CN106968438A - 一种超大跨度蘑菇状场馆钢结构的施工方法 - Google Patents
一种超大跨度蘑菇状场馆钢结构的施工方法 Download PDFInfo
- Publication number
- CN106968438A CN106968438A CN201710291382.1A CN201710291382A CN106968438A CN 106968438 A CN106968438 A CN 106968438A CN 201710291382 A CN201710291382 A CN 201710291382A CN 106968438 A CN106968438 A CN 106968438A
- Authority
- CN
- China
- Prior art keywords
- assembled unit
- sheet assembled
- installation
- ring holder
- mushroom
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
Abstract
本发明具体是一种超大跨度蘑菇状场馆钢结构的施工方法;其特征是:包括:将两榀片状桁架在地面拼装形成一个锥形片状组合单元;以设计中的屋盖最高点为中心间隔布置环形支撑架,作为锥形片状组合单元安装完毕前的端部支承点;依次将各片锥形片状组合单元吊装就位并与环形支撑架铰接固定;安装后补杆件单元,将各相邻锥形片状组合单元合拢;拆除拼装过程中使用的环形支撑架并在拼装原位进行竖向卸载。本施工方法中,吊装单元结构形式变得单一,易于吊装和定位控制\减少高空作业量,地面拼装对质量控制有利;安装就位后重点观测锥形片状组合单元端头节点,精度更便于控制。
Description
技术领域
本发明涉及钢结构施工领域,具体是一种超大跨度蘑菇状场馆钢结构的施工方法。
背景技术
超大跨度蘑菇状场馆结构中只有连续的下弦杆,上弦杆间断,各榀桁架之间通过环向桁架相连,结构整体受力。另外蘑菇状场馆各榀桁架间没有平行或垂直关系,传统安装技术很难满足该类建筑施工要求。
发明内容
本发明的目的在于,提供一种易于吊装、定位控制并减少高空作业量的超大跨度蘑菇状场馆钢结构的施工方法。
为了达到上述目的,本发明是这样实现的:
一种超大跨度蘑菇状场馆钢结构的施工方法;包括
步骤1、现场拼装:将两榀或多榀片状桁架在地面拼装形成一个锥形片状组合单元;
步骤2、支撑布置:以设计中的屋盖最高点为中心,间隔布置环形支撑架,作为步骤1中所述锥形片状组合单元安装完毕前的端部支承点;
步骤3、组合单元吊装:依次将步骤1所述各片锥形片状组合单元吊装就位并与环形支撑架铰接固定;
步骤4、补杆安装:安装后补杆件单元,将各相邻锥形片状组合单元合拢;
步骤5、拆撑卸载:拆除拼装过程中使用的环形支撑架并在拼装原位进行竖向卸载。
本方法将蘑菇状场馆钢结构的屋盖分为若干锥形片状组合单元以及后补杆件单元,施工时先将两榀或多榀片状桁架在地面拼装,再以屋盖最高点为中心布置环形支撑架,最终以环形支撑架为临时支撑实现动作单一的吊装作业,如此可有效提高吊装作业的效率并减少高空作业的工程量,从而实现提高超大跨度蘑菇状场馆钢结构作业效率和质量的目的。
附图说明
图1为本施工方法的示意图一。
图2为本施工方法的示意图二。
具体实施方式
以下通过具体实施例进一步说明本发明。
如图1、图2所示,一种超大跨度蘑菇状场馆钢结构的施工方法;包括
步骤1、现场拼装:将两榀或多榀片状桁架在地面拼装形成一个锥形片状组合单元;
步骤2、支撑布置:以设计中的屋盖最高点为中心,间隔布置环形支撑架,作为步骤1中所述锥形片状组合单元安装完毕前的端部支承点;
步骤3、组合单元吊装:依次将步骤1所述各片锥形片状组合单元吊装就位并与环形支撑架铰接固定;
步骤4、补杆安装:安装后补杆件单元,将各相邻锥形片状组合单元合拢;
步骤5、拆撑卸载:拆除拼装过程中使用的环形支撑架并在拼装原位进行竖向卸载。
本方法将蘑菇状场馆钢结构的屋盖分为若干锥形片状组合单元以及后补杆件单元,施工时先将两榀或多榀片状桁架在地面拼装,再以屋盖最高点为中心布置环形支撑架,最终以环形支撑架为临时支撑实现动作单一的吊装作业,如此可有效提高吊装作业的效率并减少高空作业的工程量,从而实现提高超大跨度蘑菇状场馆钢结构作业效率和质量的目的。
Claims (1)
1.一种超大跨度蘑菇状场馆钢结构的施工方法;其特征是:包括
步骤1、现场拼装:将两榀或多榀片状桁架在地面拼装形成一个锥形片状组合单元;
步骤2、支撑布置:以设计中的屋盖最高点为中心,间隔布置环形支撑架,作为步骤1中所述锥形片状组合单元安装完毕前的端部支承点;
步骤3、组合单元吊装:依次将步骤1所述各片锥形片状组合单元吊装就位并与环形支撑架铰接固定;
步骤4、补杆安装:安装后补杆件单元,将各相邻锥形片状组合单元合拢;
步骤5、拆撑卸载:拆除拼装过程中使用的环形支撑架并在拼装原位进行竖向卸载。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710291382.1A CN106968438A (zh) | 2017-04-28 | 2017-04-28 | 一种超大跨度蘑菇状场馆钢结构的施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710291382.1A CN106968438A (zh) | 2017-04-28 | 2017-04-28 | 一种超大跨度蘑菇状场馆钢结构的施工方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106968438A true CN106968438A (zh) | 2017-07-21 |
Family
ID=59330311
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710291382.1A Pending CN106968438A (zh) | 2017-04-28 | 2017-04-28 | 一种超大跨度蘑菇状场馆钢结构的施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106968438A (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110521649A (zh) * | 2019-08-12 | 2019-12-03 | 上海振华重工启东海洋工程股份有限公司 | 深远海网箱养殖装备基础设施桁架施工工艺 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE2433776A1 (de) * | 1973-07-20 | 1975-02-27 | Jocketa Hebegeraete Veb | Verfahren zur herstellung von gebaeuden und gebaeudesegmenten |
CN101451378A (zh) * | 2007-11-29 | 2009-06-10 | 上海市机械施工有限公司 | “水滴形”放射状单层钢管网壳分块及安装方法 |
CN103556836A (zh) * | 2013-07-30 | 2014-02-05 | 永升建设集团有限公司 | 受限空间条件下球形网壳拼装施工方法 |
CN205913766U (zh) * | 2016-07-04 | 2017-02-01 | 广州潮流水上乐园设备有限公司 | 一种大喇叭网架结构 |
-
2017
- 2017-04-28 CN CN201710291382.1A patent/CN106968438A/zh active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE2433776A1 (de) * | 1973-07-20 | 1975-02-27 | Jocketa Hebegeraete Veb | Verfahren zur herstellung von gebaeuden und gebaeudesegmenten |
CN101451378A (zh) * | 2007-11-29 | 2009-06-10 | 上海市机械施工有限公司 | “水滴形”放射状单层钢管网壳分块及安装方法 |
CN103556836A (zh) * | 2013-07-30 | 2014-02-05 | 永升建设集团有限公司 | 受限空间条件下球形网壳拼装施工方法 |
CN205913766U (zh) * | 2016-07-04 | 2017-02-01 | 广州潮流水上乐园设备有限公司 | 一种大喇叭网架结构 |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110521649A (zh) * | 2019-08-12 | 2019-12-03 | 上海振华重工启东海洋工程股份有限公司 | 深远海网箱养殖装备基础设施桁架施工工艺 |
CN110521649B (zh) * | 2019-08-12 | 2021-08-17 | 上海振华重工启东海洋工程股份有限公司 | 深远海网箱养殖装备基础设施桁架施工工艺 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104480862B (zh) | 一种斜拉桥边跨钢桁梁的架设方法 | |
CN106499193A (zh) | 一种仿生态伞状单层网壳钢结构的安装方法 | |
CN103057973B (zh) | 一种适用于取料机回转轴承更换的多点顶升的方法 | |
CN106968438A (zh) | 一种超大跨度蘑菇状场馆钢结构的施工方法 | |
CN102493666A (zh) | 一种超大超重构件高空平移安装施工方法 | |
CN206156567U (zh) | 一种薄壁圆筒体吊具 | |
CN109055637B (zh) | 一种高炉大修中炉壳安装的液压提升工艺 | |
CN204899064U (zh) | 一种大坡度坡屋面现浇混凝土施工装置 | |
EP3211154B1 (en) | Manufacturing process of concrete towers for wind turbines | |
CN204958154U (zh) | 一种烟囱玻璃钢内筒液压提升专用吊具 | |
CN104878146A (zh) | 用于重力除尘器顶部波纹补偿器更换的施工方法 | |
CN202689575U (zh) | 核电站钢衬里穹顶高空安装工装 | |
CN104947953A (zh) | 一种10kV输电线路水泥杆更换方法及更换临时杆 | |
CN108821094A (zh) | 用于船用低速柴油机电动振动补偿器的起吊工具及方法 | |
CN103669887A (zh) | 环形钢结构安装中的临时支撑架 | |
CN104675140B (zh) | 新增承重柱安装及屋架荷载转移方法 | |
CN204307806U (zh) | 一种块状物料分离格筛 | |
CN204115461U (zh) | 一种回转窑筒体对接z向调节装置 | |
CN103541574B (zh) | 狭小区域内炼钢放散塔快速安装工法 | |
CN106013819A (zh) | 一种吊装系统及基于空中换勾的预制外墙挂板吊装方法 | |
CN209288575U (zh) | 一种适用于压力钢管弯段安装的压缝焊接台车 | |
CN209538709U (zh) | 预制板吊装稳定结构 | |
CN207405876U (zh) | 一种用于柱构件的固定底座 | |
CN105129599A (zh) | 一种烟囱玻璃钢内筒液压提升专用吊具及其施工方法 | |
CN207244854U (zh) | 一种顶升支撑梁托换结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170721 |