CN206814241U - A kind of steel construction elevator ready-package corridor - Google Patents
A kind of steel construction elevator ready-package corridor Download PDFInfo
- Publication number
- CN206814241U CN206814241U CN201720669965.9U CN201720669965U CN206814241U CN 206814241 U CN206814241 U CN 206814241U CN 201720669965 U CN201720669965 U CN 201720669965U CN 206814241 U CN206814241 U CN 206814241U
- Authority
- CN
- China
- Prior art keywords
- corridor
- framework
- fixed
- fixing hole
- package
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 16
- 239000010959 steel Substances 0.000 title claims abstract description 16
- 238000010276 construction Methods 0.000 title claims abstract description 13
- 230000015572 biosynthetic process Effects 0.000 claims abstract description 4
- 230000009286 beneficial effect Effects 0.000 abstract description 2
- 238000009434 installation Methods 0.000 abstract description 2
- 238000005034 decoration Methods 0.000 description 5
- 239000000725 suspension Substances 0.000 description 3
- 230000013011 mating Effects 0.000 description 2
- 238000010586 diagram Methods 0.000 description 1
- 230000005611 electricity Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000012946 outsourcing Methods 0.000 description 1
- 239000002994 raw material Substances 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- 239000000126 substance Substances 0.000 description 1
Landscapes
- Steps, Ramps, And Handrails (AREA)
- Types And Forms Of Lifts (AREA)
- Lift-Guide Devices, And Elevator Ropes And Cables (AREA)
Abstract
A kind of steel construction elevator ready-package corridor is the utility model is related to, includes corridor framework(11), it is characterised in that:In base cross members(2)Between be provided with buttress brace(17), buttress brace(17)Upper fixed stiffening angle(4), stiffening angle(4)Above mat formation bottom plate(3), corridor framework(11)Four angles of one side on fixed plate is respectively welded(5), fixed plate(5)On be provided with fixing hole(10), upper longitudinal(7)Upper welded suspending hook(9), with relative corridor framework(11)The angle of another side four on be furnished with corridor fixed support(13), corridor fixed support(13)It is provided with fixing hole(16), described corridor framework(11)Upper and lower, left and right on the outside of be fixed with balustrade exterior panelling(12).The utility model is easy to Fast Installation, substantially reduces the construction period of whole project, goes on a journey and lives as early as possible beneficial to resident.
Description
Technical field
The utility model category technical field of elevator equipment, more particularly to a kind of steel construction elevator ready-package corridor.
Background technology
For the corridor used between steel construction elevator and building, general site operation mode is welded for raw material, weldering
Connecing and finish outsourcing external decoration again, the engineering time at general corridor scene is 3-5 days, and the time that multiple corridors need is longer,
The cycle of whole project has so been spun out, has been unfavorable for the trip and life of resident.
The content of the invention
The purpose of this utility model is to provide a kind of steel construction elevator ready-package corridor.The purpose of this utility model is this
What sample was realized:A kind of steel construction elevator ready-package corridor, includes corridor framework, and corridor framework includes base longerons, bottom
Portion's crossbeam, middle vertical beam, upper longitudinal, upper beam are formed, it is characterised in that:Buttress brace is provided between base cross members, is added
Stiffening angle is fixed on brutal, bottom plate of mating formation above stiffening angle, is respectively welded on four angles of one side of corridor framework solid
Fixed board, is provided with fixing hole in fixed plate, matches somebody with somebody on upper longitudinal on welded suspending hook, with the angle of another side four of relative corridor framework
There is corridor fixed support, corridor fixed support is provided with fixing hole, is fixed with the outside of the upper and lower, left and right of described corridor framework
Balustrade exterior panelling.
The utility model is easy to Fast Installation, substantially reduces the construction period of whole project, is gone on a journey as early as possible beneficial to resident
And life.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model;
Fig. 2 is the structural representation that the utility model removes external decoration;
Fig. 3 is structural representation of the utility model with external decoration;
Fig. 4 is zoomed-in view at A in Fig. 2.
In figure, 1, base longerons, 2, base cross members, 3, bottom plate, 4, stiffening angle, 5 fixed plates, 6, middle vertical beam, 7, on
Portion crossbeam A, 8, upper beam, 9, suspension hook, 10, fixing hole, 11, corridor framework, 12, balustrade exterior panelling, 13, corridor fixed support,
14th, band steel structure elevator, 15, building, 16, fixing hole, 17, buttress brace.
Embodiment:
Described with reference to diagram:
A kind of steel construction elevator ready-package corridor, includes corridor framework 11, and corridor framework 11 includes base longerons
1st, base cross members 2, middle vertical beam 6, upper longitudinal 7, upper beam 8 are formed, it is characterised in that:It is provided between base cross members 2
Buttress brace 17, stiffening angle 4 is fixed on buttress brace 17, bottom plate 3 of mating formation above stiffening angle 4, the one side of corridor framework 11
Fixed plate 5 is respectively welded on four angles, is provided with fixing hole 10 in fixed plate 5, welded suspending hook 9 on upper longitudinal 7, with relative corridor
It is furnished with corridor fixed support 13 on the angle of another side four of framework 11, corridor fixed support 13 is provided with fixing hole 16, described
Corridor framework 11 upper and lower, left and right on the outside of be fixed with balustrade exterior panelling 12.
Corridor framework 11 of the present utility model is to weld to complete in inside plants, outside the upper and lower, left and right of corridor framework 11
Side is fixed with external decoration 12 and completed in inside plants, and such corridor framework 11 and external decoration 12 constitute a kind of steel construction electricity
Ladder uses ready-package corridor, and for there is the project of certain distance between band steel structure elevator 14 and building 15, scene only needs handle
The fixing hole 16 of corridor fixed support 13 is fixed on building 15 with chemical anchor bolts, then a kind of steel construction elevator ready-package
Corridor is lifted by suspension hook 9, is put on corridor fixed support 13, is secured it to bolt on corridor fixed support 13, so
The fixing hole 10 of corridor framework 11, which is bolted on band steel structure elevator 14, afterwards can complete to install, such a steel knot
Structure elevator ready-package corridor becomes a kind of corridor that a kind of band steel structure elevator 14 walks to building 15.Wherein corridor frame
On frame 11 and corridor framework 11 by base longerons 1, base cross members 2, bottom plate 3, stiffening angle 4, fixed plate 5, middle vertical beam 6,
Upper longitudinal 7, upper beam 8, suspension hook 9 and buttress brace 17 are welded in inside plants and completed, and various horizontal, vertical beams are by square clod wash
Hollow section is formed.
Claims (1)
1. a kind of steel construction elevator ready-package corridor, includes corridor framework(11), corridor framework(11)Include bottom to indulge
Beam(1), base cross members(2), middle vertical beam(6), upper longitudinal(7), upper beam(8)Form, it is characterised in that:In bottom transverse
Beam(2)Between be provided with buttress brace(17), buttress brace(17)Upper fixed stiffening angle(4), stiffening angle(4)Above mat formation bottom plate
(3), corridor framework(11)Four angles of one side on fixed plate is respectively welded(5), fixed plate(5)On be provided with fixing hole(10),
Upper longitudinal(7)Upper welded suspending hook(9), with relative corridor framework(11)The angle of another side four on be furnished with corridor fixed support
(13), corridor fixed support(13)It is provided with fixing hole(16), described corridor framework(11)Upper and lower, left and right on the outside of it is fixed
There is balustrade exterior panelling(12).
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201720669965.9U CN206814241U (en) | 2017-06-10 | 2017-06-10 | A kind of steel construction elevator ready-package corridor |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201720669965.9U CN206814241U (en) | 2017-06-10 | 2017-06-10 | A kind of steel construction elevator ready-package corridor |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN206814241U true CN206814241U (en) | 2017-12-29 |
Family
ID=60759580
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201720669965.9U Expired - Fee Related CN206814241U (en) | 2017-06-10 | 2017-06-10 | A kind of steel construction elevator ready-package corridor |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN206814241U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN107010517A (en) * | 2017-06-10 | 2017-08-04 | 山东富士制御电梯有限公司 | A kind of steel construction elevator uses ready-package corridor |
-
2017
- 2017-06-10 CN CN201720669965.9U patent/CN206814241U/en not_active Expired - Fee Related
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN107010517A (en) * | 2017-06-10 | 2017-08-04 | 山东富士制御电梯有限公司 | A kind of steel construction elevator uses ready-package corridor |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN105143570B (en) | Building structure and construction method thereof | |
| CN204311719U (en) | External hanging type scaffold | |
| CN204126230U (en) | Assembly scaffold unit | |
| CN104831939A (en) | Bolt ball welding ball mixed node large span cantilever grid structure construction method | |
| CN103015706A (en) | System for lifting elevator shaft mold and construction method for cast-in-place wall of elevator shaft | |
| CN214117105U (en) | Peripheral dado of prefabricated lightweight concrete | |
| CN106760073A (en) | Assembly concrete lining structural assembly | |
| CN204001652U (en) | The portable exterior wall operating platform of fabricated shear wall structure | |
| CN102888957A (en) | Prefabricated light slab stair | |
| CN206814241U (en) | A kind of steel construction elevator ready-package corridor | |
| JP4235079B2 (en) | Structure of joint between reinforced concrete column and steel beam | |
| CN204728554U (en) | Integral structure of ceiling keel and double-layer construction platform | |
| CN103993739A (en) | Method for constructing stiff beam of spraying layer of prilling tower | |
| CN103112766A (en) | Construction elevator suspending over basement roof of building and construction method thereof | |
| CN110965757A (en) | Scaffold applicable to wall with flanging structure and construction method thereof | |
| CN206477589U (en) | A kind of live 3D builds the rack construction of printer | |
| CN206289739U (en) | A kind of energy-conservation steel construction unit and steel structures coating | |
| CN104499565A (en) | Assembled balcony | |
| CN107010517A (en) | A kind of steel construction elevator uses ready-package corridor | |
| CN209384578U (en) | A kind of hoistway with steel structure | |
| CN209293173U (en) | Module-type steel structure trestle external verandahs | |
| CN202831440U (en) | Precast light plate type stair | |
| CN117027352A (en) | Large-span high altitude vestibule curtain wall construction operation platform | |
| CN205935352U (en) | Building carrier plate is from formwork | |
| CN103469892A (en) | Primary and secondary module unit combination structure of high-rise module building space and connection method thereof |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20171229 Termination date: 20190610 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |