CN106996080A - Bridge guardrail glass installation device and its construction method - Google Patents

Bridge guardrail glass installation device and its construction method Download PDF

Info

Publication number
CN106996080A
CN106996080A CN201710173149.3A CN201710173149A CN106996080A CN 106996080 A CN106996080 A CN 106996080A CN 201710173149 A CN201710173149 A CN 201710173149A CN 106996080 A CN106996080 A CN 106996080A
Authority
CN
China
Prior art keywords
glass
guardrail
clip slot
angular wheel
sucker
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710173149.3A
Other languages
Chinese (zh)
Other versions
CN106996080B (en
Inventor
徐良
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Wanlian Mechanical Engineering Co.,Ltd.
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201710173149.3A priority Critical patent/CN106996080B/en
Priority to CN201810924042.2A priority patent/CN108867364B/en
Priority to CN201810924029.7A priority patent/CN108867363B/en
Publication of CN106996080A publication Critical patent/CN106996080A/en
Application granted granted Critical
Publication of CN106996080B publication Critical patent/CN106996080B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/10Railings; Protectors against smoke or gases, e.g. of locomotives; Maintenance travellers; Fastening of pipes or cables to bridges
    • E01D19/103Parapets, railings ; Guard barriers or road-bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

Bridge guardrail glass installation device and its construction method, including car body, the vehicle bottom are provided with movable pulley, and the front of car body is provided with mobile handrail, it is characterized in that:Glass guardrail storage bed and glass guardrail delivery platform are installed side by side on the car body, the exit side of the glass guardrail delivery platform is provided with glass guardrail construction mechanism;Compared with prior art, it is an advantage of the invention that:The present apparatus can will need guardrail glass to be mounted to be automatically transferred to installation station work workmen and install, a people or two people just can complete construction operation, save manpower, are adapted to promote the use of by rational structure design.

Description

Bridge guardrail glass installation device and its construction method
Technical field
The invention belongs to civic building Construction Technology field, and in particular to a kind of Bridge guardrail glass installation device and its apply Work method.
Background technology
Glass guardrail is using glass as facestock, is equipped with metal, the guardrail of the other materials structure such as wooden.Glass guardrail outward appearance is high Shelves, colour-fast, sturdy and durable, excellent in cushion effect, service life is long, makes simple, easy for installation, maintenance cost is low, Yi Qing Wash.Good glass guardrail is made using high quality zinc steel alloy, by safety glass and balcony perfect adaptation, security performance is not lost, steel Change glass to be embedded in aluminium alloy groove, steadiness, wind resistance is good.Because glass is both decoration in glass guardrail construction Component is primary structure member again, the external force effect such as need to have safeguard function and bearing push away, lean on, squeeze, therefore should be using safety glass, mesh Preceding many using safety glass, wire glass, interlayer safety glass and interlayer wire glass etc., its gauge thickness is no less than 12mm.
As an Application No. CN204098378U discloses a kind of guardrail glass special connecting piece, including first face and the Two faces, two sides connects into the connector body that a right angle is L shape, and first face is away from connector body right angle Provided with the first connection screw thread hole, the second segmental arc is provided with by the center of circle of connection screw thread hole, is provided with close to connector body right angle First segmental arc symmetrical above and below, each equal rounding off in junction, second face is provided with the second connecting hole, and is kidney-shaped Hole, the 3rd segmental arc, junction rounding off are being provided with away from connector body right angle.
And for example an Application No. CN105908617A discloses a kind of glass guardrail double-layer cable support system overpass Upper prestressed cable, lower prestress drag-line are combined by structure, the structure with guardrail glass panel, bridge floor glass plate, pass through shield Column glass panel Transfer of Shear constitutes new overline bridge support system together with prestressed cable, not only reasonable stress but also light and handy attractive in appearance; Guardrail glass plate is fixed between upper prestressed cable, lower prestress drag-line by prefabricated node fastener, and guardrail glass plate was both Can be as day bridge protective railings, while bearing carrier Transfer of Shear can be also served as again;Bridge floor glass plate, passes through L-shaped connector and two The bottom of side rail glass panel is connected.Such a new structure circulates permeability, and sight and stress function are in one, thus in city Had broad application prospects in the construction of city's overhead pedestrian crossing.
Guardrail glass is widely applied, it is in when installing due to appearance looks elegant in many municipal bridges It is original to install, by many people's scaffolds, so very waste of manpower, while speed of application is slow, if while imprudence, glass also has can It can be smashed.
The content of the invention
The present invention is directed to disadvantage mentioned above, based on solving slow existing guardrail installation speed, waste of manpower and flimsy ask Topic.A kind of Bridge guardrail glass installation device and its construction method are proposed, the device and construction method can accurately quickly will The guardrail installation of bridge, because glass is fixed, therefore is not in damage while only needing a people or two people to operate Situation.
To realize the purpose of the present invention, the technical solution adopted by the present invention is:
Bridge guardrail glass installation device, including car body, the vehicle bottom are provided with movable pulley, and the front of car body is provided with movement Handrail, it is characterized in that:Glass guardrail storage bed and glass guardrail delivery platform, the glass shield are installed side by side on the car body The exit side of column delivery platform is provided with glass guardrail construction mechanism;
The glass guardrail delivery platform includes the glass emplacing platform uniformly laid, and the both sides of the glass emplacing platform are provided with glass Flute profile movable block is installed between glass emplacing platform below clip slot, glass clip slot;It is additionally provided with below the flute profile movable block Rack caterpillar chain is engaged with itself;The both sides of the rack caterpillar chain are separately installed with front propeller shaft and inter-axle shaft, forward pass Angular wheel one and angular wheel two are separately installed with moving axis and inter-axle shaft;
Motor is laid in the bottom of glass guardrail delivery platform, and motor is provided with what is be meshed with angular wheel one by driving shaft Angular wheel three;Motor is provided with the angular wheel four being meshed with angular wheel two by gear-driven driven shaft;It is described Motor by rotate drive intermeshing angular wheel three and angular wheel one, angular wheel four and angular wheel two rotate from And driving front propeller shaft and inter-axle shaft to rotate makes rack caterpillar chain drive flute profile movable block to do forward or be moved rearwards by;
The glass guardrail construction mechanism includes base, and the base is provided with chute, and movable stand is arranged in chute, described to move Rotation boom is installed, one end of telescopic joint is connected with rotation boom, and both are provided with gimbal structure in junction in moving frame;It is described The other end of telescopic joint is provided with grillage, and sucker is uniformly laid in the corner of grillage;Vavuum pump is arranged on the movable stand on base Between, it is connected between vavuum pump and sucker and vacuumizes suction pipe.
Preferentially, the discharge end of the glass guardrail delivery platform is also equipped with slope chute.
Preferentially, it is also equipped with adjusting rotating disk manually above the telescopic joint;
Preferentially, rubber blanket is also equipped with the glass clip slot, the side of vavuum pump is provided with suction pump, and suction pump passes through water Pipe is connected with hydraulic giant, the movable stand and is also equipped with hydraulic giant hanger.
Based on said apparatus, the present invention also proposes a kind of Bridge guardrail glass construction method of installation, it is characterised in that including Following steps:
1)The glass that band is provided with uniformly is placed in above glass guardrail storage bed and deposited, and is laid between glass and glass Dividing plate prevents clashing and breaking;
2)Car body is promoted by mobile handrail and proceeded at guardrail construction, by manually by the glass above glass guardrail storage bed Glass is placed in glass clip slot;
3)Front propeller shaft and inter-axle shaft rotation is driven to make rack caterpillar chain drive flute profile movable block to do by motor rotary drive Move forward, glass in glass clip slot is entered station;
4)Glass and contact that boom drives sucker alignment to enter station are rotated, in the process:Glass is continuous in glass clip slot Slope chute is advanced into, vavuum pump, which is constantly vacuumized, makes sucker hold glass, when glass clip slot enters slope chute most bottom When lower, glass clip slot departs from glass, and sucker holds glass;
5)Rotation boom drives the sucker for holding glass to rotate 180 °, glass rotating band is installed station;Pass through manual adjustment glass On the position of glass and amplitude, the fastener that glass is arranged on to guardrail;
6)Continuous repeat step 2)-5)By the glass installation in glass clip slot, driven afterwards by motor by glass clip slot Drive retracts progress in situ and lays glass operation again, and constructs successively, untill all glass installations.
Compared with prior art, it is an advantage of the invention that:The present apparatus can will need peace by rational structure design The guardrail glass of dress is automatically transferred to installation station work workmen and installed, and a people or two people just can complete construction operation, Manpower is saved, is adapted to promote the use of.
Brief description of the drawings
Brief description is next carried out to the present invention by means of the accompanying drawing of embodiment now.In accompanying drawing:
Fig. 1 shows Bridge guardrail glass installation device construction schematic diagram;
Fig. 2 shows the structure chart of Bridge guardrail glass installation device of the present invention;
Fig. 3 shows the structural representation of glass guardrail construction mechanism;
Fig. 4 shows the schematic diagram of glass guardrail delivery platform of the present invention;
Fig. 5 shows Fig. 4 further disassembly diagram.
Embodiment
With reference to specific embodiment, the present invention is described in detail.Following examples will be helpful to the technology of this area Personnel further understand the present invention, but the invention is not limited in any way.It should be pointed out that to the ordinary skill of this area For personnel, without departing from the inventive concept of the premise, various modifications and improvements can be made.These belong to the present invention Protection domain.
Embodiment 1
Bridge guardrail glass installation device, including car body 100, the vehicle bottom are provided with movable pulley 6, and the front of car body is provided with Glass guardrail storage bed 7 and glass guardrail delivery platform 200, the glass are installed side by side on mobile handrail 9, the car body 100 The exit side of glass guardrail delivery platform 200 is provided with glass guardrail construction mechanism 300.
Glass guardrail delivery platform 200 includes the glass emplacing platform 31 uniformly laid, the both sides of the glass emplacing platform 31 Being also equipped with rubber blanket provided with glass clip slot 21, in glass clip slot 21 prevents glass from damaging.What the both sides of glass clip slot 21 were installed Flute profile movable block 22 is installed between baffle plate, the glass emplacing platform 31 of the lower section of glass clip slot 21;Under the flute profile movable block 22 Side is additionally provided with rack caterpillar chain 20 and engaged with itself;The both sides of the rack caterpillar chain 20 are separately installed with the He of front propeller shaft 27 Angular wheel 1 and angular wheel 2 40 are separately installed with inter-axle shaft 23, front propeller shaft 27 and inter-axle shaft 23.Glass The discharge end of guardrail delivery platform 200 is also equipped with slope chute 19.
Motor 25 is laid in the bottom of glass guardrail delivery platform 200, and motor 25 is provided with and conical tooth by driving shaft Take turns one 28 angular wheels 3 29 being meshed;Motor 25 is provided with and the phase of angular wheel 2 40 by gear-driven driven shaft 23 The angular wheel 4 26 of engagement;The motor 25 drives intermeshing angular wheel 3 29 and angular wheel one by rotating 28th, angular wheel 4 26 and the rotation of angular wheel 2 40 make rack crawler belt so as to drive front propeller shaft 27 and inter-axle shaft 23 to rotate Chain 20 drives flute profile movable block 22 to do forward or be moved rearwards by.
Glass guardrail construction mechanism 300 includes base 41, and the base 41 is provided with chute 10, and movable stand 301 is arranged on Rotation boom 14 is installed, one end of telescopic joint 16 is connected with rotation boom 14, Liang Zhelian in chute 10, on the movable stand 301 The place of connecing is provided with gimbal structure 18;The effect of gimbal structure 18 is that glass is manually finely tuned when glass is installed, and is made Glass is in suitable installation site.The other end of the telescopic joint 16 is provided with grillage 11, and sucker 12 is uniformly laid in grillage 11 corner;Spring is laid with telescopic joint 16, such telescopic joint 16 just possesses elasticity, when telescopic joint 16 drives sucker 12 to contact Possess buffering when glass, will not say that glass is broken.Vavuum pump 5 is arranged between the movable stand 301 on base 41, vavuum pump It is connected between 5 and sucker 12 and vacuumizes suction pipe.Telescopic joint 16 is also equipped with adjusting rotating disk 13 manually above.
Based on said apparatus, the present invention also proposes a kind of Bridge guardrail glass construction method of installation, it is characterised in that including Following steps:
1)The uniform glass guardrail storage bed 7 that is placed in of glass 2 that band is provided with is deposited above, is pacified between glass and glass Putting dividing plate prevents clashing and breaking;
2)Car body 100 is promoted by mobile handrail 9 and proceeded at guardrail construction, by manually by glass guardrail storage bed 7 The glass in face is placed in glass clip slot 21;
3)Front propeller shaft 27 and the rotation of inter-axle shaft 23 is driven rack caterpillar chain 20 is driven flute profile by the rotary drive of motor 25 Movable block 22 is moved forward, and glass in glass clip slot 21 is entered station;
4)Rotation boom 14 drives the alignment of sucker 12 to enter the glass 2 of station and contact, in the process:Glass in glass clip slot 21 Glass constantly advances into slope chute 19, and vavuum pump 5, which is constantly vacuumized, makes sucker 12 hold glass, when glass clip slot 21 is entered When slope chute 19 is most beneath, glass clip slot 21 departs from glass, and sucker 12 holds glass;
5)Rotation boom 14 drives the sucker 12 for holding glass to rotate 180 °, glass rotating band is installed station;By manually adjusting Save on position and the amplitude of glass, the fastener that glass is arranged on to guardrail 1;
6)Continuous repeat step 2)-5)By the glass installation in glass clip slot 21, driven afterwards by motor 25 by glass Clip slot 21, which drives, retracts progress placement glass operation, and constructing successively again in situ, untill all glass installations.
Embodiment 2
Bridge guardrail glass installation device, including car body 100, the vehicle bottom are provided with movable pulley 6, and the front of car body is provided with Glass guardrail storage bed 7 and glass guardrail delivery platform 200, the glass are installed side by side on mobile handrail 9, the car body 100 The exit side of glass guardrail delivery platform 200 is provided with glass guardrail construction mechanism 300.
Glass guardrail delivery platform 200 includes the glass emplacing platform 31 uniformly laid, the both sides of the glass emplacing platform 31 Being also equipped with rubber blanket provided with glass clip slot 21, in glass clip slot 21 prevents glass from damaging.What the both sides of glass clip slot 21 were installed Flute profile movable block 22 is installed between baffle plate, the glass emplacing platform 31 of the lower section of glass clip slot 21;Under the flute profile movable block 22 Side is additionally provided with rack caterpillar chain 20 and engaged with itself;The both sides of the rack caterpillar chain 20 are separately installed with the He of front propeller shaft 27 Angular wheel 1 and angular wheel 2 40 are separately installed with inter-axle shaft 23, front propeller shaft 27 and inter-axle shaft 23.Glass The discharge end of guardrail delivery platform 200 is also equipped with slope chute 19.
Motor 25 is laid in the bottom of glass guardrail delivery platform 200, and motor 25 is provided with and conical tooth by driving shaft Take turns one 28 angular wheels 3 29 being meshed;Motor 25 is provided with and the phase of angular wheel 2 40 by gear-driven driven shaft 23 The angular wheel 4 26 of engagement;The motor 25 drives intermeshing angular wheel 3 29 and angular wheel one by rotating 28th, angular wheel 4 26 and the rotation of angular wheel 2 40 make rack crawler belt so as to drive front propeller shaft 27 and inter-axle shaft 23 to rotate Chain 20 drives flute profile movable block 22 to do forward or be moved rearwards by.
Glass guardrail construction mechanism 300 includes base 41, and the base 41 is provided with chute 10, and movable stand 301 is arranged on Rotation boom 14 is installed, one end of telescopic joint 16 is connected with rotation boom 14, Liang Zhelian in chute 10, on the movable stand 301 The place of connecing is provided with gimbal structure 18;The effect of gimbal structure 18 is that glass is manually finely tuned when glass is installed, and is made Glass is in suitable installation site.The other end of the telescopic joint 16 is provided with grillage 11, and sucker 12 is uniformly laid in grillage 11 corner;Spring is laid with telescopic joint 16, such telescopic joint 16 just possesses elasticity, when telescopic joint 16 drives sucker 12 to contact Possess buffering when glass, will not say that glass is broken.Vavuum pump 5 is arranged between the movable stand 301 on base 41, vavuum pump It is connected between 5 and sucker 12 and vacuumizes suction pipe.Telescopic joint 16 is also equipped with adjusting rotating disk 13 manually above.
The side of vavuum pump 5 is provided with suction pump 51, and suction pump 51 is connected with hydraulic giant 52, the movable stand by water pipe Hydraulic giant hanger 53 is also equipped with 301.After glass installation, it has dust above, by the way that suction pump 51 is connected into water Source, and the glass of installation is cleaned by hydraulic giant 52.
Based on said apparatus, the present invention also proposes a kind of Bridge guardrail glass construction method of installation, it is characterised in that including Following steps:
1)The uniform glass guardrail storage bed 7 that is placed in of glass 2 that band is provided with is deposited above, is pacified between glass and glass Putting dividing plate prevents clashing and breaking;
2)Car body 100 is promoted by mobile handrail 9 and proceeded at guardrail construction, by manually by glass guardrail storage bed 7 The glass in face is placed in glass clip slot 21, while suction pump 51 is connected into water source;
3)Front propeller shaft 27 and the rotation of inter-axle shaft 23 is driven rack caterpillar chain 20 is driven flute profile by the rotary drive of motor 25 Movable block 22 is moved forward, and glass in glass clip slot 21 is entered station;
4)Rotation boom 14 drives the alignment of sucker 12 to enter the glass 2 of station and contact, in the process:Glass in glass clip slot 21 Glass constantly advances into slope chute 19, and vavuum pump 5, which is constantly vacuumized, makes sucker 12 hold glass, when glass clip slot 21 is entered When slope chute 19 is most beneath, glass clip slot 21 departs from glass, and sucker 12 holds glass;
5)Rotation boom 14 drives the sucker 12 for holding glass to rotate 180 °, glass rotating band is installed station;By manually adjusting Save on position and the amplitude of glass, the fastener that glass is arranged on to guardrail 1, suction pump 51, which starts, to draw water, while passing through hydraulic giant 52 Glass is cleaned;
6)Continuous repeat step 2)-5)By the glass installation in glass clip slot 21, driven afterwards by motor 25 by glass Clip slot 21, which drives, retracts progress placement glass operation, and constructing successively again in situ, untill all glass installations..

Claims (4)

1. Bridge guardrail glass installation device, including car body(100), the vehicle bottom is provided with movable pulley(6), before car body Side is provided with mobile handrail(9), it is characterized in that:The car body(100)On glass guardrail storage bed is installed side by side(7)With glass shield Column delivery platform(200), the glass guardrail delivery platform(200)Exit side glass guardrail construction mechanism is installed(300);
The glass guardrail delivery platform(200)Including the glass emplacing platform uniformly laid(31), the glass emplacing platform(31) Both sides be provided with glass clip slot(21), glass clip slot(21)The glass emplacing platform of lower section(31)Between flute profile movable block is installed (22);The flute profile movable block(22)Lower section be additionally provided with rack caterpillar chain (20) and engage with itself;The rack caterpillar chain (20) both sides are separately installed with front propeller shaft(27)And inter-axle shaft(23), front propeller shaft(27)And inter-axle shaft(23)Upper point Angular wheel one is not installed(28)With angular wheel two(40);
Motor(25)It is laid in glass guardrail delivery platform(200)Bottom, motor(25)It is provided with by driving shaft and taper Gear one(28)The angular wheel three being meshed(29);Motor(25)Pass through gear-driven driven shaft(23)It is provided with and taper Gear two(40)The angular wheel four being meshed(26);The motor(25)Intermeshing angular wheel three is driven by rotating (29)With angular wheel one(28), angular wheel four(26)With angular wheel two(40)Rotation is so as to drive front propeller shaft(27)With Inter-axle shaft(23)Rotation makes rack caterpillar chain (20) drive flute profile movable block(22)Do forward or be moved rearwards by;
The glass guardrail construction mechanism(300)Including base(41), the base(41)It is provided with chute(10), movable stand (301)Installed in chute(10)It is interior, the movable stand(301)It is upper that rotation boom is installed(14), telescopic joint(16)One end and rotation Rotating rack arm(14)Connection, both are provided with gimbal structure in junction(18);The telescopic joint(16)The other end plate is installed Frame(11), sucker(12)Uniformly it is laid in grillage(11)Corner;Vavuum pump(5)Installed in base(41)On movable stand (301)Between, vavuum pump(5)With sucker(12)Between be connected with and vacuumize suction pipe.
2. Bridge guardrail glass installation device according to claim 1, it is characterized in that, the glass guardrail delivery platform (200)Discharge end be also equipped with slope chute(19).
3. Bridge guardrail glass installation device according to claim 1, it is characterized in that, the telescopic joint(16)Also pacify above Equipped with manual regulation rotating disk(13).
4. Bridge guardrail glass construction method of installation, it is characterised in that comprise the following steps:
1)The glass that band is provided with(2)Uniformly it is placed in glass guardrail storage bed(7)Deposited above, glass and glass it Between lay dividing plate prevent clashing and breaking;
2)By car body(100)Pass through mobile handrail(9)Promotion is proceeded at guardrail construction, by manually by glass guardrail storage bed (7)Glass above is placed in glass clip slot(21)It is interior;
3)Pass through motor(25)Rotary drive drives front propeller shaft(27)And inter-axle shaft(23)Rotation makes rack caterpillar chain (20) Drive flute profile movable block(22)Move forward, make glass clip slot(21)Interior glass enters station;
4)Rotate boom(14)Drive sucker(12)Alignment enters the glass of station(2)And contact, in the process:Glass clip slot (21)Interior glass constantly advances into slope chute(19), vavuum pump(5)Constantly vacuumizing makes sucker(12)Glass is held, works as glass Glass clip slot(21)Enter slope chute(19)When most beneath, glass clip slot(21)Depart from glass, sucker(12)Hold glass;
5)Rotate boom(14)Drive the sucker for holding glass(12)180 ° of rotation, makes glass rotating band install station;Pass through people The position of work regulation glass and amplitude, guardrail is arranged on by glass(1)Fastener on;
6)Continuous repeat step 2)-5)By glass clip slot(21)Interior glass installation, passes through motor afterwards(25)Driving will Glass clip slot(21)Drive retracts progress in situ and lays glass operation again, and constructs successively, until all glass installations Untill.
CN201710173149.3A 2017-03-22 2017-03-22 Bridge guardrail glass installation device and its construction method Active CN106996080B (en)

Priority Applications (3)

Application Number Priority Date Filing Date Title
CN201710173149.3A CN106996080B (en) 2017-03-22 2017-03-22 Bridge guardrail glass installation device and its construction method
CN201810924042.2A CN108867364B (en) 2017-03-22 2017-03-22 Bridge guardrail glass installation device and its construction method
CN201810924029.7A CN108867363B (en) 2017-03-22 2017-03-22 Bridge guardrail glass installation device and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710173149.3A CN106996080B (en) 2017-03-22 2017-03-22 Bridge guardrail glass installation device and its construction method

Related Child Applications (2)

Application Number Title Priority Date Filing Date
CN201810924042.2A Division CN108867364B (en) 2017-03-22 2017-03-22 Bridge guardrail glass installation device and its construction method
CN201810924029.7A Division CN108867363B (en) 2017-03-22 2017-03-22 Bridge guardrail glass installation device and its construction method

Publications (2)

Publication Number Publication Date
CN106996080A true CN106996080A (en) 2017-08-01
CN106996080B CN106996080B (en) 2019-07-05

Family

ID=59431008

Family Applications (3)

Application Number Title Priority Date Filing Date
CN201810924029.7A Active CN108867363B (en) 2017-03-22 2017-03-22 Bridge guardrail glass installation device and its construction method
CN201810924042.2A Active CN108867364B (en) 2017-03-22 2017-03-22 Bridge guardrail glass installation device and its construction method
CN201710173149.3A Active CN106996080B (en) 2017-03-22 2017-03-22 Bridge guardrail glass installation device and its construction method

Family Applications Before (2)

Application Number Title Priority Date Filing Date
CN201810924029.7A Active CN108867363B (en) 2017-03-22 2017-03-22 Bridge guardrail glass installation device and its construction method
CN201810924042.2A Active CN108867364B (en) 2017-03-22 2017-03-22 Bridge guardrail glass installation device and its construction method

Country Status (1)

Country Link
CN (3) CN108867363B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112554101A (en) * 2020-12-07 2021-03-26 常路行 Automatic guardrail mounting machine

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110952455B (en) * 2019-12-05 2020-12-01 河南大学 Intelligent auxiliary robot for installing bridge guardrail
CN112832495B (en) * 2021-01-12 2022-03-25 河北建设集团股份有限公司 Construction device for installing glass partition plate

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1391907A (en) * 1971-05-07 1975-04-23 Redpath Dorman Long Ltd Method of and apparatus for moving a span or section of a bridge
CN102514867A (en) * 2010-07-30 2012-06-27 马可·皮阿扎 Apparatus for moving individual or packed plate-like products
CN203255732U (en) * 2013-01-18 2013-10-30 齐泰军 Trackless glass sheet feeding and discharging machine
CN204057226U (en) * 2014-08-29 2014-12-31 山东鑫泽装饰工程有限公司 Glass transfer sucker machine
CN106042848A (en) * 2016-06-06 2016-10-26 安徽安凯汽车股份有限公司 Installation device for passenger car windscreen

Family Cites Families (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201471426U (en) * 2009-07-08 2010-05-19 江门市科杰机械自动化有限公司 Workpiece tray used for glass processing
CN201761668U (en) * 2010-06-18 2011-03-16 安徽凤阳玻璃有限公司 Glass packaging paper-laying holder with movable guardrail
KR20150011888A (en) * 2013-07-24 2015-02-03 성영주 Balcony window with hidden openable guardrails
CN203742101U (en) * 2014-02-08 2014-07-30 万达文化旅游规划研究院有限公司 Pop-up glass guard bar
CN105059936A (en) * 2015-08-06 2015-11-18 重庆重玻节能玻璃有限公司 Glass sucker device
CN205043718U (en) * 2015-09-08 2016-02-24 广州福耀玻璃有限公司 Glass card strip installation device
CN105458656A (en) * 2016-01-07 2016-04-06 安徽江淮汽车股份有限公司 Glass conveying and mounting device
CN205532041U (en) * 2016-01-27 2016-08-31 浙江湖州市建工集团装饰有限公司 A cavity glass structure for architectural decoration
CN205634182U (en) * 2016-05-11 2016-10-12 聊城巨龙新能源车业有限公司 Window glass installs frock
CN106044224A (en) * 2016-06-27 2016-10-26 浙江飞越洁具制造有限公司 Glass sucking disc sliding device

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1391907A (en) * 1971-05-07 1975-04-23 Redpath Dorman Long Ltd Method of and apparatus for moving a span or section of a bridge
CN102514867A (en) * 2010-07-30 2012-06-27 马可·皮阿扎 Apparatus for moving individual or packed plate-like products
CN203255732U (en) * 2013-01-18 2013-10-30 齐泰军 Trackless glass sheet feeding and discharging machine
CN204057226U (en) * 2014-08-29 2014-12-31 山东鑫泽装饰工程有限公司 Glass transfer sucker machine
CN106042848A (en) * 2016-06-06 2016-10-26 安徽安凯汽车股份有限公司 Installation device for passenger car windscreen

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112554101A (en) * 2020-12-07 2021-03-26 常路行 Automatic guardrail mounting machine
CN112554101B (en) * 2020-12-07 2022-06-14 泉州台商投资区庆旺科技有限公司 Automatic guardrail mounting machine

Also Published As

Publication number Publication date
CN108867363A (en) 2018-11-23
CN108867364A (en) 2018-11-23
CN106996080B (en) 2019-07-05
CN108867363B (en) 2019-11-22
CN108867364B (en) 2019-11-19

Similar Documents

Publication Publication Date Title
CN108952184B (en) Assembled building decoration stone material wood-based plate curtain mounting bracket
CN106996080A (en) Bridge guardrail glass installation device and its construction method
CN108972280A (en) A kind of adjustable surface derusting device for steel tubes for building
CN203980196U (en) A kind of photocuring automatic telescopic lamp bracket
CN206448820U (en) A kind of tunnel construction trolley
CN205936692U (en) Tunnel evacuation platform suitable for urban rail transit
CN204252506U (en) A kind of liftable scaffold
CN219280479U (en) Explosion-proof bridge support
CN210315220U (en) Municipal administration bridge is with adjustable rail guard
CN211036638U (en) Road paving device for municipal works
CN210263867U (en) Climb a passageway plate turnover
CN112156391A (en) Safety belt hanging support
CN204827484U (en) Colliery is supporting device in pit
CN212250138U (en) Construction operation vehicle in railway tunnel
CN107227803A (en) Road construction noise barrier structure and its construction method
CN208559379U (en) Mine-used man-vehicle's re-railing block
CN110980161A (en) Building pipeline handling device
CN216811222U (en) Warning guardrail is used in road bridge construction
CN110528828A (en) A kind of mounting bracket for the people's air defense door frame being easy to install and remove
CN216893387U (en) Municipal administration is with lifting foot hand frame for architectural maintenance
CN214305573U (en) Novel municipal pipeline lays fixedly device
CN218055184U (en) Rail clamping type vehicle covering wedge for mine transport vehicle
CN216474513U (en) Noise reduction device for road and bridge construction
CN212960761U (en) Tunnel structure detection device
CN215443161U (en) Concrete pouring device for subway civil engineering construction

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20190522

Address after: 325000 No. 115 Luodong Street, Yongzhong Street, Longwan District, Wenzhou City, Zhejiang Province

Applicant after: Wu Zengjin

Address before: 315608 160 group 2, Datang mountain village, Huang Tan Town, Ninghai, Ningbo, Zhejiang

Applicant before: Xu Liang

GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20211208

Address after: 252022 No. z023, Minjian Zhongchuang space, 7th floor, building 2, Xingmei building, Dongchang East Road, economic and Technological Development Zone, Liaocheng City, Shandong Province

Patentee after: Liaocheng BeiDuo Intelligent Technology Co.,Ltd.

Address before: 325000 No. 115 Luodong Street, Yongzhong Street, Longwan District, Wenzhou City, Zhejiang Province

Patentee before: Wu Zengjin

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20230704

Address after: 506, 5th to 6th floors, South Section of Building 308 Chalu Street, Shizhong District, Jinan City, Shandong Province, 250000

Patentee after: Shandong Wanlian Mechanical Engineering Co.,Ltd.

Address before: 252022 No. z023, Minjian Zhongchuang space, 7th floor, building 2, Xingmei building, Dongchang East Road, economic and Technological Development Zone, Liaocheng City, Shandong Province

Patentee before: Liaocheng BeiDuo Intelligent Technology Co.,Ltd.