sinking
immersed tube
refuted
secretly
section
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710253686.9A
Other languages
Chinese (zh)
Other versions
CN107044137B (en
Inventor
刘德进
苏长玺
冯海暴
李增军
马宗田
张乃受
付院平
鲍占礼
石书元
仇伟淇
邹春晓
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC First Harbor Engineering Co Ltd
No 2 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd
Original Assignee
CCCC First Harbor Engineering Co Ltd
No 2 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC First Harbor Engineering Co Ltd, No 2 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd filed Critical CCCC First Harbor Engineering Co Ltd
Priority to CN201710253686.9A priority Critical patent/CN107044137B/en
Publication of CN107044137A publication Critical patent/CN107044137A/en
Application granted granted Critical
Publication of CN107044137B publication Critical patent/CN107044137B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/063Tunnels submerged into, or built in, open water
    • E02D29/07Tunnels or shuttering therefor preconstructed as a whole or continuously made, and moved into place on the water-bed, e.g. into a preformed trench
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/16Arrangement or construction of joints in foundation structures

Abstract

The present invention proposes a kind of immersed tube sinking docking calculation, comprises the following steps:Predetermined sinking position is determined, is refuted using sinking and transports immersed tube to be installed to the predetermined sinking position, the depth of water at the predetermined sinking position is more than the draft that the sinking is refuted;The immersed tube stretching to be installed sinking is refuted and is allowed in state of encorbelmenting, a section immersed tube is secretly buried with close;The immersed tube sinking to be installed is secretly buried at the identical absolute altitude of section immersed tube to described;The mobile sinking refutes the drive immersed tube to be installed, and secretly to bury section immersed tube close until docking to described.This method not by section depth of water is secretly buried and sinking is refuted draft and limited, be applicable to secretly to bury section depth of water is shallow and sinking refutes deep drawing construction operating mode.

Description

A kind of immersed tube sinking docking calculation
Technical field
The invention belongs to immersed tube tunnel technical field of construction, more particularly to a kind of immersed tube sinking docking calculation.
Background technology
At present, in immersed tube tunnel construction, when head sections immersed tube to be installed is docked with secretly burying a section immersed tube, generally using sinking Refute and transport immersed tube to be installed to precalculated position, then by the vertical sinking of immersed tube to be installed to absolute altitude identical with secretly burying section immersed tube Place, then carries out an abutting joint by immersed tube to be installed with secretly burying section immersed tube.
However, when the depth of water for secretly burying section is shallower, it is required if the immersed tube size to be installed and weight that are mated with are larger The draft that sinking is refuted will be greater than secretly burying the depth of water of section.Now, using existing immersed tube sinking docking calculation, sinking can be caused to refute Bottom and secretly bury a section immersed tube direct collision, thus, existing immersed tube sinking docking calculation is not particularly suited for this secretly burying Duan Shui The depth and sinking refutes deep drawing construction operating mode.
Therefore, how to provide a kind of not by secretly burying section depth of water and sinking refutes the immersed tube sinking docking side that draft is limited Method, is a current technical problem for being badly in need of solving.
The content of the invention
The present invention for above-mentioned existing immersed tube sinking docking calculation be not suitable for secretly burying section depth of water is shallow and sinking refutes drinking water The technical problem of deep construction operating mode, proposition is a kind of not by secretly burying section depth of water and sinking refutes the immersed tube sinking pair that draft is limited Connect method.
In order to achieve the above object, the technical solution adopted by the present invention is:
A kind of immersed tube sinking docking calculation, comprises the following steps:
S1:Predetermined sinking position is determined, is refuted using sinking and transports immersed tube to be installed to the predetermined sinking position, it is described The depth of water at predetermined sinking position is more than the draft that the sinking is refuted;
S2:The immersed tube stretching to be installed sinking is refuted and is allowed in state of encorbelmenting, a section immersed tube is secretly buried with close;
S3:The immersed tube sinking to be installed is secretly buried at the identical absolute altitude of section immersed tube to described;
S4:The mobile sinking refutes the drive immersed tube to be installed, and secretly to bury section immersed tube close until docking to described.
Preferably, in step S1, the difference that the depth of water refutes draft with the sinking at the predetermined sinking position exists More than 2m.
Preferably, in step S1, the predetermined sinking position is with the horizontal range for secretly burying section immersed tube in more than 2m.
Preferably, in step S2, by concretely comprising the following steps that the immersed tube stretching to be installed sinking is refuted:Pass through drawstring The immersed tube to be installed is pulled to refute movement relative to the sinking, the connection that the conversion immersed tube to be installed is refuted with the sinking is hung Point, makes the immersed tube to be installed in state of encorbelmenting.
Preferably, in step S2, the length that the immersed tube stretching to be installed sinking is refuted is in the range of 0.5m-5m.
Preferably, in step S2, the immersed tube to be installed is in that the immersed tube to be installed is secretly buried with described when encorbelmenting state The horizontal range of section immersed tube is in the range of 0.4m-0.6m.
Compared with prior art, advantages and positive effects of the present invention are:
The immersed tube sinking docking calculation that the present invention is provided, in immersed tube sinking and docking, by the way that immersed tube to be installed is encorbelmented The one end refuted in sinking, makes sinking to remain certain distance between refuting and secretly burying section immersed tube, effectively prevent sinking and refute Bottom impacts secretly bury a section immersed tube, be applicable to secretly to bury section depth of water is shallow and sinking refutes deep drawing construction operating mode, not by secretly burying Duan Shui Deep and sinking refutes draft limitation, and applicable construction condition range is extensive.
Brief description of the drawings
The utilization sinking that Fig. 1 is provided by the embodiment of the present invention is refuted transports showing to predetermined sinking position by immersed tube to be installed It is intended to;
Fig. 2 stretches out immersed tube to be installed in the schematic diagram that the state of encorbelmenting was refuted and be in sinking by what the embodiment of the present invention was provided;
The schematic diagram for the sinking immersed tube to be installed that Fig. 3 is provided by the embodiment of the present invention;
The mobile sinking that Fig. 4 is provided by the embodiment of the present invention, which is refuted, makes immersed tube to be installed with secretly burying the signal that section immersed tube is docked Figure;
More than in each figure, 1, sinking refutes;2nd, immersed tube to be installed;3rd, a section immersed tube is secretly buried;4th, the first suspension centre;5th, the second suspension centre; 6th, hanger rope;7th, drawstring.
Embodiment
The technical scheme in the embodiment of the present invention will be clearly and completely described below, it is clear that described implementation Example only a part of embodiment of the invention, rather than whole embodiments.Based on the embodiment in the present invention, this area is common The every other embodiment that technical staff is obtained under the premise of creative work is not made, belongs to the model that the present invention is protected Enclose.
The embodiments of the invention provide a kind of immersed tube sinking docking calculation, comprise the following steps:
S1:Predetermined sinking position is determined, is refuted using sinking and transports immersed tube to be installed to the predetermined sinking position, it is described The depth of water at predetermined sinking position is more than the draft that the sinking is refuted.
In this step, it is necessary to which explanation, can be refuted when determining predetermined sinking position according to the construction area depth of water and sinking Draft data are determined, and the predetermined sinking position should be close proximity to a section immersed tube be secretly buried, in order to subsequently be docked Work.In this step, the draft that the sinking is refuted need to be more than by limiting the depth of water of the predetermined sinking position, it is ensured that The sinking refute can normally travel, and effectively prevent the sinking and refute that collision is described secretly to bury a section immersed tube.
S2:The immersed tube stretching to be installed sinking is refuted and is allowed in state of encorbelmenting, a section immersed tube is secretly buried with close.
In this step, the one end refuted by the way that the immersed tube to be installed is encorbelmented in the sinking, it is described to be installed heavy to make Pipe secretly buries a section immersed tube close to described, meanwhile, in follow-up immersed tube sinking and docking operation, because the immersed tube to be installed is encorbelmented, The sinking is remained certain distance between refuting and secretly burying section immersed tube, effectively prevent the sinking and refute bottom impacts It is described secretly to bury a section immersed tube.
S3:The immersed tube sinking to be installed is secretly buried at the identical absolute altitude of section immersed tube to described.
In this step, it is necessary to which explanation, described in sinking during immersed tube to be installed, the hanger rope that can be refuted by the sinking enters Row sinking., it is necessary to note the height of sinking during sinking, and the immersed tube to be installed is kept to be in horizontality, so that described treat Immersed tube is installed with secretly burying section immersed tube positioned at identical height, in order to subsequently be docked.
S4:The mobile sinking refutes the drive immersed tube to be installed, and secretly to bury section immersed tube close until docking to described.
In this step, due to the immersed tube to be installed with secretly bury section immersed tube be in identical height, thus, only pass through move Move the sinking to refute, you can complete the immersed tube to be installed and dock with secretly burying the accurate of section immersed tube, simple to operate, efficiency of construction It is high.Furthermore, it is necessary to which explanation, the movement that the sinking is refuted can be refuted mobile from boat, stranded cable, towboat dragging etc. by the sinking Any move mode or the combination of a variety of move modes in mode are carried out, and are refuted as long as the sinking can be moved, are realized institute State immersed tube to be installed and docked with secretly burying the accurate of section immersed tube.In addition it is also necessary to which explanation, the mobile sinking is needed when refuting Slowly to move, to avoid the immersed tube to be installed from producing larger rock.
In the preferred embodiment of the present invention, in step S1, the depth of water is refuted with the sinking at the predetermined sinking position The difference of draft is in more than 2m.Because the water level of construction area there may be fluctuation, when the water level decreasing of construction area, The depth of water may be caused to refute draft less than the sinking at the predetermined sinking position, so influence that the sinking refutes it is normal Traveling, thus, in the preferred embodiment, further define the depth of water at the predetermined sinking position and refute drinking water with the sinking The difference lower limit of depth, makes the sinking refute when resting on the predetermined sinking position, exists between its bottom and the bottom certain Rich d -trans- allethrin, can be prevented effectively from cause because of water-level fluctuation the sinking refute can not normally travel phenomenon.Need explanation It is that those skilled in the art can refute draft and the SEA LEVEL VARIATION situation of construction area according to the sinking, specifically determine institute The difference that the depth of water at predetermined sinking position refutes draft with the sinking is stated, the difference can be 2m, 3m, 4m, 5m, 10m etc..
In the preferred embodiment of the present invention, in step S1, the predetermined sinking position and section immersed tube that secretly buries Horizontal range is in more than 2m.When the sinking, which is refuted, rests on the predetermined sinking position, being refuted due to the sinking may be with water Flow and produce and rock, thus, in the preferred embodiment, further define the predetermined sinking position and sunk with the section of secretly burying The horizontal range lower limit of pipe, makes the sinking refute when resting on the predetermined sinking position with section immersed tube of secretly burying and keeps certain Horizontal range, the sinking can be prevented effectively from refute to collide because rocking and described secretly bury a section immersed tube.It should be noted that ability Field technique personnel can rock situation according to what the flow velocity and the sinking of construction area were refuted, specifically determine the predetermined sinking position With the horizontal range for secretly burying section immersed tube, the horizontal range can be 2m, 3m, 4m, 5m etc..
In the preferred embodiment of the present invention, in step S2, the immersed tube to be installed is stretched out into the tool that the sinking is refuted Body step is:Pull the immersed tube to be installed to refute movement relative to the sinking by drawstring, convert the immersed tube to be installed with The connection suspension centre that the sinking is refuted, makes the immersed tube to be installed in state of encorbelmenting.This preferred embodiment moves described by drawstring Immersed tube to be installed, and the conversion for the suspension centre that is connected, quickly and easily can encorbelment the immersed tube to be installed in the sinking The one end refuted, it is simple to operate and more laborsaving.
In the preferred embodiment of the present invention, in step S2, the immersed tube to be installed stretches out the length that the sinking is refuted In the range of 0.5m-5m.This preferred embodiment is further carried out to the length that the immersed tube stretching to be installed sinking is refuted Limit, this is primarily due to the immersed tube stretching to be installed sinking and refutes long or too short, may influence construction.For example: If the immersed tube to be installed, which stretches out the sinking, refutes long, the sinking may be caused to refute and tumbled because of unbalance stress;If institute State the immersed tube stretching to be installed sinking and refute too short, then can not play makes the sinking refute with secretly burying a section immersed tube holding certain distance To prevent the effect of collision.It is understood that those skilled in the art can be according to the length of the immersed tube to be installed, described pre- Determine sinking position and the horizontal range for secretly burying section immersed tube, specifically determine that the immersed tube to be installed stretches out the length that the sinking is refuted Degree, the length can be 0.5m, 1m, 2m, 3m, 4m, 5m etc..
In the preferred embodiment of the present invention, in step S2, the immersed tube to be installed in encorbelment state when, it is described to wait to pacify Immersed tube and the horizontal range for secretly burying section immersed tube are filled in the range of 0.4m-0.6m.This preferred embodiment further defines institute State immersed tube to be installed in encorbelment state when, the immersed tube to be installed and the horizontal range for secretly burying section immersed tube, this be mainly because For when the immersed tube to be installed in encorbelment state when, the immersed tube to be installed and the hypotelorism or mistake for secretly burying section immersed tube Far, may influence construction.For example:If the immersed tube to be installed and the hypotelorism for secretly burying section immersed tube, described to wait to pacify A section immersed tube is secretly buried described in rocking of may being refuted by the sinking of dress immersed tube and direct collision, and hypotelorism is also unfavorable for sinking Put;If the immersed tube to be installed and the hypertelorism for secretly burying section immersed tube, when subsequently being docked, the immersed tube to be installed The distant of movement is needed, is easily caused danger.It is understood that those skilled in the art can be according to the immersed tube to be installed Length, and the predetermined sinking position and the horizontal range for secretly burying section immersed tube specifically determine the immersed tube to be installed In encorbelment state when, the immersed tube to be installed and the horizontal range for secretly burying section immersed tube, the distance can for 0.4m, 0.45m, 0.5m, 0.55m, 0.6m etc..
In order to become apparent from introducing immersed tube sinking docking calculation provided by the present invention in detail, below in conjunction with specific implementation Example is described.
As shown in Figures 1 to 4, immersed tube sinking docking calculation provided by the present invention, comprises the following steps:
First, the draft data for refuting 1 according to the construction area depth of water and sinking determine predetermined sinking position, and this is predetermined heavy Put the depth of water and sinking at position and refute the difference of 1 draft in more than 2m, with secretly burying the horizontal range of section immersed tube 3 in more than 2m, 1 transport immersed tube 2 to be installed is refuted to the predetermined sinking position using sinking.During transport, it is used to connect as shown in figure 1, sinking is refuted 1 and is provided with The first suspension centre 4 of immersed tube 2 is installed in reception, and the first suspension centre 4 is connected with hanger rope 6, and immersed tube 2 to be installed is hung with the first suspension centre 4 for connection Point, the lower section that sinking refutes 1 is connected to by hanger rope 6.Symmetrically it is connected it should be noted that immersed tube 2 to be installed refutes 1 with sinking, with Immersed tube 2 to be installed is avoided to encorbelment and cause sinking to refute 1 discontinuity.
After immersed tube 2 to be installed is transported to predetermined sinking position, the head end of immersed tube 2 to be installed is connected to as shown in Fig. 2 pulling Drawstring 7 immersed tube 2 to be installed is refuted 1 movement relative to sinking, and stretch out sinking and refute 1.Now, by immersed tube 2 to be installed and sinking The second suspension centre 5 that 1 connection suspension centre is transformed to be arranged at the front of the first suspension centre 4 by the first suspension centre 4 is refuted, makes the immersed tube 2 to be installed be in Encorbelment state, with close to secretly burying section immersed tube 3.It should be noted that the length control that the stretching of immersed tube 2 sinking to be installed refutes 1 exists In the range of 0.5m-5m, moreover, immersed tube to be installed 2 is in when encorbelmenting state, immersed tube 2 to be installed and the horizontal range for secretly burying section immersed tube 3 Control is in the range of 0.4m-0.6m.
Then, as shown in figure 3, the sinking of immersed tube 2 to be installed is sunk to secretly burying at the identical absolute altitude of section immersed tube 3 using hanger rope 6 When putting, immersed tube 2 to be installed is kept to be in horizontality.
Finally, as shown in figure 4, sinking refute 1 from air strips move immersed tube 2 to be installed to secretly bury section immersed tube 3 close to until docking.
The immersed tube sinking docking calculation that the present invention is provided, in immersed tube sinking and docking, by the way that immersed tube 2 to be installed is encorbelmented 1 one end is refuted in sinking, certain distance can be remained between section immersed tube 3 by sinking is refuted 1 and is secretly buried, and effectively prevent sinking Refute 1 bottom impacts and secretly bury section immersed tube 3, be applicable to secretly to bury section depth of water is shallow and sinking refutes 1 deep drawing construction operating mode, do not buried secretly Duan Shuishen and sinking refute the limitation of 1 draft, and applicable construction condition range is extensive.

Claims (6)

1. a kind of immersed tube sinking docking calculation, it is characterised in that comprise the following steps:
S1:Predetermined sinking position is determined, is refuted using sinking and transports immersed tube to be installed to the predetermined sinking position, it is described predetermined The depth of water at sinking position is more than the draft that the sinking is refuted;
S2:The immersed tube stretching to be installed sinking is refuted and is allowed in state of encorbelmenting, a section immersed tube is secretly buried with close;
S3:The immersed tube sinking to be installed is secretly buried at the identical absolute altitude of section immersed tube to described;
S4:The mobile sinking refutes the drive immersed tube to be installed, and secretly to bury section immersed tube close until docking to described.
2. immersed tube sinking docking calculation according to claim 1, it is characterised in that:In step S1, the predetermined sinking position The place's of putting depth of water refutes the difference of draft in more than 2m with the sinking.
3. immersed tube sinking docking calculation according to claim 1 or 2, it is characterised in that:In step S1, the predetermined sinking Position is with the horizontal range for secretly burying section immersed tube in more than 2m.
4. immersed tube sinking docking calculation according to claim 1, it is characterised in that in step S2, will be described to be installed heavy What the pipe stretching sinking was refuted concretely comprises the following steps:The immersed tube to be installed is pulled to refute movement relative to the sinking by drawstring, The connection suspension centre that the immersed tube to be installed is refuted with the sinking is converted, makes the immersed tube to be installed in state of encorbelmenting.
5. the immersed tube sinking docking calculation according to claim 1 or 4, it is characterised in that:It is described to be installed heavy in step S2 The length that the pipe stretching sinking is refuted is in the range of 0.5m-5m.
6. immersed tube sinking docking calculation according to claim 5, it is characterised in that:In step S2, the immersed tube to be installed In encorbelment state when, the immersed tube to be installed and the horizontal range for secretly burying section immersed tube are in the range of 0.4m-0.6m.
CN201710253686.9A 2017-04-18 2017-04-18 A kind of immersed tube sinking interconnection method Active CN107044137B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710253686.9A CN107044137B (en) 2017-04-18 2017-04-18 A kind of immersed tube sinking interconnection method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710253686.9A CN107044137B (en) 2017-04-18 2017-04-18 A kind of immersed tube sinking interconnection method

Publications (2)

Publication Number Publication Date
CN107044137A true CN107044137A (en) 2017-08-15
CN107044137B CN107044137B (en) 2019-06-07

Family

ID=59545751

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710253686.9A Active CN107044137B (en) 2017-04-18 2017-04-18 A kind of immersed tube sinking interconnection method

Country Status (1)

Country Link
CN (1) CN107044137B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102403753B1 (en) 2020-11-18 2022-05-30 (주)대우건설 Constructing Method of Underwater Tunnel with Tethering Tunnel Modules, and Underwater Tunnel Constructed by such Method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000064318A (en) * 1998-08-21 2000-02-29 Ishikawajima Harima Heavy Ind Co Ltd Immersion method for immersing tube
CN1399042A (en) * 2002-08-27 2003-02-26 上海隧道工程股份有限公司 Tunnel pipe section floating conveying, sinking and joining construction process
KR20110057404A (en) * 2009-11-24 2011-06-01 주식회사 케이엔티 Sinking pontoon for a construction of a submarine tunnel and a contructuion method of a submarine tunnel using the same
CN103898923A (en) * 2012-12-31 2014-07-02 中交第一航务工程局有限公司 Pipe joint lifting immersed system and method
CN103912013A (en) * 2013-01-07 2014-07-09 中交一航局第二工程有限公司 Tunnel immersed tube immersion method
CN106400841A (en) * 2016-11-29 2017-02-15 中交航局第二工程有限公司 Sinking pipe sinking control system and sinking pipe sinking method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000064318A (en) * 1998-08-21 2000-02-29 Ishikawajima Harima Heavy Ind Co Ltd Immersion method for immersing tube
CN1399042A (en) * 2002-08-27 2003-02-26 上海隧道工程股份有限公司 Tunnel pipe section floating conveying, sinking and joining construction process
KR20110057404A (en) * 2009-11-24 2011-06-01 주식회사 케이엔티 Sinking pontoon for a construction of a submarine tunnel and a contructuion method of a submarine tunnel using the same
CN103898923A (en) * 2012-12-31 2014-07-02 中交第一航务工程局有限公司 Pipe joint lifting immersed system and method
CN103912013A (en) * 2013-01-07 2014-07-09 中交一航局第二工程有限公司 Tunnel immersed tube immersion method
CN106400841A (en) * 2016-11-29 2017-02-15 中交航局第二工程有限公司 Sinking pipe sinking control system and sinking pipe sinking method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102403753B1 (en) 2020-11-18 2022-05-30 (주)대우건설 Constructing Method of Underwater Tunnel with Tethering Tunnel Modules, and Underwater Tunnel Constructed by such Method

Also Published As

Publication number Publication date
CN107044137B (en) 2019-06-07

Similar Documents

Publication Publication Date Title
CN103205980B (en) Offshore wind turbine large diameter single pile foundation and construction method thereof
CN103410133B (en) Air bag is utilized to carry out the method for Attention problems to deep water jacket
CN104806457B (en) A kind of descending sea-borne wind power generation apparatus
CN103452117B (en) Construction technology of deepwater bagged sand construction device
CN106516021A (en) Self-propelled carrying and installing all-in-one ship for underwater tunnel immersed tubes
WO2018068362A1 (en) Deep-sea mining system
CN104480865B (en) A kind of Large Steel open caisson accurate positioning method
CN103295078A (en) Structural design optimization method for deepwater catenary mooring rope
CN204000830U (en) Merogenesis take-over type sand drain machine
CN107044137A (en) A kind of immersed tube sinking docking calculation
CN206187298U (en) Integrative ship of self -navigation formula subaqueous tunnel immersed tube delivery installation
CN112709250A (en) Be favorable to reducing seabed vacuum pipeline pile foundation cushion cap structure of buoyancy
CN104196000A (en) Rapid construction method for strong-stormy-wave deep sea underwater connection system
CN113277008A (en) Underwater fixed-height towing device and method for metal detector
CN105544584A (en) Oblate ellipsoid-shaped bridge sunk shaft foundation favorable for changing course of ship colliding with bridge
CN104089755A (en) Test method for gravel structure drag-resistant anchor model covering submarine pipeline
CN106558862A (en) Assembled cable duct bank mounting structure
CN109695780A (en) One kind, which subtracts, holds formula submarine pipeline active flexion control device
CN108860475A (en) When a kind of installation anchor body surrounding can jet bubble torpedo anchor
CN103899842B (en) Method for installing deepwater online tee joint
CN106985969A (en) A kind of positioner and its localization method
CN208169822U (en) A kind of anti-drag anchor damage device of bottom of shallow sea pipeline
CN104002936B (en) A kind of shoal, strand drilling platform
CN215622551U (en) Underwater fixed-height towing device of metal detector
CN209876135U (en) Bearing-reducing type active buckling control device for submarine pipeline

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant