CN106958351B - 一种在搭建完工的楼板上临时开设大孔洞的方法 - Google Patents
一种在搭建完工的楼板上临时开设大孔洞的方法 Download PDFInfo
- Publication number
- CN106958351B CN106958351B CN201710341340.4A CN201710341340A CN106958351B CN 106958351 B CN106958351 B CN 106958351B CN 201710341340 A CN201710341340 A CN 201710341340A CN 106958351 B CN106958351 B CN 106958351B
- Authority
- CN
- China
- Prior art keywords
- hole
- floor
- girder steel
- well word
- chemical bolt
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
Abstract
Description
Claims (6)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710341340.4A CN106958351B (zh) | 2017-05-16 | 2017-05-16 | 一种在搭建完工的楼板上临时开设大孔洞的方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710341340.4A CN106958351B (zh) | 2017-05-16 | 2017-05-16 | 一种在搭建完工的楼板上临时开设大孔洞的方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106958351A CN106958351A (zh) | 2017-07-18 |
CN106958351B true CN106958351B (zh) | 2019-04-12 |
Family
ID=59481969
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710341340.4A Active CN106958351B (zh) | 2017-05-16 | 2017-05-16 | 一种在搭建完工的楼板上临时开设大孔洞的方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106958351B (zh) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH04333776A (ja) * | 1991-05-02 | 1992-11-20 | Mitsubishi Heavy Ind Ltd | ビルの建設方法と同建設方法に使用されるビルの建設装置 |
JPH0913658A (ja) * | 1995-06-28 | 1997-01-14 | Natl House Ind Co Ltd | 足場板支持構造 |
JPH09317186A (ja) * | 1996-06-01 | 1997-12-09 | Takaaki Hamada | 開口部閉塞兼用ドレーン回収具 |
CN103480889A (zh) * | 2013-09-23 | 2014-01-01 | 中国五冶集团有限公司 | 专用于对顶梁进行钻孔的装置及其施工方法 |
CN205576923U (zh) * | 2016-05-10 | 2016-09-14 | 温州市建设监理有限公司 | 一种用于逆作法预埋格构柱施工的定位架 |
-
2017
- 2017-05-16 CN CN201710341340.4A patent/CN106958351B/zh active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH04333776A (ja) * | 1991-05-02 | 1992-11-20 | Mitsubishi Heavy Ind Ltd | ビルの建設方法と同建設方法に使用されるビルの建設装置 |
JPH0913658A (ja) * | 1995-06-28 | 1997-01-14 | Natl House Ind Co Ltd | 足場板支持構造 |
JPH09317186A (ja) * | 1996-06-01 | 1997-12-09 | Takaaki Hamada | 開口部閉塞兼用ドレーン回収具 |
CN103480889A (zh) * | 2013-09-23 | 2014-01-01 | 中国五冶集团有限公司 | 专用于对顶梁进行钻孔的装置及其施工方法 |
CN205576923U (zh) * | 2016-05-10 | 2016-09-14 | 温州市建设监理有限公司 | 一种用于逆作法预埋格构柱施工的定位架 |
Also Published As
Publication number | Publication date |
---|---|
CN106958351A (zh) | 2017-07-18 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102146672B (zh) | 一种在岩溶地区的桩基施工方法 | |
CN109610881A (zh) | 一种既有多层建筑改造中预应力梁托换断柱施工方法 | |
CN108193894A (zh) | 绳锯拆除混凝土墙体的施工方法 | |
CN110847915A (zh) | 浅埋粉细砂层双侧壁临时支撑跳割拆除分段回顶施工工艺 | |
JP2012107479A (ja) | 地下・地上構造物の施工方法 | |
CN111894204A (zh) | 一种钢管混凝土叠合柱施工方法 | |
CN106065628B (zh) | 基于永临结合理念的大直径自来水管安全防护施工方法 | |
CN108797323B (zh) | 一种适用于硬质地层的钢栈桥 | |
KR101051978B1 (ko) | 피씨부재를 이용한 지하층 구조물 시공방법 | |
CN201172830Y (zh) | 塔式起重机锚杆静压桩基础 | |
CN108166772B (zh) | 一种柱包钢加固变截面节点的加固方法 | |
CN104947662B (zh) | 一种基于装配式可回收工艺的土钉墙支护体系 | |
CN113914327A (zh) | 一种基坑围护及土方开挖的施工方法 | |
CN106958351B (zh) | 一种在搭建完工的楼板上临时开设大孔洞的方法 | |
CN109024670B (zh) | 埋地高压电缆上穿地下综合管廊保护加固体系及加固方法 | |
CN101725147A (zh) | 低净空间下先插后喷型钢旋喷桩围护结构施工工艺 | |
CN110552445A (zh) | 一种主体墙柱结构预留拉结筋的施工工艺 | |
KR100626328B1 (ko) | 운행중인 지하철 구조물의 벽체 철거 및 확장 공법 | |
CN113266019B (zh) | 一种基坑钢管支撑体系的施工工法 | |
CN112610022B (zh) | 临近深基坑的老建筑平移施工方法 | |
CN113863675A (zh) | 一种主变洞结构混凝土施工方法 | |
KR200263526Y1 (ko) | 매달아 내려치고 되올려치는 콘크리트 구조물 구축장치 | |
JP6341027B2 (ja) | 床版拡幅工法 | |
CN112593723A (zh) | 一种既有建筑的上接方法 | |
KR100473477B1 (ko) | 교량연석을 비해체하는 교량방호울타리 보강공법 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB02 | Change of applicant information |
Address after: 230000 East Fozhang Road and North Tingyun Road Office Building, Hefei Economic and Technological Development Zone, Anhui Province Applicant after: China National Chemical Engineering Third Construction Co., Ltd. Address before: 232038 No. 98 Dongshan Road, Tianjiaan District, Huainan City, Anhui Province Applicant before: China National Chemical Engineering Third Construction Co., Ltd. |
|
CB02 | Change of applicant information | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20190918 Address after: 230000 Office of Fozhang Road East and Tingyun Road North, Hefei Economic and Technological Development Zone, Anhui Province Co-patentee after: CHINA CHEMICAL ENGINEERING HEAVY MECHANIZATION CO., LTD. Patentee after: China National Chemical Engineering Third Construction Co., Ltd. Address before: 230000 East Fozhang Road and North Tingyun Road Office Building, Hefei Economic and Technological Development Zone, Anhui Province Patentee before: China National Chemical Engineering Third Construction Co., Ltd. |
|
TR01 | Transfer of patent right |