CN107031801A - A kind of level land shipbuilding launching method - Google Patents

A kind of level land shipbuilding launching method Download PDF

Info

Publication number
CN107031801A
CN107031801A CN201710353087.4A CN201710353087A CN107031801A CN 107031801 A CN107031801 A CN 107031801A CN 201710353087 A CN201710353087 A CN 201710353087A CN 107031801 A CN107031801 A CN 107031801A
Authority
CN
China
Prior art keywords
shipbuilding
launching
slideway
new
barge
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710353087.4A
Other languages
Chinese (zh)
Other versions
CN107031801B (en
Inventor
练博强
梁剑明
蒋勇刚
周骥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CSSC Huangpu Wenchong Shipbuilding Co Ltd
Original Assignee
CSSC Huangpu Wenchong Shipbuilding Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CSSC Huangpu Wenchong Shipbuilding Co Ltd filed Critical CSSC Huangpu Wenchong Shipbuilding Co Ltd
Priority to CN201710353087.4A priority Critical patent/CN107031801B/en
Publication of CN107031801A publication Critical patent/CN107031801A/en
Application granted granted Critical
Publication of CN107031801B publication Critical patent/CN107031801B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63CLAUNCHING, HAULING-OUT, OR DRY-DOCKING OF VESSELS; LIFE-SAVING IN WATER; EQUIPMENT FOR DWELLING OR WORKING UNDER WATER; MEANS FOR SALVAGING OR SEARCHING FOR UNDERWATER OBJECTS
    • B63C3/00Launching or hauling-out by landborne slipways; Slipways
    • B63C3/08Tracks on slipways
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B73/00Building or assembling vessels or marine structures, e.g. hulls or offshore platforms

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Architecture (AREA)
  • Structural Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Ship Loading And Unloading (AREA)

Abstract

The invention provides a kind of level land shipbuilding launching method, comprise the following steps:In harbour hull size and distribution laying piston shoes formation slide rail are made according to new;Multiple clumps for being used to support new shipbuilding body are set in every side of slide rail both sides, adjustable for height active pier, the then shipbuilding on active pier are connected in clump upper end;Slideway support is laid in slide rail;Turn down active pier height so that newly make hull loads and move on slideway support;Pass through the ballasting system of constantly regulate launching barge, it is ensured that new shipbuilding body and slideway bracket stable are moved into launching barge;The ballasting system of regulation launching barge makes its submerged, and new shipbuilding body is kept afloat by natural buoyancy, realizes water under new shipbuilding body horizontal.Using the level land shipbuilding launching method of technical solution of the present invention, directly in shipbuilding on level land so as to accelerate Speed of Shipbuilding, piston shoes, slideway supporting structure are simple, and lower water is simple to operate and cost is low;Ensure new shipbuilding body horizontal launching, security incident can be prevented effectively from.

Description

A kind of level land shipbuilding launching method
Technical field
The present invention relates to technical field of ships, and in particular to a kind of level land shipbuilding launching method.
Background technology
With the development of modern science and technology, shipping industry is increasingly to high-end development, from original wooden boat to ten thousand tons Bulk freighter more than level steel vessel development, existing ten ton, substantially increases the transport capacity of ship, but such ship one As be all in dock build, because dock space is limited and position relationship, greatly reduce construction speed;Have in the prior art Water under new shipbuilding body is completed using sliding trolley, but sliding trolley input and maintenance cost are high, to launching barge main deck and code The leveling of head requires high;The lower water mode of water under new shipbuilding body weight power tilting is leaned in the prior art, and ship tail can be produced when floating Very big head end pressure, in lower water due to being difficult to hold center of gravity, it is easy to cause ship part water entering accident or topple, be one Individual urgent problem.
The content of the invention
It is an object of the present invention to provide a kind of level land shipbuilding launching method, the level land shipbuilding launching method can directly in Shipbuilding is so as to accelerate Speed of Shipbuilding on level land, and piston shoes, slideway supporting structure are simple, and lower water is easy to operate and cost is low;The lower water Method realizes new shipbuilding body horizontal launching, can be prevented effectively from security incident.
Based on this, the present invention proposes a kind of level land shipbuilding launching method, comprises the following steps:
1) hull size and distribution laying piston shoes are made according to new in harbour, multiple piston shoes connect to form slide rail, described Piston shoes are fixed with harbour;
2) multiple clumps for being used to support new shipbuilding body are set in every side of the slide rail both sides, in the clump Upper end connects adjustable for height active pier, the then shipbuilding on the active pier;
3) slideway support is laid on the slide rail;
4) the slideway cantilever tip and new make set stow-wood between hull bottom, and the urgent stow-wood causes described New shipbuilding body is in close contact with the slideway cantilever tip, turns down the active pier height so that described newly to make hull loads shifting On to the slideway support;
5) institute on slideway and harbour in the launching barge is ensured by the ballasting system of constantly regulate launching barge Slide rail is stated on sustained height and same straight line, applies external force by the new shipbuilding body and the slideway support in the lump along institute State slide rail and be dragged to the launching barge;
6) launching barge is travelled to predetermined waters, by adjust the ballasting system of the launching barge make it is described Launching barge submerged, and the new shipbuilding body is kept afloat by natural buoyancy, realizes water under the new shipbuilding body horizontal.
Further, step 5) in be partly into the launching barge when the new shipbuilding body and the slideway support When, the translational speed of the new shipbuilding body and the slideway support is controlled in 1.4m/min-1.5m/min.
Further, step 6) concrete operations be:
After the new shipbuilding body and the slideway support transport predetermined waters by the launching barge, remove on the bank Spacing winch for limiting launching barge, then fixes the slideway support and the launching barge, described in subsequent start-up The ballasting system of launching barge, to the launching barge ballast lock pressure water, sinks to the launching barge and the slideway support In water, and the new shipbuilding body is kept afloat by natural buoyancy, completes water under new shipbuilding body horizontal.
Alternatively, the piston shoes include bottom plate and slide spacing limiting plate for the slideway support, in step 1) in, The bottom plate first is laid in harbour, the bottom plate is then fixed on harbour with code plate at bottom plate two ends, afterwards in bottom plate both sides Limiting plate is installed.
Further, after piston shoes laying is completed, lubricating oil is coated with the plate upper surface.
Further, the lubricating oil is polytetrafluoroethylene (PTFE).
Alternatively, when laying slideway support, connecting plate first is set in the slideway frame bottom, then in the connection Plate installs wearing plate.
Further, the active pier includes the support frame that two ends are symmetrically arranged with inclined top face, each inclined top face difference Sliding block is slidably connected, the upper end of slide block is superimposed with inside the steel pad pier for supporting new shipbuilding body, support frame as described above It is provided with the locking device for controlling the sliding block whether to slide.
Further, step 3) concretely comprise the following steps:Slideway support described in multistage is laid on slide rail, and makes adjacent two sections The slideway support is fixedly connected by welding.
Implement the embodiment of the present invention, have the advantages that:
1st, the level land shipbuilding launching method can complete shipbuilding on level land, so as to accelerate Speed of Shipbuilding, turn down active pier Height by carrying so that be transferred to slideway support, and active pier can be recycled for multiple times and easy to operate, pass through constantly regulate The ballasting system of launching barge ensures that the slide rail on slideway and harbour in launching barge is located on sustained height and same straight line, Apply external force and new shipbuilding body and slideway support are dragged to launching barge in the lump, launching barge is travelled to predetermined waters, passed through The ballasting system of regulation launching barge makes launching barge submerged, and new shipbuilding body is kept afloat by natural buoyancy, and realization is newly made Water under hull horizontal, thus solve in the prior art directly by new shipbuilding body from harbour slip into water in easily cause part water inlet Accident or the problem of topple.
2nd, when new shipbuilding body and slideway support are partly into launching barge, the movement of new shipbuilding body and slideway support is made Speed control is in 1.4m/min-1.5m/min, so as to ensure new shipbuilding body and slideway bracket stable moving to launching barge.
3rd, the plate upper surface of piston shoes scribbles lubricating oil, so as to reduce the friction factor on piston shoes surface, and then reduces friction Power, further, lubricating oil are polytetrafluoroethylene (PTFE), and the coefficient of friction of polytetrafluoroethylene (PTFE) is extremely low, and have resistant to elevated temperatures feature, by The heat that the new shipbuilding body of this heavy duty is produced when sliding does not interfere with the performance of polytetrafluoroethylene (PTFE), so as to ensure to slide smoothly.
4th, in order to further reduce the frictional force between slideway support and piston shoes, slideway frame bottom is provided with connecting plate, Connecting plate is provided with wearing plate, and wearing plate can also protect slideway support while frictional force is reduced, so that improving slideway The service life of support.
5th, active pier is turned down highly by adjusting its internal locking device so as to realize, so that new shipbuilding body carrying Smooth transfer can be realized and be used for multiple times to slideway support, reduce cost and convenient construction is in progress.
6th, multistage slideway support is laid on slide rail, and two sections of adjacent slideway supports is fixedly connected by welding, So that easy construction and reduction laying cost, adjacent slideway support are fixedly connected by welding so that adjacent slideway support Firm connection.
Brief description of the drawings
The structural representation that Fig. 1 is connected for the slideway support of the embodiment of the present invention with piston shoes.
Fig. 2 is the piston shoes structural representation of the embodiment of the present invention.
Fig. 3 highly turns down contrast schematic diagram for active pier in the embodiment of the present invention.
In figure:1- harbours, the new shipbuilding bodies of 2-, 3- piston shoes, 4- clumps, the active piers of 5-, 6- slideway supports, 7- stow-woods, 8- Lubricating oil, 9- connecting plates, 10- wearing plates;3a- bottom plates, 3b- limiting plates, 3c- code plates, 5a- inclined top faces, 5b- support frames, 5c- is slided Block, 5d- steel pad piers.
Embodiment
Technical solution of the present invention is further illustrated with reference to the accompanying drawings and examples:
As shown in Figure 1 to Figure 3, the level land shipbuilding launching method in the present embodiment, comprises the following steps:
1) in harbour 1 according to the new size of shipbuilding body 2 and distribution laying piston shoes 3, multiple connections of piston shoes 3 form slide rail, The piston shoes 3 are fixed with harbour 1;
2) multiple clumps 4 for being used to support new shipbuilding body 2 are set in every side of the slide rail both sides, in clump 4 Upper end connects adjustable for height active pier 5, the then shipbuilding on active pier 5;It is pointed out that above-mentioned steps 1) and step 2) Interchangeable sequence of construction during specific implementation, you can with the leading shipbuilding after the layout path of slide rail is reserved, is completed after shipbuilding again Carry out the laying of slide rail;
3) in slide rail laying slideway support 6;
4) between the top of slideway support 6 and the new bottom of shipbuilding body 2 set stow-wood 7, urgent stow-wood 7 cause new shipbuilding body 2 with The top of slideway support 6 is in close contact, in the present embodiment, laterally beats the vertical height increase that stow-wood 7 may be such that two blocks of stow-woods 7 So as to realize the urgent of stow-wood, the active height of pier 5 is turned down so that the new load of shipbuilding body 2 is moved on slideway support 6, and stow-wood 7 causes Slideway top is in close contact with new shipbuilding body 2, so that more stablize in new 2 load transfer of shipbuilding body, and active pier 5 can also It is recycled for multiple times, prior art is, by for supporting the block, abutment pier and support of new shipbuilding body 2 all to remove, thus to make Into construction inconvenience and waste of resource;
5) slideway in launching barge and the slide rail position on harbour 1 are ensured by the ballasting system of constantly regulate launching barge New shipbuilding body 2 and slideway support 6 are dragged to launching barge along slide rail in the lump on sustained height and same straight line, applying external force Ship, need to be according to new shipbuilding body 2 and the institute of slideway support 6 during new shipbuilding body 2 and slideway support 6 slide onto launching barge The change of displacement, adjusts launching barge cabin internal pressure and carries water, the slide rail and launching barge slideway for making harbour 1 are remained at any time In same level, to ensure model of the structural strength in permission of new shipbuilding body 2 and slideway support 6, launching barge and harbour 1 In enclosing;
6) launching barge is travelled to predetermined waters, and launching barge is sunk to by the ballasting system for adjusting launching barge In water, and new shipbuilding body 2 is kept afloat by natural buoyancy, realizes water under the horizontal of new shipbuilding body 2.
Based on above technical scheme, the level land shipbuilding launching method can complete shipbuilding on level land, so as to accelerate shipbuilding Speed, using the structure of slide rail and slideway support 6, lower water is easy to operate and input and maintenance cost are low, turns down the active height of pier 5 So as to which carrying is transferred into slideway support 6, and active pier 5 can be recycled for multiple times and easy to operate, by under constantly regulate The ballasting system of water barge ship ensures that the slideway in launching barge is located on sustained height and same straight line with the slide rail on harbour 1, Apply external force and new shipbuilding body 2 and slideway support 6 are dragged to launching barge along slide rail in the lump, launching barge is travelled to predetermined water Behind domain, make launching barge submerged by adjusting the ballasting system of launching barge, new shipbuilding body 2 floats over water by natural buoyancy Face, realizes water under the new horizontal of shipbuilding body 2, thus solve in the prior art directly by new shipbuilding body 2 from harbour 1 slip into water in hold The problem of easily causing part water entering accident or topple.
Further, step 5) in when new shipbuilding body and slideway support are partly into the launching barge, make newly to make Hull 2 and the control of the translational speed of slideway support 6 are in 1.4m/min-1.5m/min, so as to ensure new shipbuilding body 2 and slideway support 6 stabilizations move to launching barge.
Further, step 6) in detailed operating process be:When new shipbuilding body 2 and slideway support 6 are by launching barge shipping Defeated to arrive behind predetermined waters, remove is used for the spacing winch for limiting launching barge on the bank, then by slideway support 6 and launching barge It is fixed, prevent slideway support 6 from sliding, the ballasting system of subsequent start-up launching barge, to launching barge ballast lock pressure water, makes lower water Barge and the submerged of slideway support 6, thus slideway support 6, which can be put into, uses next time, and new shipbuilding body 2 leans on natural buoyancy Float in water, so as to complete water under the new horizontal of shipbuilding body 2, so as to solve in the prior art directly by new shipbuilding body 2 from code First 1 slips into water the problem of easily causing part water entering accident or topple.
Further, piston shoes 3 include bottom plate 3a and spacing limiting plate 3b are slided for slideway support 6, in step 1) in, Bottom plate 3a first is laid in harbour, bottom plate 3a is then fixed on harbour 1 with code plate 3c at bottom plate two ends, so as to complete piston shoes 3 Laying, the firm piston shoes 3 being easy in construction, the present embodiment simple in construction of piston shoes 3 are mutually solid with the ground ox on harbour 1 by code plate 3c It is fixed, so as to ensure its stability.
Complete that after piston shoes 3 lay, lubricating oil 8 is coated with bottom plate 3a upper surfaces, thus reduce the friction on the surface of piston shoes 3 because Number, and then frictional force is reduced, further, lubricating oil 8 is polytetrafluoroethylene (PTFE), and the coefficient of friction of polytetrafluoroethylene (PTFE) is extremely low, and tool There is resistant to elevated temperatures feature, the heat that thus heavily loaded new shipbuilding body 2 is produced when sliding does not interfere with the performance of polytetrafluoroethylene (PTFE), So as to ensure to slide smoothly.
In order to further reduce the frictional force between slideway support 6 and piston shoes 3, when laying slideway support 6, first in slideway The bottom of support 6 sets connecting plate 9, then installs wearing plate 10 in connecting plate 9, and wearing plate 10 also may be used while frictional force is reduced Slideway support 6 is protected, so that improving the service life of slideway support 6.
Active pier 5 includes the support frame 5b that two ends are symmetrically arranged with inclined top face 5a, each oblique top in the present embodiment Face 5a is respectively slidably connected with sliding block 5c, and sliding block 5c upper ends are superimposed with the steel pad pier 5d for supporting new shipbuilding body 2, support Frame 5b is internally provided with the locking device for controlling the sliding block 5c whether to slide, thus when needing to turn down active 5 height of pier, adjusts The locking device inside support frame 5b is saved, unblock rear slider 5c glides along inclined plane, so that new shipbuilding body 2 is with steel pad pier 5d Decline so that on load transfer to the slideway support 6 of new shipbuilding body 2, it is pointed out that the locking device can be a kind of lock Buckle device, such as a kind of limit bolt, extracting latch sliding block 5d just can realize unblock, can realize whether locking for sliding block 5c Locking device.
Concretely comprising the following steps for slideway support 6 is laid on slide rail:Multistage slideway support 6 is laid on slide rail, and is made adjacent Two sections of slideway supports 6 be fixedly connected by welding, slideway support 6 is longer, for easy construction and reduces slideway support 6 Cost is laid, therefore uses multistage slideway support 6 to connect, adjacent slideway support 6 is fixedly connected by welding so that adjacent slideway branch The firm connection of frame 6.
Using the level land shipbuilding launching method of the embodiment of the present invention, the level land shipbuilding launching method can be completed on level land Shipbuilding, so as to accelerate Speed of Shipbuilding, using the structure of slide rail and slideway support 6, lower water is easy to operate and puts into and maintenance cost It is low, turn down the active height of pier 5 carrying is transferred into slideway support 6, and active pier 5 can be recycled for multiple times and operate letter Just, ensure that the slideway in launching barge is located at the slide rail on harbour 1 by the ballasting system of constantly regulate launching barge same In height and same straight line, apply external force and new shipbuilding body 2 and slideway support 6 are dragged to launching barge, launching barge traveling in the lump After to predetermined waters, make launching barge submerged by adjusting the ballasting system of launching barge, new shipbuilding body 2 is floating by itself Power is kept afloat, and realizes water under new shipbuilding body horizontal, so as to solve in the prior art directly to slide new shipbuilding body 2 from harbour 1 The problem of entering to easily cause part water entering accident in water or topple.Launching barge is partly into new shipbuilding body 2 and slideway support 6 Ship time, makes the translational speed of new shipbuilding body 2 and slideway support 6 control in 1.4m/min-1.5m/min, so as to ensure new shipbuilding Body 2 and the stabilization of slideway support 6 move to launching barge.The bottom plate 3a upper surfaces of piston shoes scribble lubricating oil 8, so as to reduce slide rail surface Friction factor, and then reduce frictional force, further, lubricating oil 8 be polytetrafluoroethylene (PTFE), the coefficient of friction pole of polytetrafluoroethylene (PTFE) It is low, and with resistant to elevated temperatures feature, the heat that thus heavily loaded new shipbuilding body 2 is produced when sliding does not interfere with polytetrafluoroethylene (PTFE) Performance, so as to ensure to slide smooth.In order to further reduce the frictional force between slideway support 6 and piston shoes 3, slideway support 6 Bottom is provided with connecting plate 9, and connecting plate 9 is provided with wearing plate 10, and wearing plate 10 can also protect cunning while frictional force is reduced Road support 6, so that improving the service life of slideway support 6.Active pier 5 is by adjusting its internal locking device so as to reality Height is now turned down, so that carrying smooth transfer is to slideway support 6, and can realize and be used for multiple times, cost is reduced and conveniently applies Work is in progress.Multistage slideway support 6 is laid on slide rail, and two sections of adjacent slideway supports 6 is fixedly connected by welding, from And cause easy construction and reduce laying cost, adjacent slideway support 6 is fixedly connected by welding so that adjacent slideway support 6 Firm connection.
Described above is only the preferred embodiment of the present invention, it is noted that for the ordinary skill people of the art For member, without departing from the technical principles of the invention, some improvement and replacement can also be made, these improve and replaced Also it should be regarded as protection scope of the present invention.

Claims (9)

1. a kind of level land shipbuilding launching method, it is characterised in that comprise the following steps:
1) hull size and distribution laying piston shoes are made according to new in harbour, multiple piston shoes connect to form slide rail, the piston shoes Fixed with harbour;
2) multiple clumps for being used to support new shipbuilding body are set in every side of the slide rail both sides, in the clump upper end Adjustable for height active pier is connected, then the shipbuilding on the active pier;
3) slideway support is laid on the slide rail;
4) the slideway cantilever tip and new make set stow-wood between hull bottom, and the urgent stow-wood described newly to make Hull is in close contact with the slideway cantilever tip, turns down the active pier height so that described newly making hull loads moves to institute State on slideway support;
5) cunning on slideway and harbour in the launching barge is ensured by the ballasting system of constantly regulate launching barge Rail is located on sustained height and same straight line, applies external force by the new shipbuilding body and the slideway support in the lump along the cunning Rail is dragged to the launching barge;
6) launching barge is travelled to predetermined waters, makes the lower water by adjusting the ballasting system of the launching barge Barge submerged, and the new shipbuilding body is kept afloat by natural buoyancy, realizes water under the new shipbuilding body horizontal.
2. shipbuilding launching method in level land according to claim 1, it is characterised in that step 5) in when the new shipbuilding body and When the slideway support is partly into the launching barge, make the translational speed control of the new shipbuilding body and the slideway support System is in 1.4m/min-1.5m/min.
3. shipbuilding launching method in level land according to claim 1, it is characterised in that step 6) concrete operations be:
After the new shipbuilding body and the slideway support transport predetermined waters by the launching barge, dismounting is used on the bank The spacing winch of launching barge is limited, then the slideway support and the launching barge is fixed, lower water described in subsequent start-up The ballasting system of barge, to the launching barge ballast lock pressure water, makes the launching barge and the slideway support submerged, And the new shipbuilding body is kept afloat by natural buoyancy, water under new shipbuilding body horizontal is completed.
4. shipbuilding launching method in level land according to claim 1, it is characterised in that the piston shoes include bottom plate and for institute State slideway support and slide spacing limiting plate, in step 1) in, the bottom plate first is laid in harbour, then in bottom plate two ends code The bottom plate is fixed on harbour by plate, installs limiting plate in bottom plate both sides afterwards.
5. shipbuilding launching method in level land according to claim 4, it is characterised in that after piston shoes laying is completed, described Plate upper surface is coated with lubricating oil.
6. shipbuilding launching method in level land according to claim 5, it is characterised in that the lubricating oil is polytetrafluoroethylene (PTFE).
7. shipbuilding launching method in level land according to claim 1, it is characterised in that when laying slideway support, first in institute State slideway frame bottom and connecting plate is set, wearing plate then is installed in the connecting plate.
8. shipbuilding launching method in level land according to claim 1, it is characterised in that the active pier is symmetrically set including two ends The support frame of inclined top face is equipped with, each inclined top face is respectively slidably connected with sliding block, and the upper end of slide block, which is superimposed with, to be used for The steel pad pier of new shipbuilding body is supported, support frame as described above is internally provided with the locking device for controlling the sliding block whether to slide.
9. shipbuilding launching method in level land according to claim 1, it is characterised in that step 3) concretely comprise the following steps:In slide rail Slideway support described in upper laying multistage, and the slideway support of adjacent two sections is fixedly connected by welding.
CN201710353087.4A 2017-05-18 2017-05-18 A kind of level land shipbuilding launching method Active CN107031801B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710353087.4A CN107031801B (en) 2017-05-18 2017-05-18 A kind of level land shipbuilding launching method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710353087.4A CN107031801B (en) 2017-05-18 2017-05-18 A kind of level land shipbuilding launching method

Publications (2)

Publication Number Publication Date
CN107031801A true CN107031801A (en) 2017-08-11
CN107031801B CN107031801B (en) 2019-12-03

Family

ID=59538632

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710353087.4A Active CN107031801B (en) 2017-05-18 2017-05-18 A kind of level land shipbuilding launching method

Country Status (1)

Country Link
CN (1) CN107031801B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108502124A (en) * 2018-04-26 2018-09-07 太重(天津)滨海重型机械有限公司 Ocean platform launching gear and method
CN113120188A (en) * 2021-05-20 2021-07-16 中船黄埔文冲船舶有限公司 Refuting method of launching member
CN113338223A (en) * 2021-06-09 2021-09-03 上海振华重工(集团)股份有限公司 Method for adjusting unloading load
CN116238664A (en) * 2023-05-12 2023-06-09 广州文船重工有限公司 Floating type offshore wind power platform launching method

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20010066358A (en) * 1999-12-31 2001-07-11 송영수 A Shipbuilding Method in a Drydock Using a Skid Mounting Method and a Skid Bogie System Therefor
KR20030083938A (en) * 2002-04-23 2003-11-01 삼성중공업 주식회사 Shipbuilding method on floating dock
KR20060017558A (en) * 2006-02-08 2006-02-23 (주)유영정공 Apparatus for transfering a ship
CN1789076A (en) * 2004-12-13 2006-06-21 Stx造船株式会社 Method for building ship on ground and launching ship using skid launching system
CN1926024A (en) * 2004-10-08 2007-03-07 现代重工业株式会社 Method and equipment for transversely launching ship built on the ground
KR20070032444A (en) * 2005-09-16 2007-03-22 성동조선해양(주) A water level transport of a land dryness vessel and launching system
CN105346687A (en) * 2015-11-27 2016-02-24 广船国际有限公司 Dock docking block

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20010066358A (en) * 1999-12-31 2001-07-11 송영수 A Shipbuilding Method in a Drydock Using a Skid Mounting Method and a Skid Bogie System Therefor
KR20030083938A (en) * 2002-04-23 2003-11-01 삼성중공업 주식회사 Shipbuilding method on floating dock
CN1926024A (en) * 2004-10-08 2007-03-07 现代重工业株式会社 Method and equipment for transversely launching ship built on the ground
CN1789076A (en) * 2004-12-13 2006-06-21 Stx造船株式会社 Method for building ship on ground and launching ship using skid launching system
KR20070032444A (en) * 2005-09-16 2007-03-22 성동조선해양(주) A water level transport of a land dryness vessel and launching system
KR20060017558A (en) * 2006-02-08 2006-02-23 (주)유영정공 Apparatus for transfering a ship
CN105346687A (en) * 2015-11-27 2016-02-24 广船国际有限公司 Dock docking block

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
应长春: "《船舶工艺技术》", 31 January 2013 *
王瑞璧: "《平地造船技术介绍》", 《第三届长三角地区船舶工业发展论坛论文集》 *
闻鸣: "《大型钻井平台平地建造的平移和下水工艺》", 《2010年力学与工程应用学术研讨会论文集》 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108502124A (en) * 2018-04-26 2018-09-07 太重(天津)滨海重型机械有限公司 Ocean platform launching gear and method
CN113120188A (en) * 2021-05-20 2021-07-16 中船黄埔文冲船舶有限公司 Refuting method of launching member
CN113338223A (en) * 2021-06-09 2021-09-03 上海振华重工(集团)股份有限公司 Method for adjusting unloading load
CN116238664A (en) * 2023-05-12 2023-06-09 广州文船重工有限公司 Floating type offshore wind power platform launching method

Also Published As

Publication number Publication date
CN107031801B (en) 2019-12-03

Similar Documents

Publication Publication Date Title
CN107031801A (en) A kind of level land shipbuilding launching method
KR100623201B1 (en) A Method for Shipbuilding on the ground and Launching Ships Using a Skid Launching System
KR100949891B1 (en) On-ground building method for conventional type of ship with transverse load-out
KR101331294B1 (en) Dual draft vessel
CN201224866Y (en) Floating pier steel bridge approach floating type elevating system
CN102114899A (en) Extra-large float installation barge and design method thereof
CN102367650A (en) Construction method of steel pipe arch bridge
KR20100129451A (en) Ship launching method using divided shipbuilding
CN201999177U (en) Super-large barge for float-over installation
CN206635654U (en) A kind of barging device of underwater narrow-bore tunnel super long type prefabricated case beam
GB2199791A (en) Method and apparatus for manoeuvering a superstructure element relative to a fixed construction arranged in water
CN101781887A (en) Overhang installation method for upper structure of offshore platform
CN107165046A (en) A kind of installation method of bridge inspection car
CN202642027U (en) Floating fitting-out device
CN103215957B (en) Underwater construction method for large object and used device
CN103334442A (en) Method and structure for connecting cofferdams in vertically rotating mode
CN209798721U (en) Bridge-rail ferry device for crossing river in canal
CN208882038U (en) Semi-submersible type loads and unloads ship
CN108382540B (en) Barge disembarkation, launching method
CN204310021U (en) A kind of ballast-type deadwood
CN201587808U (en) Track system for moving ship unloaders
CN105947123A (en) Double-body semi-submerged ship with submersible deck
CN103332271A (en) Advancing type floating platform for sand blowing
GB2434341A (en) A method and vessel for removing offshore structures
CN209836981U (en) Lower suspension bridge crossing device for crossing river in canal

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant