CN107038151A - The step Optimized Operation drawing drawing method and dispatching method controlled based on accumulation of energy - Google Patents

The step Optimized Operation drawing drawing method and dispatching method controlled based on accumulation of energy Download PDF

Info

Publication number
CN107038151A
CN107038151A CN201710172508.3A CN201710172508A CN107038151A CN 107038151 A CN107038151 A CN 107038151A CN 201710172508 A CN201710172508 A CN 201710172508A CN 107038151 A CN107038151 A CN 107038151A
Authority
CN
China
Prior art keywords
energy
accumulation
year
flood
month
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710172508.3A
Other languages
Chinese (zh)
Other versions
CN107038151B (en
Inventor
李朝新
朱江
高英
何勇
王静
王俊莉
顾文钰
过团挺
邹兴建
聂明慧
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huadian Electric Power Research Institute Co Ltd
Guizhou Wujiang Hydropower Development Co Ltd
Original Assignee
Huadian Electric Power Research Institute Co Ltd
Guizhou Wujiang Hydropower Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huadian Electric Power Research Institute Co Ltd, Guizhou Wujiang Hydropower Development Co Ltd filed Critical Huadian Electric Power Research Institute Co Ltd
Priority to CN201710172508.3A priority Critical patent/CN107038151B/en
Publication of CN107038151A publication Critical patent/CN107038151A/en
Application granted granted Critical
Publication of CN107038151B publication Critical patent/CN107038151B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F40/00Handling natural language data
    • G06F40/10Text processing
    • G06F40/166Editing, e.g. inserting or deleting
    • G06F40/174Form filling; Merging
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/04Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A10/00TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
    • Y02A10/40Controlling or monitoring, e.g. of flood or hurricane; Forecasting, e.g. risk assessment or mapping
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E40/00Technologies for an efficient electrical power generation, transmission or distribution
    • Y02E40/70Smart grids as climate change mitigation technology in the energy generation sector
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Theoretical Computer Science (AREA)
  • Economics (AREA)
  • Health & Medical Sciences (AREA)
  • Strategic Management (AREA)
  • Human Resources & Organizations (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Tourism & Hospitality (AREA)
  • Marketing (AREA)
  • General Health & Medical Sciences (AREA)
  • General Business, Economics & Management (AREA)
  • Artificial Intelligence (AREA)
  • Computational Linguistics (AREA)
  • Water Supply & Treatment (AREA)
  • Primary Health Care (AREA)
  • Audiology, Speech & Language Pathology (AREA)
  • General Engineering & Computer Science (AREA)
  • Public Health (AREA)
  • Development Economics (AREA)
  • Game Theory and Decision Science (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The present invention relates to a kind of step Optimized Operation drawing drawing method controlled based on accumulation of energy, the method for drafting comprises the following steps:Determine step hydropower station generator operation rule;It is determined that the step accumulation of energy zone of reasonableness of material time node and corresponding step hydropower station water level combination in year;Calculate t month step natural water generating capacities;Long series or the step accumulation of energy value and t month step generated energy at the Typical Year t the end of month are obtained, while calculating t the end of month step hydropower station water level combinations and t month step maximum generation abilities;The long series of connection or step accumulation of energy graph in Typical Year step accumulation of energy result of calculation value formation year, will be used as the normal accumulation of energy area dispatching line of step by envelope curve as line, lower envelope curve is dispatched in the normal accumulation of energy area of step thereon.With reference to step hydropower station generator operation rule, rationally reflection step hydropower station accumulation of energy and step hydropower station gross generation relation, fully instruct step hydropower station generator operation mode.

Description

The step Optimized Operation drawing drawing method and dispatching method controlled based on accumulation of energy
Technical field
The present invention relates to hydraulic and electric engineering industry step power station Optimized Operation field, and in particular to one kind is based on accumulation of energy control Step power station Optimized Operation drawing drawing method and a kind of reservoir dispatching method.
Background technology
Graph of reservoir operation is to represent decision variable in reservoir operation (water level, exert oneself, letdown flow, output etc.) and state Graph of a relation between variable (water level, accumulation of energy etc.), it is painted according to power station history hydrological data and reservoir comprehensive utilization task One group of system has the state variable change procedure line of control meaning.The state with control meaning is included in graph of reservoir operation to become Amount change graph and some regions divided by these graphs, and define tune when reservoir is in different conditions variable Metric is then.There is scheduling graph, so that it may according to reservoir at a time state variable numerical values recited and its work in scheduling graph Region, determines reservoir capacity adjustment mode.
At present, about single graph of reservoir operation formulation and its application study data are more, method is ripe, and in reservoir Huge effect is played in scheduling, and (has larger regulation performance, reservoir on step reservoir particularly higher-dimension Cascade Reservoirs The formulation and its application study that number is more than 2) scheduling graph are very few.It is preferable by multiple regulation performances with the cascade development in river Reservoir composition, carry out unified management, United Dispatching multi-reservoir it is more and more.Therefore, it is highly desirable to carry out step reservoir The formulation and application study of group's scheduling graph, the foundation of science is provided for the traffic control of Cascade Reservoirs.
Existing Cascade Reservoirs Optimized Operation figure research contents mainly has:Content 1:Thought based on Cascade Reservoirs combined dispatching Think, it is considered to which hydraulic power is contacted between step reservoir, according to long series or Typical Year historical summary, choose more efficient method and build Mould is solved, and draws each graph of reservoir operation of step;Content 2:Step accumulation of energy is chosen to weigh the overall performane of Cascade Reservoirs, according to length Series or Typical Year historical summary, build step Optimized model and solve, draw and be based on step accumulation of energy and step gross capability function The Cascade Reservoirs Optimized Operation figure of relation.
The problem of existing research contents is present:Although embodying the thought of step combined dispatching, end result in content 1 Remain as single storehouse scheduling graph, it is impossible to which the index of Cascade Reservoirs is weighed in displaying directly perceived;Cascade operation figure in content 2 gives ladder Level accumulation of energy and the directive relationship of step gross capability, but the step that can not be reacted in the case of current step accumulation of energy answers generated energy, it is impossible to Reference is given for the medium-term and long-term generator operation mode of step hydropower station.
The content of the invention
The present invention in order to solve it is existing can not be with step accumulation of energy and generated energy corresponding relation for reservoir dispatching figure There is provided a kind of step Optimized Operation figure drafting side controlled based on accumulation of energy for the problem of intuitively instructing step power station management and running In method, the step Optimized Operation figure, using accumulation of energy as ordinate, step accumulation of energy-electricity scheduling is formed by abscissa of calendar month Figure, the method for drafting comprises the following steps:
Step 1:Determine step hydropower station generator operation rule;
Step 2:Power station characteristic and dispatching of power netwoks actual influence factor are considered, from abandoning water risk, peak regulation risk, electricity risk Angle is analyzed, the reasonable model of step accumulation of energy at (such as beginning of the year, flood just, the flood withered alternately end of term) it is determined that material time node in year Enclose and corresponding step hydropower station water level combination;
Step 3:It is first using long series or Typical Year step natural runoff data as foundation according to step accumulation of energy zone of reasonableness Secondary calculating makes t=1, calculates t month step natural water generating capacities;
Step 4:Stored according to the step of the step hydropower station generator operation rule in step 1, the material time node in step 2 Step t month natural water generating capacities in energy zone of reasonableness, step 3, obtain long series or the step at the Typical Year t the end of month Accumulation of energy value;
Step 5:T=t+1 is made, if t≤12 turn to step 3, if t > 12, step 6 is turned to;
Step 6:The long series of connection or step accumulation of energy graph in Typical Year step accumulation of energy result of calculation value formation year, by it Upper envelope curve is abided by as line, lower envelope curve is dispatched in the normal accumulation of energy area of step as the normal accumulation of energy area dispatching line of step, wherein flood season Follow the principle for reducing under the premise of flood control safety is ensured and abandoning water risk, the period, normal accumulation of energy area needed specially treated, i.e., it is normal to store The part that energy area dispatching line value is taken as between flood just step accumulation of energy zone of reasonableness lower limit, upper dispatching line is normal accumulation of energy Area, normal accumulation of energy area area above is reduction accumulation of energy area, and region below is increase accumulation of energy area;Generated electricity according to the step in step 1 Operation rule, different zones are divided into by normal accumulation of energy area according to the time, wherein beginning of the year step accumulation of energy is equal to target accumulation of energy at the beginning of flood It is balanced falling zone to balance out the period fallen, and the period that flood season step accumulation of energy passively goes up is passive rise area, and flood season Mo step stores The period that can be adjusted according to water to year end target accumulation of energy is active accommodation area;In the step accumulation of energy-electricity scheduling graph acceptance of the bid Outpour balanced falling zone, passively rise area, active accommodation area, normal accumulation of energy area, reduction accumulation of energy area, increase accumulation of energy area, most end form Into step accumulation of energy-electricity Optimized Operation figure.
Further, the step 1 is specifically included:In general, Cascade Hydropower Stations on River Basin considers combined dispatching mode, the beginning of the year Step accumulation of energy balances out to target accumulation of energy at the beginning of flood, and leading power station, which downstream discharges water, adjusts compensation;Flood season is ensuring flood control safety Under the premise of reduce and abandon water risk, retaining is shut down in leading power station, and remaining power station of downstream is stored by the multiple full method of step natural water, step Can passively it go up;Flood season Mo, leading power station, which downstream discharges water, adjusted compensation, and step hydropower station adjusts accumulation of energy according to water to year end To year end target accumulation of energy.
Further, it is based on including the step of abandoning water risk control step hydropower station node accumulation of energy scope in the step 2:Adopt Electricity consumption head of a station series or Typical Year Streamflow Data, consider power station characteristic, dispatching of power netwoks factor, determine that just different steps store flood Can lower power station abandon water risk, and combine ensure safety in the case of completely send out multiple, the principle of reducing abandoned water, to provide flood just step stores Can zone of reasonableness;
Further, the step of peak regulation risk control step hydropower station node accumulation of energy scope is based in the step 2 includes:Year Just hydropower station water level progressively disappears first arrival flood with month, and at least disappears at the beginning of flood and fall on flood season limit level;At the beginning of the year, consider negative Lotus demand, electric power generating composition, water power generating capacity Multiple factors, it is determined that under beginning of the year difference step accumulation of energy the withered phase peak regulation risk, and Beginning of the year step accumulation of energy zone of reasonableness is provided with reference to the peak regulation control requirement of power network;
Further, the step of electricity risk control step hydropower station node accumulation of energy scope is based in the step 2 includes:Root It is predicted that water situation establishment power station year generation schedule, it is determined that annual electricity target;At the beginning of the year, consider natural water, The factor such as power station characteristic and the cooperation of other power supplys, it is determined that the electricity risk under beginning of the year difference step accumulation of energy, and combine step hydropower station Electricity objectives of examination determines beginning of the year step accumulation of energy zone of reasonableness.
Further, specifically included in the step 3:
S31, by each power station characteristic of step, (t-1) the end of month step hydropower station water level combination (if t=1, the step as at the beginning of 1 month Power station water level combination), calculate t monthly average water consumption rates;
S32, according to long series or Typical Year step natural runoff data, calculate t month step natural water generating capacities, Calculation formula is
In formula, ENatural tFor t month step natural water generating capacities;ENatural i, tGenerated electricity for t month power stations i natural water Ability;N is step hydropower station sum;Qi,tFor t month power stations i dam site natural water flow;ri,tFor being averaged for t month power station i Water consumption rate;tsFor time, unit s.
Further, the step 4 is specifically included:According to the step generator operation rule in step 1, the pass in step 2 Step accumulation of energy zone of reasonableness, the long series in step 3 or the Typical Year step t month natural water generating energy of key timing node Power, it then follows the conservation of energy, calculates t the end of month step accumulation of energys and t month step generated energy, while calculating t the end of month step hydropower stations Water level combination and t month step maximum generation abilities, wherein t month step maximum generation abilities are used as t month step generated energy The constraint upper limit, it is specific to calculate and method for drafting is as follows:
If S41, the t months are in year first arrival flood just (balanced falling zone):Period step accumulation of energy change, which is followed, to be balanced out Principle, i.e., should be equal per daily generation.According to beginning of the year step accumulation of energy X0With step accumulation of energy X at the beginning of floodT1, send out the step t months in period Electricity ESend out t, t the end of month step accumulation of energys XtCalculation formula is as follows,
Xt=Xt-1+ENatural t-ESend out t
In formula, D1~T1For total number of days at the beginning of year first arrival flood;Emax,tFor t month step hydropower stations maximum generation ability;{}minFor Take the smaller in the two.
If S42, the t months are in flood season (area of passively going up):The period flood just step accumulation of energy XT1Calculated by S41, tap Retaining is shut down in power station, and downstream stage power station generates electricity by full step natural water.Step t month generated energy ESend out tFor the moon full step The smaller of natural water generating capacity and downstream stage power station maximum generation ability, t the end of month step accumulation of energys XtCan be as at the beginning of flood Step accumulation of energy is calculated month by month, and calculation formula is as follows,
ESend out t={ ENatural t,EDetain dragon max, t}min
Xt=Xt-1+ENatural t-ESend out t
In formula, EDetain dragon max, tTo deduct the maximum generation ability in downstream stage power station outside leading power station the t months.
If S43, the t months are flood season Mo to year end (active accommodation area):Step accumulation of energy is known as X at the end of the periodT, i.e. XT =X0, flood season Mo step accumulation of energy XT2Calculated by S42;Flood season Mo, step hydropower station generated electricity by natural water to the flood withered alternately end of term; At the flood withered alternately end of term to year end, step accumulation of energy equilibrium is adjusted to year end target accumulation of energy XT, step accumulation of energy variable quantity is consistent month by month;Order The moon number at the flood withered alternately end of term to year end is T3, and such as flood withered alternately end of term is September end, then T3=3, and calculation formula is as follows,
Flood season Mo to the flood withered alternately end of term:ESend out t={ ENatural t,Emax,t}min
Xt=Xt-1+ENatural t-ESend out t
The flood withered alternately end of term to year end:
ESend out t={ Xt-1-Xt+ENatural t, Emax,t}min
Further, the step 6 is specifically included:The long series or Typical Year step that Connection Step 1- steps 5 are obtained store Can result of calculation value, form step accumulation of energy graph in year, will thereon envelope curve as dispatching line, lower bag in the normal accumulation of energy area of step Line follows the original for reducing under the premise of flood control safety is ensured and abandoning water risk as the normal accumulation of energy area dispatching line of step, wherein flood season Then, normal accumulation of energy area needs specially treated the period, i.e., normal accumulation of energy area dispatching line value is taken as the reasonable model of flood just step accumulation of energy Enclose and more than lower limit, normal accumulation of energy area be labeled as reduction accumulation of energy area, increase accumulation of energy area is labeled as below, by normal accumulation of energy area per year First arrival flood just, flood season, flood season Mo to year end be respectively labeled as balanced falling zone, passively rise area, active accommodation area.
Another aspect of the present invention additionally provides a kind of step water with any of the above-described step accumulation of energy-electricity Optimized Operation figure Storehouse dispatching method, in the step accumulation of energy-electricity Optimized Operation figure, on longitudinal direction, scheduling graph, which is divided into, reduces accumulation of energy area, normal Accumulation of energy area and increase accumulation of energy area;In transverse direction, normal accumulation of energy area is divided into balanced falling zone, passively rise area, active according to the time Adjust area;The scheduling graph application method comprises the following steps:
When step accumulation of energy is located at normal accumulation of energy area, setting step hydropower station accumulation of energy at the beginning of year first arrival flood disappears towards target accumulation of energy value Fall, step reservoir answers generated energy to include natural water generating capacity and accumulation of energy and normally disappear to fall part;The leading power station of flood season setting Retaining is shut down, remaining power station of downstream generates electricity by full step natural water, and step accumulation of energy passively goes up;Flood season Mo to year end setting ladder Level power station adjusts water level according to water to year end target accumulation of energy.
When step accumulation of energy is located at reduction accumulation of energy area, setting power station, which is increased, exerts oneself, and increase generated energy makes accumulation of energy return to normal storage Can area;
When step accumulation of energy is located at increase accumulation of energy area, the reduction of setting power station is exerted oneself, and reducing generated energy makes accumulation of energy return to normal storage Can area.
Technical scheme combination step hydropower station generator operation rule, rationally reflection step hydropower station accumulation of energy and step electricity Gross generation of standing relation, fully instructs step hydropower station generator operation mode.
Brief description of the drawings
The features and advantages of the present invention can be more clearly understood from by reference to accompanying drawing, accompanying drawing is schematical without that should manage Solve to carry out any limitation to the present invention, in the accompanying drawings:
Fig. 1 is shown for the flow of the step Optimized Operation drawing drawing method controlled based on accumulation of energy in some embodiments of the invention It is intended to;
Fig. 2 is Cascade Stations on Wujiang River accumulation of energy-electricity Optimized Operation figure in some embodiments of the invention.
Embodiment
It is below in conjunction with the accompanying drawings and specific real in order to be more clearly understood that the above objects, features and advantages of the present invention Mode is applied the present invention is further described in detail.It should be noted that in the case where not conflicting, the implementation of the application Feature in example and embodiment can be mutually combined.
Many details are elaborated in the following description to facilitate a thorough understanding of the present invention, still, the present invention may be used also Implemented with being different from other modes described here using other, therefore, protection scope of the present invention is not by described below Specific embodiment limitation.
Embodiment one
The embodiments of the invention provide a kind of step Optimized Operation drawing drawing method controlled based on accumulation of energy, the step is excellent Change in scheduling graph, using accumulation of energy as ordinate, step accumulation of energy-electricity scheduling graph is formed by abscissa of calendar month, as shown in figure 1, The method for drafting comprises the following steps:
S110:Determine step hydropower station generator operation rule.Cascade Hydropower Stations on River Basin considers combined dispatching mode, and beginning of the year step stores It can balance out to target accumulation of energy at the beginning of flood, leading power station, which downstream discharges water, adjusts compensation;Flood season is under the premise of flood control safety is ensured Water risk is abandoned in reduction, and retaining is shut down in leading power station, and remaining power station of downstream is by the multiple full method of step natural water, and step accumulation of energy is passive Go up;Flood season Mo, leading power station, which downstream discharges water, adjusted compensation, and step hydropower station adjusts accumulation of energy to year end according to water to year end Target accumulation of energy.
S120:Power station characteristic and dispatching of power netwoks actual influence factor are considered, from abandoning water risk, peak regulation risk, electricity risk Angle is analyzed, it is determined that the step accumulation of energy zone of reasonableness of material time node and corresponding step hydropower station water level combination in year. Based on abandoning water risk control step hydropower station accumulation of energy scope, based on peak regulation risk control step hydropower station accumulation of energy scope, based on electricity wind Danger control step hydropower station accumulation of energy scope;It is described to be based on including the step of abandoning water risk control step hydropower station accumulation of energy scope:Using electricity Head of a station's series or Typical Year Streamflow Data, consider power station characteristic, dispatching of power netwoks factor, determine flood just under different step accumulation of energys Abandon water risk, and combine ensure safety in the case of completely send out multiple, the principle of reducing abandoned water, provide the reasonable model of flood just step accumulation of energy Enclose;It is described be based on peak regulation risk control step hydropower station accumulation of energy scope the step of include:The first hydropower station water level of year first arrival flood is with month Progressively disappear, and at least disappear at the beginning of flood and fall on flood season limit level;At the beginning of the year, consider workload demand, electric power generating composition, water power and generate electricity Ability Multiple factors, it is determined that under beginning of the year difference step accumulation of energy the withered phase peak regulation risk, and combine the peak regulation control requirement of power network and give Go out beginning of the year step accumulation of energy zone of reasonableness;It is described be based on electricity risk control step hydropower station accumulation of energy scope the step of include:According to pre- Water situation establishment power station year generation schedule is surveyed, it is determined that annual electricity target;At the beginning of the year, natural water, power station are considered The factor such as characteristic and the cooperation of other power supplys, it is determined that the electricity risk under beginning of the year difference step accumulation of energy, and combine step hydropower station electricity Objectives of examination determines beginning of the year step accumulation of energy zone of reasonableness.
S130:T month step natural waters generating capacity is calculated.According to step accumulation of energy zone of reasonableness, with long series or allusion quotation Type year step natural runoff data is foundation, calculates make t=1 first, calculates t month step natural water generating capacities, including:
1. by each power station characteristic of step, (t-1) the end of month step hydropower station water level combination, (if t=1, step is electric as at the beginning of 1 month Stand water level combination), calculate t monthly average water consumption rates;
2. according to long series or Typical Year step natural runoff data, t month step natural water generating capacities, meter are calculated Calculating formula is
In formula, ENatural tFor t month step natural water generating capacities;ENatural i, tGenerated electricity for t month power stations i natural water Ability;N is step hydropower station sum;Qi,tFor t month power stations i dam site natural water flow;ri,tFor being averaged for t month power station i Water consumption rate;tsFor time, unit s.
S140:T the end of month step accumulation of energys and t month steps generated energy are calculated.Step hydropower station in S110, which generates electricity, transports Step t month natural water generating energy in the step accumulation of energy zone of reasonableness of material time node in line discipline, S120, S130 Power, it then follows the conservation of energy, calculates t the end of month step accumulation of energys and t month step generated energy, while calculating t the end of month step hydropower stations Water level combination and t month step maximum generation abilities, wherein t month step maximum generation abilities are used as t month step generated energy The constraint upper limit, circular is as follows:
If being 1. in year first arrival flood the t months just (balanced falling zone):Period step accumulation of energy change, which follows to balance out, falls original Then, i.e., should be equal per daily generation.According to beginning of the year step accumulation of energy X0With step accumulation of energy X at the beginning of floodT1, generate electricity the step t months in period Measure ESend out t, t the end of month step accumulation of energys XtCalculation formula is as follows,
Xt=Xt-1+ENatural t-ESend out t
In formula, D1~T1For total number of days at the beginning of year first arrival flood;Emax,tFor t month step hydropower stations maximum generation ability;{}minFor Take the smaller in the two.
If 2. the t months are in flood season (area of passively going up):The period flood just step accumulation of energy XT1By 1. calculating, leading power station Retaining is shut down, downstream stage power station generates electricity by full step natural water.Step t month generated energy ESend out tIt is natural for the moon full step The smaller of water generating capacity and downstream stage power station maximum generation ability, t the end of month step accumulation of energys XtCan as at the beginning of flood step Accumulation of energy is calculated month by month, and calculation formula is as follows,
ESend out t={ ENatural t,EDetain dragon max, t}min
Xt=Xt-1+ENatural t-ESend out t
In formula, EDetain dragon max, tTo deduct the maximum generation ability in downstream stage power station outside leading power station the t months.
If 3. the t months are flood season Mo to year end (active accommodation area):Step accumulation of energy is known as X at the end of the periodT, i.e. XT= X0, flood season Mo step accumulation of energy XT2By 2. calculating;Flood season Mo, step hydropower station generated electricity by natural water to the flood withered alternately end of term;Flood At the withered alternately end of term to year end, step accumulation of energy equilibrium is adjusted to year end target accumulation of energy XT, step accumulation of energy variable quantity is consistent month by month;Make flood The moon number at the withered alternately end of term to year end is T3, and such as flood withered alternately end of term is September end, then T3=3, and calculation formula is as follows,
Flood season Mo to the flood withered alternately end of term:ESend out t={ ENatural t,Emax,t}min
Xt=Xt-1+ENatural t-ESend out t
The flood withered alternately end of term to year end:
ESend out t={ Xt-1-Xt+ENatural t, Emax,t}min
S150, t=t+1 is made, if t≤12 turn to step 3, if t > 12, turn to step 6;
S160, the long series of connection or step accumulation of energy graph in Typical Year step accumulation of energy result of calculation value formation year, by it Upper envelope curve is abided by as line, lower envelope curve is dispatched in the normal accumulation of energy area of step as the normal accumulation of energy area dispatching line of step, wherein flood season Follow the principle for reducing under the premise of flood control safety is ensured and abandoning water risk, the period, normal accumulation of energy area needed specially treated, i.e., it is normal to store The part that energy area dispatching line value is taken as between flood just step accumulation of energy zone of reasonableness lower limit, upper dispatching line is normal accumulation of energy Area, normal accumulation of energy area area above is reduction accumulation of energy area, and region below is increase accumulation of energy area;Step in S110, which generates electricity, to be transported Line discipline, different zones are divided into by normal accumulation of energy area according to the time, wherein beginning of the year step accumulation of energy is balanced to target accumulation of energy at the beginning of flood The period fallen disappear for balanced falling zone, the period that flood season step accumulation of energy passively goes up is passive rise area, flood season Mo step accumulation of energy The period adjusted according to water to year end target accumulation of energy is active accommodation area;Marked in the step accumulation of energy-electricity scheduling graph Go out balanced falling zone, passively rise area, active accommodation area, normal accumulation of energy area, reduction accumulation of energy area, increase accumulation of energy area, ultimately form Step accumulation of energy-electricity Optimized Operation figure.
The step Optimized Operation drawing drawing method controlled based on accumulation of energy of the present invention can rationally reflect step hydropower station accumulation of energy With step hydropower station gross generation relation, step hydropower station generator operation mode is fully instructed.
The embodiment of the present invention additionally provides a kind of reservoir dispatching using above-mentioned step accumulation of energy-electricity Optimized Operation figure Method, in the step accumulation of energy-electricity Optimized Operation figure, on longitudinal direction, scheduling graph is divided into reduction accumulation of energy area, normal accumulation of energy area With increase accumulation of energy area;In transverse direction, normal accumulation of energy area is divided into balanced falling zone, passively rise area, active accommodation area according to the time; The scheduling graph application method comprises the following steps:
When step accumulation of energy is located at normal accumulation of energy area, beginning of the year step hydropower station accumulation of energy balances out towards target accumulation of energy at the beginning of flood, ladder Level reservoir answers generated energy to include natural water generating capacity and accumulation of energy and normally disappear to fall part;Retaining is shut down in flood season tap power station, Remaining power station of downstream generates electricity by step natural water, and step accumulation of energy passively goes up;Flood season Mo to year end set step hydropower station according to Water adjusts water level to year end target accumulation of energy.
When step accumulation of energy is located at reduction accumulation of energy area, setting power station, which is increased, exerts oneself, and increase generated energy makes accumulation of energy return to normal storage Can area;
When step accumulation of energy is located at increase accumulation of energy area, the reduction of setting power station is exerted oneself, and reducing generated energy makes accumulation of energy return to normal storage Can area.
Embodiment two
The embodiment of the present invention additionally provides a kind of step Optimized Operation drawing drawing method controlled based on accumulation of energy, specific steps Comprise the following steps:
First, generator operation rule in step hydropower station is determined
In general, Cascade Hydropower Stations on River Basin considers combined dispatching mode, target, year first arrival flood are turned to benefits maximum Just need to meet the requirements of comprehensive utilization such as diversion, irrigation, leading power station, which downstream discharges water, is adjusted compensation, and regulation performance is poor Power station should ensure that sufficiently high water level operation, and step accumulation of energy balances out to target accumulation of energy at the beginning of flood;Flood just step hydropower station accumulation of energy disappears Relatively low level in year is dropped down onto, water risk is abandoned in reduction of being tried one's best under the premise of flood control safety is ensured, now leading power station, which is shut down, stores The multiple full hair of natural water is pressed in water, downstream stage power station, and the preferable power station of regulation performance should make full use of itself regulation storage capacity to exist Later stage in flood season water conservation, it is ensured that enough compensation ability of withered phase;Leading power station downstream discharged water to adjust and mended to year end flood season Mo Repay, downstream stage power station keeps higher level operation, and step hydropower station adjusts accumulation of energy to year end target accumulation of energy according to water.
2nd, the step accumulation of energy zone of reasonableness of key node and corresponding step hydropower station water level combination are determined
The influence factors such as power station characteristic and dispatching of power netwoks be actual are considered, from abandoning water risk, peak regulation risk, electricity risk Angularly analysed in depth, the step hydropower station at (such as beginning of the year, flood just, the flood withered alternately end of term) it is determined that material time node in year Reasonable accumulation of energy scope and corresponding step hydropower station water level combination, it is ensured that step hydropower station accumulation of energy within that range, which ensure that, fills Divide power network safety operation and meet electricity power enterprise's evaluation requirement.
S21. based on the step hydropower station node accumulation of energy scope control for abandoning water risk control
Flood season power station natural water is concentrated, to make full use of water resource, and power network is generally given priority in arranging for hydropower station, The more region of water power, part power station even undertakes base lotus, therefore, power station should be multiple full on the premise of ensuring safety Hair, reducing abandoned water.Because flood season step accumulation of energy controls that directly influence will be produced on the water probability of abandoning in flood season, using power station length series Or Typical Year Streamflow Data, consider many factors such as power station characteristic, dispatching of power netwoks, electricity under the just different step accumulation of energys of research flood That stands abandons water risk, provides flood just step accumulation of energy zone of reasonableness, to instruct power station reasonable water level control, is ensureing power plant safety fortune On the premise of row, the maximization of power generation in the flood seasons benefit is realized.
S22. the step hydropower station node accumulation of energy scope control based on peak regulation risk control
Just main function of the power station in power system is to provide Peak Load to year first arrival flood, ensures that the safety of power network is steady Fixed operation, this stage hydropower station water level progressively should disappear, and necessary peak regulation power be provided for power network, while need at least disappear at the beginning of flood Flood season limit level is fallen on to meet Flood, protection power station flood control safety.Because the period water is relatively fewer, beginning of the year water level is high The low peak regulation power level that will directly affect period power station, considers workload demand, electric power generating composition, water power generating capacity etc. The peak regulation control requirement of Multiple factors, the peak regulation risk under the different step accumulation of energys of the research beginning of the year, and combination power network provides beginning of the year ladder Level accumulation of energy zone of reasonableness, to instruct power station rationally to disappear in the period, has both ensured self generating benefit, the peace of power network can be ensured again Full stable operation.
S23. the step hydropower station node accumulation of energy scope control based on electricity risk control
From the perspective of annual management and running, power station must work out year generation schedule according to prediction water situation, really Fixed year electricity target.On the one hand this target influences the benefit in power station, on the other hand also contributes to electricity in whole power network and supplies With the balance of demand.Due to the uncertainty of water, and the various non-intellectuals for dispatching correlative factors in actual motion, power station is deposited The risk that can not be completed in electricity target.In addition to natural water, beginning of the year power station accumulation of energy is protruded the influence for carrying out annual electricity generating capacity, comprehensive Consider the factors such as natural water, power station characteristic, the electricity risk under the different step accumulation of energys of the research beginning of the year, and combine step hydropower station electricity Amount objectives of examination provides beginning of the year step accumulation of energy zone of reasonableness, to instruct power station rationally to work out electricity plan, reply natural water Uncertainty influence.
3rd, natural water generating capacity is calculated
According to step accumulation of energy zone of reasonableness, using long series or Typical Year step natural runoff data as foundation, calculate first T=1 is made, t month step natural water generating capacities are calculated, including:
S31, by each power station characteristic of step, (t-1) the end of month step hydropower station water level combination (if t=1, the step as at the beginning of 1 month Power station water level combination), calculate t monthly average water consumption rates;
S32, according to long series or Typical Year step natural runoff data, calculate t month step natural water generating capacities, Calculation formula is
In formula, ENatural tFor t month step natural water generating capacities;ENatural i, tGenerated electricity for t month power stations i natural water Ability;N is step hydropower station sum;Qi,tFor t month power stations i dam site natural water flow;ri,tFor being averaged for t month power station i Water consumption rate;tsFor time, unit s.
4th, step stores energy value calculation
Step hydropower station generator operation rule in one, the step accumulation of energy zone of reasonableness of material time node in two, Step t month natural water generating capacities in three, it then follows the conservation of energy, calculate t the end of month step accumulation of energys and t month steps hair Electricity, while t the end of month step hydropower station water level combinations and t month step maximum generation abilities are calculated, wherein t month steps are maximum Generating capacity is specifically included as the constraint upper limit of t month step generated energy:
If S41, the t months are in year first arrival flood just (balanced falling zone):Period step accumulation of energy change, which is followed, to be balanced out Principle, i.e., should be equal per daily generation.According to beginning of the year step accumulation of energy X0With step accumulation of energy X at the beginning of floodT1, send out the step t months in period Electricity ESend out t, t the end of month step accumulation of energys XtCalculation formula is as follows,
Xt=Xt-1+ENatural t-ESend out t
In formula, D1~T1For total number of days at the beginning of year first arrival flood;Emax,tFor t month step hydropower stations maximum generation ability;{}minFor Take the smaller in the two.
If S42, the t months are in flood season (area of passively going up):The period flood just step accumulation of energy XT1Calculated by S41, step Retaining is shut down in the leading power station of operation pattern of plant, and downstream stage power station generates electricity by full step natural water.The step t months generate electricity Measure ESend out tFor the smaller of this month full step natural water generating capacity and downstream stage power station maximum generation ability, t the end of month ladder Level accumulation of energy XtStep accumulation of energy can month by month it be calculated as at the beginning of flood, calculation formula is as follows,
ESend out t={ ENatural t,EDetain dragon max, t}min
Xt=Xt-1+ENatural t-ESend out t
In formula, EDetain dragon max, tTo deduct the maximum generation ability in downstream stage power station outside leading power station the t months.
If S43, the t months are flood season Mo to year end (active accommodation area):Step accumulation of energy is known as X at the end of the periodT, i.e. XT =X0, flood season Mo step accumulation of energy XT2Calculated by S42;Flood season Mo, step hydropower station generated electricity by natural water to the flood withered alternately end of term; At the flood withered alternately end of term to year end, step accumulation of energy equilibrium is adjusted to year end target accumulation of energy XT, step accumulation of energy variable quantity is consistent month by month;Order The moon number at the flood withered alternately end of term to year end is T3, and such as flood withered alternately end of term is September end, then T3=3, and calculation formula is as follows,
Flood season Mo to the flood withered alternately end of term:ESend out t={ ENatural t,Emax,t}min
Xt=Xt-1+ENatural t-ESend out t
The flood withered alternately end of term to year end:
ESend out t={ Xt-1-Xt+ENatural t, Emax,t}min
5th, step accumulation of energy-electricity scheduling graph is drawn
After all long series or Typical Year step storage energy value calculation are finished, step accumulation of energy in connection result of calculation value formation year Graph, will thereon envelope curve as dispatching line in the normal accumulation of energy area of step, lower envelope curve as the normal accumulation of energy area dispatching line of step, Wherein flood season follows the principle for reducing under the premise of flood control safety is ensured and abandoning water risk, and the period, normal accumulation of energy area needed special place Reason, i.e., normal accumulation of energy area dispatching line value is taken as the portion between flood just step accumulation of energy zone of reasonableness lower limit, upper dispatching line It is divided into normal accumulation of energy area, normal accumulation of energy area area above is reduction accumulation of energy area, and region below is increase accumulation of energy area;According in one Step generator operation rule, different zones are divided into by normal accumulation of energy area according to the time, wherein beginning of the year step accumulation of energy is to mesh at the beginning of flood Mark accumulation of energy balances out the period fallen for balanced falling zone, and the period that flood season step accumulation of energy passively goes up is passive rise area, flood season The period that last step accumulation of energy is adjusted according to water to year end target accumulation of energy is active accommodation area;Adjusted in the step accumulation of energy-electricity Balanced falling zone, passively rise area, active accommodation area, normal accumulation of energy area, reduction accumulation of energy area, increase accumulation of energy are marked out in degree figure Area, ultimately forms step accumulation of energy-electricity Optimized Operation figure.
6th, step accumulation of energy-electricity scheduling graph uses regular (reservoir dispatching method)
From step accumulation of energy-electricity Optimized Operation it can be seen from the figure that, in terms of regulation of longitudinal angle, scheduling graph is divided into reduction accumulation of energy Area, normal accumulation of energy area and increase accumulation of energy area;In terms of lateral angles, normal accumulation of energy area is divided into balanced falling zone, quilt according to the time Dynamic rise area, active accommodation area.
1) normal accumulation of energy area:
A. year first arrival flood is first (balanced falling zone):The period step accumulation of energy balances out towards target accumulation of energy value at the beginning of flood, ladder Level reservoir answers generated energy to include natural water generating capacity and accumulation of energy and normally disappear to fall part.
B. flood season (area of passively going up):Retaining is shut down in period tap power station, and downstream stage power station is naturally come according to step Water generates electricity, and step accumulation of energy passively goes up.
C. flood season Mo to year end (active accommodation area):Compensation, each storehouse in downstream is downstream adjusted in the period backbone reservoir Progressively lifting reservoir level, step hydropower station adjusts water level according to water to year end target accumulation of energy.
2) reduction accumulation of energy area
If accumulation of energy is interval interior herein, it should suitably increase and exert oneself, increase generated energy makes accumulation of energy return to normal accumulation of energy area.
3) increase accumulation of energy area
If accumulation of energy is interval interior herein, it should suitably reduce and exert oneself, reducing generated energy makes accumulation of energy return to normal accumulation of energy area.
Embodiments of the invention combination step hydropower station generator operation rule, rationally reflects step hydropower station accumulation of energy and step hydropower station Gross generation relation, fully instructs step hydropower station generator operation mode.
Embodiment three
The step Optimized Operation drawing drawing method controlled based on accumulation of energy of the present embodiment, with Cascade Stations on Wujiang River power station (including flood Family cross, east wind, Suofengying, Wu Jiangdu, great Hua water, Ge Liqiao, Goupitan, Silin, nine power stations of Sha Tuo) be research object, bag Include following steps:
First, generator operation rule in Cascade Stations on Wujiang River power station is determined
Just (- 4 the end of month at the beginning of 1 month) generator operation is regular for year first arrival flood:Defer to step accumulation of energy and balance out and fall principle, step accumulation of energy Balance out to target accumulation of energy at the beginning of flood;Leading power station Hong Jia crosses the regulation compensation that downstream discharges water, to raise downstream stage power station water Position.
Flood season (at the beginning of 5 months-August end) generator operation rule:Leading power station Hong Jia crosses shutdown retaining, and downstream stage generated energy is Step natural water generating capacity stores with both downstream stage power station maximum generation abilities in addition to big vast family is crossed smaller value, step Can passively it go up.
Flood season Mo to year end (September first -12 the end of month) generator operation rule:Leading power station Hong Jia crosses the regulation that downstream discharges water and mended Repay, each reservoir level lifting in downstream, step hydropower station adjusts water level according to water to year end target accumulation of energy, and wherein flood season Mo hands over to flood is withered Generated electricity for the end of term (September first arrival September end) step hydropower station by natural water, the flood withered alternately end of term to year end (September end to 12 the end of month) Step accumulation of energy equilibrium is adjusted to target accumulation of energy.
2nd, the Cascade Stations on Wujiang River accumulation of energy zone of reasonableness of key node is determined
Flood just (4 the end of month) Cascade Stations on Wujiang River accumulation of energy zone of reasonableness be defined as 19~3,000,000,000 kWh, primarily for it is following some examine Consider:
1) from abandon water risk angle consider, Cascade Stations on Wujiang River flood just accumulation of energy should not be higher than 3,000,000,000 kWh, otherwise flood season abandon water risk It is larger;
2) consider from Hong Jiadu later stage retainings angle, the just accumulation of energy of Cascade Stations on Wujiang River flood should not be higher than 3,000,000,000 kWh, otherwise big vast family is crossed Abandon water risk larger.
3) consider from unit economy point and scheduling actual angle, Cascade Stations on Wujiang River flood just accumulation of energy not preferably less than 1,900,000,000 kWh, Otherwise unit economy level is not high.
The beginning of the year (at the beginning of 1 month) Cascade Stations on Wujiang River accumulation of energy zone of reasonableness is defined as 50~7,000,000,000 kWh, primarily for it is following some examine Consider:
1) consider from peak regulation risk angle, accumulation of energy not preferably less than 5,000,000,000 kWh, otherwise steady to power grid security at the beginning of Cascade Stations on Wujiang River Fixed operation can be impacted;
2) consider from hydro thermal coordination angle, accumulation of energy should not be higher than 7,000,000,000 kWh at the beginning of Cascade Stations on Wujiang River, otherwise can be squeezed in the withered phase Account for thermoelectricity generating space.
3rd, natural water generating capacity is calculated
Using long series or Typical Year step natural runoff data as foundation, by each power station characteristic of step, (t-1) the end of month ladder Level power station water level combination, calculates t monthly average water consumption rates, and then calculate t month step natural water generating capacities by following formula.When During t=1, January, water consumption rate step hydropower station water level combination as at the beginning of 1 month was extrapolated, and substituted into following formula calculating step natural water in January hair Electric energy power.
In formula, ENatural tFor t month step natural water generating capacities;ENatural i, tGenerated electricity for t month power stations i natural water Ability;N is step hydropower station sum;Qi,tFor t month power stations i dam site natural water flow;ri,tFor being averaged for t month power station i Water consumption rate;tsFor time, unit s.
4th, step stores energy value calculation
Step hydropower station generator operation rule in one, the step accumulation of energy zone of reasonableness of material time node in two, Step t month natural water generating capacities in three, it then follows the conservation of energy, calculate t the end of month step accumulation of energys and t month steps hair Electricity, while t the end of month step hydropower station water level combinations and t month step maximum generation abilities are calculated, wherein t month steps are maximum Generating capacity is specifically included as the constraint upper limit of t month step generated energy:
If S41, the t months are in year first arrival flood just (balanced falling zone):Period step accumulation of energy change, which is followed, to be balanced out Principle, i.e., should be equal per daily generation.According to beginning of the year step accumulation of energy X0With step accumulation of energy X at the beginning of floodT1, send out the step t months in period Electricity ESend out t, t the end of month step accumulation of energys XtCalculation formula is as follows,
Xt=Xt-1+ENatural t-ESend out t
In formula, D1~T1For total number of days at the beginning of year first arrival flood;Emax,tFor t month step hydropower stations maximum generation ability;{}minFor Take the smaller in the two.
If S42, the t months are in flood season (area of passively going up):The period flood just step accumulation of energy XT1Calculated by S41, tap Retaining is shut down in power station, and downstream stage power station generates electricity by full step natural water.Step t month generated energy ESend out tFor the moon full step The smaller of natural water generating capacity and downstream stage power station maximum generation ability, t the end of month step accumulation of energys XtCan be as at the beginning of flood Step accumulation of energy is calculated month by month, and calculation formula is as follows,
ESend out t={ ENatural t,EDetain dragon max, t}min
Xt=Xt-1+ENatural t-ESend out t
In formula, EDetain dragon max, tTo deduct the maximum generation ability in downstream stage power station outside leading power station the t months.
Step accumulation of energy is known as X at the end of S43, the periodT, i.e. XT=X0, flood season Mo step accumulation of energy XT2Calculated by S72;Flood The end of term, step hydropower station generated electricity by natural water to the flood withered alternately end of term;The flood withered alternately end of term to year end, step accumulation of energy equilibrium adjustment To year end target accumulation of energy XT, step accumulation of energy variable quantity is consistent month by month;The moon number for making the flood withered alternately end of term to year end is T3, calculates public Formula is as follows,
Flood season Mo to the flood withered alternately end of term:ESend out t={ ENatural t,Emax,t}min
Xt=Xt-1+ENatural t-ESend out t
The flood withered alternately end of term to year end:
ESend out t={ Xt-1-Xt+ENatural t, Emax,t}min
After t month steps storage energy value calculation is finished, t=t+1 is made, three are returned to, cycle calculations (t+1) moon step naturally comes Water generating capacity and (t+1) the end of month step accumulation of energy value, terminate until 12 the end of month calculated.Using many annual step natural waters as Example, many annual natural water amounts, the corresponding many annuals of the step accumulation of energy zone of reasonableness upper limit month by month of Cascade Stations on Wujiang River power station dam site The corresponding many annual natural water generating capacities of natural water generating capacity, step accumulation of energy zone of reasonableness lower limit respectively as table 1, Shown in table 2, table 3:
The Cascade Stations on Wujiang River power station dam site of table 1 many annual natural water amounts month by month
Power station January 2 months March April May June July August September October November December
Flood 1.26 1.14 1.29 2.24 5.05 8.95 8.71 5.87 4.27 3.62 2.34 1.51
East 2.84 2.56 2.90 5.04 11.34 20.12 19.57 13.20 9.61 8.14 5.25 3.40
Rope 3.34 3.01 3.41 5.93 13.34 23.66 23.02 15.53 11.30 9.57 6.18 3.99
Crow 4.09 3.69 4.18 7.26 16.34 28.98 28.20 19.02 13.84 11.72 7.57 4.89
Structure 6.16 5.56 6.30 10.94 24.63 43.68 42.50 28.66 20.87 17.67 11.41 7.37
Think 7.16 6.46 7.32 12.71 28.61 50.74 49.37 33.30 24.24 20.52 13.25 8.57
It is husky 8.13 7.34 8.31 14.44 32.50 57.63 56.08 37.82 27.53 23.31 15.05 9.73
Greatly 0.65 0.59 0.67 1.16 2.61 4.62 4.50 3.03 2.21 1.87 1.21 0.78
Lattice 0.71 0.64 0.72 1.26 2.83 5.02 4.89 3.30 2.40 2.03 1.31 0.85
The corresponding many annual step natural water generating capacities of the step accumulation of energy zone of reasonableness upper limit of table 2
Power station January 2 months March April May June July August September October November December
Flood 0.42 0.37 0.37 0.47 0.00 0.00 0.00 0.00 1.66 1.24 0.73 0.49
East 0.84 0.71 0.71 0.95 1.39 3.37 3.85 2.66 3.73 2.91 1.63 1.03
Rope 0.57 0.50 0.50 0.73 1.30 2.97 3.12 2.11 2.54 1.96 1.10 0.70
Crow 1.13 0.97 1.00 1.47 2.72 5.89 6.28 4.23 4.73 3.74 2.23 1.41
Structure 2.85 2.50 2.68 4.34 8.92 16.99 17.14 11.27 10.64 8.87 5.63 3.55
Think 1.24 1.10 1.22 2.07 4.13 7.36 7.16 4.69 4.27 3.67 2.41 1.53
It is husky 1.46 1.30 1.45 2.47 4.89 8.50 8.19 5.41 4.78 4.18 2.80 1.78
Greatly 0.24 0.21 0.23 0.42 0.98 1.53 1.44 0.91 0.62 0.55 0.42 0.29
Lattice 0.18 0.16 0.18 0.34 0.79 1.22 1.13 0.70 0.47 0.41 0.31 0.21
Step 8.93 7.82 8.35 13.26 25.12 47.83 48.32 31.98 33.45 27.52 17.25 10.98
The corresponding many annual step natural water generating capacities of the step accumulation of energy zone of reasonableness lower limit of table 3
Power station January 2 months March April May June July August September October November December
Flood 0.37 0.34 0.35 0.46 0.00 0.00 0.00 0.00 1.52 1.11 0.64 0.43
East 0.82 0.70 0.70 0.93 1.36 3.30 3.78 2.61 3.66 2.86 1.59 1.01
Rope 0.57 0.50 0.50 0.73 1.30 2.97 3.12 2.11 2.54 1.96 1.10 0.70
Crow 1.09 0.94 0.97 1.42 2.62 5.69 6.07 4.09 4.58 3.62 2.16 1.37
Structure 2.82 2.43 2.55 4.05 8.19 15.79 16.11 10.72 10.25 8.65 5.56 3.50
Think 1.21 1.08 1.20 2.04 4.09 7.26 7.05 4.61 4.18 3.58 2.35 1.49
It is husky 1.43 1.26 1.40 2.37 4.68 8.17 7.90 5.24 4.65 4.07 2.74 1.75
Greatly 0.24 0.21 0.23 0.41 0.94 1.48 1.40 0.89 0.61 0.54 0.42 0.29
Lattice 0.18 0.16 0.18 0.34 0.79 1.22 1.13 0.70 0.47 0.41 0.31 0.21
Step 8.73 7.61 8.07 12.75 23.98 45.87 46.56 30.96 32.46 26.81 16.87 10.74
5th, step accumulation of energy-electricity scheduling graph is drawn
Long series or Typical Year step accumulation of energy result of calculation value that connection above step is obtained, form step accumulation of energy in year Journey line, will thereon envelope curve as dispatching line in the normal accumulation of energy area of step, lower envelope curve as the normal accumulation of energy area dispatching line of step, its Middle flood season follows the principle for reducing under the premise of flood control safety is ensured and abandoning water risk, and the period, normal accumulation of energy area needed specially treated, I.e. normal accumulation of energy area dispatching line value is taken as flood just step accumulation of energy zone of reasonableness lower limit.Above and below the normal accumulation of energy area of Cascade Stations on Wujiang River Dispatch line as shown in table 4:
Dispatching line in the normal accumulation of energy area of the Cascade Stations on Wujiang River of table 4
Month January 2 months March April May June July August September October November December
Scheduling graph is reached the standard grade (hundred million kWh) 60 50 40 31 37 51 69 83 83 78 74 70
Scheduling graph is offline (hundred million kWh) 42 35 27 19 19 19 19 70 70 63 57 50
The normal accumulation of energy area of step is divided into different zones according to the time, wherein beginning of the year step accumulation of energy is to target accumulation of energy at the beginning of flood It is balanced falling zone to balance out the period fallen, and the period that flood season step accumulation of energy passively goes up is passive rise area, flood season Mo to year The period that last step hydropower station is adjusted according to water to target accumulation of energy is active accommodation area;The normal accumulation of energy area area above of step is drop Low accumulation of energy area, region below is increase accumulation of energy area.
By above-mentioned scheduling line, characteristic area mark in scheduling graph, as shown in Fig. 2 it is excellent to form Cascade Stations on Wujiang River accumulation of energy-electricity Change scheduling graph.
6th, step accumulation of energy-electricity scheduling graph uses regular (reservoir dispatching method)
From accumulation of energy-electricity Optimized Operation it can be seen from the figure that, in terms of regulation of longitudinal angle, scheduling graph be divided into reduction accumulation of energy area, Normal accumulation of energy area and increase accumulation of energy area;In terms of lateral angles, normal accumulation of energy area is according to time subregion:Year first arrival flood is just (- 4 at the beginning of 1 month The end of month) for balanced falling zone, flood season (at the beginning of 5 months-August end) is passive rise area, and flood season Mo to year end (September first -12 the end of month) is Active accommodation area.
A. year first arrival flood just -4 the end of month (balanced falling zone) at the beginning of 1 month:Accumulation of energy should be towards target accumulation of energy value at the beginning of flood in the period (19~3,100,000,000 kWh) disappearing falls, and step reservoir answers generated energy to include natural water generating capacity and accumulation of energy and normally disappear to fall part.
At the beginning of 5 months flood seasons b.-August is last (area of passively going up):Big vast family crosses power station and shuts down retaining, downstream stage power station in the period Generated electricity according to step natural water, step accumulation of energy passively goes up.Generated energy is answered to be generated electricity for step natural water in downstream stage power station Ability and both downstream stage power station maximum generation abilities in addition to big vast family is crossed smaller value.
C. -12 the end of month at the beginning of flood season Mo to year end September (active accommodation area):Big vast family, which is crossed, in the period is downstream adjusted benefit Repay, each storehouse in downstream progressively lifting reservoir level, each power station of step is adjusted according to water towards year end target accumulation of energy (50~7,000,000,000 kWh) Water level.
2) reduction accumulation of energy area
If accumulation of energy is interval interior herein, it should suitably increase and exert oneself, increase generated energy makes accumulation of energy return to normal accumulation of energy area.
3) increase accumulation of energy area
If accumulation of energy is interval interior herein, it should suitably reduce and exert oneself, reducing generated energy makes accumulation of energy return to normal accumulation of energy area.
In the present invention, term " first ", " second ", " the 3rd " are only used for describing purpose, and it is not intended that indicate or Imply relative importance.Term " multiple " refers to two or more, unless otherwise clear and definite restriction.
The preferred embodiments of the present invention are the foregoing is only, are not intended to limit the invention, for the skill of this area For art personnel, the present invention can have various modifications and variations.Within the spirit and principles of the invention, that is made any repaiies Change, equivalent substitution, improvement etc., should be included in the scope of the protection.

Claims (9)

1. a kind of step Optimized Operation drawing drawing method controlled based on accumulation of energy, it is characterised in that the step Optimized Operation figure In, using accumulation of energy as ordinate, step accumulation of energy-electricity scheduling graph is formed by abscissa of calendar month, the method for drafting is included such as Lower step:
Step 1:Determine step hydropower station generator operation rule;
Step 2:Power station characteristic and dispatching of power netwoks actual influence factor are considered, from abandoning water risk, peak regulation risk, electricity risk angle Analyzed, it is determined that the step accumulation of energy zone of reasonableness of material time node and corresponding step hydropower station water level combination in year;
Step 3:According to step accumulation of energy zone of reasonableness, using long series or Typical Year step natural runoff data as foundation, count first Calculation makes t=1, calculates t month step natural water generating capacities;
Step 4:Closed according to the step accumulation of energy of the step hydropower station generator operation rule in step 1, the material time node in step 2 The step t month natural water generating capacities in scope, step 3 are managed, long series or the step accumulation of energy at the Typical Year t the end of month is obtained Value;
Step 5:T=t+1 is made, if t≤12 turn to step 3, if t > 12, step 6 is turned to;
Step 6:The long series of connection or step accumulation of energy graph in Typical Year step accumulation of energy result of calculation value formation year, will be wrapped thereon Line is followed as line, lower envelope curve is dispatched in the normal accumulation of energy area of step as the normal accumulation of energy area dispatching line of step, wherein flood season Ensure to reduce the principle for abandoning water risk under the premise of flood control safety, the period, normal accumulation of energy area needed specially treated, i.e., normal accumulation of energy area The part that dispatching line value is taken as between flood just step accumulation of energy zone of reasonableness lower limit, upper dispatching line is normal accumulation of energy area, Normal accumulation of energy area area above is reduction accumulation of energy area, and region below is increase accumulation of energy area;According to the step generator operation in step 1 Rule, different zones are divided into by normal accumulation of energy area according to the time, wherein beginning of the year step accumulation of energy balances out to target accumulation of energy at the beginning of flood The period fallen is balanced falling zone, and the period that flood season step accumulation of energy passively goes up is passive rise area, flood season Mo step accumulation of energy root The period adjusted according to water to year end target accumulation of energy is active accommodation area;Marked out in the step accumulation of energy-electricity scheduling graph Balanced falling zone, passively rise area, active accommodation area, normal accumulation of energy area, reduction accumulation of energy area, increase accumulation of energy area, ultimately form ladder Level accumulation of energy-electricity Optimized Operation figure.
2. the step Optimized Operation drawing drawing method controlled according to claim 1 based on accumulation of energy, it is characterised in that the step Rapid 1 specifically includes:Cascade Hydropower Stations on River Basin considers combined dispatching mode, and beginning of the year step accumulation of energy balances out to target accumulation of energy at the beginning of flood, Leading power station, which downstream discharges water, adjusts compensation;Flood season reduces step on the premise of flood control safety is ensured and abandons water risk, tap electricity Stand and shut down retaining, remaining power station of downstream is passively gone up by the multiple full method of step natural water, step accumulation of energy;Flood season Mo to year end, Leading power station, which downstream discharges water, adjusts compensation, and step accumulation of energy is adjusted to year end target accumulation of energy according to water.
3. the step Optimized Operation drawing drawing method controlled according to claim 1 based on accumulation of energy, it is characterised in that the step It is based on including the step of abandoning water risk control step hydropower station node accumulation of energy scope in rapid 2:Using power station length series or Typical Year footpath Stream data, considers power station characteristic, dispatching of power netwoks factor, and determine power station under flood just different step accumulation of energys abandons water risk, and With reference to completely sending out multiple in the case of ensuring safety, the principle of reducing abandoned water, provide flood just step accumulation of energy zone of reasonableness.
4. the step Optimized Operation drawing drawing method controlled according to claim 1 based on accumulation of energy, it is characterised in that the step The step of peak regulation risk control step hydropower station node accumulation of energy scope is based in rapid 2 includes:The first hydropower station water level of year first arrival flood is with the moon Part progressively disappear, and at least disappear at the beginning of flood and fall on flood season limit level;At the beginning of the year, workload demand, electric power generating composition, water power hair are considered Electric energy power Multiple factors, it is determined that the peak regulation risk in beginning of the year difference step accumulation of energy first arrival next year flood first period, and combine the tune of power network Peak control requirement provides the beginning of the year reasonable accumulation of energy scope of step.
5. the step Optimized Operation drawing drawing method controlled according to claim 1 based on accumulation of energy, it is characterised in that the step The step of electricity risk control step hydropower station node accumulation of energy scope is based in rapid 2 includes:According to prediction water situation establishment water power Stand year generation schedule, it is determined that annual electricity target;At the beginning of the year, consider natural water, power station characteristic, coordinate with other power supplys Etc. factor, it is determined that ladder at the beginning of the electricity risk under beginning of the year difference step accumulation of energy, and combination step hydropower station electricity objectives of examination determination Level rationally accumulation of energy scope.
6. the step Optimized Operation drawing drawing method controlled according to claim 1 based on accumulation of energy, it is characterised in that the step Specifically included in rapid 3:
S61, by each power station characteristic of step, each power station water level combination of (t-1) the end of month step, if t=1, as at the beginning of 1 month step electricity Stand water level combination, calculate t monthly average water consumption rates;
S62, according to long series or Typical Year step natural runoff data, calculate t month step natural water generating capacities, calculating Formula is
In formula, ENatural tFor t month step natural water generating capacities;ENatural i, tFor t month power stations i natural water generating capacity;N For step hydropower station sum;Qi,tFor t month power stations i dam site natural water flow;ri,tFor t month power stations i average water consumption rate; tsFor time, unit s.
7. the step Optimized Operation drawing drawing method controlled according to claim 1 based on accumulation of energy, it is characterised in that the step Rapid 4 specifically include:It is reasonable according to the step accumulation of energy of the step generator operation rule in step 1, the material time node in step 2 Long series or Typical Year step t month natural water generating capacities in scope, step 3, it then follows the conservation of energy, calculate the t months Last step accumulation of energy and t month step generated energy, while calculating t the end of month step hydropower station water level combinations and t month steps maximum hair Electric energy power, wherein the constraint upper limit of the t month step maximum generation abilities as t month step generated energy, specific to calculate and draw Method is as follows:
If at the beginning of S71, the t months are in year first arrival flood:Period step accumulation of energy change, which follows to balance out, falls principle, i.e., per daily generation Answer equal according to beginning of the year step accumulation of energy X0With step accumulation of energy X at the beginning of floodT1, period step t month generated energy ESend out t, t the end of month steps Accumulation of energy XtCalculation formula is as follows,
Xt=Xt-1+ENatural t-ESend out t
In formula, D1~T1For total number of days at the beginning of year first arrival flood;Emax,tFor t month step hydropower stations maximum generation ability;{}minTo take two Smaller in person;
If S72, the t months are in flood season:The period flood just step accumulation of energy XT1Calculated by S71, retaining, downstream are shut down in leading power station Step hydropower station generates electricity by full step natural water;Step t month generated energy ESend out tFor the moon full step natural water generating capacity and The smaller of downstream stage power station maximum generation ability, t the end of month step accumulation of energys XtIt step accumulation of energy can month by month calculate, count as at the beginning of flood Calculate formula as follows,
ESend out t={ ENatural t,EDetain dragon max, t}min
Xt=Xt-1+ENatural t-ESend out t
In formula, EDetain dragon max, tTo deduct the maximum generation ability in downstream stage power station outside leading power station the t months;
If S73, the t months are flood season Mo to year end:Step accumulation of energy is known as X at the end of the periodT, i.e. XT=X0, flood season Mo step storage Can XT2Calculated by S72;Flood season Mo, step hydropower station generated electricity by natural water to the flood withered alternately end of term;The flood withered alternately end of term to year End, step accumulation of energy equilibrium is adjusted to year end target accumulation of energy XT, step accumulation of energy variable quantity is consistent month by month;Make the flood withered alternately end of term to year The moon number at end is T3, and such as flood withered alternately end of term is September end, then T3=3, and calculation formula is as follows,
Flood season Mo to the flood withered alternately end of term:ESend out t={ ENatural t,Emax,t}min
Xt=Xt-1+ENatural t-ESend out t
The flood withered alternately end of term to year end:
ESend out t={ Xt-1-Xt+ENatural t, Emax,t}min
8. the step Optimized Operation drawing drawing method controlled according to claim 1 based on accumulation of energy, it is characterised in that the step Rapid 6 specifically include:Long series or Typical Year step accumulation of energy result of calculation value that Connection Step 1- steps 5 are obtained, form year manhole ladder Level accumulation of energy graph, will envelope curve is as line is dispatched thereon in the normal accumulation of energy area of step, lower envelope curve is as under the normal accumulation of energy area of step Line is dispatched, wherein flood season follows the principle for reducing under the premise of flood control safety is ensured and abandoning water risk, and the period, normal accumulation of energy area was needed Specially treated, i.e., normal accumulation of energy area dispatching line value is taken as flood just step accumulation of energy zone of reasonableness lower limit, normal accumulation of energy area with On be labeled as reduction accumulation of energy area, increase accumulation of energy area is labeled as below, by normal accumulation of energy area per year at the beginning of first arrival flood, flood season, flood season Mo Balanced falling zone, passively rise area, active accommodation area are respectively labeled as to year end.
9. a kind of reservoir dispatching method of any step accumulation of energy-electricity Optimized Operation figure in utilization claim 1-8, Characterized in that, in the step accumulation of energy-electricity Optimized Operation figure, on longitudinal direction, scheduling graph, which is divided into, reduces accumulation of energy area, normal Accumulation of energy area and increase accumulation of energy area;In transverse direction, normal accumulation of energy area is divided into balanced falling zone, passively rise area, active according to the time Adjust area;The dispatching method comprises the following steps:
When step accumulation of energy is located at normal accumulation of energy area, target accumulation of energy value at the beginning of setting step accumulation of energy towards flood at the beginning of year first arrival flood disappears, ladder Level reservoir answers generated energy to include natural water generating capacity and accumulation of energy and normally disappear to fall part;The leading power station of flood season setting, which is shut down, to be stored Water, downstream stage power station generates electricity according to natural water, and step accumulation of energy passively goes up;Flood season Mo to year end set step accumulation of energy according to Water is adjusted to year end target accumulation of energy;
When step accumulation of energy is located at reduction accumulation of energy area, setting power station, which is increased, exerts oneself, and increase generated energy makes accumulation of energy return to normal accumulation of energy area;
When step accumulation of energy is located at increase accumulation of energy area, the reduction of setting power station is exerted oneself, and reducing generated energy makes accumulation of energy return to normal accumulation of energy area.
CN201710172508.3A 2017-03-22 2017-03-22 Energy storage control-based cascade optimization scheduling graph drawing method and scheduling method Active CN107038151B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710172508.3A CN107038151B (en) 2017-03-22 2017-03-22 Energy storage control-based cascade optimization scheduling graph drawing method and scheduling method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710172508.3A CN107038151B (en) 2017-03-22 2017-03-22 Energy storage control-based cascade optimization scheduling graph drawing method and scheduling method

Publications (2)

Publication Number Publication Date
CN107038151A true CN107038151A (en) 2017-08-11
CN107038151B CN107038151B (en) 2020-03-31

Family

ID=59534621

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710172508.3A Active CN107038151B (en) 2017-03-22 2017-03-22 Energy storage control-based cascade optimization scheduling graph drawing method and scheduling method

Country Status (1)

Country Link
CN (1) CN107038151B (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107808041A (en) * 2017-10-16 2018-03-16 南京南瑞继保电气有限公司 It is a kind of to optimize the method for drawing step reservoir hydraulic connection figure
CN107808237A (en) * 2017-09-30 2018-03-16 河海大学 A kind of parallel reservoir group Real time Flood risk Analytic Calculation Method
CN107832916A (en) * 2017-10-13 2018-03-23 四川大学 The recognition methods of step power station key risk factor and risk transmission critical path based on Bayes risk network
CN107832917A (en) * 2017-10-13 2018-03-23 四川大学 The recognition methods of Cascade Reservoirs weakness step, crucial step and controlling step based on Bayes risk network
CN109272245A (en) * 2018-09-30 2019-01-25 国电大渡河流域水电开发有限公司 The real-time auto-allocation method of step power station floodgate aperture and system
CN111079297A (en) * 2019-12-20 2020-04-28 华中科技大学 Method and system for calculating combined pre-flood settlement opportunity of cascade reservoir
CN114024339A (en) * 2021-11-26 2022-02-08 国网四川省电力公司电力科学研究院 Method for expanding full-power variable-speed pumped storage unit by utilizing cascade hydropower

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102080366A (en) * 2011-01-01 2011-06-01 国网电力科学研究院 Method for drawing joint scheduling graph of step reservoir
CN102867275A (en) * 2012-08-14 2013-01-09 贵州乌江水电开发有限责任公司 Medium-term and long-term combined power generation optimal scheduling method and system in cascade reservoir group
US20170039659A1 (en) * 2014-04-11 2017-02-09 Wuhan University Daily electricity generation plan making method of cascade hydraulic power plant group

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102080366A (en) * 2011-01-01 2011-06-01 国网电力科学研究院 Method for drawing joint scheduling graph of step reservoir
CN102867275A (en) * 2012-08-14 2013-01-09 贵州乌江水电开发有限责任公司 Medium-term and long-term combined power generation optimal scheduling method and system in cascade reservoir group
US20170039659A1 (en) * 2014-04-11 2017-02-09 Wuhan University Daily electricity generation plan making method of cascade hydraulic power plant group

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
张双虎: "梯级水库群发电优化调度的理论与实践", 《中国博士学位论文全文数据库 工程科技II辑》 *
缪益平等: "雅砻江下游梯级水库蓄放水调度规则及梯级水库总调度图研制", 《中国水力发电工程学会梯级调度控制专业委员会2011年年会》 *
艾显仁: "云南澜沧江中下游梯级水电站群蓄能调度研究", 《中国优秀硕士学位论文全文数据库 工程科技II辑》 *
谢维等: "金沙江梯级水电站群联合发电运行三种常规调度方法研究", 《水力发电》 *

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107808237A (en) * 2017-09-30 2018-03-16 河海大学 A kind of parallel reservoir group Real time Flood risk Analytic Calculation Method
CN107832916A (en) * 2017-10-13 2018-03-23 四川大学 The recognition methods of step power station key risk factor and risk transmission critical path based on Bayes risk network
CN107832917A (en) * 2017-10-13 2018-03-23 四川大学 The recognition methods of Cascade Reservoirs weakness step, crucial step and controlling step based on Bayes risk network
CN107832917B (en) * 2017-10-13 2021-09-10 四川大学 Identification method of weak cascade, key cascade and controllable cascade of cascade reservoir group based on Bayesian risk network
CN107832916B (en) * 2017-10-13 2022-04-08 四川大学 Identification method for critical risk factors and critical risk transmission path of cascade hydropower station based on Bayesian risk network
CN107808041A (en) * 2017-10-16 2018-03-16 南京南瑞继保电气有限公司 It is a kind of to optimize the method for drawing step reservoir hydraulic connection figure
CN107808041B (en) * 2017-10-16 2020-11-17 南京南瑞继保电气有限公司 Method for optimally drawing cascade reservoir hydraulic connection diagram
CN109272245A (en) * 2018-09-30 2019-01-25 国电大渡河流域水电开发有限公司 The real-time auto-allocation method of step power station floodgate aperture and system
CN109272245B (en) * 2018-09-30 2021-09-07 国能大渡河流域水电开发有限公司 Method and system for automatically distributing opening of flood discharge gate of cascade hydropower station in real time
CN111079297A (en) * 2019-12-20 2020-04-28 华中科技大学 Method and system for calculating combined pre-flood settlement opportunity of cascade reservoir
CN114024339A (en) * 2021-11-26 2022-02-08 国网四川省电力公司电力科学研究院 Method for expanding full-power variable-speed pumped storage unit by utilizing cascade hydropower

Also Published As

Publication number Publication date
CN107038151B (en) 2020-03-31

Similar Documents

Publication Publication Date Title
CN107038151A (en) The step Optimized Operation drawing drawing method and dispatching method controlled based on accumulation of energy
US10534327B2 (en) Method for long-term optimal operations of interprovincial hydropower system considering peak-shaving demands
CN104063808B (en) Trans-provincial power transmission cascade hydropower station group peak-shaving dispatching two-phase search method
CN102855591B (en) Cascade Reservoirs short-term cogeneration Optimization Scheduling and system
CN106682810B (en) Long-term operation method of cross-basin cascade hydropower station group under dynamic production of giant hydropower station
CN106485366A (en) A kind of complexity Cascade Reservoirs retaining phase Optimization Scheduling
CN109636674B (en) Large-scale hydropower station group monthly transaction electric quantity decomposition and checking method
CN103049671B (en) A kind of reservoir Multiobjective Optimal Operation figure preparation method of self-adaptation climate change
CN107274302A (en) It is a kind of transprovincially to interconnect the long-term combined adjusting peak dispatching method of GROUP OF HYDROPOWER STATIONS
CN105869070A (en) Cooperation optimization scheduling method for transbasin step hydropower station group benefit equalization
CN104967126A (en) Interbasin hydropower station group multiple power grid combination adjusting peak method facing regional power grid
CN106485346A (en) A kind of series-parallel connection reservoir impoundment ahead Multiobjective Optimal Operation method
CN104636830A (en) Water power and thermal power generation real-time load adjusting method of provincial grid under inflow change
CN104333047B (en) Real-time rolling planning method applied to wind power integration of power system
CN102080366A (en) Method for drawing joint scheduling graph of step reservoir
CN105634024A (en) Price demand response-based intraday economic scheduling model and linear solving method
CN104268653A (en) Cascade reservoir optimal scheduling method based on ESP
CN105552971B (en) Small power station and the subregion consumption method of large medium-size station group coordination optimization
CN103887813B (en) Based on the control method that the wind power system of wind power prediction uncertainty runs
CN103617453A (en) Electric system medium and long term transaction operation plan obtaining method taking wind electricity harmonic absorption into consideration
CN104047258A (en) Environmental-protection-oriented ecological reservoir capacity determination method for combined scheduling reservoir group
CN107563538A (en) Multiple-use reservoir group's method for optimizing scheduling towards crucial water level control under bulk power grid platform
CN110942212B (en) Cascade reservoir operation coefficient-based cascade reservoir optimal operation method
CN104636831B (en) A kind of power station short-term peak regulation eigenvalue search method towards many electrical networks
CN105335561A (en) Ultra short-term scheduling method for cascade hydropower station group sequencing based on indexes

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant