, the solidness of earth dam can be improved, while by rammed earth step layer and the setting for widening matrix interval, the degree that earth dam is widened can be improved to the full extent.

Description

A kind of earth dam widens construction technology
Technical field
The present invention relates to Earth Dam Construction technical field, specially a kind of earth dam widens construction technology.
Background technology
Earth dam is the dam built up using local earth material and sand, gravel, ovum gravel, ballast, building stones etc..It is a kind of ancient and arrived The water retaining structure that the present also continues to develop and is used widely, sometimes referred to as earth and rockfill dam.Some particular condition in use are often needed Original earth dam is widened, but widen width it is wide in the case of frequently can lead to caving in for earth dam widened section, Cause the accident generation, and these are the problem of we need to solve.
The content of the invention
Widen construction technology it is an object of the invention to provide a kind of earth dam, the earth dam widens construction technology specific steps such as Under:
S1:Cleaning to earth dam matrix slope top layer, the impurity on earth dam matrix slope top layer is removed, by the weeds on top layer and filling Wood is purged, and trees is implanted with, it is necessary to which trees are removed if being planted on earth dam matrix slope, while needing trees ' root by soil In dig;
S2:The construction of first rammed earth step layer, earth filling tamping is carried out to earth dam matrix slope top layer, and rammed earth layer needs to be fabricated to platform Scalariform, the width of the horizontal direction of step needs to be maintained at 20-30 centimetres;
S3:First widens the construction of matrix, needs progress first to widen applying for matrix after the construction of the first rammed earth step layer is finished Work, to mound outside the first rammed earth step layer, while first widens in matrix and need press-in cement concrete stake, base is widened to first Body is compacted, while a diameter of 7-10 centimetres of the cement concrete stake of press-in, first widens the mound horizontal width of matrix For 50-100 centimetres;
S4:The construction of second rammed earth step layer, the second rammed earth layer is identical with the first rammed earth step layer form of construction work, is carried out after mound Tamp to be step-like, the width of step horizontal direction is 20-30 centimetres;
S5:Second widens the construction of matrix, needs to carry out the second construction for widening matrix after constructing to the second rammed earth step layer, the Two widen in matrix need press-in cement concrete stake, cement concrete stake a diameter of 7-10 centimetres, second widens base layer When widening matrix for outermost layer, the second width for widening base layer horizontal direction is 40-70 centimetres;
S6:The maintenance on earth dam top layer, second, which widens matrix, widens after the completion of matrix construction as outermost layer, it is necessary to be carried out to slope Slope protection plate is built, and Slope protection plate needs to plant shrub to the hollow part of Slope protection plate after building, and strengthens bank protection ability.
It is preferred that, the first rammed earth step layer and the second rammed earth step layer use yellow soil and sandstone grain in proportion for 2:The material of 1 mixing.
It is preferred that, described first, which widens matrix and second, widens matrix and is needed in work progress using watering so that soil Lower floor so that first finally constructed widens matrix and second and widen matrix more consolidation, and irrigation amount is often stood according to 50-70 kilograms The mode of square rice soil is carried out, while widening the construction at least needing interval to carry out subsequent processing for 2 days after matrix construction.
It is preferred that, described first widen matrix and second widen in matrix cement concrete stake between need to wind Buddhist nun Imperial mesh sheet, more helping prevents that widening matrix collapses.
It is preferred that, described first widen matrix and second widen be pressed into matrix cement concrete stake length control exist 0.5-4 meters, cement concrete pilespacing must not be less than 30 centimetres from the vertical distance of topsoil.
Compared with prior art, the beneficial effects of the invention are as follows:Rammed earth step layer of the present invention and the side for widening matrix interval Formula widens earth dam, and the setting of rammed earth step layer can make it that widening matrix is preferably attached on dam body, it is to avoid widen matrix Landslide, prevents from widening matrix level and widens that width is excessive, cause the generation of landslide, can improve the solidness of earth dam, lead to simultaneously Cross rammed earth step layer and widen the setting at matrix interval, the degree that earth dam is widened can be improved to the full extent.
Brief description of the drawings
Fig. 1 is schematic structural view of the invention.
In figure:1 earth dam matrix, 2 first rammed earth step layers, 3 first widen matrix, 4 second widen matrix, 5 second rammed earths Step layer, the stake of 6 cement concretes.
Embodiment
In order to make the purpose , technical scheme and advantage of the present invention be clearer, below in conjunction with specific embodiment, to this Invention is further elaborated.It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, not For limiting the present invention.
Embodiment 1
A kind of earth dam widens construction technology, and the earth dam is widened construction technology and comprised the following steps that:
S1:Cleaning to earth dam matrix slope top layer, the impurity on earth dam matrix slope top layer is removed, by the weeds on top layer and filling Wood is purged, and trees is implanted with, it is necessary to which trees are removed if being planted on earth dam matrix slope, while needing trees ' root by soil In dig;
S2:The construction of first rammed earth step layer, earth filling tamping is carried out to earth dam matrix slope top layer, and rammed earth layer needs to be fabricated to platform Scalariform, the width of the horizontal direction of step needs to be maintained at 20 centimetres;
S3:First widens the construction of matrix, needs progress first to widen applying for matrix after the construction of the first rammed earth step layer is finished Work, to mound outside the first rammed earth step layer, while first widens in matrix and need press-in cement concrete stake, base is widened to first Body is compacted, while a diameter of 7 centimetres of the cement concrete stake of press-in, the first mound horizontal width for widening matrix is 50 Centimetre;
S4:The construction of second rammed earth step layer, the second rammed earth layer is identical with the first rammed earth step layer form of construction work, is carried out after mound Tamp to be step-like, the width of step horizontal direction is 20 centimetres;
S5:Second widens the construction of matrix, needs to carry out the second construction for widening matrix after constructing to the second rammed earth step layer, the Two widen in matrix and need press-in cement concrete stake, and a diameter of 7 centimetres of cement concrete stake, second widens base layer for most When outer layer widens matrix, the second width for widening base layer horizontal direction is 40 centimetres;
S6:The maintenance on earth dam top layer, second, which widens matrix, widens after the completion of matrix construction as outermost layer, it is necessary to be carried out to slope Slope protection plate is built, and Slope protection plate needs to plant shrub to the hollow part of Slope protection plate after building, and strengthens bank protection ability.
The first rammed earth step layer and the second rammed earth step layer use yellow soil with sandstone grain in proportion for 2:1 mixing Material.Described first, which widens matrix and second, widens matrix and is needed in work progress using watering so that soil lower floor, makes Must finally construct first widens matrix and second and widens matrix more consolidation, and irrigation amount is according to 50 kilograms per cubic meter soil Mode is carried out, while widening the construction at least needing interval to carry out subsequent processing for 2 days after matrix construction.Described first widens matrix Widen with second needs to wind upper nylon mesh sheet between the cement concrete stake in matrix, and more helping prevents that widening matrix collapses. Described first, which widens matrix and second, widens the length control of the cement concrete stake being pressed into matrix at 0.5-4 meter, and cement is mixed Solidifying soil pilespacing must not be less than 30 centimetres from the vertical distance of topsoil.
Embodiment 2
A kind of earth dam widens construction technology, and the earth dam is widened construction technology and comprised the following steps that:
S1:Cleaning to earth dam matrix slope top layer, the impurity on earth dam matrix slope top layer is removed, by the weeds on top layer and filling Wood is purged, and trees is implanted with, it is necessary to which trees are removed if being planted on earth dam matrix slope, while needing trees ' root by soil In dig;
S2:The construction of first rammed earth step layer, earth filling tamping is carried out to earth dam matrix slope top layer, and rammed earth layer needs to be fabricated to platform Scalariform, the width of the horizontal direction of step needs to be maintained at 30 centimetres;
S3:First widens the construction of matrix, needs progress first to widen applying for matrix after the construction of the first rammed earth step layer is finished Work, to mound outside the first rammed earth step layer, while first widens in matrix and need press-in cement concrete stake, base is widened to first Body is compacted, while a diameter of 10 centimetres of the cement concrete stake of press-in, the first mound horizontal width for widening matrix is 100 centimetres;
S4:The construction of second rammed earth step layer, the second rammed earth layer is identical with the first rammed earth step layer form of construction work, is carried out after mound Tamp to be step-like, the width of step horizontal direction is 30 centimetres;
S5:Second widens the construction of matrix, needs to carry out the second construction for widening matrix after constructing to the second rammed earth step layer, the Two widen in matrix need press-in cement concrete stake, cement concrete stake a diameter of 10 centimetres, second, which widens base layer, is When outermost layer widens matrix, the second width for widening base layer horizontal direction is 70 centimetres;
S6:The maintenance on earth dam top layer, second, which widens matrix, widens after the completion of matrix construction as outermost layer, it is necessary to be carried out to slope Slope protection plate is built, and Slope protection plate needs to plant shrub to the hollow part of Slope protection plate after building, and strengthens bank protection ability.
The first rammed earth step layer and the second rammed earth step layer use yellow soil with sandstone grain in proportion for 2:1 mixing Material.Described first, which widens matrix and second, widens matrix and is needed in work progress using watering so that soil lower floor, makes Must finally construct first widens matrix and second and widens matrix more consolidation, and irrigation amount is according to 70 kilograms per cubic meter soil Mode is carried out, while widening the construction at least needing interval to carry out subsequent processing for 2 days after matrix construction.Described first widens matrix Widen with second needs to wind upper nylon mesh sheet between the cement concrete stake in matrix, and more helping prevents that widening matrix collapses. Described first, which widens matrix and second, widens the length control of the cement concrete stake being pressed into matrix at 0.5-4 meter, and cement is mixed Solidifying soil pilespacing must not be less than 30 centimetres from the vertical distance of topsoil.
Embodiment 3
A kind of earth dam widens construction technology, and the earth dam is widened construction technology and comprised the following steps that:
S1:Cleaning to earth dam matrix slope top layer, the impurity on earth dam matrix slope top layer is removed, by the weeds on top layer and filling Wood is purged, and trees is implanted with, it is necessary to which trees are removed if being planted on earth dam matrix slope, while needing trees ' root by soil In dig;
S2:The construction of first rammed earth step layer, earth filling tamping is carried out to earth dam matrix slope top layer, and rammed earth layer needs to be fabricated to platform Scalariform, the width of the horizontal direction of step needs to be maintained at 25 centimetres;
S3:First widens the construction of matrix, needs progress first to widen applying for matrix after the construction of the first rammed earth step layer is finished Work, to mound outside the first rammed earth step layer, while first widens in matrix and need press-in cement concrete stake, base is widened to first Body is compacted, while a diameter of 8 centimetres of the cement concrete stake of press-in, the first mound horizontal width for widening matrix is 70 Centimetre;
S4:The construction of second rammed earth step layer, the second rammed earth layer is identical with the first rammed earth step layer form of construction work, is carried out after mound Tamp to be step-like, the width of step horizontal direction is 25 centimetres;
S5:Second widens the construction of matrix, needs to carry out the second construction for widening matrix after constructing to the second rammed earth step layer, the Two widen in matrix and need press-in cement concrete stake, and a diameter of 8 centimetres of cement concrete stake, second widens base layer for most When outer layer widens matrix, the second width for widening base layer horizontal direction is 50 centimetres;
S6:The maintenance on earth dam top layer, second, which widens matrix, widens after the completion of matrix construction as outermost layer, it is necessary to be carried out to slope Slope protection plate is built, and Slope protection plate needs to plant shrub to the hollow part of Slope protection plate after building, and strengthens bank protection ability.
The first rammed earth step layer and the second rammed earth step layer use yellow soil with sandstone grain in proportion for 2:1 mixing Material.Described first, which widens matrix and second, widens matrix and is needed in work progress using watering so that soil lower floor, makes Must finally construct first widens matrix and second and widens matrix more consolidation, and irrigation amount is according to 60 kilograms per cubic meter soil Mode is carried out, while widening the construction at least needing interval to carry out subsequent processing for 2 days after matrix construction.Described first widens matrix Widen with second needs to wind upper nylon mesh sheet between the cement concrete stake in matrix, and more helping prevents that widening matrix collapses. Described first, which widens matrix and second, widens the length control of the cement concrete stake being pressed into matrix at 0.5-4 meter, and cement is mixed Solidifying soil pilespacing must not be less than 30 centimetres from the vertical distance of topsoil.
Rammed earth step layer of the present invention is with widening the mode at matrix interval to widen earth dam, and the setting of rammed earth step layer can make Matrix must be widened preferably to be attached on dam body, it is to avoid widen matrix landslide, preventing from widening matrix level, to widen width excessive, leads The generation of landslide is caused, the solidness of earth dam can be improved, can be with while by rammed earth step layer and the setting for widening matrix interval The degree that earth dam is widened is improved to the full extent.
The foregoing is only a preferred embodiment of the present invention, but protection scope of the present invention be not limited thereto, Any one skilled in the art the invention discloses technical scope in, technique according to the invention scheme and its Inventive concept is subject to equivalent substitution or change, should all be included within the scope of the present invention.

Claims (5)

1. a kind of earth dam widens construction technology, it is characterised in that:The earth dam is widened construction technology and comprised the following steps that:
S1:Cleaning to earth dam matrix slope top layer, the impurity on earth dam matrix slope top layer is removed, by the weeds on top layer and filling Wood is purged, and trees is implanted with, it is necessary to which trees are removed if being planted on earth dam matrix slope, while needing trees ' root by soil In dig;
S2:The construction of first rammed earth step layer, earth filling tamping is carried out to earth dam matrix slope top layer, and rammed earth layer needs to be fabricated to platform Scalariform, the width of the horizontal direction of step needs to be maintained at 20-30 centimetres;
S3:First widens the construction of matrix, needs progress first to widen applying for matrix after the construction of the first rammed earth step layer is finished Work, to mound outside the first rammed earth step layer, while first widens in matrix and need press-in cement concrete stake, base is widened to first Body is compacted, while a diameter of 7-10 centimetres of the cement concrete stake of press-in, first widens the mound horizontal width of matrix For 50-100 centimetres;
S4:The construction of second rammed earth step layer, the second rammed earth layer is identical with the first rammed earth step layer form of construction work, is carried out after mound Tamp to be step-like, the width of step horizontal direction is 20-30 centimetres;
S5:Second widens the construction of matrix, needs to carry out the second construction for widening matrix after constructing to the second rammed earth step layer, the Two widen in matrix need press-in cement concrete stake, cement concrete stake a diameter of 7-10 centimetres, second widens base layer When widening matrix for outermost layer, the second width for widening base layer horizontal direction is 40-70 centimetres;
S6:The maintenance on earth dam top layer, second, which widens matrix, widens after the completion of matrix construction as outermost layer, it is necessary to be carried out to slope Slope protection plate is built, and Slope protection plate needs to plant shrub to the hollow part of Slope protection plate after building, and strengthens bank protection ability.
2. a kind of earth dam according to claim 1 widens construction technology, it is characterised in that:The first rammed earth step layer and Second rammed earth step layer uses yellow soil with sandstone grain in proportion for 2:The material of 1 mixing.
3. a kind of earth dam according to claim 1 widens construction technology, it is characterised in that:Described first widens matrix and Two, which widen matrix, needs in work progress using watering so that soil lower floor so that first finally constructed widens matrix and the Two widen matrix more consolidation, and irrigation amount is carried out in the way of 50-70 kilograms per cubic meter soil, while widening matrix construction Interval is at least needed to carry out within 2 days the construction of subsequent processing afterwards.
4. a kind of earth dam according to claim 1 widens construction technology, it is characterised in that:Described first widens matrix and Two widen in matrix cement concrete stake between need to wind nylon mesh sheet, more helping prevents that widening matrix collapses.
5. a kind of earth dam according to claim 1 widens construction technology, it is characterised in that:Described first widens matrix and Two length for widening the cement concrete stake being pressed into matrix are controlled at 0.5-4 meters, and cement concrete pilespacing is from topsoil Vertical distance must not be less than 30 centimetres.
CN201710234199.8A 2017-04-11 2017-04-11 A kind of earth dam widens construction technology Pending CN107059799A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710234199.8A CN107059799A (en) 2017-04-11 2017-04-11 A kind of earth dam widens construction technology

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710234199.8A CN107059799A (en) 2017-04-11 2017-04-11 A kind of earth dam widens construction technology

Publications (1)

Publication Number Publication Date
CN107059799A true CN107059799A (en) 2017-08-18

Family

ID=59601987

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710234199.8A Pending CN107059799A (en) 2017-04-11 2017-04-11 A kind of earth dam widens construction technology

Country Status (1)

Country Link
CN (1) CN107059799A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114960555A (en) * 2022-07-19 2022-08-30 河南绿岩工程科技有限公司 Widened seepage-proofing structure for penetrated earth-rock dam and construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114960555A (en) * 2022-07-19 2022-08-30 河南绿岩工程科技有限公司 Widened seepage-proofing structure for penetrated earth-rock dam and construction method

Similar Documents

Publication Publication Date Title
CN106759104B (en) Ecological slope protection structure and construction method
CN104328766A (en) Ecological stone cage net box retaining wall and construction method
CN104186233A (en) Frame beam slope greening method and frame beam slope greening facility
CN201826318U (en) Simple ecological slope protecting structure for loose soil of road
CN107237334A (en) A kind of road foundation execavated rockmass frame gird type slope protection code builds the construction method of plant biological bag greening
CN110552356B (en) Comprehensive treatment system for hanging slag on lower side slope of road in plateau area and construction method thereof
CN111005393B (en) Slope protection structure for repairing landslide body by using live tree piles and construction method
CN106522244B (en) A kind of embankment combination binding structure and its construction method
CN111593748A (en) Ecological protection structure of broken rock abrupt slope and construction method thereof
KR100959828B1 (en) A vegetation slope structure
US6494009B1 (en) Green concrete retaining wall and method for constructing the same
CN203334301U (en) Cave slope strengthening protection structure
CN107059799A (en) A kind of earth dam widens construction technology
CN108293831A (en) Heavy saline afforestation greening method
CN204676571U (en) A kind of flexible protective slope structure of feldspathic sandstone natural slope
KR200403507Y1 (en) Cellular Block Of A Plant Community Type
CN212427130U (en) Mudstone high-fill side slope structure
CN114635432A (en) Construction method of composite ecological slope protection of foundation pit
KR101104691B1 (en) Reinforcement constructing method for embankment using vegetation cemented sand and gravel
CN211037008U (en) Comprehensive treatment system for slope slag-adhering under plateau area road
CN211447015U (en) H-shaped anti-slide pile plate wall
CN204238176U (en) Ecotypic Stone Mesh-box net cage barricade
CN208251014U (en) A kind of upright embankment structure of composite foundation base empty van
CN202672182U (en) Reinforcing slab and geogrid reinforced retaining wall
CN105908987A (en) Ecological reinforcement composite material used for historical site protection project and construction method thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20170818

WD01 Invention patent application deemed withdrawn after publication