- CN107023153A CN107023153A CN201710277558.8A CN201710277558A CN107023153A CN 107023153 A CN107023153 A CN 107023153A CN 201710277558 A CN201710277558 A CN 201710277558A CN 107023153 A CN107023153 A CN 107023153A
- Authority
- CN
- China
- Prior art keywords
- monitoring probe
- fixed mount
- display instrument
- fixedly connected
- pedal
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G1/00—Scaffolds primarily resting on the ground
- E04G1/15—Scaffolds primarily resting on the ground essentially comprising special means for supporting or forming platforms; Platforms
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G5/00—Component parts or accessories for scaffolds
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G5/00—Component parts or accessories for scaffolds
- E04G5/08—Scaffold boards or planks
Abstract
The invention discloses a kind of multi-layer scaffold for installing monitoring probe, including scaffold body and monitoring probe, the scaffold body both sides are arranged with fixed mount, at least level is equipped with three layers of pedal from top to down between the fixed mount, the side of the pedal is provided with cross bar, workbench is installed on the cross bar, the monitoring probe and display instrument are installed in the workbench, the corresponding monitoring probe and the display instrument are connected and display monitoring with net at three layers of pedal, the side of the workbench is fixedly connected with network mouth piece, the top of the fixed mount is fixedly connected with pulling apparatus, the top of the pulling apparatus and the fixed mount is horizontally connected with fix bar.By the above-mentioned means, the present invention can facilitate worker to carry out the process observation worked between different layers during operation on multi-layer scaffold, to carry out cooperating each other.
Description
Technical field
The present invention relates to scaffold field, more particularly to a kind of multi-layer scaffold for installing monitoring probe.
Background technology
Scaffold refers to job site for operative and solves vertically and horizontally to transport the various supports set up, architecture field
Generic term, refer on construction site be used in exterior wall, inside fitting or the higher place that can not directly construct of floor height, mainly for
Worked above and below workmen or perimeter security net is safeguarded and high-altitude installation component etc., be exactly plainly to build a framework, scaffold makes
Material generally has:Bamboo and wood, steel pipe or synthetic material etc., some engineerings also with scaffold when template is used, in addition advertising,
The departments such as municipal administration, traffic road and bridge, mine are also used extensively, are often used in tier building and skyscraper processing environment
To the scaffold of multilayer, worker is operated simultaneously in the different layers of scaffold, under daily working environment, different layers it
Between worker need timely to be exchanged to understand the mutual progress of work, so as to be operated between the different layers
On cooperation processing, traditional multi-layer scaffold lacks corresponding medium and the instrument person that comes cooperating, and worker generally requires
Enter the transmission of row information by shouting, but often because working environment noisy and can not smoothly transmission information and influence work
Make process, worker may cause various situations to include safe thing because can not timely know the situation of each layer job schedule
Therefore generation.
The content of the invention
The present invention solves the technical problem of a kind of multi-layer scaffold for installing monitoring probe is provided, work can be facilitated
Author carries out the process observation worked between different layers on multi-layer scaffold during operation, to be coordinated each other
Work.
In order to solve the above technical problems, one aspect of the present invention is:A kind of installation monitoring probe is provided
Multi-layer scaffold, including scaffold body and monitoring probe, the scaffold body both sides are arranged with fixed mount, the fixation
At least level is equipped with three layers of pedal from top to down between frame, and the side of the pedal is provided with cross bar, and the cross bar level is fixed
Be connected between the fixed mount, be provided with the cross bar in workbench, the workbench be provided with the monitoring probe and
Display instrument, the monitoring probe is corresponded to towards at the pedal of same layer, and the display instrument connects the monitoring probe, three layers
The corresponding monitoring probe and the display instrument are connected and display monitoring with net at the pedal, and the side of the workbench is consolidated
Surely it is connected between network mouth piece, three layers of network mouth piece with net connection, the top of the fixed mount is fixedly connected with
Pulling apparatus, the top of the pulling apparatus and the fixed mount is horizontally connected with fix bar, the pulling apparatus include motor,
Reel and steel wire rope and basketry, the output end of the motor connect the reel, and the output shaft of the reel and the motor is same
Axle is rotated, and winding is provided with the steel wire rope on the reel, and the lower end of the steel wire rope is fixedly connected with the basketry.
In a preferred embodiment of the present invention, the side of the fixed mount is fixedly connected with wireless network transmitter, institute
State wireless network transmitter and connect the monitoring probe, the display instrument and the network mouth piece.
In a preferred embodiment of the present invention, the monitoring probe is provided with the control that the monitoring probe can be controlled to turn to
Button processed, the display instrument, which is provided with, can adjust the operation button of picture.
In a preferred embodiment of the present invention, the workbench is provided with rain-baffling device and lightning arrester.
The beneficial effects of the invention are as follows:The multi-layer scaffold that the present invention is designed is applied to the working environment of tier building, phase
Compare traditional multi-layer scaffold, the present invention can improve the mutual cooperation degree that worker between different layers works, different layers it
Between the monitoring probe installed the working condition of worker can be monitored, facilitate the worker of levels can be by display
Instrument observes mutually job schedule, to carry out cooperating each other, improves the whole efficiency of work, it is unnecessary to save
Time, worker can also be communicated with each other by network mouth piece, can also in case of emergency remind mutual prompting, plus
Transmission between strong information so that integrated engineering can be carried out effectively in order, when needed can also using pulling apparatus come
Transmission material or instrument, improve the utilization rate of resource mutually, it is to avoid because individual layer worker shortage material or instrument can not works
The situation of work occurs.
Brief description of the drawings
Technical scheme in order to illustrate the embodiments of the present invention more clearly, makes required in being described below to embodiment
Accompanying drawing is briefly described, it should be apparent that, drawings in the following description are only some embodiments of the present invention, for
For those of ordinary skill in the art, on the premise of not paying creative work, it can also obtain other according to these accompanying drawings
Accompanying drawing, wherein:
Fig. 1 is the structural representation for the preferred embodiment of multi-layer scaffold one that the present invention installs monitoring probe;
The mark of each part is as follows in accompanying drawing:1st, scaffold body;2nd, monitoring probe;3rd, fixed mount;4th, pedal;5th, cross bar;6、
Workbench;7th, display instrument;8th, network mouth piece;9th, pulling apparatus;10th, fix bar;11st, motor;12nd, reel;13rd, steel wire rope;
14th, basketry;15th, wireless network transmitter.
Embodiment
The technical scheme in the embodiment of the present invention will be clearly and completely described below, it is clear that described implementation
Example is only a part of embodiment of the present invention, rather than whole embodiments.Based on the embodiment in the present invention, this area is common
All other embodiment that technical staff is obtained under the premise of creative work is not made, belongs to the model that the present invention is protected
Enclose.
Referring to Fig. 1, the embodiment of the present invention includes:
A kind of multi-layer scaffold for installing monitoring probe, including scaffold body 1 and monitoring probe 2,1 liang of the scaffold body
Side is arranged between fixed mount 3, the fixed mount 3 that at least level is equipped with three layers of pedal 4 from top to down, the pedal 4
Side is provided with cross bar 5, and the level of cross bar 5 is fixedly connected between the fixed mount 3, and workbench is provided with the cross bar 5
6, the monitoring probe 2 and display instrument 7 are installed, the correspondence of monitoring probe 2 is towards described in same layer in the workbench 6
At pedal 4, the display instrument 7 connects at the monitoring probe 2, three layers of pedal 4 the corresponding monitoring probe 2 and described
The display monitoring with net connection of display instrument 7, the side of the workbench 6 is fixedly connected with network mouth piece 8, three layers of network
With net connection between mouth piece 8, the top of the fixed mount 3 is fixedly connected with pulling apparatus 9, the pulling apparatus 9 with it is described
The top of fixed mount 3 is horizontally connected with fix bar 10, and the pulling apparatus 9 includes motor 11, reel 12 and steel wire rope 13 and basket
Basket 14, the output end of the motor 11 connects the reel 12, and the output shaft of the reel 12 and the motor 11 is rotated coaxially,
Winding is provided with the steel wire rope 13 on the reel 12, and the lower end of the steel wire rope 13 is fixedly connected with the basketry 14.
In addition, the side of the fixed mount 3 is fixedly connected with wireless network transmitter 15, the wireless network transmitter 15
Connect the monitoring probe 2, the display instrument 7 and the network mouth piece 8.
In addition, the monitoring probe 2 is provided with the control button that the monitoring probe 2 can be controlled to turn to, the display instrument 7
The operation button of picture can be adjusted by being provided with.
In addition, the workbench 6 is provided with rain-baffling device and lightning arrester.
The operation principle of the present invention is arranged between fixed mount 3, fixed mount 3 from top to down for the both sides of scaffold body 1
At least level is equipped with three layers of pedal 4, it is adaptable to the construction working of tier building, and the side of pedal 4 is provided with cross bar 5, the water of cross bar 5
It is flat to be fixedly connected between fixed mount 3, it is provided with cross bar 5 in workbench 6, workbench 6 and monitoring probe 2 and display instrument is installed
7, workbench 6 is provided with rain-baffling device and lightning arrester, prevents monitoring probe 2 and display instrument 7 from being damaged in rainy day and thunderstorm day
Bad, monitoring probe 2 is corresponded to towards at the pedal 4 of same layer, and the working environment at each layer pedal 4 of 2 pairs of monitoring probe is monitored,
Monitoring probe 2 is provided with the control button that monitoring probe 2 can be controlled to turn to, and worker can adjust monitoring by control button
The direction of probe 2, display instrument 7 is provided with that can adjust the operation button of picture, and worker switches display instrument 7 by operation button
Upper picture and recall the working condition at each layer pedal 4, the connection monitoring probe 2 of display instrument 7, corresponding monitoring at three layers of pedal 4
Probe 2 and display instrument 7 display monitoring with net connection, upper strata worker can observe lower floor's work by the display instrument 7 on upper strata
The working condition of author, the worker of lower floor can also observe the working condition of upper strata worker by the display instrument 7 of lower floor,
So as to being operated for mutual cooperation, operating efficiency is improved, the side of workbench 6 is fixedly connected with network mouth piece 8, three-layer network
With net connection between network mouth piece 8, the worker of different layers can be passed on a message by network and 8 carry out communication, fixed mount 3
Top is fixedly connected with pulling apparatus 9, and the top of pulling apparatus 9 and fixed mount 3 is horizontally connected with fix bar 10, pulling apparatus 9
Including motor 11, reel 12 and steel wire rope 13 and basketry 14, the output end of motor 11 connects reel 12, reel 12 and motor 11
Output shaft is rotated coaxially, and winding is provided with steel wire rope 13 on reel 12, and the lower end of steel wire rope 13 is fixedly connected with basketry 14, worker
The oscilaltion of pulling apparatus 9 can be controlled and the object in basketry 14 is transported, worker when needed can be between the different layers
The exchange of carry out instrument or the transfer of material, the side of fixed mount 3 are fixedly connected with wireless network transmitter 15, wireless network hair
The connection of emitter 15 monitoring probe 2, display instrument 7 and network mouth piece 8, wireless network transmitter 15 is to monitoring probe 2, display instrument 7
Wireless signal is sent with network mouth piece 8.
Embodiments of the invention are the foregoing is only, are not intended to limit the scope of the invention, it is every to utilize this hair
Equivalent structure or equivalent flow conversion that bright description is made, or directly or indirectly it is used in other related technology necks
Domain, is included within the scope of the present invention.
Claims (4)
1. a kind of multi-layer scaffold for installing monitoring probe, including scaffold body and monitoring probe, it is characterised in that the pin
Hand cradle body both sides are arranged between fixed mount, the fixed mount from top to down at least level and are equipped with three layers of pedal, described
The side of pedal is provided with cross bar, and the cross bar level is fixedly connected between the fixed mount, and work is provided with the cross bar
The monitoring probe and display instrument be installed, the monitoring probe correspondence described in same layer towards stepping in platform, the workbench
At plate, the display instrument connects the corresponding monitoring probe and the display instrument at the monitoring probe, three layers of pedal
The display monitoring with net connection, the side of the workbench is fixedly connected with network mouth piece, three layers of network mouth piece it
Between with net connection, the top of the fixed mount is fixedly connected with pulling apparatus, the top of the pulling apparatus and the fixed mount
Fix bar is horizontally connected with, the pulling apparatus includes motor, reel and steel wire rope and basketry, and the output end of the motor is connected
The reel, the output shaft of the reel and the motor is rotated coaxially, and winding is provided with the steel wire rope on the reel, described
The lower end of steel wire rope is fixedly connected with the basketry.
2. the multi-layer scaffold according to claim 1 for installing monitoring probe, it is characterised in that the side of the fixed mount
It is fixedly connected with wireless network transmitter, the wireless network transmitter connects the monitoring probe, the display instrument and described
Network mouth piece.
3. the multi-layer scaffold according to claim 1 for installing monitoring probe, it is characterised in that set on the monitoring probe
There is the control button that the monitoring probe can be controlled to turn to, the display instrument, which is provided with, can adjust the operation button of picture.
4. the multi-layer scaffold according to claim 1 for installing monitoring probe, it is characterised in that the workbench is provided with
Rain-baffling device and lightning arrester.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710277558.8A CN107023153A (en) | 2017-04-25 | 2017-04-25 | The multi-layer scaffold of monitoring probe is installed |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710277558.8A CN107023153A (en) | 2017-04-25 | 2017-04-25 | The multi-layer scaffold of monitoring probe is installed |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107023153A true CN107023153A (en) | 2017-08-08 |
Family
ID=59527702
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710277558.8A Pending CN107023153A (en) | 2017-04-25 | 2017-04-25 | The multi-layer scaffold of monitoring probe is installed |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107023153A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111988410A (en) * | 2020-08-21 | 2020-11-24 | 广东星层建筑科技股份有限公司 | Climbing frame control interaction method based on wireless communication module |
CN115874790A (en) * | 2022-11-30 | 2023-03-31 | 中国十七冶集团有限公司 | Combined ladder monitoring device for building construction and operation method thereof |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104110124A (en) * | 2014-07-25 | 2014-10-22 | 广东信海建筑有限公司 | Inserted lift scaffold with video security monitoring system |
CN205330131U (en) * | 2016-01-06 | 2016-06-22 | 王博 | Jenny scaffold for building |
CN205637532U (en) * | 2016-05-16 | 2016-10-12 | 刘勇 | Self -propelled building support frame of indoor usefulness |
CN205918075U (en) * | 2016-08-23 | 2017-02-01 | 江苏嘉图建筑科技有限公司 | A scaffold frame for low -rise building |
CN206737377U (en) * | 2017-04-25 | 2017-12-12 | 无锡市龙海杰机械制造有限公司 | The multi-layer scaffold of monitoring probe is installed |
-
2017
- 2017-04-25 CN CN201710277558.8A patent/CN107023153A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104110124A (en) * | 2014-07-25 | 2014-10-22 | 广东信海建筑有限公司 | Inserted lift scaffold with video security monitoring system |
CN205330131U (en) * | 2016-01-06 | 2016-06-22 | 王博 | Jenny scaffold for building |
CN205637532U (en) * | 2016-05-16 | 2016-10-12 | 刘勇 | Self -propelled building support frame of indoor usefulness |
CN205918075U (en) * | 2016-08-23 | 2017-02-01 | 江苏嘉图建筑科技有限公司 | A scaffold frame for low -rise building |
CN206737377U (en) * | 2017-04-25 | 2017-12-12 | 无锡市龙海杰机械制造有限公司 | The multi-layer scaffold of monitoring probe is installed |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111988410A (en) * | 2020-08-21 | 2020-11-24 | 广东星层建筑科技股份有限公司 | Climbing frame control interaction method based on wireless communication module |
CN111988410B (en) * | 2020-08-21 | 2023-11-21 | 广东星层建筑科技股份有限公司 | Climbing frame control interaction method based on wireless communication module |
CN115874790A (en) * | 2022-11-30 | 2023-03-31 | 中国十七冶集团有限公司 | Combined ladder monitoring device for building construction and operation method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102733615B (en) | Unsymmetrical integral lifting construction method | |
CN103723663B (en) | The high-rise working method and hanging basket of preset drawstring | |
CN103523683B (en) | Construction method for dismantling tower crane by use of small hoisting equipment | |
CN102900021B (en) | Split mounting type bridge wet joint construction method | |
CN107190964A (en) | A kind of construction method of prefabricated hoistway operation platform | |
CN107023153A (en) | The multi-layer scaffold of monitoring probe is installed | |
CN206737377U (en) | The multi-layer scaffold of monitoring probe is installed | |
CN206915598U (en) | Possesses the explosion-proof crane of ventilation function | |
CN206625610U (en) | Construction protection canopy | |
CN206051380U (en) | A kind of tower crane for carrying lowering or hoisting gear | |
CN206298286U (en) | A kind of wet electrical dust precipitator body equipment integral hoisting aids in hanging beam | |
CN107840255A (en) | A kind of both arms safe tower crane machine | |
CN208120600U (en) | A kind of quick provision for disengagement of large size inside-climbing tower crane | |
CN207700068U (en) | A kind of modularization Bridge Pier Construction job platform | |
CN206636152U (en) | Double-deck scaffold in simple type room | |
CN203475801U (en) | Telescopic steel platform for elevator shaft | |
CN202672752U (en) | Curtain wall elevating sling cart | |
CN109162466A (en) | Room level units formula curtain wall installing structure and method | |
CN105781610A (en) | Safety cabin for manual hole digging operation | |
CN203594215U (en) | High-altitude large-area work platform semi-automatic lifting apparatus | |
CN106836766A (en) | Double-deck scaffold in simple type room | |
CN205134921U (en) | Building outer wall concrete constructional column hangs construction platform | |
CN211596994U (en) | Protection device for repairing inspection well for traffic | |
CN207986526U (en) | A kind of cladding panel hoisting structure | |
CN209668645U (en) | One kind being used for crane hook visualization device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20170808 |