CN204899064U - 一种大坡度坡屋面现浇混凝土施工装置 - Google Patents

一种大坡度坡屋面现浇混凝土施工装置 Download PDF

Info

Publication number
CN204899064U
CN204899064U CN201520602692.7U CN201520602692U CN204899064U CN 204899064 U CN204899064 U CN 204899064U CN 201520602692 U CN201520602692 U CN 201520602692U CN 204899064 U CN204899064 U CN 204899064U
Authority
CN
China
Prior art keywords
lower carriage
upper bracket
lead wire
heavy grade
horizontal support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520602692.7U
Other languages
English (en)
Inventor
王俊峰
张震
张海强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Construction Engineering Co Ltd
Original Assignee
Shanxi Construction Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi Construction Engineering Group Co Ltd filed Critical Shanxi Construction Engineering Group Co Ltd
Priority to CN201520602692.7U priority Critical patent/CN204899064U/zh
Application granted granted Critical
Publication of CN204899064U publication Critical patent/CN204899064U/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

本实用新型属于建筑结构施工技术领域,具体涉及一种大坡度坡屋面现浇混凝土施工装置。主要解决现有技术在混凝土浇筑中坡屋面结构松散、渗漏、施工难度大、速度慢、效率低、影响外观质量的问题。其技术方案是:包括铅丝网、横向支架、下支架、上支架、混凝土模板;所述的下支架位于混凝土模板的上方,所述的上支架位于下支架上面,在所述的上支架与下支架之间设置若干个铅丝网,所述的横向支架对称设置在铅丝网的下面,且位于上支架与下支架的内侧。本实用新型具有操作简单、振捣密实、速度快、效率高、屋面外观质量好等优点。

Description

一种大坡度坡屋面现浇混凝土施工装置
技术领域
本实用新型属于建筑结构施工技术领域,具体涉及一种大坡度坡屋面现浇混凝土施工装置。
背景技术
现今的建筑中,坡屋面的应用越来越多,大坡度混凝土屋面的施工,尤其浇筑混凝土的难度较大。在现浇钢筋混凝土结构坡屋面施工时,混凝土浇筑时的坍落度、浇筑顺序、振捣方法等直接影响屋面外观的质量,尤其振捣时难度较大。由于屋面坡度过大,振捣时混凝土流坠、塌落,无法保证坡屋面外形;振捣不到位会形成屋面结构松散、渗漏;支设双面模板费时费工,且屋面混凝土厚度较小,不易振捣。
实用新型内容
本实用新型的目的是为解决上述现有技术在混凝土浇筑中坡屋面结构松散、渗漏、施工难度大、速度慢、效率低、影响外观质量的问题,提供一种大坡度坡屋面现浇混凝土施工装置。
为实现上述目的,本实用新型所采用的技术方案是:一种大坡度坡屋面现浇混凝土施工装置,包括铅丝网(1)、横向支架(2)、下支架(3)、上支架(5)、混凝土模板(4);所述的下支架(3)位于混凝土模板(4)的上方,所述的上支架(5)位于下支架(3)上面,且上支架(5)与下支架(3)之间的间距为25mm,在所述的上支架(5)与下支架(3)之间设置若干个铅丝网,所述的横向支架(2)对称设置在铅丝网(1)的下面,且位于上支架(5)与下支架(3)的内侧。
进一步优选方式,所述的铅丝网(1)与铅丝网(1)之间的间距为300mm。
所述横向支架(2)、下支架(3)、上支架(5)均为钢筋材料制成。
本实用新型与一般混凝土施工技术相比,铅丝网能有效阻止混凝土流坠,形成坡屋面混凝土浇筑的分段施工,且不用等留施工缝,混凝土通过网眼联通,不破坏混凝土的整体性;浇筑混凝土时能有效进行振捣,不用支设双层模板。操作简单,节省分段施工等待混凝土凝固时间或支设双层模板时间及材料,大大节省了成本,而且施工速度快,效率高。因此,本实用新型具有操作简单、振捣密实、速度快、效率高、屋面外观质量好等优点。
附图说明
图1是本实用新型的结构示意图。
具体实施方式
如图1所示,本实施例一种大坡度坡屋面现浇混凝土施工装置,包括铅丝网1、横向支架2、下支架3、上支架5、混凝土模板4;所述的下支架3位于混凝土模板4的上方,所述的上支架5位于下支架3上面,且上支架5与下支架3之间的间距为25mm,在所述的上支架5与下支架3之间设置若干个铅丝网,所述的横向支架2对称设置在铅丝网1的下面,且位于上支架5与下支架3的内侧。所述的铅丝网1与铅丝网1之间的间距为300mm。
所述横向支架2、下支架3、上支架5均为钢筋材料制成。
本实用新型在施工时,在屋面模板支设完成,钢筋绑扎完成后,在双层钢筋网片中间横向钢筋处将5×5mm铅丝网绑扎固定在屋面钢筋上,每300mm绑扎一道铅丝网,混凝土施工时按绑扎的铅丝网分段施工即可。

Claims (3)

1.一种大坡度坡屋面现浇混凝土施工装置,其特征是:包括铅丝网(1)、横向支架(2)、下支架(3)、上支架(5)、混凝土模板(4);所述的下支架(3)位于混凝土模板(4)的上方,所述的上支架(5)位于下支架(3)上面,且上支架(5)与下支架(3)之间的间距为25mm,在所述的上支架(5)与下支架(3)之间设置若干个铅丝网,所述的横向支架(2)对称设置在铅丝网(1)的下面,且位于上支架(5)与下支架(3)的内侧。
2.根据权利要求1所述的一种大坡度坡屋面现浇混凝土施工装置,其特征是:所述的铅丝网(1)与铅丝网(1)之间的间距为300mm。
3.根据权利要求1所述的一种大坡度坡屋面现浇混凝土施工装置,其特征是:所述横向支架(2)、下支架(3)、上支架(5)均为钢筋材料制成。
CN201520602692.7U 2015-08-11 2015-08-11 一种大坡度坡屋面现浇混凝土施工装置 Expired - Fee Related CN204899064U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520602692.7U CN204899064U (zh) 2015-08-11 2015-08-11 一种大坡度坡屋面现浇混凝土施工装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520602692.7U CN204899064U (zh) 2015-08-11 2015-08-11 一种大坡度坡屋面现浇混凝土施工装置

Publications (1)

Publication Number Publication Date
CN204899064U true CN204899064U (zh) 2015-12-23

Family

ID=54921251

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520602692.7U Expired - Fee Related CN204899064U (zh) 2015-08-11 2015-08-11 一种大坡度坡屋面现浇混凝土施工装置

Country Status (1)

Country Link
CN (1) CN204899064U (zh)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106284875A (zh) * 2016-08-31 2017-01-04 中冶天工集团有限公司 大坡度屋面的混凝土截留装置及施工方法
CN106836593A (zh) * 2016-12-21 2017-06-13 浙江海洋大学 大坡度现浇混凝土屋面防流淌浇捣方法
CN110714582A (zh) * 2019-09-27 2020-01-21 中国一冶集团有限公司 一种斜屋面m型拼装挡浆钢板及其施工方法
CN111877630A (zh) * 2020-07-28 2020-11-03 防城港中一重工有限公司 坡屋面混凝土浇筑施工方法

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106284875A (zh) * 2016-08-31 2017-01-04 中冶天工集团有限公司 大坡度屋面的混凝土截留装置及施工方法
CN106284875B (zh) * 2016-08-31 2019-05-03 中冶天工集团有限公司 大坡度屋面的混凝土截留装置及施工方法
CN106836593A (zh) * 2016-12-21 2017-06-13 浙江海洋大学 大坡度现浇混凝土屋面防流淌浇捣方法
CN106836593B (zh) * 2016-12-21 2020-07-03 浙江海洋大学 大坡度现浇混凝土屋面防流淌浇捣方法
CN110714582A (zh) * 2019-09-27 2020-01-21 中国一冶集团有限公司 一种斜屋面m型拼装挡浆钢板及其施工方法
CN111877630A (zh) * 2020-07-28 2020-11-03 防城港中一重工有限公司 坡屋面混凝土浇筑施工方法

Similar Documents

Publication Publication Date Title
CN204899064U (zh) 一种大坡度坡屋面现浇混凝土施工装置
CN202170600U (zh) 大角度坡屋面混凝土浇筑防离析装置
CN201666157U (zh) 仰拱整体式移动模架
CN102505839A (zh) 工业厂房弧形剪力墙浇筑用弧形模板及其制作方法
CN104294984A (zh) 薄壁方箱抗浮结构及其施工方法
CN103615075A (zh) 混凝土斜屋面连续浇注成型方法
CN202787330U (zh) 一种后浇带模板
CN204687050U (zh) 一种预制混凝土矩形梁的模具
CN104295089A (zh) 一种现浇混凝土gbf蜂巢芯密肋楼盖的支撑系统
CN203200719U (zh) 悬空式倒坡模板装置
CN201649639U (zh) 基础底板后浇带模板支撑体系
CN103628684B (zh) 一种同时浇筑楼板和剪力墙的施工方法
CN204199509U (zh) 薄壁方箱抗浮结构
CN202878454U (zh) 一种t梁模板安装拆卸装置
CN205591579U (zh) 一种采用钢梁加固加气混凝土屋面板结构
CN204212302U (zh) 一种空心板轻质管抗浮结构
CN202850041U (zh) 用于大型筏板及肋梁基础钢筋绑扎的钢筋支架
CN203066303U (zh) 一种防火隔热保温建筑外墙板
CN203238938U (zh) 一种自振式建筑模板
CN208167766U (zh) 一种简易快速连接预制砼板胎膜
CN202125072U (zh) 支模用桁架
CN207944479U (zh) 一种管廊斜坡板砼隔离装置
CN201546371U (zh) 大直径筒仓成束无粘结预应力筋锚固体系
CN206376557U (zh) 大坡度斜屋面混凝土浇筑装置
CN2856262Y (zh) 模板支护架

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20180614

Address after: 030006 9-12, C block 32, South Pingyang Road, Xiaodian District, Taiyuan, Shanxi.

Patentee after: Shanxi Construction Engineering Co., Ltd.

Address before: 030001 new road, Yingze District, Taiyuan, Shanxi Province, No. 9

Patentee before: Shanxi Construction Engineering (Group) Corporation

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20151223

Termination date: 20190811

CF01 Termination of patent right due to non-payment of annual fee