CN107013217A - 一种露天煤矿排土桥式拉斗铲倒堆作业方法 - Google Patents

一种露天煤矿排土桥式拉斗铲倒堆作业方法 Download PDF

Info

Publication number
CN107013217A
CN107013217A CN201710279884.2A CN201710279884A CN107013217A CN 107013217 A CN107013217 A CN 107013217A CN 201710279884 A CN201710279884 A CN 201710279884A CN 107013217 A CN107013217 A CN 107013217A
Authority
CN
China
Prior art keywords
quick
casting
fried heap
bridge
dumps
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710279884.2A
Other languages
English (en)
Other versions
CN107013217B (zh
Inventor
张瑞新
孙健东
李志伟
武海龙
范延强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Mining and Technology Beijing CUMTB
Original Assignee
China University of Mining and Technology Beijing CUMTB
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Mining and Technology Beijing CUMTB filed Critical China University of Mining and Technology Beijing CUMTB
Priority to CN201710279884.2A priority Critical patent/CN107013217B/zh
Publication of CN107013217A publication Critical patent/CN107013217A/zh
Application granted granted Critical
Publication of CN107013217B publication Critical patent/CN107013217B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C41/00Methods of underground or surface mining; Layouts therefor
    • E21C41/26Methods of surface mining; Layouts therefor
    • E21C41/28Methods of surface mining; Layouts therefor for brown or hard coal

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Remote Sensing (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Auxiliary Methods And Devices For Loading And Unloading (AREA)

Abstract

本发明涉及一种露天煤矿排土桥式拉斗铲倒堆作业方法,它包括如下步骤:①煤层以上约40m厚的岩石台阶经抛掷爆破形成爆堆;②单斗‑卡车剥离爆堆上部物料,将物料定点排弃至爆堆的下部坡面上;③推土机向排土场方向整平排弃点料堆;④重复②、③过程,该排弃点物料将形成向排土场延伸的排土桥;⑤当排土桥延伸至一定距离后,卡车停止向该处排弃点排弃物料;⑥在工作面推进方向上,间隔一定距离选择新的排弃点,重复上述过程,直至完成整个爆堆的倒堆工作,总之本发明具有剥离成本较低、剥采效率较高、爆堆玻璃速度较快、大幅提高原煤产量的优点。

Description

一种露天煤矿排土桥式拉斗铲倒堆作业方法
技术领域
本发明属于露天煤矿开采技术领域,具体涉及一种露天煤矿排土桥式拉斗铲倒堆作业方法。
背景技术
在现行无运输倒堆工艺的实践中,单斗-卡车剥离爆堆上部物料,就近排弃至临近拉斗铲倒堆作业拓展台阶,拉斗铲站立于整平后的工作面上作业,按一定次序将爆堆物料倒堆至排土场,这种作业方式如图5所示,主要包括I倒堆台阶预先抛掷爆破,II液压反铲刷帮、推土机平整作业,III单斗-卡车辅助拓展平台作业,IV拉斗铲倒堆作业这四个步骤,该种作业方式中,爆堆上部的大部分物料首先需要经过单斗-卡车倒堆至临近排土场的爆堆下部坡面上,之后拉斗铲再对爆堆下部坡面上的这部分物料进行倒堆,最终才进入排土场,故该部分物料量称为“二次倒堆量”,而“二次倒堆量”将会降低整体的剥采的效率,增加剥采成本,因此减少倒堆作业中的“二次倒堆量”,对提高工艺系统效率、降低剥离成本意义重大。
发明内容
本发明的目的是为了克服现有技术的不足,而提供一种剥离成本较低、剥采效率较高、爆堆玻璃速度较快、大幅提高原煤产量的露天煤矿排土桥式拉斗铲倒堆作业方法。
本发明的目的是这样实现的:一种露天煤矿排土桥式拉斗铲倒堆作业方法,它包括如下步骤:
①煤层以上约40m厚的岩石台阶经抛掷爆破形成爆堆;
②单斗-卡车剥离爆堆上部物料,将物料定点排弃至爆堆的下部坡面上;
③推土机向排土场方向整平排弃点料堆;
④重复②、③过程,该排弃点物料将形成向排土场延伸的排土桥;
⑤当排土桥延伸至一定距离后,卡车停止向该处排弃点排弃物料;
⑥在工作面推进方向上,间隔一定距离选择新的排弃点,重复上述过程,直至完成整个爆堆的倒堆工作。
所述步骤②中爆堆上部物料不就近排弃,而是定点排弃至爆堆的下部坡面上。
所述步骤③、④中推土机向排土场方向整平排弃点料堆,形成排土桥。
所述步骤⑤中在工作面推进方向上,间隔一定距离选择新的排弃点。
本发明的有益效果:本作业方法以运输倒堆工艺实践中爆堆物料倒堆移运的自身特点为依据,通过改变爆堆上部的物料排弃位置而对“二次爆堆量”进行优化,在具体实践过程中可以有如下的技术效果:排土桥的设计可以有效避免倒堆物料在煤沟处的堆积,使得尽可能多的物料由推土机、单斗电铲-卡车直接倒堆进入内排土场,减少“二次爆堆量”,极大的降低剥离成本;“二次爆堆量”的减少可有效提高爆堆剥离速度,加快原煤揭露,从而提高原煤产量,总之本发明具有剥离成本较低、剥采效率较高、爆堆玻璃速度较快、大幅提高原煤产量的优点。
附图说明
图1是本发明一种露天煤矿排土桥式拉斗铲倒堆作业方法的待爆破高台阶剖面示意图。
图2是本发明一种露天煤矿排土桥式拉斗铲倒堆作业方法的抛掷爆破后爆堆剖面示意图。
图3是本发明一种露天煤矿排土桥式拉斗铲倒堆作业方法的推土机、单斗-卡车倒堆作业剖面示意图。
图4是本发明一种露天煤矿排土桥式拉斗铲倒堆作业方法的推土机、单斗-卡车倒堆作业平面示意图。
图5是本发明一种露天煤矿排土桥式拉斗铲倒堆作业方法的常规倒堆作业流程。
图中:1、待爆破高台阶 2、煤层 3、倒土堆 4、爆堆 5、爆堆上部物料 6、排土桥 7、工作面推进方向 8、卡车排土路径 9、拉斗铲站立平台 10、煤层顶板 11、待剥离的爆堆上部物料 12、排土场。
具体实施方式
下面结合附图对本发明做进一步的说明。
实施例1
如图1-5所示,一种露天煤矿排土桥式拉斗铲倒堆作业方法,它包括如下步骤:
①煤层以上约40m厚的岩石台阶经抛掷爆破形成爆堆;
②单斗-卡车剥离爆堆上部物料,将物料定点排弃至爆堆的下部坡面上;
③推土机向排土场方向整平排弃点料堆;
④重复②、③过程,该排弃点物料将形成向排土场延伸的排土桥;
⑤当排土桥延伸至一定距离后,卡车停止向该处排弃点排弃物料;
⑥在工作面推进方向上,间隔一定距离选择新的排弃点,重复上述过程,直至完成整个爆堆的倒堆工作。
本发明在实施时,具体的作业方法为:
(一)煤层2以上约40m厚的待爆破高台阶1经抛掷爆破形成爆堆4;
(二)单斗-卡车剥离爆堆上部物料5,将物料定点排弃至爆堆的下部坡面上;
(三)推土机向排土场方向整平排弃点料堆;
(四)重复(二)、(三)过程,该排弃点物料将形成排土桥6,向排土场12延伸;
(五)当上述桥状料堆延伸至一定距离后,卡车停止向该处排弃点排弃物料;
(六)在工作面推进方向上,间隔一定距离选择新的排弃点,重复上述过程,直至完成整个爆堆的倒堆工作。
本作业方法以运输倒堆工艺实践中爆堆物料倒堆移运的自身特点为依据,通过改变爆堆上部的物料排弃位置而对“二次爆堆量”进行优化,在具体实践过程中可以有如下的技术效果:排土桥的设计可以有效避免倒堆物料在煤沟处的堆积,使得尽可能多的物料由推土机、单斗电铲-卡车直接倒堆进入内排土场,减少“二次爆堆量”,极大的降低剥离成本;“二次爆堆量”的减少可有效提高爆堆剥离速度,加快原煤揭露,从而提高原煤产量,总之本发明具有剥离成本较低、剥采效率较高、爆堆玻璃速度较快、大幅提高原煤产量的优点。

Claims (4)

1.一种露天煤矿排土桥式拉斗铲倒堆作业方法,它包括如下步骤:
①煤层以上约40m厚的岩石台阶经抛掷爆破形成爆堆;
②单斗-卡车剥离爆堆上部物料,将物料定点排弃至爆堆的下部坡面上;
③推土机向排土场方向整平排弃点料堆;
④重复②、③过程,该排弃点物料将形成向排土场延伸的排土桥;
⑤当排土桥延伸至一定距离后,卡车停止向该处排弃点排弃物料;
⑥在工作面推进方向上,间隔一定距离选择新的排弃点,重复上述过程,直至完成整个爆堆的倒堆工作。
2.如权利要求1所述的一种露天煤矿排土桥式拉斗铲倒堆作业方法,其特征在于:所述步骤②中爆堆上部物料不就近排弃,而是定点排弃至爆堆的下部坡面上。
3.如权利要求1所述的一种露天煤矿排土桥式拉斗铲倒堆作业方法,其特征在于:所述步骤③、④中推土机向排土场方向整平排弃点料堆,形成排土桥。
4.如权利要求1所述的一种露天煤矿排土桥式拉斗铲倒堆作业方法,其特征在于:所述步骤⑤中在工作面推进方向上,间隔一定距离选择新的排弃点。
CN201710279884.2A 2017-04-18 2017-04-18 一种露天煤矿排土桥式拉斗铲倒堆作业方法 Expired - Fee Related CN107013217B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710279884.2A CN107013217B (zh) 2017-04-18 2017-04-18 一种露天煤矿排土桥式拉斗铲倒堆作业方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710279884.2A CN107013217B (zh) 2017-04-18 2017-04-18 一种露天煤矿排土桥式拉斗铲倒堆作业方法

Publications (2)

Publication Number Publication Date
CN107013217A true CN107013217A (zh) 2017-08-04
CN107013217B CN107013217B (zh) 2018-10-30

Family

ID=59448304

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710279884.2A Expired - Fee Related CN107013217B (zh) 2017-04-18 2017-04-18 一种露天煤矿排土桥式拉斗铲倒堆作业方法

Country Status (1)

Country Link
CN (1) CN107013217B (zh)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109899072A (zh) * 2019-03-22 2019-06-18 华北科技学院 一种露天煤矿拉斗铲工作面循环走行作业方法
CN109931065A (zh) * 2019-04-03 2019-06-25 华北科技学院 一种露天煤矿抛掷爆破-松动爆破分区开采方法
CN109944592A (zh) * 2019-03-28 2019-06-28 辽宁工程技术大学 拉斗铲倒堆工艺抛掷爆破台阶高度设计方法
CN110700837A (zh) * 2019-11-29 2020-01-17 神华准格尔能源有限责任公司 拉斗铲作业方法
CN111963176A (zh) * 2020-08-27 2020-11-20 中国矿业大学 一种有助于采场冬季通风的露天煤矿采排方法
CN112682042A (zh) * 2021-02-02 2021-04-20 内蒙古华威矿业工程有限责任公司 露天煤矿运输排土方法
CN113047840A (zh) * 2021-04-27 2021-06-29 车兆学 一种露天煤矿剥离半连续倒堆工艺
CN115726785A (zh) * 2022-10-28 2023-03-03 国能经济技术研究院有限责任公司 拉斗铲开采工艺预留行走通道的作业方法
CN116025357A (zh) * 2022-10-28 2023-04-28 国能经济技术研究院有限责任公司 拉斗铲开采工艺临时联络通道的作业方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1744256A1 (ru) * 1990-02-27 1992-06-30 Днепропетровский горный институт им.Артема Способ ведени вскрышных работ при разработке горизонтальных и пологих месторождений
US5194689A (en) * 1991-11-25 1993-03-16 Atlantic Richfield Company Earth excavation using blast casting and excavating apparatus
CN103216238A (zh) * 2012-12-28 2013-07-24 中国神华能源股份有限公司 一种露天煤矿开采工艺
CN103216237A (zh) * 2012-12-28 2013-07-24 中国神华能源股份有限公司 一种露天煤矿开采工艺
CN103470262A (zh) * 2013-09-12 2013-12-25 中国矿业大学 一种露天煤田近水平矿床倒堆内排的开采方法

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1744256A1 (ru) * 1990-02-27 1992-06-30 Днепропетровский горный институт им.Артема Способ ведени вскрышных работ при разработке горизонтальных и пологих месторождений
US5194689A (en) * 1991-11-25 1993-03-16 Atlantic Richfield Company Earth excavation using blast casting and excavating apparatus
CN103216238A (zh) * 2012-12-28 2013-07-24 中国神华能源股份有限公司 一种露天煤矿开采工艺
CN103216237A (zh) * 2012-12-28 2013-07-24 中国神华能源股份有限公司 一种露天煤矿开采工艺
CN103470262A (zh) * 2013-09-12 2013-12-25 中国矿业大学 一种露天煤田近水平矿床倒堆内排的开采方法

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109899072A (zh) * 2019-03-22 2019-06-18 华北科技学院 一种露天煤矿拉斗铲工作面循环走行作业方法
CN109899072B (zh) * 2019-03-22 2020-08-18 华北科技学院 一种露天煤矿拉斗铲工作面循环走行作业方法
CN109944592A (zh) * 2019-03-28 2019-06-28 辽宁工程技术大学 拉斗铲倒堆工艺抛掷爆破台阶高度设计方法
CN109931065A (zh) * 2019-04-03 2019-06-25 华北科技学院 一种露天煤矿抛掷爆破-松动爆破分区开采方法
CN109931065B (zh) * 2019-04-03 2020-09-25 华北科技学院 一种露天煤矿抛掷爆破-松动爆破分区开采方法
CN110700837A (zh) * 2019-11-29 2020-01-17 神华准格尔能源有限责任公司 拉斗铲作业方法
CN111963176A (zh) * 2020-08-27 2020-11-20 中国矿业大学 一种有助于采场冬季通风的露天煤矿采排方法
CN112682042A (zh) * 2021-02-02 2021-04-20 内蒙古华威矿业工程有限责任公司 露天煤矿运输排土方法
CN113047840A (zh) * 2021-04-27 2021-06-29 车兆学 一种露天煤矿剥离半连续倒堆工艺
CN115726785A (zh) * 2022-10-28 2023-03-03 国能经济技术研究院有限责任公司 拉斗铲开采工艺预留行走通道的作业方法
CN116025357A (zh) * 2022-10-28 2023-04-28 国能经济技术研究院有限责任公司 拉斗铲开采工艺临时联络通道的作业方法
CN116025357B (zh) * 2022-10-28 2023-09-05 国能经济技术研究院有限责任公司 拉斗铲开采工艺临时联络通道的作业方法

Also Published As

Publication number Publication date
CN107013217B (zh) 2018-10-30

Similar Documents

Publication Publication Date Title
CN107013217B (zh) 一种露天煤矿排土桥式拉斗铲倒堆作业方法
CN105781554B (zh) 一种露天煤矿拉斗铲无运输倒堆工艺开采方法
CN103216237B (zh) 一种露天煤矿开采工艺
CN103216238B (zh) 一种露天煤矿开采工艺
CN102996131B (zh) 一种预掘两巷前进式固体充填采煤方法
CN103470262A (zh) 一种露天煤田近水平矿床倒堆内排的开采方法
CN108222938A (zh) 一种大倾角煤层采空区组合注浆充填开采方法
CN102852550B (zh) 一种无煤柱半原位沿空留巷方法
WO2020010696A1 (zh) 一种预留巷道胶结充填回收房式煤柱的方法
CN110096787A (zh) 一种露天煤矿内排土场排土参数的优化方法
CN109882239B (zh) 一种露天端帮压煤放射式充填开采方法
CN109931064B (zh) 一种露天煤矿拉斗铲独立倒堆作业方法
US11994027B2 (en) Dendritic reverse underground mining method for thin coal seam at end slope of strip mine
CN102261249B (zh) 一种带钢混结构人工假顶的挑檐式无底柱阶段崩落采矿法
CN107687342A (zh) 一种露天煤矿拉斗铲工作线分段交替式采区转向方法
CN103388478B (zh) 露天煤矿应用吊斗铲的运输道路形成方法
CN106907177A (zh) 一种薄煤层沿空留巷巷旁充填支护方法
CN102937035A (zh) 在煤矿采空区内采岩充填的方法
CN106150509A (zh) 一种双线隧道非钻爆机械化施工方法
CN109209491A (zh) 一种矸石充填方法
CN103161498A (zh) 急倾斜煤层区段煤柱巷旁充填方法
CN105626076B (zh) 一种拉斗铲锯齿形工作平盘高效开采方法
CN103244127A (zh) 一种加快连拱隧道施工速度的方法
CN105626068A (zh) 露天煤矿端帮桥的拆除方法
CN211648152U (zh) 一种用于露天端帮采煤的掘进充填一体机

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181030

Termination date: 20190418

CF01 Termination of patent right due to non-payment of annual fee