CN106996080B - Bridge guardrail glass installation device and its construction method - Google Patents

Bridge guardrail glass installation device and its construction method Download PDF

Info

Publication number
CN106996080B
CN106996080B CN201710173149.3A CN201710173149A CN106996080B CN 106996080 B CN106996080 B CN 106996080B CN 201710173149 A CN201710173149 A CN 201710173149A CN 106996080 B CN106996080 B CN 106996080B
Authority
CN
China
Prior art keywords
glass
guardrail
clip slot
angular wheel
rotation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710173149.3A
Other languages
Chinese (zh)
Other versions
CN106996080A (en
Inventor
徐良
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Wanlian Mechanical Engineering Co.,Ltd.
Original Assignee
Wu Zengjin
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wu Zengjin filed Critical Wu Zengjin
Priority to CN201810924029.7A priority Critical patent/CN108867363B/en
Priority to CN201710173149.3A priority patent/CN106996080B/en
Priority to CN201810924042.2A priority patent/CN108867364B/en
Publication of CN106996080A publication Critical patent/CN106996080A/en
Application granted granted Critical
Publication of CN106996080B publication Critical patent/CN106996080B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/10Railings; Protectors against smoke or gases, e.g. of locomotives; Maintenance travellers; Fastening of pipes or cables to bridges
    • E01D19/103Parapets, railings ; Guard barriers or road-bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Abstract

Bridge guardrail glass installation device and its construction method, including car body, the vehicle bottom is equipped with movable pulley, the front of car body is equipped with mobile handrail, it is characterized in that: being equipped with glass guardrail storage bed and glass guardrail delivery platform on the car body side by side, the exit side of the glass guardrail delivery platform is equipped with glass guardrail construction mechanism;Compared with prior art, the invention has the advantages that the present apparatus is designed by reasonable structure, can need to guardrail glass to be mounted be automatically transferred to installation station work construction personnel installation, a people or two people can complete construction operation, manpower is saved, is suitble to promote the use of.

Description

Bridge guardrail glass installation device and its construction method
Technical field
The invention belongs to civic building Construction Technology fields, and in particular to a kind of Bridge guardrail glass installation device and Its construction method.
Background technique
Glass guardrail is to be equipped with the guardrail of the other materials structure such as metal, wooden using glass as plane materiel.Glass guardrail appearance Top grade, colour-fast, sturdy and durable, excellent in cushion effect, long service life, production is simple, easy for installation, and maintenance cost is low, easy Cleaning.Good glass guardrail is made of high quality zinc steel alloy, by tempered glass and balcony perfect combination, does not lose security performance, Tempered glass is embedded in aluminium alloy groove, stability, and wind resistance is good.Since glass is both decoration in glass guardrail construction Component is primary structure member again, need to have safeguard function and can bear the external forces such as to push away, lean on, squeeze, therefore should use safety glass, mesh Preceding to use tempered glass, wire glass, interlayer tempered glass and interlayer wire glass etc., gauge thickness is no less than 12mm more.
A kind of guardrail glass special connecting piece is disclosed application No. is CN204098378U such as one, including first face and the Two faces, two sides connect into the connector ontology that a right angle is L shape, and first face is far from connector ontology right angle Equipped with the first connection screw thread hole, it is equipped with the second segmental arc by the center of circle of connection screw thread hole, is equipped with close to connector ontology right angle First segmental arc symmetrical above and below, each equal rounding off in junction, second face are equipped with the second connecting hole, and are kidney-shaped Hole is being equipped with third segmental arc, junction rounding off far from connector ontology right angle.
For another example one application No. is CN105908617A to disclose a kind of glass guardrail double-layer cable support system overpass Structure, the structure combine upper prestressed cable, lower prestress drag-line with guardrail glass panel, bridge floor glass plate, pass through shield Column glass panel Transfer of Shear constitutes novel overline bridge support system together with prestressed cable, not only reasonable stress but also light and handy beauty; Guardrail glass plate is through prefabricated node fastener fixing between upper prestressed cable, lower prestress drag-line, and guardrail glass plate was both It can be used as a day bridge protective railings, while bearing carrier Transfer of Shear can be also served as again;Bridge floor glass plate passes through L shape connector and two The lower part of side rail glass panel is connected.Such new structure circulates permeability, and ornamental value and stress function are in one, thus in city It has broad application prospects in the construction of city's overhead pedestrian crossing.
Guardrail glass is widely applied in many municipal bridges, is in when installation due to appearance looks elegant Original installation, by more people's scaffolds, so very waste of manpower, while speed of application is slow, while if accidentally, glass also may be used It can be smashed.
Summary of the invention
The present invention is directed to disadvantage mentioned above, based on solving slow existing guardrail installation speed, waste of manpower and easy to damage The problem of.A kind of Bridge guardrail glass installation device and its construction method are proposed, the device and construction method can be accurately fast The guardrail of bridge is installed by speed, while a people or two people only being needed to operate, and since glass is fixed, is not in The case where damage.
To achieve the purpose of the present invention, the technical solution adopted by the present invention is that:
Bridge guardrail glass installation device, including car body, the vehicle bottom are equipped with movable pulley, and the front of car body is equipped with Mobile handrail, it is characterized in that: glass guardrail storage bed and glass guardrail delivery platform are installed side by side on the car body, the glass The exit side of glass guardrail delivery platform is equipped with glass guardrail construction mechanism;
The glass guardrail delivery platform includes the uniformly distributed glass emplacing platform laid, and the two sides of the glass emplacing platform are equipped with Glass clip slot is equipped with flute profile movable block between the glass emplacing platform below glass clip slot;The lower section of the flute profile movable block is also It is engaged with itself equipped with rack gear caterpillar chain;The two sides of the rack gear caterpillar chain are separately installed with front propeller shaft and inter-axle shaft, Angular wheel one and angular wheel two are separately installed on front propeller shaft and inter-axle shaft;
Motor is laid in the bottom of glass guardrail delivery platform, and motor is equipped with by driving shaft and is nibbled with one phase of angular wheel The angular wheel three of conjunction;Motor is equipped with the angular wheel four being meshed with angular wheel two by gear-driven driven shaft; The motor drives intermeshing angular wheel three and angular wheel one, angular wheel four and angular wheel two to revolve by rotation Turn that front propeller shaft and inter-axle shaft rotation is driven to make rack gear caterpillar chain that flute profile movable block be driven to do forward or move backward;
The glass guardrail construction mechanism includes pedestal, and the pedestal is equipped with sliding slot, and movable stand is mounted in sliding slot, institute Installation rotation boom on movable stand is stated, one end of telescopic joint is connect with rotation boom, and the two junction is equipped with gimbal structure; The other end of the telescopic joint is equipped with grillage, and sucker is uniformly laid in the quadrangle of grillage;The shifting that vacuum pump is mounted on the base Between moving frame, it is connected between vacuum pump and sucker and vacuumizes suction pipe.
Preferentially, the discharge end of the glass guardrail delivery platform is also equipped with slope sliding slot.
Preferentially, it is also equipped with above the telescopic joint and manually adjusts rotating disk;
Preferentially, rubber pad is also equipped in the glass clip slot, the side of vacuum pump is equipped with suction pump, and suction pump is logical It crosses water pipe and is connected with hydraulic giant, hydraulic giant hanger is also equipped on the movable stand.
Based on above-mentioned apparatus, the present invention also proposes a kind of Bridge guardrail glass construction method of installation, which is characterized in that including Following steps:
1) glass is evenly distributed with to be placed in above glass guardrail storage bed and is stored, it is anti-that partition is placed between glass and glass Only clashing and breaking;
2) car body is passed through mobile handrail promotion to proceed at guardrail construction, by manually will be above glass guardrail storage bed Glass be placed in glass clip slot;
3) drive front propeller shaft and inter-axle shaft rotation that rack gear caterpillar chain is made to drive flute profile mobile by motor rotary drive Block moves forward, and glass in glass clip slot is made to enter station;
4) swivel mount armband moves glass and the contact that sucker alignment enters station, in the process: glass in glass clip slot Slope sliding slot constantly is advanced into, vacuum pump, which constantly vacuumizes, makes sucker that glass be sucked, when glass clip slot enters slope sliding slot When most beneath, glass clip slot and glass are detached from, and glass is sucked in sucker;
5) the dynamic sucker that glass is sucked of swivel mount armband rotates 180 °, and glass is made to rotate to installation station;By manually adjusting Position and the amplitude for saving glass, glass is mounted on the fastener of guardrail;
6) step 2) -5 is constantly repeated) glass in glass clip slot is installed, it is driven later by motor by glass Clip slot drive retracts progress in situ and places glass operation again, and successively constructs, until all glass are installed.
Compared with prior art, it the invention has the advantages that the present apparatus is designed by reasonable structure, can will need to pacify The guardrail glass of dress is automatically transferred to installation station work construction personnel installation, and a people or two people can complete construction operation, Manpower is saved, is suitble to promote the use of.
Detailed description of the invention
Brief description is next carried out to the present invention by means of the attached drawing of embodiment now.In attached drawing:
Fig. 1 shows Bridge guardrail glass installation device construction schematic diagram;
Fig. 2 shows the structure charts of Bridge guardrail glass installation device of the present invention;
Fig. 3 shows the structural schematic diagram of glass guardrail construction mechanism;
Fig. 4 shows the schematic diagram of glass guardrail delivery platform of the present invention;
Fig. 5 shows the further disassembly diagram of Fig. 4.
Specific embodiment
The present invention is described in detail combined with specific embodiments below.Following embodiment will be helpful to the technology of this field Personnel further understand the present invention, but the invention is not limited in any way.It should be pointed out that the ordinary skill of this field For personnel, without departing from the inventive concept of the premise, various modifications and improvements can be made.These belong to the present invention Protection scope.
Embodiment 1
Bridge guardrail glass installation device, including car body 100, the vehicle bottom are equipped with movable pulley 6, the front of car body Equipped with mobile handrail 9, glass guardrail storage bed 7 and glass guardrail delivery platform 200, institute are installed side by side on the car body 100 The exit side for stating glass guardrail delivery platform 200 is equipped with glass guardrail construction mechanism 300.
Glass guardrail delivery platform 200 includes the glass emplacing platform 31 uniformly laid, the two sides of the glass emplacing platform 31 Equipped with glass clip slot 21, being also equipped with rubber pad in glass clip slot 21 prevents glass from damaging.The two sides installation of glass clip slot 21 Baffle is equipped with flute profile movable block 22 between the glass emplacing platform 31 of the lower section of glass clip slot 21;Under the flute profile movable block 22 Side is additionally provided with rack gear caterpillar chain 20 and engages with itself;The two sides of the rack gear caterpillar chain 20 are separately installed with 27 He of front propeller shaft Angular wheel 1 and angular wheel 2 40 are separately installed on inter-axle shaft 24, front propeller shaft 27 and inter-axle shaft 24.Glass The discharge end of guardrail delivery platform 200 is also equipped with slope sliding slot 19.
Motor 25 is laid in the bottom of glass guardrail delivery platform 200, and motor 25 is equipped with by driving shaft and conical tooth Take turns one 28 angular wheels 3 29 being meshed;Motor 25 is equipped with and 2 40 phase of angular wheel by gear-driven driven shaft 23 The angular wheel 4 26 of engagement;The motor 25 drives intermeshing angular wheel 3 29 and angular wheel one by rotation 28, angular wheel 4 26 and the rotation of angular wheel 2 40 are to drive front propeller shaft 27 and the rotation of inter-axle shaft 24 to make rack gear crawler belt Chain 20 drives flute profile movable block 22 to do forward or move backward.
Glass guardrail construction mechanism 300 includes pedestal 41, and the pedestal 41 is equipped with sliding slot 10, and movable stand 301 is mounted on In sliding slot 10, one end of installation rotation boom 14 on the movable stand 301, telescopic joint 16 is connect with rotation boom 14, and the two connects The place of connecing is equipped with gimbal structure 18;The effect of gimbal structure 18 is manually to be finely tuned in glass installation to glass, is made Glass is in suitable installation site.The other end of the telescopic joint 16 is equipped with grillage 11, and sucker 12 is uniformly laid in grillage 11 quadrangle;Spring is laid in telescopic joint 16, such telescopic joint 16 just has elasticity, when telescopic joint 16 drives sucker 12 to contact Have buffering when glass, will not say that glass is broken.Vacuum pump 5 is mounted between the movable stand 301 on pedestal 41, vacuum pump It is connected between 5 and sucker 12 and vacuumizes suction pipe.Telescopic joint 16 is also equipped with manually adjusts rotating disk 13 above.
Based on above-mentioned apparatus, the present invention also proposes a kind of Bridge guardrail glass construction method of installation, which is characterized in that including Following steps:
1) glass 2 is uniformly placed in glass guardrail storage bed 7 to store above, partition is placed between glass and glass Prevent clashing and breaking;
2) car body 100 is passed through the mobile promotion of handrail 9 to proceed at guardrail construction, by manually by glass guardrail storage bed Glass above 7 is placed in glass clip slot 21;
3) front propeller shaft 27 and the rotation of inter-axle shaft 24 is driven to drive rack gear caterpillar chain 20 by 25 rotary drive of motor Flute profile movable block 22 moves forward, and glass in glass clip slot 21 is made to enter station;
4) rotation boom 14 drives the alignment of sucker 12 to enter the glass 2 of station and contacts, in the process: glass clip slot 21 Interior glass constantly advances into slope sliding slot 19, and vacuum pump 5, which constantly vacuumizes, makes sucker 12 that glass be sucked, when glass clip slot 21 into When entering most beneath to slope sliding slot 19, glass clip slot 21 and glass are detached from, and glass is sucked in sucker 12;
5) rotation boom 14 drives the sucker 12 that glass is sucked to rotate 180 °, and glass is made to rotate to installation station;Pass through people Work adjusts position and the amplitude of glass, glass is mounted on the fastener of guardrail 1;
6) step 2) -5 is constantly repeated) glass in glass clip slot 21 is installed, being driven later by motor 25 will The drive of glass clip slot 21 retracts it is in situ carry out placing glass operation again, and successively construct, until all glass be installed for Only.
Embodiment 2
Bridge guardrail glass installation device, including car body 100, the vehicle bottom are equipped with movable pulley 6, the front of car body Equipped with mobile handrail 9, glass guardrail storage bed 7 and glass guardrail delivery platform 200, institute are installed side by side on the car body 100 The exit side for stating glass guardrail delivery platform 200 is equipped with glass guardrail construction mechanism 300.
Glass guardrail delivery platform 200 includes the glass emplacing platform 31 uniformly laid, the two sides of the glass emplacing platform 31 Equipped with glass clip slot 21, being also equipped with rubber pad in glass clip slot 21 prevents glass from damaging.The two sides installation of glass clip slot 21 Baffle is equipped with flute profile movable block 22 between the glass emplacing platform 31 of the lower section of glass clip slot 21;Under the flute profile movable block 22 Side is additionally provided with rack gear caterpillar chain 20 and engages with itself;The two sides of the rack gear caterpillar chain 20 are separately installed with 27 He of front propeller shaft Angular wheel 1 and angular wheel 2 40 are separately installed on inter-axle shaft 24, front propeller shaft 27 and inter-axle shaft 24.Glass The discharge end of guardrail delivery platform 200 is also equipped with slope sliding slot 19.
Motor 25 is laid in the bottom of glass guardrail delivery platform 200, and motor 25 is equipped with by driving shaft and conical tooth Take turns one 28 angular wheels 3 29 being meshed;Motor 25 is equipped with and 2 40 phase of angular wheel by gear-driven driven shaft 23 The angular wheel 4 26 of engagement;The motor 25 drives intermeshing angular wheel 3 29 and angular wheel one by rotation 28, angular wheel 4 26 and the rotation of angular wheel 2 40 are to drive front propeller shaft 27 and the rotation of inter-axle shaft 24 to make rack gear crawler belt Chain 20 drives flute profile movable block 22 to do forward or move backward.
Glass guardrail construction mechanism 300 includes pedestal 41, and the pedestal 41 is equipped with sliding slot 10, and movable stand 301 is mounted on In sliding slot 10, one end of installation rotation boom 14 on the movable stand 301, telescopic joint 16 is connect with rotation boom 14, and the two connects The place of connecing is equipped with gimbal structure 18;The effect of gimbal structure 18 is manually to be finely tuned in glass installation to glass, is made Glass is in suitable installation site.The other end of the telescopic joint 16 is equipped with grillage 11, and sucker 12 is uniformly laid in grillage 11 quadrangle;Spring is laid in telescopic joint 16, such telescopic joint 16 just has elasticity, when telescopic joint 16 drives sucker 12 to contact Have buffering when glass, will not say that glass is broken.Vacuum pump 5 is mounted between the movable stand 301 on pedestal 41, vacuum pump It is connected between 5 and sucker 12 and vacuumizes suction pipe.Telescopic joint 16 is also equipped with manually adjusts rotating disk 13 above.
The side of vacuum pump 5 is equipped with suction pump 51, and suction pump 51 is connected with hydraulic giant 52, the movable stand by water pipe Hydraulic giant hanger 53 is also equipped on 301.After glass is installed, dust is had above, by the way that suction pump 51 is connected water Source, and the glass being installed is cleaned by hydraulic giant 52.
Based on above-mentioned apparatus, the present invention also proposes a kind of Bridge guardrail glass construction method of installation, which is characterized in that including Following steps:
1) glass 2 is uniformly placed in glass guardrail storage bed 7 to store above, partition is placed between glass and glass Prevent clashing and breaking;
2) car body 100 is passed through the mobile promotion of handrail 9 to proceed at guardrail construction, by manually by glass guardrail storage bed Glass above 7 is placed in glass clip slot 21, while suction pump 51 is connected water source;
3) front propeller shaft 27 and the rotation of inter-axle shaft 24 is driven to drive rack gear caterpillar chain 20 by 25 rotary drive of motor Flute profile movable block 22 moves forward, and glass in glass clip slot 21 is made to enter station;
4) rotation boom 14 drives the alignment of sucker 12 to enter the glass 2 of station and contacts, in the process: glass clip slot 21 Interior glass constantly advances into slope sliding slot 19, and vacuum pump 5, which constantly vacuumizes, makes sucker 12 that glass be sucked, when glass clip slot 21 into When entering most beneath to slope sliding slot 19, glass clip slot 21 and glass are detached from, and glass is sucked in sucker 12;
5) rotation boom 14 drives the sucker 12 that glass is sucked to rotate 180 °, and glass is made to rotate to installation station;Pass through people Work adjusts position and the amplitude of glass, glass is mounted on the fastener of guardrail 1, and the starting of suction pump 51 is drawn water, while passing through water Rifle 52 cleans glass;
6) step 2) -5 is constantly repeated) glass in glass clip slot 21 is installed, being driven later by motor 25 will The drive of glass clip slot 21 retracts it is in situ carry out placing glass operation again, and successively construct, until all glass be installed for Only.

Claims (4)

1. Bridge guardrail glass installation device, including car body (100), the vehicle bottom are equipped with movable pulley (6), before car body Side is equipped with mobile handrail (9), it is characterized in that: being equipped with glass guardrail storage bed (7) and glass shield on the car body (100) side by side The exit side of column delivery platform (200), the glass guardrail delivery platform (200) is equipped with glass guardrail construction mechanism (300);
The glass guardrail delivery platform (200) includes the uniformly distributed glass emplacing platform (31) laid, the glass emplacing platform (31) Two sides be equipped with glass clip slot (21), flute profile movable block is installed between the glass emplacing platform (31) below glass clip slot (21) (22);Rack gear caterpillar chain (20) is additionally provided with below the flute profile movable block (22) to engage with itself;The rack gear caterpillar chain (20) two sides are separately installed with front propeller shaft (27) and inter-axle shaft (24), divide on front propeller shaft (27) and inter-axle shaft (24) Angular wheel one (28) and angular wheel two (40) are not installed;
Motor (25) is laid in the bottom of glass guardrail delivery platform (200), and motor (25) is equipped with by driving shaft and taper The angular wheel three (29) that gear one (28) is meshed;Motor (25) is equipped with by gear-driven driven shaft (23) and taper The angular wheel four (26) that gear two (40) is meshed;The motor (25) drives intermeshing angular wheel three by rotation (29) and angular wheel one (28), angular wheel four (26) and angular wheel two (40) rotation to drive front propeller shaft (27) and Inter-axle shaft (24) rotation makes rack gear caterpillar chain (20) that flute profile movable block (22) to be driven to do forward or move backward;
The glass guardrail construction mechanism (300) includes pedestal (41), and the pedestal (41) is equipped with sliding slot (10), movable stand (301) it is mounted in sliding slot (10), installation rotation boom (14), one end of telescopic joint (16) and rotation on the movable stand (301) Rotating rack arm (14) connection, the two junction is equipped with gimbal structure (18);The other end of the telescopic joint (16) is equipped with plate Frame (11), sucker (12) are uniformly laid in the quadrangle of grillage (11);Vacuum pump (5) is mounted on the movable stand on pedestal (41) (301) it between, is connected between vacuum pump (5) and sucker (12) and vacuumizes suction pipe.
2. Bridge guardrail glass installation device according to claim 1, characterized in that the glass guardrail delivery platform (200) discharge end is also equipped with slope sliding slot (19).
3. Bridge guardrail glass installation device according to claim 1, characterized in that the telescopic joint (16) is also pacified above Equipped with manually adjusting rotating disk (13).
4. a kind of construction method using Bridge guardrail glass installation device as described in claim 1, which is characterized in that including Following steps:
1) by glass (2) be uniformly placed in glass guardrail storage bed (7) above store, between glass and glass place every Plate prevents clashing and breaking;
2) car body (100) are passed through mobile handrail (9) promotion to proceed at guardrail construction, by manually by glass guardrail storage bed (7) glass above is placed in glass clip slot (21);
3) front propeller shaft (27) and inter-axle shaft (24) rotation are driven to make rack gear caterpillar chain (20) by motor (25) rotary drive It drives flute profile movable block (22) to move forward, glass clip slot (21) interior glass is made to enter station;
4) rotation boom (14) drives sucker (12) alignment to enter the glass (2) of station and contacts, in the process: glass clip slot (21) interior glass constantly advances into slope sliding slot (19), and vacuum pump (5), which constantly vacuumizes, makes sucker (12) that glass be sucked, and works as glass Glass clip slot (21) enter slope sliding slot (19) it is most beneath when, glass clip slot (21) and glass are detached from, and glass is sucked in sucker (12);
5) rotation boom (14) drives the sucker (12) that glass is sucked to rotate 180 °, and glass is made to rotate to installation station;Pass through people Work adjusts position and the amplitude of glass, glass is mounted on the fastener of guardrail (1);
6) step 2-5 is constantly repeated) glass in glass clip slot (21) is installed, being driven later by motor (25) will Glass clip slot (21) drive retracts progress in situ and places glass operation again, and successively constructs, until all glass are installed Until.
CN201710173149.3A 2017-03-22 2017-03-22 Bridge guardrail glass installation device and its construction method Active CN106996080B (en)

Priority Applications (3)

Application Number Priority Date Filing Date Title
CN201810924029.7A CN108867363B (en) 2017-03-22 2017-03-22 Bridge guardrail glass installation device and its construction method
CN201710173149.3A CN106996080B (en) 2017-03-22 2017-03-22 Bridge guardrail glass installation device and its construction method
CN201810924042.2A CN108867364B (en) 2017-03-22 2017-03-22 Bridge guardrail glass installation device and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710173149.3A CN106996080B (en) 2017-03-22 2017-03-22 Bridge guardrail glass installation device and its construction method

Related Child Applications (2)

Application Number Title Priority Date Filing Date
CN201810924029.7A Division CN108867363B (en) 2017-03-22 2017-03-22 Bridge guardrail glass installation device and its construction method
CN201810924042.2A Division CN108867364B (en) 2017-03-22 2017-03-22 Bridge guardrail glass installation device and its construction method

Publications (2)

Publication Number Publication Date
CN106996080A CN106996080A (en) 2017-08-01
CN106996080B true CN106996080B (en) 2019-07-05

Family

ID=59431008

Family Applications (3)

Application Number Title Priority Date Filing Date
CN201810924042.2A Active CN108867364B (en) 2017-03-22 2017-03-22 Bridge guardrail glass installation device and its construction method
CN201710173149.3A Active CN106996080B (en) 2017-03-22 2017-03-22 Bridge guardrail glass installation device and its construction method
CN201810924029.7A Active CN108867363B (en) 2017-03-22 2017-03-22 Bridge guardrail glass installation device and its construction method

Family Applications Before (1)

Application Number Title Priority Date Filing Date
CN201810924042.2A Active CN108867364B (en) 2017-03-22 2017-03-22 Bridge guardrail glass installation device and its construction method

Family Applications After (1)

Application Number Title Priority Date Filing Date
CN201810924029.7A Active CN108867363B (en) 2017-03-22 2017-03-22 Bridge guardrail glass installation device and its construction method

Country Status (1)

Country Link
CN (3) CN108867364B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110952455A (en) * 2019-12-05 2020-04-03 河南大学 Intelligent auxiliary robot for installing bridge guardrail

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112554101B (en) * 2020-12-07 2022-06-14 泉州台商投资区庆旺科技有限公司 Automatic guardrail mounting machine
CN112832495B (en) * 2021-01-12 2022-03-25 河北建设集团股份有限公司 Construction device for installing glass partition plate

Family Cites Families (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1391907A (en) * 1971-05-07 1975-04-23 Redpath Dorman Long Ltd Method of and apparatus for moving a span or section of a bridge
CN201471426U (en) * 2009-07-08 2010-05-19 江门市科杰机械自动化有限公司 Workpiece tray used for glass processing
CN201761668U (en) * 2010-06-18 2011-03-16 安徽凤阳玻璃有限公司 Glass packaging paper-laying holder with movable guardrail
IT1401339B1 (en) * 2010-07-30 2013-07-18 Piazza PERFECT EQUIPMENT FOR HANDLING SINGLE OR IN PACKAGE PRODUCTS
CN203255732U (en) * 2013-01-18 2013-10-30 齐泰军 Trackless glass sheet feeding and discharging machine
KR20150011888A (en) * 2013-07-24 2015-02-03 성영주 Balcony window with hidden openable guardrails
CN203742101U (en) * 2014-02-08 2014-07-30 万达文化旅游规划研究院有限公司 Pop-up glass guard bar
CN204057226U (en) * 2014-08-29 2014-12-31 山东鑫泽装饰工程有限公司 Glass transfer sucker machine
CN105059936A (en) * 2015-08-06 2015-11-18 重庆重玻节能玻璃有限公司 Glass sucker device
CN205043718U (en) * 2015-09-08 2016-02-24 广州福耀玻璃有限公司 Glass card strip installation device
CN105458656A (en) * 2016-01-07 2016-04-06 安徽江淮汽车股份有限公司 Glass conveying and mounting device
CN205532041U (en) * 2016-01-27 2016-08-31 浙江湖州市建工集团装饰有限公司 A cavity glass structure for architectural decoration
CN205634182U (en) * 2016-05-11 2016-10-12 聊城巨龙新能源车业有限公司 Window glass installs frock
CN106042848B (en) * 2016-06-06 2018-06-29 安徽安凯汽车股份有限公司 A kind of car windshield installation device
CN106044224A (en) * 2016-06-27 2016-10-26 浙江飞越洁具制造有限公司 Glass sucking disc sliding device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110952455A (en) * 2019-12-05 2020-04-03 河南大学 Intelligent auxiliary robot for installing bridge guardrail

Also Published As

Publication number Publication date
CN108867363B (en) 2019-11-22
CN108867363A (en) 2018-11-23
CN108867364A (en) 2018-11-23
CN106996080A (en) 2017-08-01
CN108867364B (en) 2019-11-19

Similar Documents

Publication Publication Date Title
CN106996080B (en) Bridge guardrail glass installation device and its construction method
CN105442884A (en) Rail-mounted vertical circulating three-dimensional garage
CN110904895A (en) Highway bridge railing cleaning equipment based on vehicle
CN212056853U (en) Lighting device for construction
CN210315220U (en) Municipal administration bridge is with adjustable rail guard
CN209990195U (en) Construction of wisdom city is with multi-functional management pavilion
CN201730624U (en) Construction work vehicle for subway region tunnel
CN208749063U (en) A kind of mobile job platform of underground chamber abutment wall
CN212250138U (en) Construction operation vehicle in railway tunnel
CN208559379U (en) Mine-used man-vehicle's re-railing block
CN107680480A (en) A kind of construction warning sign
CN216275345U (en) Warning device is used in road and bridge construction
CN210976786U (en) Avoidance-free stereo garage
CN216893387U (en) Municipal administration is with lifting foot hand frame for architectural maintenance
CN112875526A (en) Combined type hoisting device for constructional engineering
CN107934861B (en) A kind of traffic vcehicular tunnel maintenance and reinforcement platform
CN112037549A (en) Traffic safety is with portable interim signal lamp
CN206538708U (en) A kind of intelligent parking lot berth lock
CN207539445U (en) A kind of novel piping lane pipe lining device
CN210622465U (en) Safety device that building engineering construction was used
CN218263404U (en) Highway crack processing apparatus that highway engineering was used
CN217680974U (en) Municipal works are with portable rail
CN214575555U (en) Protector is used in high-rise building construction
CN214305573U (en) Novel municipal pipeline lays fixedly device
CN105000484B (en) Tower crane capable of being connected with building

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20190522

Address after: 325000 No. 115 Luodong Street, Yongzhong Street, Longwan District, Wenzhou City, Zhejiang Province

Applicant after: Wu Zengjin

Address before: 315608 160 group 2, Datang mountain village, Huang Tan Town, Ninghai, Ningbo, Zhejiang

Applicant before: Xu Liang

GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20211208

Address after: 252022 No. z023, Minjian Zhongchuang space, 7th floor, building 2, Xingmei building, Dongchang East Road, economic and Technological Development Zone, Liaocheng City, Shandong Province

Patentee after: Liaocheng BeiDuo Intelligent Technology Co.,Ltd.

Address before: 325000 No. 115 Luodong Street, Yongzhong Street, Longwan District, Wenzhou City, Zhejiang Province

Patentee before: Wu Zengjin

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20230704

Address after: 506, 5th to 6th floors, South Section of Building 308 Chalu Street, Shizhong District, Jinan City, Shandong Province, 250000

Patentee after: Shandong Wanlian Mechanical Engineering Co.,Ltd.

Address before: 252022 No. z023, Minjian Zhongchuang space, 7th floor, building 2, Xingmei building, Dongchang East Road, economic and Technological Development Zone, Liaocheng City, Shandong Province

Patentee before: Liaocheng BeiDuo Intelligent Technology Co.,Ltd.