CN107059704A - Guardrail - Google Patents

Guardrail Download PDF

Info

Publication number
CN107059704A
CN107059704A CN201710044291.8A CN201710044291A CN107059704A CN 107059704 A CN107059704 A CN 107059704A CN 201710044291 A CN201710044291 A CN 201710044291A CN 107059704 A CN107059704 A CN 107059704A
Authority
CN
China
Prior art keywords
support base
cross beam
column
firm banking
fixedly connected
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201710044291.8A
Other languages
Chinese (zh)
Inventor
贾宁
卜倩淼
李勇
周志伟
王成虎
杨曼娟
于海霞
张宏松
李萌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BEIJING ZHONGJIAO HUA AN SCIENCE AND TECHNOLOGY Co Ltd
Original Assignee
BEIJING ZHONGJIAO HUA AN SCIENCE AND TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BEIJING ZHONGJIAO HUA AN SCIENCE AND TECHNOLOGY Co Ltd filed Critical BEIJING ZHONGJIAO HUA AN SCIENCE AND TECHNOLOGY Co Ltd
Priority to CN201710044291.8A priority Critical patent/CN107059704A/en
Publication of CN107059704A publication Critical patent/CN107059704A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01FADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
    • E01F15/00Safety arrangements for slowing, redirecting or stopping errant vehicles, e.g. guard posts or bollards; Arrangements for reducing damage to roadside structures due to vehicular impact
    • E01F15/006Lane control by movable lane separating barriers, e.g. shiftable barriers, retractable kerbs ; Apparatus or barriers specially adapted therefor, e.g. wheeled barriers

Abstract

The present invention relates to highway protective equipment technical field, a kind of guardrail is disclosed, for the protection of construction of the highway area and central separating belt opening place protection, with preferable conveniently moving and protection safety.Guardrail, including:At least two canned paragraphs, each canned paragraph includes:Firm banking and the first crossbeam being arranged on firm banking, firm banking are fixedly connected with region to be placed;Multiple active segments between two neighboring canned paragraph are connected, active segment includes:Mobile base and the second cross beam being arranged in mobile base, are detachably connected between mobile base and firm banking and between two neighboring mobile base, are detachably connected between second cross beam and first crossbeam and between two neighboring second cross beam.

Description

Guardrail
Technical field
The present invention relates to highway protective equipment technical field, more particularly to a kind of guardrail.
Background technology
The reconstruction and extension project and maintenance construction of highway are typically what is carried out under conditions of uninterrupted traffic, are applied for convenience Work, when construction area takes runway, vehicular traffic needs forced deceleration and crossover lane and kept often in this road section scope Low speed jogging is by construction section, often because of vehicle and the construction of passing through to lose control of one's vehicle or caused by other reasonses in this road section scope Personnel or equipment collision cause traffic accident in area.Generally put outside current construction of the highway operation area cone, Anti-collision barrel or every Work zone is isolated from isolation facilities such as piers, but such isolation facility does not have security protection ability substantially, it is impossible to it is right Personnel and equipment or errant vehicle are effectively protected in work zone.Put continous way coagulation in the section that part is constructed for a long time Native hard shoulder, such a hard shoulder has certain protective capacities, but is not easy to transport and dismounts, and space-consuming is larger.
Median opening guardrail be in case of emergency passed through for traffic accident treatment vehicle and ambulance vehicles and It is interim during the construction of the highway closing of side to open the facility let pass, require that there is certain protective capacities in the case of normal switching-off, Should be able to quickly, flexibly it be moved in interim open.The existing movable rail of China is generally plug-in, telescopic and water-filling fills sand Formula, though possessing mobile flexible function, does not possess defined protective capacities, the traffic accident for easily occurring vehicles traverse.
The content of the invention
It is an object of the invention to provide a kind of guardrail, for the protection of construction of the highway area and central separating belt opening place protection, With preferable conveniently moving and protection safety.
To reach above-mentioned purpose, the invention provides following technical scheme:
The invention provides a kind of guardrail, including:
At least two canned paragraphs, each canned paragraph includes:Firm banking and be arranged on the firm banking the One crossbeam, the firm banking is fixedly connected with region to be placed;
At least one active segment between the two neighboring canned paragraph is connected, the active segment includes:Mobile base and The second cross beam in the mobile base is arranged at, it is between the mobile base and the firm banking and two neighboring described It is detachably connected between mobile base, between the second cross beam and the first crossbeam and the two neighboring second cross beam Between be detachably connected.
The guardrail that the present invention is provided, the canned paragraph and active segment independent by setting, can improve the easy for installation of guardrail Property, when in use, firm banking is installed on region to be placed, as needed the quantity of selection active segment, by active segment Mobile base is connected with the firm banking in canned paragraph, when needing multiple active segments, and the mobile base of adjacent activities section is connected Connect, first crossbeam is connected with second cross beam, the second cross beam connection of adjacent activities section;During dismounting, it is only necessary to by active segment Mobile base and second cross beam are disassembled, due to, without fixedly connected part, therefore being torn open between mobile base and region to be placed Unload more convenient, can play a part of stopping vehicle collision by the first crossbeam and second cross beam of setting, stop peace Full property is higher.
Therefore the guardrail that the present invention is provided, for the protection of construction of the highway area and central separating belt opening place protection, with preferable Conveniently moving and protection safety.
In some optional embodiments, each firm banking includes:
First support base;
Be fixedly arranged in first support base, the first column for supporting and fixing the first crossbeam.
In some optional embodiments, first support base is cuboid support base or prismatoid support bottom Seat.
In some optional embodiments, the upper plate of first support base is passed through provided with permission first column Through hole, one end of first column is fixedly connected through the through hole with the bottom plate of first support base.
In some optional embodiments, above-mentioned guardrail also includes:It is arranged at the first reinforcing plate on the through hole; And/or;
The second reinforcing plate on the bottom plate of first support base is arranged at, second reinforcing plate includes being used to support First supporting part of the upper plate of first support base, it is used for and bottom plate and first column of first support base are consolidated Surely the second supporting part that the region connected is fixedly connected, first supporting part and second supporting part are integrally formed.
In some optional embodiments, each mobile base includes:
Second support base;
Be fixedly arranged in second support base, the second column for supporting and fixing the second cross beam.
In some optional embodiments, second support base is cuboid support base or prismatoid support bottom Seat, the upper plate of second support base is provided with the through hole for allowing second column to pass through, and one end of second column is worn The bottom plate that the through hole is crossed with second support base is fixedly connected, and the through hole is provided with the 3rd reinforcing plate, described the The region being fixedly connected on the bottom plate of two support bases with second column is provided with the 4th reinforcing plate.
In some optional embodiments, the bottom plate of second support base is set away from the side of the second cross beam There is liftable pulley.
In some optional embodiments, between the first crossbeam and the second cross beam and two adjacent institutes State between second cross beam and to be detachably connected by sleeve pipe and locking inserted link;And/or,
First support base and second support base are respectively equipped with connecting cross beam, and first support base is set Between the connecting cross beam that the connecting cross beam and second support base having are provided with and adjacent two described It is detachably connected between the connecting cross beam that two support bases are provided with by sleeve pipe and locking inserted link, and the first support bottom The connecting cross beam that seat is provided with is fixedly connected by the first fixed plate with the side of first column, the second support bottom The connecting cross beam that seat is provided with is fixedly connected by the second fixed plate with the side of second column.
In some optional embodiments, the firm banking is fixed by screw or bolt with the region to be placed Connection.
Brief description of the drawings
Fig. 1 is the dimensional structure diagram of guardrail provided in an embodiment of the present invention;
Fig. 2 is the first planar structure schematic diagram of guardrail provided in an embodiment of the present invention;
Fig. 3 is the A-A of the first planar structure schematic diagram of the guardrail shown in Fig. 2 to sectional view;
Fig. 4 is the B-B direction sectional view of the first planar structure schematic diagram of the guardrail shown in Fig. 2;
Fig. 5 is the C of the first planar structure schematic diagram of the guardrail shown in Fig. 2 to structural representation;
Fig. 6 is second of planar structure schematic diagram of guardrail provided in an embodiment of the present invention.
Reference:
1- canned paragraph 11- firm bankings
111- the first support base the first columns of 112-
12- first crossbeam 2- active segments
21- mobile bases the second support bases of 211-
212- the second column 22- second cross beams
3- the first reinforcing plate the second reinforcing plates of 4-
41- the first supporting part the second supporting parts of 42-
The reinforcing plates of the 3rd reinforcing plate 52- of 51- the 4th
53- the first fixed plate the second fixed plates of 54-
6- connecting cross beam 7- sleeve pipes
8- locks inserted link 91- screws
92- bolts
Embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete Site preparation is described, it is clear that described embodiment is only a part of embodiment of the invention, rather than whole embodiments.It is based on Embodiment in the present invention, it is every other that those of ordinary skill in the art are obtained under the premise of creative work is not made Embodiment, belongs to the scope of patent protection of the present invention.
As shown in Figure 1, Figure 2 with shown in Fig. 5, wherein:Fig. 1 is the dimensional structure diagram of guardrail provided in an embodiment of the present invention; Fig. 2 is the first planar structure schematic diagram of guardrail provided in an embodiment of the present invention;Fig. 5 is the first of the guardrail shown in Fig. 2 The C of planar structure schematic diagram is to structural representation;The invention provides a kind of guardrail, including:
At least two canned paragraphs 1, each canned paragraph 1 includes:Firm banking 11 and first be arranged on firm banking 11 Crossbeam 12, firm banking 11 is fixedly connected with region to be placed;
At least one active segment 2 between two neighboring canned paragraph 1 is connected, active segment 2 includes:Mobile base 21 and setting In the second cross beam 22 in mobile base 21, between mobile base 21 and firm banking 11 and be connected two mobile bases 21 it Between be detachably connected, be detachably connected between second cross beam 22 and first crossbeam 12 and between two neighboring second cross beam 22.
The guardrail that the present invention is provided, the canned paragraph 1 and active segment 2 independent by setting, can improve the installation side of guardrail Just property, when in use, region to be placed is installed on by firm banking 11, as needed the length of selection active segment 2, by active segment Mobile base 21 in 2 is connected with the firm banking 11 in canned paragraph 1, when needing multiple active segments 2, by adjacent activities section 2 Mobile base 21 connect, first crossbeam 12 is connected with second cross beam 22, adjacent activities section 2 second cross beam 22 connect;Dismounting When, it is only necessary to the mobile base 21 and second cross beam 22 in active segment 2 are disassembled, due to mobile base 21 and waiting to put Put between region without fixedly connected part, thus remove it is more convenient, can be with by the first crossbeam 12 and second cross beam 22 of setting Play a part of stopping vehicle collision, stop that security is higher.
Therefore the guardrail that the present invention is provided, for the protection of construction of the highway area and central separating belt opening place protection, with preferable Conveniently moving and protection safety.
The concrete structure of above-mentioned firm banking 11 can have a variety of, in a kind of optional embodiment, as shown in figure 1, often Individual firm banking 11 includes:
First support base 111;
Be fixedly arranged in the first support base 111, the first column 112 for supporting and fixing first crossbeam 12.
Optionally, the first support base 111 is cuboid support base or prismatoid support base.The support bottom of prismatoid The inside of the support base of seat and cuboid can also can be engraved structure with entity structure.
As shown in Figure 3 and Figure 4, wherein:Fig. 3 is the A-A of the first planar structure schematic diagram of the guardrail shown in Fig. 2 to cuing open View;Fig. 4 is the B-B direction sectional view of the first planar structure schematic diagram of the guardrail shown in Fig. 2;For the ease of the first column 112 installation, the upper plate of the first support base 111 is provided with the through hole for allowing the first column 112 to pass through, the one of the first column 112 End is fixedly connected through through hole with the bottom plate of the first support base 111.
Further, as shown in Fig. 2 intensity in order to improve the first support base 111, above-mentioned guardrail also includes:Set In the first reinforcing plate 3 on through hole;And/or;
It is arranged at the second reinforcing plate 4 on the bottom plate of the first support base 111, the second reinforcing plate 4 includes being used for supporting the First supporting part of the upper plate of one support base, it is used for and the bottom plate of the first support base 111 is fixedly connected with the first column 112 The second supporting part that region is fixedly connected, the first supporting part and the second supporting part are integrally formed.
In order to coordinate the first support base 111, the shape of the first supporting part it is identical with the shape of the first support base 111 or It is similar.
In a kind of optional embodiment, each mobile base 21 includes:
Second support base 211;
Be fixedly arranged in the second support base 211, the second column 212 for supporting and fixing second cross beam 22.
Optionally, the second support base 211 is cuboid support base or prismatoid support base.The support bottom of prismatoid The inside of the support base of seat and cuboid can also can be engraved structure with entity structure.
For the ease of fixing the second column 212, the upper plate of the second support base 211 is passed through provided with the second column 212 of permission Through hole, one end of the second column 212 is fixedly connected through through hole with the bottom plate of the second support base 211, and through hole is provided with The region being fixedly connected on 3rd reinforcing plate 51, the bottom plate of the second support base 211 with the second column 212 is provided with the 4th reinforcing plate 52.The above-mentioned column 212 of first column 112 and second can use identical shape.
Pass through sleeve pipe and locking between above-mentioned first crossbeam and second cross beam and between adjacent two second cross beams 22 Inserted link is detachably connected;And/or,
As shown in figure 1, the above-mentioned support base 211 of first support base 111 and second is respectively equipped with connecting cross beam 6, first Between the connecting cross beam 6 that the support base 211 of connecting cross beam 6 and second that support base 111 is provided with is provided with and adjacent two It is detachably connected between the connecting cross beam 6 that second base is provided with by sleeve pipe 7 and locking inserted link 8, and the first support base 111 is set Some connecting cross beams 6 are fixedly connected by the first fixed plate 53 with the side of the first column 112, and the second support base 211 is provided with Connecting cross beam 6 be fixedly connected by the second fixed plate 54 with the side of the second column 212.By the first support base during connection 111 and second in the connecting cross beam insertion sleeve that has of support base 211, then by locking the insertion sleeve of inserted link 8 by first Support base 111 is fixedly connected with the second support base 211, and similarly first crossbeam 12 and second cross beam 22 be also in the same way Achieve a fixed connection.It is above-mentioned and/or comprising:Between first crossbeam 12 and second cross beam 22 and two neighboring second cross beam 22 it Between by sleeve pipe 7 and locking inserted link 8 be detachably connected;It is between first support base 111 and the second support base 211 and adjacent Even it is detachably connected between two the second support bases by sleeve pipe 7 and locking inserted link 8;Or, first crossbeam 12 and second is horizontal It is detachably connected between beam 22 and by sleeve pipe 7 and locking inserted link 8 between two neighboring second cross beam 22, the first support base 111 and second between support base 211 and between two neighboring second support base 211 using other manner connection;Or, Connected between first crossbeam 12 and second cross beam 22 and using other manner between two neighboring second cross beam 22, the first support Inserted between the support base 211 of base 111 and second and by sleeve pipe 7 and locking between two neighboring second support base 211 Bar 8 is detachably connected.
Preferably in embodiment, the bottom plate of above-mentioned second support base 211 is set away from the side of the second cross beam 22 There is liftable pulley.The movement of active segment 2 is easy in the setting of pulley.
Optionally, above-mentioned first crossbeam 12 and second cross beam 22 can be square steel or other shapes of shaped steel, such as channel-section steel Or round steel etc., just no longer repeat one by one here.
Above-mentioned first crossbeam 12, second cross beam 22, the first reinforcing plate 3, the second reinforcing plate 4, the 3rd reinforcing plate 51 and Four reinforcing plates 52 are fixed by the way of welding to be connected with corresponding support base.
Above-mentioned firm banking 11 can be fixedly connected using various ways with region to be placed, optionally, as shown in Fig. 2 Firm banking 11 is fixedly connected by screw 91 with region to be placed.
Optionally, as shown in fig. 6, firm banking 11 is fixedly connected using bolt 92 with region to be placed.It is solid in order to improve Determine intensity, above-mentioned bolt 92 can use collided gudgeon.
Specific size those skilled in the art of guardrail provided in an embodiment of the present invention can set as needed, optionally The total height of guardrail can be 82 centimetres, and the height of the first support base 111 and the second support base 211 is 42 centimetres, first Crossbeam 12 and second cross beam 22 are higher by 40 centimetres with respect to the top of the first support base.
Obviously, those skilled in the art can carry out the essence of various changes and modification without departing from the present invention to the present invention God and scope.So, if these modifications and variations of the present invention belong to the scope of the claims in the present invention and its equivalent technologies Within, then the present invention is also intended to comprising including these changes and modification.

Claims (10)

1. a kind of guardrail, it is characterised in that including:
At least two canned paragraphs, each canned paragraph includes:Firm banking and the first horizontal stroke being arranged on the firm banking Beam, the firm banking is fixedly connected with region to be placed;
At least one active segment between the two neighboring canned paragraph is connected, the active segment includes:Mobile base and setting Second cross beam in the mobile base, between the mobile base and the firm banking and the two neighboring activity It is detachably connected between base, between the second cross beam and the first crossbeam and between the two neighboring second cross beam It is detachably connected.
2. guardrail according to claim 1, it is characterised in that each firm banking includes:
First support base;
Be fixedly arranged in first support base, the first column for supporting and fixing the first crossbeam.
3. guardrail according to claim 2, it is characterised in that first support base is cuboid support base or ladder Body support base.
4. guardrail according to claim 3, it is characterised in that the upper plate of first support base is provided with allowing described the The through hole that one column is passed through, one end of first column is fixed through the bottom plate of the through hole and first support base to be connected Connect.
5. guardrail according to claim 4, it is characterised in that also include:It is arranged at the first reinforcing plate on the through hole; And/or;
The second reinforcing plate on the bottom plate of first support base is arranged at, second reinforcing plate includes being used to support described First supporting part of the upper plate of the first support base, it is used for and bottom plate and first column of first support base are fixed and connected The second supporting part that the region connect is fixedly connected, first supporting part and second supporting part are integrally formed.
6. guardrail according to claim 2, it is characterised in that each mobile base includes:
Second support base;
Be fixedly arranged in second support base, the second column for supporting and fixing the second cross beam.
7. guardrail according to claim 6, it is characterised in that second support base is cuboid support base or ladder Body support base, the upper plate of second support base is stood provided with the through hole for allowing second column to pass through, described second One end of post is fixedly connected through the through hole with the bottom plate of second support base, and the through hole is strengthened provided with the 3rd The region being fixedly connected on plate, the bottom plate of second support base with second column is provided with the 4th reinforcing plate.
8. guardrail according to claim 7, it is characterised in that the bottom plate of second support base is horizontal away from described second The side of beam is provided with liftable pulley.
9. the guardrail according to any one of claim 6~8, it is characterised in that the first crossbeam and the second cross beam Between and two adjacent second cross beams between by sleeve pipe and locking inserted link be detachably connected;And/or,
First support base and second support base are respectively equipped with connecting cross beam, what first support base was provided with Between the connecting cross beam that the connecting cross beam and second support base are provided with and adjacent two described second It is detachably connected between the connecting cross beam that support base is provided with by sleeve pipe and locking inserted link, and first support base is set The connecting cross beam having is fixedly connected by the first fixed plate with the side of first column, and second support base is set The connecting cross beam having is fixedly connected by the second fixed plate with the side of second column.
10. guardrail according to claim 9, it is characterised in that the firm banking is treated by screw or bolt with described Placement region is fixedly connected.
CN201710044291.8A 2017-01-19 2017-01-19 Guardrail Withdrawn CN107059704A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710044291.8A CN107059704A (en) 2017-01-19 2017-01-19 Guardrail

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710044291.8A CN107059704A (en) 2017-01-19 2017-01-19 Guardrail

Publications (1)

Publication Number Publication Date
CN107059704A true CN107059704A (en) 2017-08-18

Family

ID=59598088

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710044291.8A Withdrawn CN107059704A (en) 2017-01-19 2017-01-19 Guardrail

Country Status (1)

Country Link
CN (1) CN107059704A (en)

Citations (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20010067866A (en) * 2001-04-03 2001-07-13 선민영 Shock absorbing device using waste tires
CN2661763Y (en) * 2003-10-28 2004-12-08 卢少鹏 Hanging spring type freeway safety guard rail
CN201443051U (en) * 2009-04-07 2010-04-28 梁静 Folding guardrail with adjustable bracket
CN201567543U (en) * 2009-07-30 2010-09-01 孙霖 Zoning activity guardrail in highway
CN203160163U (en) * 2013-04-08 2013-08-28 交通运输部公路科学研究所 Protective guard
CN203625809U (en) * 2013-11-11 2014-06-04 北京深华达交通工程检测有限公司 Truss type anti-collision movable guardrail
CN203960783U (en) * 2014-08-01 2014-11-26 北京城建道桥建设集团有限公司 Reinforced sliding movable rail
CN204000693U (en) * 2014-08-22 2014-12-10 深圳市正道公路工程有限公司 Median strip Mobile steel guardrail
CN204212086U (en) * 2014-10-21 2015-03-18 杨力 A kind of highway safety guardrail
CN204435226U (en) * 2015-02-09 2015-07-01 中交公路养护工程技术有限公司 The removable protection guardrail of a kind of bridge
CN104809888A (en) * 2014-01-29 2015-07-29 都快通(北京)交通疏导设备有限公司 City plane intersection guidance command system for cancelling left turning
CN204676985U (en) * 2015-04-23 2015-09-30 广东爱得威建设(集团)股份有限公司 Telescopic enclosure wall electronic grille fence
CN204804366U (en) * 2015-02-13 2015-11-25 方彥苏 Construction safety rail guard and stair railing
CN204849652U (en) * 2015-07-17 2015-12-09 杨静怡 Dismantlement formula rail for municipal works
CN204940174U (en) * 2015-05-08 2016-01-06 北京中交路成交通技术有限公司 Ground locking-type movable rail and comprise its speedway guardrail
AU2016100380B4 (en) * 2014-07-29 2016-12-08 Lee, Damian Kevin MR Support System and Structure Supported Thereby
CN206721756U (en) * 2017-01-19 2017-12-08 北京中交华安科技有限公司 Guardrail

Patent Citations (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20010067866A (en) * 2001-04-03 2001-07-13 선민영 Shock absorbing device using waste tires
CN2661763Y (en) * 2003-10-28 2004-12-08 卢少鹏 Hanging spring type freeway safety guard rail
CN201443051U (en) * 2009-04-07 2010-04-28 梁静 Folding guardrail with adjustable bracket
CN201567543U (en) * 2009-07-30 2010-09-01 孙霖 Zoning activity guardrail in highway
CN203160163U (en) * 2013-04-08 2013-08-28 交通运输部公路科学研究所 Protective guard
CN203625809U (en) * 2013-11-11 2014-06-04 北京深华达交通工程检测有限公司 Truss type anti-collision movable guardrail
CN104809888A (en) * 2014-01-29 2015-07-29 都快通(北京)交通疏导设备有限公司 City plane intersection guidance command system for cancelling left turning
AU2016100380B4 (en) * 2014-07-29 2016-12-08 Lee, Damian Kevin MR Support System and Structure Supported Thereby
CN203960783U (en) * 2014-08-01 2014-11-26 北京城建道桥建设集团有限公司 Reinforced sliding movable rail
CN204000693U (en) * 2014-08-22 2014-12-10 深圳市正道公路工程有限公司 Median strip Mobile steel guardrail
CN204212086U (en) * 2014-10-21 2015-03-18 杨力 A kind of highway safety guardrail
CN204435226U (en) * 2015-02-09 2015-07-01 中交公路养护工程技术有限公司 The removable protection guardrail of a kind of bridge
CN204804366U (en) * 2015-02-13 2015-11-25 方彥苏 Construction safety rail guard and stair railing
CN204676985U (en) * 2015-04-23 2015-09-30 广东爱得威建设(集团)股份有限公司 Telescopic enclosure wall electronic grille fence
CN204940174U (en) * 2015-05-08 2016-01-06 北京中交路成交通技术有限公司 Ground locking-type movable rail and comprise its speedway guardrail
CN204849652U (en) * 2015-07-17 2015-12-09 杨静怡 Dismantlement formula rail for municipal works
CN206721756U (en) * 2017-01-19 2017-12-08 北京中交华安科技有限公司 Guardrail

Similar Documents

Publication Publication Date Title
CN206721756U (en) Guardrail
CN203295961U (en) Railway bridge surface safety protection arrangement structure
JP2014077230A (en) Guard fence and installation method for the same
CN102787574B (en) Shallow foundation movable anticollision device
CN107740352A (en) The isolating and protecting platform and construction method of bridge maintaining transformation are shared applied to rail-road
CN202989771U (en) High-protective-level combination type anti-collision guardrail with controllable working width
CN107059704A (en) Guardrail
CN209053039U (en) A kind of open and close it is convenient it is antitheft in point band opening activity guard bar structure
CN103966959B (en) High-flying highway railway bridge crashproof Self-resetting clearance limit frame
CN207944391U (en) A kind of movable rail
CN102787554B (en) Anti-seismic abutment structure along bridge
CN108560453A (en) A kind of movable rail
KR20130116619A (en) Reinforce type guard fence
CN202787140U (en) Movable guardrail
CN206916675U (en) A kind of guardrail section and combination-type guardrail
CN205532717U (en) Tunnel guard gate anti -overturning device and tunnel guard gate system
CN209722728U (en) A kind of bridge median strip flat protective device
CN208379509U (en) A kind of anti-collision movable guardrail with quick open function
CN208830219U (en) Emergency lane passive protection auxiliary system
WO2016195240A1 (en) Guard rail for absorbing impact
CN206721757U (en) A kind of combination-type guardrail
CN209162892U (en) A kind of section of track well system based on subway station list branch-cut bridge
CN208815996U (en) A kind of municipal road construction guardrail
KR102021853B1 (en) Pillar reinforcement apparatus for dike
CN206346507U (en) A kind of steel truss girder bridge construction safe passageway system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication

Application publication date: 20170818

WW01 Invention patent application withdrawn after publication