CN107010517A - A kind of steel construction elevator uses ready-package corridor - Google Patents
A kind of steel construction elevator uses ready-package corridor Download PDFInfo
- Publication number
- CN107010517A CN107010517A CN201710434829.6A CN201710434829A CN107010517A CN 107010517 A CN107010517 A CN 107010517A CN 201710434829 A CN201710434829 A CN 201710434829A CN 107010517 A CN107010517 A CN 107010517A
- Authority
- CN
- China
- Prior art keywords
- corridor
- framework
- fixed
- package
- fixing hole
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 17
- 239000010959 steel Substances 0.000 title claims abstract description 17
- 238000010276 construction Methods 0.000 title claims abstract description 14
- 230000015572 biosynthetic process Effects 0.000 claims abstract description 4
- 230000009286 beneficial effect Effects 0.000 abstract description 2
- 238000009434 installation Methods 0.000 abstract description 2
- 238000005034 decoration Methods 0.000 description 6
- 239000000725 suspension Substances 0.000 description 3
- 230000013011 mating Effects 0.000 description 2
- 239000007787 solid Substances 0.000 description 2
- 238000010586 diagram Methods 0.000 description 1
- 230000005611 electricity Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000012946 outsourcing Methods 0.000 description 1
- 239000002994 raw material Substances 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
- 239000000126 substance Substances 0.000 description 1
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66B—ELEVATORS; ESCALATORS OR MOVING WALKWAYS
- B66B13/00—Doors, gates, or other apparatus controlling access to, or exit from, cages or lift well landings
Abstract
Ready-package corridor is used the present invention relates to a kind of steel construction elevator, includes corridor framework(11), it is characterised in that:In base cross members(2)Between be provided with buttress brace(17), buttress brace(17)Upper fixed stiffening angle(4), stiffening angle(4)Above mat formation bottom plate(3), corridor framework(11)Four angles of one side on fixed plate is respectively welded(5), fixed plate(5)On be provided with fixing hole(10), upper longitudinal(7)Upper welded suspending hook(9), with relative corridor framework(11)The angle of another side four on be furnished with corridor fixed support(13), corridor fixed support(13)It is provided with fixing hole(16), described corridor framework(11)Upper and lower, left and right on the outside of be fixed with balustrade exterior panelling(12).The present invention is easy to Fast Installation, substantially reduces the construction period of whole project, goes on a journey and lives as early as possible beneficial to resident.
Description
Technical field
Ready-package corridor is used the invention belongs to technical field of elevator equipment, more particularly to a kind of steel construction elevator.
Background technology
For the corridor used between steel construction elevator and building, general site operation mode is welded for raw material, weldering
Connect and finish outsourcing external decoration again, the engineering time at general corridor scene is 3-5 days, and the time that multiple corridors need is longer,
The cycle of whole project has so been spun out, has been unfavorable for the trip and life of resident.
The content of the invention
Ready-package corridor is used it is an object of the invention to provide a kind of steel construction elevator.The purpose of the present invention is realized in
's:A kind of steel construction elevator uses ready-package corridor, includes corridor framework, corridor framework include base longerons, base cross members,
Middle vertical beam, upper longitudinal, upper beam are constituted, it is characterised in that:It is provided with solid on buttress brace, buttress brace between base cross members
Determine fixed plate is respectively welded on bottom plate of above stiffening angle, stiffening angle mating formation, four angles of one side of corridor framework, it is fixed
Welded suspending hook on fixing hole, upper longitudinal is provided with plate, with consolidating on the angle of another side four of relative corridor framework equipped with corridor
Fixed rack, corridor fixed support is provided with fixing hole, and the upper and lower, left and right outside of described corridor framework is fixed with external decoration
Plate.
The present invention is easy to Fast Installation, substantially reduces the construction period of whole project, goes on a journey and gives birth to as early as possible beneficial to resident
It is living.
Brief description of the drawings
Fig. 1 is the structural representation of the present invention;
Fig. 2 is the structural representation that the present invention removes external decoration;
Fig. 3 is the structural representation of the invention with external decoration;
Fig. 4 is zoomed-in view at A in Fig. 2.
In figure, 1, base longerons, 2, base cross members, 3, bottom plate, 4, stiffening angle, 5 fixed plates, 6, middle vertical beam, 7, on
Portion crossbeam A, 8, upper beam, 9, suspension hook, 10, fixing hole, 11, corridor framework, 12, balustrade exterior panelling, 13, corridor fixed support,
14th, band steel structure elevator, 15, building, 16, fixing hole, 17, buttress brace.
Embodiment:
With reference to diagram description:
A kind of steel construction elevator uses ready-package corridor, includes corridor framework 11, and corridor framework 11 includes base longerons 1, bottom
Portion's crossbeam 2, middle vertical beam 6, upper longitudinal 7, upper beam 8 are constituted, it is characterised in that:Provided with reinforcement between base cross members 2
Bottom plate 3 of mating formation above stiffening angle 4, stiffening angle 4, the one side of corridor framework 11 four are fixed on beam 17, buttress brace 17
It is respectively welded on angle in fixed plate 5, fixed plate 5 and is provided with fixing hole 10, welded suspending hook 9 on upper longitudinal 7, with relative corridor framework
It is furnished with corridor fixed support 13 on 11 angle of another side four, corridor fixed support 13 is provided with fixing hole 16, and described walks
Balustrade exterior panelling 12 is fixed with the outside of the upper and lower, left and right of corridor framework 11.
The corridor framework 11 of the present invention is to weld to complete in inside plants, solid on the outside of the upper and lower, left and right of corridor framework 11
Surely it is also to be completed in inside plants to have external decoration 12, and such corridor framework 11 and external decoration 12 constitute a kind of steel construction elevator and used
Ready-package corridor, for there is the project of certain distance between band steel structure elevator 14 and building 15, scene only needs to a corridor
The fixing hole 16 of fixed support 13 is fixed on building 15 with chemical anchor bolts, then a kind of steel construction elevator is used ready-package corridor
Lifted, be put on corridor fixed support 13 by suspension hook 9, secured it to bolt on corridor fixed support 13, then
The fixing hole 10 of corridor framework 11, which is bolted on band steel structure elevator 14, can complete to install, such a steel construction electricity
Ladder ready-package corridor becomes a kind of corridor that a kind of band steel structure elevator 14 walks to building 15.Wherein corridor framework 11
And on corridor framework 11 by base longerons 1, base cross members 2, bottom plate 3, stiffening angle 4, fixed plate 5, middle vertical beam 6, top
Longeron 7, upper beam 8, suspension hook 9 and buttress brace 17 are welded in inside plants and completed, and various horizontal, vertical beams are hollow by square clod wash
Shaped steel is constituted.
Claims (1)
1. a kind of steel construction elevator uses ready-package corridor, include corridor framework(11), corridor framework(11)Include bottom to indulge
Beam(1), base cross members(2), middle vertical beam(6), upper longitudinal(7), upper beam(8)Constitute, it is characterised in that:In bottom transverse
Beam(2)Between be provided with buttress brace(17), buttress brace(17)Upper fixed stiffening angle(4), stiffening angle(4)Above mat formation bottom plate
(3), corridor framework(11)Four angles of one side on fixed plate is respectively welded(5), fixed plate(5)On be provided with fixing hole(10),
Upper longitudinal(7)Upper welded suspending hook(9), with relative corridor framework(11)The angle of another side four on be furnished with corridor fixed support
(13), corridor fixed support(13)It is provided with fixing hole(16), described corridor framework(11)Upper and lower, left and right on the outside of it is fixed
There is balustrade exterior panelling(12).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710434829.6A CN107010517A (en) | 2017-06-10 | 2017-06-10 | A kind of steel construction elevator uses ready-package corridor |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710434829.6A CN107010517A (en) | 2017-06-10 | 2017-06-10 | A kind of steel construction elevator uses ready-package corridor |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107010517A true CN107010517A (en) | 2017-08-04 |
Family
ID=59452756
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710434829.6A Pending CN107010517A (en) | 2017-06-10 | 2017-06-10 | A kind of steel construction elevator uses ready-package corridor |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107010517A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112962914A (en) * | 2021-02-08 | 2021-06-15 | 斯迈普电梯(中国)有限公司 | Light steel keel elevator shaft system with through columns |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101845849A (en) * | 2010-06-22 | 2010-09-29 | 中国建筑第二工程局有限公司 | Large-span steel gallery erected between new building and old building and construction method thereof |
US20110173907A1 (en) * | 2008-09-18 | 2011-07-21 | Epaminondas Katsalidis | Unitised Building System |
CN202882352U (en) * | 2011-09-19 | 2013-04-17 | 广东讯达电梯有限公司 | Multi-layer steel structure connection corridor shaped like Chinese character 'gan' of old commercial and residential building adding elevator |
JP2016020567A (en) * | 2014-07-14 | 2016-02-04 | ミサワホーム株式会社 | Outside corridor construction method for unit-type building |
CN206814241U (en) * | 2017-06-10 | 2017-12-29 | 山东富士制御电梯有限公司 | A kind of steel construction elevator ready-package corridor |
-
2017
- 2017-06-10 CN CN201710434829.6A patent/CN107010517A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20110173907A1 (en) * | 2008-09-18 | 2011-07-21 | Epaminondas Katsalidis | Unitised Building System |
CN101845849A (en) * | 2010-06-22 | 2010-09-29 | 中国建筑第二工程局有限公司 | Large-span steel gallery erected between new building and old building and construction method thereof |
CN202882352U (en) * | 2011-09-19 | 2013-04-17 | 广东讯达电梯有限公司 | Multi-layer steel structure connection corridor shaped like Chinese character 'gan' of old commercial and residential building adding elevator |
JP2016020567A (en) * | 2014-07-14 | 2016-02-04 | ミサワホーム株式会社 | Outside corridor construction method for unit-type building |
CN206814241U (en) * | 2017-06-10 | 2017-12-29 | 山东富士制御电梯有限公司 | A kind of steel construction elevator ready-package corridor |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112962914A (en) * | 2021-02-08 | 2021-06-15 | 斯迈普电梯(中国)有限公司 | Light steel keel elevator shaft system with through columns |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101886468B (en) | Construction method of suspension type template support in high-position conjoined structure | |
CN102535845A (en) | Construction method of bearing frame of corridor structure | |
CN106677509A (en) | Design finalization external protective frame system used for assembly type building construction | |
CN202627506U (en) | Formwork for cast-in-place concrete connecting beams | |
CN201367728Y (en) | Derrick-less hydraulic slip form device used for reinforced concrete water tower supporting tube construction | |
CN104831939A (en) | Bolt ball welding ball mixed node large span cantilever grid structure construction method | |
CN104372961A (en) | Anti-seismic integrated lightweight steel construction house | |
CN202481960U (en) | Wall-attached frame of tower crane | |
CN204001652U (en) | The portable exterior wall operating platform of fabricated shear wall structure | |
CN104291222B (en) | The inner hard protection of a kind of high-rise building Core Walls Structure hangs integrated system with row | |
CN109162437B (en) | Integral steel platform for multi-cylinder steel plate shear wall and construction method thereof | |
CN205444975U (en) | Large -scale room lid steel construction construction braced system with view platform | |
CN104878867A (en) | Ceiling joist and double-layer construction platform integrated structure and manufacturing method thereof | |
CN202731104U (en) | Novel reinforcing mesh sheet support structure | |
CN206814241U (en) | A kind of steel construction elevator ready-package corridor | |
CN107010517A (en) | A kind of steel construction elevator uses ready-package corridor | |
CN105625732B (en) | Superelevation overhanging steel structure truss support free construction method | |
CN208965581U (en) | A kind of non-console mode tower crane platform | |
CN103993739A (en) | Method for constructing stiff beam of spraying layer of prilling tower | |
CN104652853B (en) | Quick lifting installation building structure | |
CN203795459U (en) | Foundation structure of tower crane for high-altitude roofs | |
CN103669817B (en) | Building structure overhanging scaffold external corner assembling type frame body device | |
CN201687083U (en) | Suspension type template supporting structure with high-position integrated structure | |
CN211473320U (en) | Tool type external hanging rack for corridor | |
CN205777531U (en) | Floor slab construction beam string shuttering supporting equipment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170804 |