CN107740352A - The isolating and protecting platform and construction method of bridge maintaining transformation are shared applied to rail-road - Google Patents

The isolating and protecting platform and construction method of bridge maintaining transformation are shared applied to rail-road Download PDF

Info

Publication number
CN107740352A
CN107740352A CN201710796357.9A CN201710796357A CN107740352A CN 107740352 A CN107740352 A CN 107740352A CN 201710796357 A CN201710796357 A CN 201710796357A CN 107740352 A CN107740352 A CN 107740352A
Authority
CN
China
Prior art keywords
platform
bridge
outside
isolating
rail
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710796357.9A
Other languages
Chinese (zh)
Inventor
崔海
杜元
刘华
张军雷
鲍莉霞
阳春龙
王捷
王满满
耿东升
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Major Bridge Reconnaissance and Design Institute Co Ltd
China Railway Major Bridge Nanjing Bridge and Tunnel Inspec and Retrofit Co Ltd
China Railway Bridge Nanjing Bridge and Tunnel Diagnosis and Treatment Co Ltd
Original Assignee
China Railway Major Bridge Reconnaissance and Design Institute Co Ltd
China Railway Bridge Nanjing Bridge and Tunnel Diagnosis and Treatment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Major Bridge Reconnaissance and Design Institute Co Ltd, China Railway Bridge Nanjing Bridge and Tunnel Diagnosis and Treatment Co Ltd filed Critical China Railway Major Bridge Reconnaissance and Design Institute Co Ltd
Priority to CN201710796357.9A priority Critical patent/CN107740352A/en
Publication of CN107740352A publication Critical patent/CN107740352A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D22/00Methods or apparatus for repairing or strengthening existing bridges ; Methods or apparatus for dismantling bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses a kind of isolating and protecting platform and construction method that bridge maintaining transformation is shared applied to rail-road, it is related to bridge maintaining field.The isolating and protecting platform includes an inner side platform and two outside platforms, inner side platform is fixed on the steel truss girder crossbeam of highway bridge, steel truss girder crossbeam is located at highway bridge bottom surface, two outside platforms are separately fixed at the both sides of highway bridge direction across bridge, and the height of outside platform is less than the height of highway bridge bridge floor.The construction method includes:A, travelling bridge platform is set up as the operation of isolating and protecting platform construction and transport of materials platform;B, the platform on the outside of the construction of the both sides of highway bridge;C, platform on the inside of being constructed on steel truss girder crossbeam.The present invention can avoid producing interference to rail track operation, not influence the normal operation of rail track, and ensure the operation security of rail track in the dismounting of upper strata highway structure.

Description

The isolating and protecting platform and construction method of bridge maintaining transformation are shared applied to rail-road
Technical field
The present invention relates to bridge maintaining field, is specifically related to a kind of isolation that bridge maintaining transformation is shared applied to rail-road Protective platform and construction method, suitable for the transformation project of the large-scale public bridge superstructure thing of rail-road, be particularly suitable for use on Layer carriageway plate is changed and rebuilding construction.
Background technology
The large-scale bridge that China is built early stage, because the various component service lifes of bridge are different, Earlier designs use Haydite concrete carriageway plate substantially achieved design service life.Therefore, many bridges have been faced with bridge floor driving The problems such as guidance tape is transformed or changed, bridge deck is removed and is changed.Generally, the improvement project amount of bridge is huge, particularly rail-road Shared Bridge Reconstruction can produce huge potential safety hazard to the operation security of lower floor's rail track.Limited by railway operation safety System, part rail-road share bridge and even can not be repaired and be transformed, it has to are faced with off-load, restricting traffic flow etc. and ask Topic.At present, the dismounting of upper strata highway structure inevitably produces interference to rail track operation, influences rail track The falling of normal operation, especially building waste, build dust, sewage etc. and can all have a strong impact on the safety of railway operation.
The content of the invention
The invention aims to overcome the shortcomings of above-mentioned background technology, there is provided one kind is applied to rail-road and shares bridge dimension Change the isolating and protecting platform made and construction method.The present invention can be avoided to railway in the dismounting of upper strata highway structure Railroad embankment produces interference, does not influence the normal operation of rail track, and ensure the operation security of rail track.
The present invention provides a kind of isolating and protecting platform that bridge maintaining transformation is shared applied to rail-road, and the rail-road shares bridge Beam includes highway bridge and railroad bridge, and highway bridge is located at the top of railroad bridge, and the isolating and protecting platform includes one Inner side platform and two outside platforms, inner side platform are fixed on the steel truss girder crossbeam of highway bridge, and steel truss girder crossbeam is positioned at public affairs Road and bridge soffit, two outside platforms are separately fixed at the both sides of highway bridge direction across bridge, and the height of outside platform is less than public affairs The height of road and bridge beam bridge floor.
On the basis of above-mentioned technical proposal, the outside platform is fixed on the both sides of highway bridge, highway by suspension rod On the steel truss girder top boom of bridge be horizontally disposed with have anchor beam, one end of the suspension rod is fixedly connected with anchor beam, the suspension rod it is another One end is fixedly connected with outside platform.
On the basis of above-mentioned technical proposal, the outside platform includes outside platform surface layer, multiple outside platform beams With multiple outside platform longerons, the outside platform longeron along bridge to be fixed on outside platform beams on, the outside flat surface Layer is laid on the platform longeron of outside.
On the basis of above-mentioned technical proposal, the suspension rod includes the first suspension rod and the second suspension rod, and first suspension rod inclines Tiltedly set, second suspension rod is vertically arranged, and the anchor beam includes the first anchor beam and the second anchor beam, first anchor beam and second Anchor beam is arranged on steel truss girder top boom, and first anchor beam is located at the top of the second anchor beam, the both ends point of first suspension rod Be not fixedly connected with the first anchor beam and outside platform beams, the both ends of second suspension rod respectively with the second anchor beam and outside platform Crossbeam is fixedly connected.
On the basis of above-mentioned technical proposal, first anchor beam and the second anchor beam are fixedly connected by screw-thread steel.
On the basis of above-mentioned technical proposal, the both sides of the outside platform are provided with guardrail, outside platform surface layer bag Include scaffold board, waterproof ventilated membrane and the checkered steel plate being laid on successively on the platform longeron of outside.
On the basis of above-mentioned technical proposal, the inner side platform includes inner side platform surface layer, multiple inner side platform longerons With multiple inner side platform beams, multiple inner side platform longerons are along bridge to being fixed on steel truss girder crossbeam, the inner side platform beams It is fixed between two adjacent inner side platform longerons, the inner side platform surface layer is laid on the platform longeron of inner side.
On the basis of above-mentioned technical proposal, safety net is provided with below the inner side platform, the two of the safety net End is connected with outside platform respectively.
On the basis of above-mentioned technical proposal, the inner side platform surface layer includes being laid on successively on the platform longeron of inner side Scaffold board, waterproof ventilated membrane and checkered steel plate.
The present invention also provides a kind of applying for the above-mentioned isolating and protecting platform that bridge maintaining transformation is shared applied to rail-road Work method, comprises the following steps:
A, travelling bridge platform is set up as the operation of isolating and protecting platform construction and transport of materials platform;
B, the platform on the outside of the construction of the both sides of highway bridge;
C, platform on the inside of being constructed on steel truss girder crossbeam.
On the basis of above-mentioned technical proposal, in step B, construction outside platform specifically comprises the following steps:
B1, the first anchor beam and the second anchor beam are installed on steel truss girder top boom, then the first anchor beam and the second anchor beam are passed through Screw-thread steel is fixedly connected;
B2, installation outside platform beams, the both ends of the first suspension rod are fixed with the first anchor beam and outside platform beams respectively, The both ends of second suspension rod are fixed with the second anchor beam and outside platform beams respectively;
B3, on the platform beams of outside installation on the outside of platform longeron, then on the platform longeron of outside laying on the outside of platform Surface layer.
On the basis of above-mentioned technical proposal, in step C, construction inner side platform specifically comprises the following steps:
C1, in steel truss girder below the crossbeam hang safety net;
C2, multiple inner side platform longerons are fixedly mounted on steel truss girder crossbeam, pacify between adjacent inner side platform longeron Dress inner side platform beams;
C3, on the platform longeron of inner side laying on the inside of platform surface layer.
Compared with prior art, advantages of the present invention is as follows:
(1) the isolating and protecting platform that the present invention designs shares rail-road by inner side platform and outside platform on the upper strata of bridge Highway and lower floor railway are completely isolated, and protection effect is served to the rail track of operation.The highway structure on upper strata During dismounting, it can avoid producing interference to rail track operation, not influence the normal operation of rail track, and ensure rail track Operation security.Moreover, the isolating and protecting platform can also provide support and construction platform to the highway part on upper strata, ensure Bridge structure safe.
(2) outside platform of the invention is by the anchor beam of upper setting first and the second anchor beam in steel truss girder top boom, then Outside platform beams are fixed on the first anchor beam and the second anchor beam by the first suspension rod and the second suspension rod, the first suspension rod is tilted and set To put, the second suspension rod is vertically arranged so that the first suspension rod and the second suspension rod turn into the strong point of outside platform beams, simple in construction, And ensure the fix stably of outside platform.
(3) inner side platform of the invention is fixed on steel truss girder crossbeam, and inner side platform is located at rail-road and shares bridge floor Lower section, can be as the construction platform of the maintenance and renovation of upper strata highway, while during intercepting the maintenance and renovation of upper strata highway Rubbish, building dust, sewage, do not influence the normal operation of railway, and ensure the operation security of rail track.
Brief description of the drawings
Fig. 1 is that the embodiment of the present invention is applied to the structure that rail-road shares the isolating and protecting platform cross section of bridge maintaining transformation Schematic diagram.
Fig. 2 is that the embodiment of the present invention is applied to the structure that rail-road shares the isolating and protecting platform vertical section of bridge maintaining transformation Schematic diagram.
Reference:Platform on the inside of 1-, platform on the outside of 2-, 3- steel truss girder top booms, platform beams on the outside of 4- are flat on the outside of 5- Platform longeron, 6- suspension rods, the suspension rods of 61- first, the suspension rods of 62- second, 7- anchor beams, the anchor beams of 71- first, the anchor beams of 72- second, 8- outsides are flat Table top layer, 9- guardrails, 10- steel truss girder crossbeams, 11- inner sides platform longeron, 12- inner sides platform beams, 13- inner sides platform surface layer, 14- safety nets.
Embodiment
Below in conjunction with the accompanying drawings and specific embodiment the present invention is described in further detail.
Shown in Figure 1, the embodiment of the present invention provides a kind of isolating and protecting that bridge maintaining transformation is shared applied to rail-road Platform, rail-road, which shares bridge, includes highway bridge and railroad bridge, and highway bridge is located at the top of railroad bridge.Isolating and protecting is put down Platform includes an inner side platform 1 and two outside platforms 2, and inner side platform 1 is fixed on the steel truss girder crossbeam 10 of highway bridge, steel Trusses crossbeam 10 is located at highway bridge bottom surface side, and two outside platforms 2 are separately fixed at the both sides of highway bridge direction across bridge, and The height of outside platform 2 is less than the height of highway bridge bridge floor.
Wherein, outside platform 2 is fixed on the both sides of highway bridge direction across bridge by suspension rod 6, on the steel truss girder of highway bridge Being horizontally disposed with chord member 3 has anchor beam 7, and one end of suspension rod 6 is fixedly connected with anchor beam 7, and the other end and outside platform 2 of suspension rod 6 are solid Fixed connection.Outside platform 2 includes outside platform surface layer 8, multiple outside platform beams 4 and multiple outside platform longerons 5, and outside is put down Direction of the platform crossbeam 4 along bridge cross section is set, and outside platform longeron 5 along bridge to being fixed on the platform beams 4 of outside, put down by outside Table top layer 8 is laid on outside platform longeron 5.The both sides of outside platform 2 are provided with guardrail 9, outside platform surface layer 8 include according to Secondary scaffold board, waterproof ventilated membrane and the checkered steel plate being laid on outside platform longeron 5.
In the present embodiment, suspension rod 6 includes the first suspension rod 61 and the second suspension rod 62, and the first suspension rod 61 is obliquely installed, and second Suspension rod 62 is vertically arranged, and anchor beam 7 includes the first anchor beam 71 and the second anchor beam 72, and the first anchor beam 71 and the second anchor beam 72 are arranged on steel On trusses top boom 3, the first anchor beam 71 is located at the top of the second anchor beam 72, between being left between the first anchor beam 71 and the second anchor beam 72 Away from.The both ends of first suspension rod 61 are fixedly connected with the first anchor beam 71 and outside platform beams 4 respectively, the both ends point of the second suspension rod 62 It is not fixedly connected with the second anchor beam 72 and outside platform beams 4.Wherein, the first anchor beam 71 and the second anchor beam 72 are consolidated by screw-thread steel Fixed connection, is further fixed to the first anchor beam 71 and the second anchor beam 72.
Wherein, inner side platform 1 includes inner side platform surface layer 13, multiple inner side platform longerons 11 and multiple inner side platform beams 12, for multiple inner side platform longerons 11 along bridge to being fixed on steel truss girder crossbeam 10, inner side platform beams 12 are fixed on adjacent two Between individual inner side platform longeron 11, inner side platform surface layer 13 is laid on inner side platform longeron 11.Wherein, under inner side platform 1 Side is provided with safety net 14, the rubbish to drop during maintenance and renovation for intercepting upper strata highway, further railway fortune The safety of battalion.The both ends of safety net 14 are connected with outside platform 2 respectively, in the present embodiment, the both ends of safety net 14 respectively with Guardrail 9 connects.Inner side platform surface layer 13 includes scaffold board, waterproof ventilated membrane and the flower being laid on successively on inner side platform longeron 11 Line steel plate.
Shown in Figure 2, outside platform 2 and inner side platform 1 and rail-road share that bridge is isometric, and rail-road shares bridge both sides Steel truss girder vertical beam passes through outside platform 2, and steel truss girder top boom 3 is between bridge structure and steel truss girder vertical beam.
The embodiment of the present invention also provides a kind of construction for the isolating and protecting platform that bridge maintaining transformation is shared applied to rail-road Method, comprise the following steps:
A, travelling bridge platform is set up as the operation of isolating and protecting platform construction and transport of materials platform.Specifically, first exist The bridge floor of highway bridge sets up travelling bridge platform, then in the position that the bridge floor of highway bridge corresponds to above anchor beam 7 to be installed Put perforate.
B, the platform 2 on the outside of the construction of highway bridge both sides.The outside specifically, the movable loop wheel machine of travelling bridge platform will construct Material required for platform 2 is transported to the bridge floor of highway bridge by the bridge floor perforate of highway bridge.Installation anchor beam 7, hang Bar 6, outside platform longeron 5, movable loop wheel machine run to next position for needing to install anchor beam 7, are gradually completing outside platform 2 again Construction.
C, platform 1 on the inside of being constructed on steel truss girder crossbeam 10.During the platform 1 of construction inner side, it is used as inner side flat on outside platform 2 The material transfer of platform 1 and construction platform.
In step B, construction outside platform 2 specifically comprises the following steps:
B1, the first anchor beam 71 and the second anchor beam 72 be installed on steel truss girder top boom 3, then by the first anchor beam 71 and the second anchor Beam 72 is fixedly connected by screw-thread steel;
B2, installation outside platform beams 4, by the both ends of the first suspension rod 61 respectively with the first anchor beam 71 and outside platform beams 4 are fixed, and the both ends of the second suspension rod 62 are fixed with the second anchor beam 72 and outside platform beams 4 respectively;
B3, on outside platform beams 4 installation on the outside of platform longeron 5, then on outside platform longeron 5 laying on the outside of put down Table top layer 8;
In step C, construction inner side platform 1 specifically comprises the following steps:
C1, safety net 14 is hung below steel truss girder crossbeam 10;
C2, multiple inner side platform longerons 11 are fixedly mounted on steel truss girder crossbeam 10, in adjacent inner side platform longeron 11 Between installation inner side platform beams 12;
C3, on inner side platform longeron 11 laying on the inside of platform surface layer 13.
In actual applications, isolating and protecting platform of the invention is also applied for the maintenance of individual layer bridge and other common bridges Transformation.
Those skilled in the art can carry out various modifications and variations to the embodiment of the present invention, if these modifications and change Type is within the scope of the claims in the present invention and its equivalent technologies, then these modifications and variations are also in protection scope of the present invention Within.
The prior art that the content not being described in detail in specification is known to the skilled person.

Claims (12)

1. a kind of isolating and protecting platform that bridge maintaining transformation is shared applied to rail-road, the rail-road, which shares bridge, includes highway bridge Beam and railroad bridge, highway bridge are located at the top of railroad bridge, it is characterised in that:The isolating and protecting platform is included in one Side platform (1) and two outside platforms (2), inner side platform (1) are fixed on the steel truss girder crossbeam (10) of highway bridge, steel truss girder Crossbeam (10) is located at highway bridge bottom surface, and two outside platforms (2) are separately fixed at the both sides of highway bridge direction across bridge, and outside The height of platform (2) is less than the height of highway bridge bridge floor.
2. the isolating and protecting platform of bridge maintaining transformation is shared applied to rail-road as claimed in claim 1, it is characterised in that:Institute State the both sides that outside platform (2) is fixed on highway bridge direction across bridge by suspension rod (6), the steel truss girder top boom (3) of highway bridge Upper horizontally disposed have anchor beam (7), and one end of the suspension rod (6) is fixedly connected with anchor beam (7), the other end of the suspension rod (6) and Outside platform (2) is fixedly connected.
3. the isolating and protecting platform of bridge maintaining transformation is shared applied to rail-road as claimed in claim 2, it is characterised in that:Institute Stating outside platform (2) includes outside platform surface layer (8), multiple outside platform beams (4) and multiple outside platform longerons (5), institute Outside platform longeron (5) is stated along bridge to being fixed on outside platform beams (4), the outside platform surface layer (8) is laid on outside On platform longeron (5).
4. the isolating and protecting platform of bridge maintaining transformation is shared applied to rail-road as claimed in claim 3, it is characterised in that:Institute Stating suspension rod (6) includes the first suspension rod (61) and the second suspension rod (62), and first suspension rod (61) is obliquely installed, second suspension rod (62) it is vertically arranged, the anchor beam (7) includes the first anchor beam (71) and the second anchor beam (72), first anchor beam (71) and second Anchor beam (72) is arranged on steel truss girder top boom (3), and first anchor beam (71) is located at the top of the second anchor beam (72), and described The both ends of one suspension rod (61) are fixedly connected with the first anchor beam (71) and outside platform beams (4) respectively, second suspension rod (62) Both ends be fixedly connected respectively with the second anchor beam (72) and outside platform beams (4).
5. the isolating and protecting platform of bridge maintaining transformation is shared applied to rail-road as claimed in claim 4, it is characterised in that:Institute The first anchor beam (71) is stated to be fixedly connected by screw-thread steel with the second anchor beam (72).
6. the isolating and protecting platform of bridge maintaining transformation is shared applied to rail-road as claimed in claim 3, it is characterised in that:Institute The both sides for stating outside platform (2) are provided with guardrail (9), and outside platform surface layer (8) includes being laid on outside platform longeron successively (5) scaffold board, waterproof ventilated membrane and checkered steel plate on.
7. the isolating and protecting platform for being applied to rail-road and sharing bridge maintaining transformation as any one of claim 1-6, its It is characterised by:The inner side platform (1) is put down including inner side platform surface layer (13), multiple inner side platform longerons (11) and multiple inner sides Platform crossbeam (12), multiple inner side platform longerons (11) are along bridge to being fixed on steel truss girder crossbeam (10), the inner side platform beams (12) it is fixed between two adjacent inner side platform longerons (11), the inner side platform surface layer (13) is laid on inner side platform and indulged On beam (11).
8. the isolating and protecting platform of bridge maintaining transformation is shared applied to rail-road as claimed in claim 7, it is characterised in that:Institute State and safety net (14) is provided with below inner side platform (1), the both ends of the safety net (14) connect with outside platform (2) respectively Connect.
9. the isolating and protecting platform of bridge maintaining transformation is shared applied to rail-road as claimed in claim 8, it is characterised in that:Institute State scaffold board, waterproof ventilated membrane and riffled iron that inner side platform surface layer (13) includes being laid on successively on inner side platform longeron (11) Plate.
A kind of 10. construction for being applied to rail-road and sharing the isolating and protecting platform of bridge maintaining transformation for described in claim 1 Method, it is characterised in that comprise the following steps:
A, travelling bridge platform is set up as the operation of isolating and protecting platform construction and transport of materials platform;
B, the platform (2) on the outside of the construction of the both sides of highway bridge;
C, the construction inner side platform (1) on steel truss girder crossbeam (10).
11. the construction method of the isolating and protecting platform of bridge maintaining transformation is shared applied to rail-road as claimed in claim 10, It is characterized in that:In step B, construction outside platform (2) specifically comprises the following steps:
B1, the first anchor beam (71) and the second anchor beam (72) be installed on steel truss girder top boom (3), then by the first anchor beam (71) and Two anchor beams (72) are fixedly connected by screw-thread steel;
B2, installation outside platform beams (4), the both ends of the first suspension rod (61) are horizontal with the first anchor beam (71) and outside platform respectively Beam (4) is fixed, and the both ends of the second suspension rod (62) are fixed with the second anchor beam (72) and outside platform beams (4) respectively;
B3, the installation outside platform longeron (5) on outside platform beams (4), then lay outside on outside platform longeron (5) Platform surface layer (8).
12. the construction method of the isolating and protecting platform of bridge maintaining transformation is shared applied to rail-road as claimed in claim 11, It is characterized in that:In step C, construction inner side platform (1) specifically comprises the following steps:
C1, hang safety net (14) below steel truss girder crossbeam (10);
C2, multiple inner side platform longerons (11) are fixedly mounted on steel truss girder crossbeam (10), in adjacent inner side platform longeron (11) installation inner side platform beams (12) between;
C3, the laying inner side platform surface layer (13) on inner side platform longeron (11).
CN201710796357.9A 2017-09-06 2017-09-06 The isolating and protecting platform and construction method of bridge maintaining transformation are shared applied to rail-road Pending CN107740352A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710796357.9A CN107740352A (en) 2017-09-06 2017-09-06 The isolating and protecting platform and construction method of bridge maintaining transformation are shared applied to rail-road

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710796357.9A CN107740352A (en) 2017-09-06 2017-09-06 The isolating and protecting platform and construction method of bridge maintaining transformation are shared applied to rail-road

Publications (1)

Publication Number Publication Date
CN107740352A true CN107740352A (en) 2018-02-27

Family

ID=61235241

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710796357.9A Pending CN107740352A (en) 2017-09-06 2017-09-06 The isolating and protecting platform and construction method of bridge maintaining transformation are shared applied to rail-road

Country Status (1)

Country Link
CN (1) CN107740352A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108342980A (en) * 2018-04-04 2018-07-31 中铁第四勘察设计院集团有限公司 A kind of railway suspension bridge steel-truss deck bridge face structure
CN110485315A (en) * 2019-08-26 2019-11-22 广西建工集团联合建设有限公司 Reinforced Concrete Bridge hangs anchor formula operating platform and its construction
CN110528911A (en) * 2019-07-30 2019-12-03 中铁大桥局武汉桥梁特种技术有限公司 Both wired protecting canopy frame, protection canopy and installation method
CN112878188A (en) * 2021-01-25 2021-06-01 中铁大桥勘测设计院集团有限公司 Self-telescopic maintenance device and system suitable for steel truss bridge

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007113348A (en) * 2005-10-24 2007-05-10 Yoneyama Kogyo Kk Movable suspension-type scaffold device and construction method of movable suspension type scaffold
CN203514209U (en) * 2013-08-18 2014-04-02 窦勇芝 Wire rope hanging bracket platform for reinforcement of arch bridges
CN105239515A (en) * 2015-09-02 2016-01-13 中铁大桥局武汉桥梁特种技术有限公司 Device and method for bracket installation of railway protective scaffolding in combined highway and railway bridge
CN107059656A (en) * 2017-01-04 2017-08-18 杭州江润科技有限公司 Active service bridge maintenance repairs the construction method of boat scaffold operating platform

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007113348A (en) * 2005-10-24 2007-05-10 Yoneyama Kogyo Kk Movable suspension-type scaffold device and construction method of movable suspension type scaffold
CN203514209U (en) * 2013-08-18 2014-04-02 窦勇芝 Wire rope hanging bracket platform for reinforcement of arch bridges
CN105239515A (en) * 2015-09-02 2016-01-13 中铁大桥局武汉桥梁特种技术有限公司 Device and method for bracket installation of railway protective scaffolding in combined highway and railway bridge
CN107059656A (en) * 2017-01-04 2017-08-18 杭州江润科技有限公司 Active service bridge maintenance repairs the construction method of boat scaffold operating platform

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
方新跃等: "公铁两用桥改造防护隔离技术", 《施工技术》 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108342980A (en) * 2018-04-04 2018-07-31 中铁第四勘察设计院集团有限公司 A kind of railway suspension bridge steel-truss deck bridge face structure
CN110528911A (en) * 2019-07-30 2019-12-03 中铁大桥局武汉桥梁特种技术有限公司 Both wired protecting canopy frame, protection canopy and installation method
CN110485315A (en) * 2019-08-26 2019-11-22 广西建工集团联合建设有限公司 Reinforced Concrete Bridge hangs anchor formula operating platform and its construction
CN112878188A (en) * 2021-01-25 2021-06-01 中铁大桥勘测设计院集团有限公司 Self-telescopic maintenance device and system suitable for steel truss bridge
CN112878188B (en) * 2021-01-25 2022-02-15 中铁大桥勘测设计院集团有限公司 Self-telescopic maintenance device and system suitable for steel truss bridge

Similar Documents

Publication Publication Date Title
CN107740352A (en) The isolating and protecting platform and construction method of bridge maintaining transformation are shared applied to rail-road
CN101914897B (en) Construction method of single main cable inclined suspender ground anchor type suspension bridge
CN104499433B (en) One wears high ferro low clearance erecting beam construction method under acutangulating intersection
CN104594173B (en) One kind embraces rail magnetic levitation track traffic box beam
CN106592406B (en) Through tied arch bridge and its construction method
CN106149576B (en) On removed and construction method of installation across both wired bridge whole groups
JP2022023107A (en) System for construction of complex u-shaped reinforcement beam bridge deck, and method thereof
CN106284109B (en) On across both wired bridge main beam method for dismounting
CN101781878A (en) Integral lifting template of main pylon of single-pylon cable-stayed bridge without dorsal cables and lifting construction method thereof
CN206902556U (en) It is a kind of to combine protector across both wired bridge constructions
CN102392536A (en) Construction method for long-span hanging vestibule type template support system
CN112727132B (en) Method for dismantling existing canopy of overhead operation subway station
CN108505405A (en) A kind of suspension type monorail and highway bridge build structure jointly
CN106592962A (en) Large-height-difference long-span stiff-skeleton cladding concrete formwork construction method and apparatus
CN206873495U (en) A kind of Portable piping lane side wall formwork jumbo
CN105544409B (en) Double guide beam bridge erecting machine sets up combination beam and now spells a section girder steel construction technology
CN110512517B (en) Bridge engineering construction platform
CN108547225A (en) A kind of assembly moving type security construction of prevention work job platform and construction method and application
CN208995936U (en) S type steel box girder of cable stayed bridge on across ground rail traffic slides mounting bracket
WO2022142193A1 (en) Construction method for large-span thin-wall concrete sound barrier pouring trolley
CN206858966U (en) A kind of truss structure
CN203767643U (en) Closed type steelwork conveying trestle bridge
CN106758741B (en) Modular box type plate beam structure and pontic erection method based on box type plate beam structure
CN107217685A (en) A kind of Portable piping lane side wall formwork jumbo
CN205188823U (en) Construction of light rail prestressing force bent cap and end -blocking work platform

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180227

RJ01 Rejection of invention patent application after publication