CN107010517A - A kind of steel construction elevator uses ready-package corridor - Google Patents

A kind of steel construction elevator uses ready-package corridor Download PDF

Info

Publication number
CN107010517A
CN107010517A CN201710434829.6A CN201710434829A CN107010517A CN 107010517 A CN107010517 A CN 107010517A CN 201710434829 A CN201710434829 A CN 201710434829A CN 107010517 A CN107010517 A CN 107010517A
Authority
CN
China
Prior art keywords
corridor
framework
fixed
package
fixing hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710434829.6A
Other languages
Chinese (zh)
Inventor
刘立新
滕法元
王飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANDONG FUJI ZHIYU ELEVATOR CO Ltd
Original Assignee
SHANDONG FUJI ZHIYU ELEVATOR CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANDONG FUJI ZHIYU ELEVATOR CO Ltd filed Critical SHANDONG FUJI ZHIYU ELEVATOR CO Ltd
Priority to CN201710434829.6A priority Critical patent/CN107010517A/en
Publication of CN107010517A publication Critical patent/CN107010517A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B13/00Doors, gates, or other apparatus controlling access to, or exit from, cages or lift well landings

Abstract

Ready-package corridor is used the present invention relates to a kind of steel construction elevator, includes corridor framework(11), it is characterised in that:In base cross members(2)Between be provided with buttress brace(17), buttress brace(17)Upper fixed stiffening angle(4), stiffening angle(4)Above mat formation bottom plate(3), corridor framework(11)Four angles of one side on fixed plate is respectively welded(5), fixed plate(5)On be provided with fixing hole(10), upper longitudinal(7)Upper welded suspending hook(9), with relative corridor framework(11)The angle of another side four on be furnished with corridor fixed support(13), corridor fixed support(13)It is provided with fixing hole(16), described corridor framework(11)Upper and lower, left and right on the outside of be fixed with balustrade exterior panelling(12).The present invention is easy to Fast Installation, substantially reduces the construction period of whole project, goes on a journey and lives as early as possible beneficial to resident.

Description

A kind of steel construction elevator uses ready-package corridor
Technical field
Ready-package corridor is used the invention belongs to technical field of elevator equipment, more particularly to a kind of steel construction elevator.
Background technology
For the corridor used between steel construction elevator and building, general site operation mode is welded for raw material, weldering Connect and finish outsourcing external decoration again, the engineering time at general corridor scene is 3-5 days, and the time that multiple corridors need is longer, The cycle of whole project has so been spun out, has been unfavorable for the trip and life of resident.
The content of the invention
Ready-package corridor is used it is an object of the invention to provide a kind of steel construction elevator.The purpose of the present invention is realized in 's:A kind of steel construction elevator uses ready-package corridor, includes corridor framework, corridor framework include base longerons, base cross members, Middle vertical beam, upper longitudinal, upper beam are constituted, it is characterised in that:It is provided with solid on buttress brace, buttress brace between base cross members Determine fixed plate is respectively welded on bottom plate of above stiffening angle, stiffening angle mating formation, four angles of one side of corridor framework, it is fixed Welded suspending hook on fixing hole, upper longitudinal is provided with plate, with consolidating on the angle of another side four of relative corridor framework equipped with corridor Fixed rack, corridor fixed support is provided with fixing hole, and the upper and lower, left and right outside of described corridor framework is fixed with external decoration Plate.
The present invention is easy to Fast Installation, substantially reduces the construction period of whole project, goes on a journey and gives birth to as early as possible beneficial to resident It is living.
Brief description of the drawings
Fig. 1 is the structural representation of the present invention;
Fig. 2 is the structural representation that the present invention removes external decoration;
Fig. 3 is the structural representation of the invention with external decoration;
Fig. 4 is zoomed-in view at A in Fig. 2.
In figure, 1, base longerons, 2, base cross members, 3, bottom plate, 4, stiffening angle, 5 fixed plates, 6, middle vertical beam, 7, on Portion crossbeam A, 8, upper beam, 9, suspension hook, 10, fixing hole, 11, corridor framework, 12, balustrade exterior panelling, 13, corridor fixed support, 14th, band steel structure elevator, 15, building, 16, fixing hole, 17, buttress brace.
Embodiment:
With reference to diagram description:
A kind of steel construction elevator uses ready-package corridor, includes corridor framework 11, and corridor framework 11 includes base longerons 1, bottom Portion's crossbeam 2, middle vertical beam 6, upper longitudinal 7, upper beam 8 are constituted, it is characterised in that:Provided with reinforcement between base cross members 2 Bottom plate 3 of mating formation above stiffening angle 4, stiffening angle 4, the one side of corridor framework 11 four are fixed on beam 17, buttress brace 17 It is respectively welded on angle in fixed plate 5, fixed plate 5 and is provided with fixing hole 10, welded suspending hook 9 on upper longitudinal 7, with relative corridor framework It is furnished with corridor fixed support 13 on 11 angle of another side four, corridor fixed support 13 is provided with fixing hole 16, and described walks Balustrade exterior panelling 12 is fixed with the outside of the upper and lower, left and right of corridor framework 11.
The corridor framework 11 of the present invention is to weld to complete in inside plants, solid on the outside of the upper and lower, left and right of corridor framework 11 Surely it is also to be completed in inside plants to have external decoration 12, and such corridor framework 11 and external decoration 12 constitute a kind of steel construction elevator and used Ready-package corridor, for there is the project of certain distance between band steel structure elevator 14 and building 15, scene only needs to a corridor The fixing hole 16 of fixed support 13 is fixed on building 15 with chemical anchor bolts, then a kind of steel construction elevator is used ready-package corridor Lifted, be put on corridor fixed support 13 by suspension hook 9, secured it to bolt on corridor fixed support 13, then The fixing hole 10 of corridor framework 11, which is bolted on band steel structure elevator 14, can complete to install, such a steel construction electricity Ladder ready-package corridor becomes a kind of corridor that a kind of band steel structure elevator 14 walks to building 15.Wherein corridor framework 11 And on corridor framework 11 by base longerons 1, base cross members 2, bottom plate 3, stiffening angle 4, fixed plate 5, middle vertical beam 6, top Longeron 7, upper beam 8, suspension hook 9 and buttress brace 17 are welded in inside plants and completed, and various horizontal, vertical beams are hollow by square clod wash Shaped steel is constituted.

Claims (1)

1. a kind of steel construction elevator uses ready-package corridor, include corridor framework(11), corridor framework(11)Include bottom to indulge Beam(1), base cross members(2), middle vertical beam(6), upper longitudinal(7), upper beam(8)Constitute, it is characterised in that:In bottom transverse Beam(2)Between be provided with buttress brace(17), buttress brace(17)Upper fixed stiffening angle(4), stiffening angle(4)Above mat formation bottom plate (3), corridor framework(11)Four angles of one side on fixed plate is respectively welded(5), fixed plate(5)On be provided with fixing hole(10), Upper longitudinal(7)Upper welded suspending hook(9), with relative corridor framework(11)The angle of another side four on be furnished with corridor fixed support (13), corridor fixed support(13)It is provided with fixing hole(16), described corridor framework(11)Upper and lower, left and right on the outside of it is fixed There is balustrade exterior panelling(12).
CN201710434829.6A 2017-06-10 2017-06-10 A kind of steel construction elevator uses ready-package corridor Pending CN107010517A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710434829.6A CN107010517A (en) 2017-06-10 2017-06-10 A kind of steel construction elevator uses ready-package corridor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710434829.6A CN107010517A (en) 2017-06-10 2017-06-10 A kind of steel construction elevator uses ready-package corridor

Publications (1)

Publication Number Publication Date
CN107010517A true CN107010517A (en) 2017-08-04

Family

ID=59452756

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710434829.6A Pending CN107010517A (en) 2017-06-10 2017-06-10 A kind of steel construction elevator uses ready-package corridor

Country Status (1)

Country Link
CN (1) CN107010517A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112962914A (en) * 2021-02-08 2021-06-15 斯迈普电梯(中国)有限公司 Light steel keel elevator shaft system with through columns

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101845849A (en) * 2010-06-22 2010-09-29 中国建筑第二工程局有限公司 Large-span steel gallery erected between new building and old building and construction method thereof
US20110173907A1 (en) * 2008-09-18 2011-07-21 Epaminondas Katsalidis Unitised Building System
CN202882352U (en) * 2011-09-19 2013-04-17 广东讯达电梯有限公司 Multi-layer steel structure connection corridor shaped like Chinese character 'gan' of old commercial and residential building adding elevator
JP2016020567A (en) * 2014-07-14 2016-02-04 ミサワホーム株式会社 Outside corridor construction method for unit-type building
CN206814241U (en) * 2017-06-10 2017-12-29 山东富士制御电梯有限公司 A kind of steel construction elevator ready-package corridor

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20110173907A1 (en) * 2008-09-18 2011-07-21 Epaminondas Katsalidis Unitised Building System
CN101845849A (en) * 2010-06-22 2010-09-29 中国建筑第二工程局有限公司 Large-span steel gallery erected between new building and old building and construction method thereof
CN202882352U (en) * 2011-09-19 2013-04-17 广东讯达电梯有限公司 Multi-layer steel structure connection corridor shaped like Chinese character 'gan' of old commercial and residential building adding elevator
JP2016020567A (en) * 2014-07-14 2016-02-04 ミサワホーム株式会社 Outside corridor construction method for unit-type building
CN206814241U (en) * 2017-06-10 2017-12-29 山东富士制御电梯有限公司 A kind of steel construction elevator ready-package corridor

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112962914A (en) * 2021-02-08 2021-06-15 斯迈普电梯(中国)有限公司 Light steel keel elevator shaft system with through columns

Similar Documents

Publication Publication Date Title
CN101886468B (en) Construction method of suspension type template support in high-position conjoined structure
CN102535845A (en) Construction method of bearing frame of corridor structure
CN106677509A (en) Design finalization external protective frame system used for assembly type building construction
CN202627506U (en) Formwork for cast-in-place concrete connecting beams
CN201367728Y (en) Derrick-less hydraulic slip form device used for reinforced concrete water tower supporting tube construction
CN104831939A (en) Bolt ball welding ball mixed node large span cantilever grid structure construction method
CN104372961A (en) Anti-seismic integrated lightweight steel construction house
CN202481960U (en) Wall-attached frame of tower crane
CN204001652U (en) The portable exterior wall operating platform of fabricated shear wall structure
CN104291222B (en) The inner hard protection of a kind of high-rise building Core Walls Structure hangs integrated system with row
CN109162437B (en) Integral steel platform for multi-cylinder steel plate shear wall and construction method thereof
CN205444975U (en) Large -scale room lid steel construction construction braced system with view platform
CN104878867A (en) Ceiling joist and double-layer construction platform integrated structure and manufacturing method thereof
CN202731104U (en) Novel reinforcing mesh sheet support structure
CN206814241U (en) A kind of steel construction elevator ready-package corridor
CN107010517A (en) A kind of steel construction elevator uses ready-package corridor
CN105625732B (en) Superelevation overhanging steel structure truss support free construction method
CN208965581U (en) A kind of non-console mode tower crane platform
CN103993739A (en) Method for constructing stiff beam of spraying layer of prilling tower
CN104652853B (en) Quick lifting installation building structure
CN203795459U (en) Foundation structure of tower crane for high-altitude roofs
CN103669817B (en) Building structure overhanging scaffold external corner assembling type frame body device
CN201687083U (en) Suspension type template supporting structure with high-position integrated structure
CN211473320U (en) Tool type external hanging rack for corridor
CN205777531U (en) Floor slab construction beam string shuttering supporting equipment

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170804