CN107059799A - A kind of earth dam widens construction technology - Google Patents
A kind of earth dam widens construction technology Download PDFInfo
- Publication number
- CN107059799A CN107059799A CN201710234199.8A CN201710234199A CN107059799A CN 107059799 A CN107059799 A CN 107059799A CN 201710234199 A CN201710234199 A CN 201710234199A CN 107059799 A CN107059799 A CN 107059799A
- Authority
- CN
- China
- Prior art keywords
- matrix
- widens
- earth
- construction
- layer
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B7/00—Barrages or weirs; Layout, construction, methods of, or devices for, making same
- E02B7/02—Fixed barrages
- E02B7/04—Dams across valleys
- E02B7/06—Earth-fill dams; Rock-fill dams
Abstract
Widen construction technology the invention discloses a kind of earth dam, the earth dam is widened construction technology and comprised the following steps that:S1:Cleaning to earth dam matrix slope top layer, S2:The construction of first rammed earth step layer, S2:The processing of salt-soda soil topsoil, S3:First widens the construction of matrix, S4:The construction of second rammed earth step layer, S5:Second widens the construction of matrix, S6:The maintenance on earth dam top layer.Rammed earth step layer of the present invention is with widening the mode at matrix interval to widen earth dam, the setting of rammed earth step layer can make it that widening matrix is preferably attached on dam body, avoid widening matrix landslide, preventing from widening matrix level, to widen width excessive, cause the generation of landslide, the solidness of earth dam can be improved, while by rammed earth step layer and the setting for widening matrix interval, the degree that earth dam is widened can be improved to the full extent.
Description
Technical field
The present invention relates to Earth Dam Construction technical field, specially a kind of earth dam widens construction technology.
Background technology
Earth dam is the dam built up using local earth material and sand, gravel, ovum gravel, ballast, building stones etc..It is a kind of ancient and arrived
The water retaining structure that the present also continues to develop and is used widely, sometimes referred to as earth and rockfill dam.Some particular condition in use are often needed
Original earth dam is widened, but widen width it is wide in the case of frequently can lead to caving in for earth dam widened section,
Cause the accident generation, and these are the problem of we need to solve.
The content of the invention
Widen construction technology it is an object of the invention to provide a kind of earth dam, the earth dam widens construction technology specific steps such as
Under:
S1:Cleaning to earth dam matrix slope top layer, the impurity on earth dam matrix slope top layer is removed, by the weeds on top layer and filling
Wood is purged, and trees is implanted with, it is necessary to which trees are removed if being planted on earth dam matrix slope, while needing trees ' root by soil
In dig;
S2:The construction of first rammed earth step layer, earth filling tamping is carried out to earth dam matrix slope top layer, and rammed earth layer needs to be fabricated to platform
Scalariform, the width of the horizontal direction of step needs to be maintained at 20-30 centimetres;
S3:First widens the construction of matrix, needs progress first to widen applying for matrix after the construction of the first rammed earth step layer is finished
Work, to mound outside the first rammed earth step layer, while first widens in matrix and need press-in cement concrete stake, base is widened to first
Body is compacted, while a diameter of 7-10 centimetres of the cement concrete stake of press-in, first widens the mound horizontal width of matrix
For 50-100 centimetres;
S4:The construction of second rammed earth step layer, the second rammed earth layer is identical with the first rammed earth step layer form of construction work, is carried out after mound
Tamp to be step-like, the width of step horizontal direction is 20-30 centimetres;
S5:Second widens the construction of matrix, needs to carry out the second construction for widening matrix after constructing to the second rammed earth step layer, the
Two widen in matrix need press-in cement concrete stake, cement concrete stake a diameter of 7-10 centimetres, second widens base layer
When widening matrix for outermost layer, the second width for widening base layer horizontal direction is 40-70 centimetres;
S6:The maintenance on earth dam top layer, second, which widens matrix, widens after the completion of matrix construction as outermost layer, it is necessary to be carried out to slope
Slope protection plate is built, and Slope protection plate needs to plant shrub to the hollow part of Slope protection plate after building, and strengthens bank protection ability.
It is preferred that, the first rammed earth step layer and the second rammed earth step layer use yellow soil and sandstone grain in proportion for
2:The material of 1 mixing.
It is preferred that, described first, which widens matrix and second, widens matrix and is needed in work progress using watering so that soil
Lower floor so that first finally constructed widens matrix and second and widen matrix more consolidation, and irrigation amount is often stood according to 50-70 kilograms
The mode of square rice soil is carried out, while widening the construction at least needing interval to carry out subsequent processing for 2 days after matrix construction.
It is preferred that, described first widen matrix and second widen in matrix cement concrete stake between need to wind Buddhist nun
Imperial mesh sheet, more helping prevents that widening matrix collapses.
It is preferred that, described first widen matrix and second widen be pressed into matrix cement concrete stake length control exist
0.5-4 meters, cement concrete pilespacing must not be less than 30 centimetres from the vertical distance of topsoil.
Compared with prior art, the beneficial effects of the invention are as follows:Rammed earth step layer of the present invention and the side for widening matrix interval
Formula widens earth dam, and the setting of rammed earth step layer can make it that widening matrix is preferably attached on dam body, it is to avoid widen matrix
Landslide, prevents from widening matrix level and widens that width is excessive, cause the generation of landslide, can improve the solidness of earth dam, lead to simultaneously
Cross rammed earth step layer and widen the setting at matrix interval, the degree that earth dam is widened can be improved to the full extent.
Brief description of the drawings
Fig. 1 is schematic structural view of the invention.
In figure:1 earth dam matrix, 2 first rammed earth step layers, 3 first widen matrix, 4 second widen matrix, 5 second rammed earths
Step layer, the stake of 6 cement concretes.
Embodiment
In order to make the purpose , technical scheme and advantage of the present invention be clearer, below in conjunction with specific embodiment, to this
Invention is further elaborated.It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, not
For limiting the present invention.
Embodiment 1
A kind of earth dam widens construction technology, and the earth dam is widened construction technology and comprised the following steps that:
S1:Cleaning to earth dam matrix slope top layer, the impurity on earth dam matrix slope top layer is removed, by the weeds on top layer and filling
Wood is purged, and trees is implanted with, it is necessary to which trees are removed if being planted on earth dam matrix slope, while needing trees ' root by soil
In dig;
S2:The construction of first rammed earth step layer, earth filling tamping is carried out to earth dam matrix slope top layer, and rammed earth layer needs to be fabricated to platform
Scalariform, the width of the horizontal direction of step needs to be maintained at 20 centimetres;
S3:First widens the construction of matrix, needs progress first to widen applying for matrix after the construction of the first rammed earth step layer is finished
Work, to mound outside the first rammed earth step layer, while first widens in matrix and need press-in cement concrete stake, base is widened to first
Body is compacted, while a diameter of 7 centimetres of the cement concrete stake of press-in, the first mound horizontal width for widening matrix is 50
Centimetre;
S4:The construction of second rammed earth step layer, the second rammed earth layer is identical with the first rammed earth step layer form of construction work, is carried out after mound
Tamp to be step-like, the width of step horizontal direction is 20 centimetres;
S5:Second widens the construction of matrix, needs to carry out the second construction for widening matrix after constructing to the second rammed earth step layer, the
Two widen in matrix and need press-in cement concrete stake, and a diameter of 7 centimetres of cement concrete stake, second widens base layer for most
When outer layer widens matrix, the second width for widening base layer horizontal direction is 40 centimetres;
S6:The maintenance on earth dam top layer, second, which widens matrix, widens after the completion of matrix construction as outermost layer, it is necessary to be carried out to slope
Slope protection plate is built, and Slope protection plate needs to plant shrub to the hollow part of Slope protection plate after building, and strengthens bank protection ability.
The first rammed earth step layer and the second rammed earth step layer use yellow soil with sandstone grain in proportion for 2:1 mixing
Material.Described first, which widens matrix and second, widens matrix and is needed in work progress using watering so that soil lower floor, makes
Must finally construct first widens matrix and second and widens matrix more consolidation, and irrigation amount is according to 50 kilograms per cubic meter soil
Mode is carried out, while widening the construction at least needing interval to carry out subsequent processing for 2 days after matrix construction.Described first widens matrix
Widen with second needs to wind upper nylon mesh sheet between the cement concrete stake in matrix, and more helping prevents that widening matrix collapses.
Described first, which widens matrix and second, widens the length control of the cement concrete stake being pressed into matrix at 0.5-4 meter, and cement is mixed
Solidifying soil pilespacing must not be less than 30 centimetres from the vertical distance of topsoil.
Embodiment 2
A kind of earth dam widens construction technology, and the earth dam is widened construction technology and comprised the following steps that:
S1:Cleaning to earth dam matrix slope top layer, the impurity on earth dam matrix slope top layer is removed, by the weeds on top layer and filling
Wood is purged, and trees is implanted with, it is necessary to which trees are removed if being planted on earth dam matrix slope, while needing trees ' root by soil
In dig;
S2:The construction of first rammed earth step layer, earth filling tamping is carried out to earth dam matrix slope top layer, and rammed earth layer needs to be fabricated to platform
Scalariform, the width of the horizontal direction of step needs to be maintained at 30 centimetres;
S3:First widens the construction of matrix, needs progress first to widen applying for matrix after the construction of the first rammed earth step layer is finished
Work, to mound outside the first rammed earth step layer, while first widens in matrix and need press-in cement concrete stake, base is widened to first
Body is compacted, while a diameter of 10 centimetres of the cement concrete stake of press-in, the first mound horizontal width for widening matrix is
100 centimetres;
S4:The construction of second rammed earth step layer, the second rammed earth layer is identical with the first rammed earth step layer form of construction work, is carried out after mound
Tamp to be step-like, the width of step horizontal direction is 30 centimetres;
S5:Second widens the construction of matrix, needs to carry out the second construction for widening matrix after constructing to the second rammed earth step layer, the
Two widen in matrix need press-in cement concrete stake, cement concrete stake a diameter of 10 centimetres, second, which widens base layer, is
When outermost layer widens matrix, the second width for widening base layer horizontal direction is 70 centimetres;
S6:The maintenance on earth dam top layer, second, which widens matrix, widens after the completion of matrix construction as outermost layer, it is necessary to be carried out to slope
Slope protection plate is built, and Slope protection plate needs to plant shrub to the hollow part of Slope protection plate after building, and strengthens bank protection ability.
The first rammed earth step layer and the second rammed earth step layer use yellow soil with sandstone grain in proportion for 2:1 mixing
Material.Described first, which widens matrix and second, widens matrix and is needed in work progress using watering so that soil lower floor, makes
Must finally construct first widens matrix and second and widens matrix more consolidation, and irrigation amount is according to 70 kilograms per cubic meter soil
Mode is carried out, while widening the construction at least needing interval to carry out subsequent processing for 2 days after matrix construction.Described first widens matrix
Widen with second needs to wind upper nylon mesh sheet between the cement concrete stake in matrix, and more helping prevents that widening matrix collapses.
Described first, which widens matrix and second, widens the length control of the cement concrete stake being pressed into matrix at 0.5-4 meter, and cement is mixed
Solidifying soil pilespacing must not be less than 30 centimetres from the vertical distance of topsoil.
Embodiment 3
A kind of earth dam widens construction technology, and the earth dam is widened construction technology and comprised the following steps that:
S1:Cleaning to earth dam matrix slope top layer, the impurity on earth dam matrix slope top layer is removed, by the weeds on top layer and filling
Wood is purged, and trees is implanted with, it is necessary to which trees are removed if being planted on earth dam matrix slope, while needing trees ' root by soil
In dig;
S2:The construction of first rammed earth step layer, earth filling tamping is carried out to earth dam matrix slope top layer, and rammed earth layer needs to be fabricated to platform
Scalariform, the width of the horizontal direction of step needs to be maintained at 25 centimetres;
S3:First widens the construction of matrix, needs progress first to widen applying for matrix after the construction of the first rammed earth step layer is finished
Work, to mound outside the first rammed earth step layer, while first widens in matrix and need press-in cement concrete stake, base is widened to first
Body is compacted, while a diameter of 8 centimetres of the cement concrete stake of press-in, the first mound horizontal width for widening matrix is 70
Centimetre;
S4:The construction of second rammed earth step layer, the second rammed earth layer is identical with the first rammed earth step layer form of construction work, is carried out after mound
Tamp to be step-like, the width of step horizontal direction is 25 centimetres;
S5:Second widens the construction of matrix, needs to carry out the second construction for widening matrix after constructing to the second rammed earth step layer, the
Two widen in matrix and need press-in cement concrete stake, and a diameter of 8 centimetres of cement concrete stake, second widens base layer for most
When outer layer widens matrix, the second width for widening base layer horizontal direction is 50 centimetres;
S6:The maintenance on earth dam top layer, second, which widens matrix, widens after the completion of matrix construction as outermost layer, it is necessary to be carried out to slope
Slope protection plate is built, and Slope protection plate needs to plant shrub to the hollow part of Slope protection plate after building, and strengthens bank protection ability.
The first rammed earth step layer and the second rammed earth step layer use yellow soil with sandstone grain in proportion for 2:1 mixing
Material.Described first, which widens matrix and second, widens matrix and is needed in work progress using watering so that soil lower floor, makes
Must finally construct first widens matrix and second and widens matrix more consolidation, and irrigation amount is according to 60 kilograms per cubic meter soil
Mode is carried out, while widening the construction at least needing interval to carry out subsequent processing for 2 days after matrix construction.Described first widens matrix
Widen with second needs to wind upper nylon mesh sheet between the cement concrete stake in matrix, and more helping prevents that widening matrix collapses.
Described first, which widens matrix and second, widens the length control of the cement concrete stake being pressed into matrix at 0.5-4 meter, and cement is mixed
Solidifying soil pilespacing must not be less than 30 centimetres from the vertical distance of topsoil.
Rammed earth step layer of the present invention is with widening the mode at matrix interval to widen earth dam, and the setting of rammed earth step layer can make
Matrix must be widened preferably to be attached on dam body, it is to avoid widen matrix landslide, preventing from widening matrix level, to widen width excessive, leads
The generation of landslide is caused, the solidness of earth dam can be improved, can be with while by rammed earth step layer and the setting for widening matrix interval
The degree that earth dam is widened is improved to the full extent.
The foregoing is only a preferred embodiment of the present invention, but protection scope of the present invention be not limited thereto,
Any one skilled in the art the invention discloses technical scope in, technique according to the invention scheme and its
Inventive concept is subject to equivalent substitution or change, should all be included within the scope of the present invention.
Claims (5)
1. a kind of earth dam widens construction technology, it is characterised in that:The earth dam is widened construction technology and comprised the following steps that:
S1:Cleaning to earth dam matrix slope top layer, the impurity on earth dam matrix slope top layer is removed, by the weeds on top layer and filling
Wood is purged, and trees is implanted with, it is necessary to which trees are removed if being planted on earth dam matrix slope, while needing trees ' root by soil
In dig;
S2:The construction of first rammed earth step layer, earth filling tamping is carried out to earth dam matrix slope top layer, and rammed earth layer needs to be fabricated to platform
Scalariform, the width of the horizontal direction of step needs to be maintained at 20-30 centimetres;
S3:First widens the construction of matrix, needs progress first to widen applying for matrix after the construction of the first rammed earth step layer is finished
Work, to mound outside the first rammed earth step layer, while first widens in matrix and need press-in cement concrete stake, base is widened to first
Body is compacted, while a diameter of 7-10 centimetres of the cement concrete stake of press-in, first widens the mound horizontal width of matrix
For 50-100 centimetres;
S4:The construction of second rammed earth step layer, the second rammed earth layer is identical with the first rammed earth step layer form of construction work, is carried out after mound
Tamp to be step-like, the width of step horizontal direction is 20-30 centimetres;
S5:Second widens the construction of matrix, needs to carry out the second construction for widening matrix after constructing to the second rammed earth step layer, the
Two widen in matrix need press-in cement concrete stake, cement concrete stake a diameter of 7-10 centimetres, second widens base layer
When widening matrix for outermost layer, the second width for widening base layer horizontal direction is 40-70 centimetres;
S6:The maintenance on earth dam top layer, second, which widens matrix, widens after the completion of matrix construction as outermost layer, it is necessary to be carried out to slope
Slope protection plate is built, and Slope protection plate needs to plant shrub to the hollow part of Slope protection plate after building, and strengthens bank protection ability.
2. a kind of earth dam according to claim 1 widens construction technology, it is characterised in that:The first rammed earth step layer and
Second rammed earth step layer uses yellow soil with sandstone grain in proportion for 2:The material of 1 mixing.
3. a kind of earth dam according to claim 1 widens construction technology, it is characterised in that:Described first widens matrix and
Two, which widen matrix, needs in work progress using watering so that soil lower floor so that first finally constructed widens matrix and the
Two widen matrix more consolidation, and irrigation amount is carried out in the way of 50-70 kilograms per cubic meter soil, while widening matrix construction
Interval is at least needed to carry out within 2 days the construction of subsequent processing afterwards.
4. a kind of earth dam according to claim 1 widens construction technology, it is characterised in that:Described first widens matrix and
Two widen in matrix cement concrete stake between need to wind nylon mesh sheet, more helping prevents that widening matrix collapses.
5. a kind of earth dam according to claim 1 widens construction technology, it is characterised in that:Described first widens matrix and
Two length for widening the cement concrete stake being pressed into matrix are controlled at 0.5-4 meters, and cement concrete pilespacing is from topsoil
Vertical distance must not be less than 30 centimetres.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710234199.8A CN107059799A (en) | 2017-04-11 | 2017-04-11 | A kind of earth dam widens construction technology |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710234199.8A CN107059799A (en) | 2017-04-11 | 2017-04-11 | A kind of earth dam widens construction technology |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107059799A true CN107059799A (en) | 2017-08-18 |
Family
ID=59601987
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710234199.8A Pending CN107059799A (en) | 2017-04-11 | 2017-04-11 | A kind of earth dam widens construction technology |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107059799A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114960555A (en) * | 2022-07-19 | 2022-08-30 | 河南绿岩工程科技有限公司 | Widened seepage-proofing structure for penetrated earth-rock dam and construction method |
-
2017
- 2017-04-11 CN CN201710234199.8A patent/CN107059799A/en active Pending
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114960555A (en) * | 2022-07-19 | 2022-08-30 | 河南绿岩工程科技有限公司 | Widened seepage-proofing structure for penetrated earth-rock dam and construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106759104B (en) | Ecological slope protection structure and construction method | |
CN104328766A (en) | Ecological stone cage net box retaining wall and construction method | |
CN104186233A (en) | Frame beam slope greening method and frame beam slope greening facility | |
CN201826318U (en) | Simple ecological slope protecting structure for loose soil of road | |
CN107237334A (en) | A kind of road foundation execavated rockmass frame gird type slope protection code builds the construction method of plant biological bag greening | |
CN110552356B (en) | Comprehensive treatment system for hanging slag on lower side slope of road in plateau area and construction method thereof | |
CN111005393B (en) | Slope protection structure for repairing landslide body by using live tree piles and construction method | |
CN106522244B (en) | A kind of embankment combination binding structure and its construction method | |
CN111593748A (en) | Ecological protection structure of broken rock abrupt slope and construction method thereof | |
KR100959828B1 (en) | A vegetation slope structure | |
US6494009B1 (en) | Green concrete retaining wall and method for constructing the same | |
CN203334301U (en) | Cave slope strengthening protection structure | |
CN107059799A (en) | A kind of earth dam widens construction technology | |
CN108293831A (en) | Heavy saline afforestation greening method | |
CN204676571U (en) | A kind of flexible protective slope structure of feldspathic sandstone natural slope | |
KR200403507Y1 (en) | Cellular Block Of A Plant Community Type | |
CN212427130U (en) | Mudstone high-fill side slope structure | |
CN114635432A (en) | Construction method of composite ecological slope protection of foundation pit | |
KR101104691B1 (en) | Reinforcement constructing method for embankment using vegetation cemented sand and gravel | |
CN211037008U (en) | Comprehensive treatment system for slope slag-adhering under plateau area road | |
CN211447015U (en) | H-shaped anti-slide pile plate wall | |
CN204238176U (en) | Ecotypic Stone Mesh-box net cage barricade | |
CN208251014U (en) | A kind of upright embankment structure of composite foundation base empty van | |
CN202672182U (en) | Reinforcing slab and geogrid reinforced retaining wall | |
CN105908987A (en) | Ecological reinforcement composite material used for historical site protection project and construction method thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20170818 |
|