CN106958351A - 一种在搭建完工的楼板上临时开设大孔洞的方法 - Google Patents
一种在搭建完工的楼板上临时开设大孔洞的方法 Download PDFInfo
- Publication number
- CN106958351A CN106958351A CN201710341340.4A CN201710341340A CN106958351A CN 106958351 A CN106958351 A CN 106958351A CN 201710341340 A CN201710341340 A CN 201710341340A CN 106958351 A CN106958351 A CN 106958351A
- Authority
- CN
- China
- Prior art keywords
- hole
- floor
- opening
- interim
- girder steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
Description
Claims (6)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710341340.4A CN106958351B (zh) | 2017-05-16 | 2017-05-16 | 一种在搭建完工的楼板上临时开设大孔洞的方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710341340.4A CN106958351B (zh) | 2017-05-16 | 2017-05-16 | 一种在搭建完工的楼板上临时开设大孔洞的方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106958351A true CN106958351A (zh) | 2017-07-18 |
CN106958351B CN106958351B (zh) | 2019-04-12 |
Family
ID=59481969
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710341340.4A Active CN106958351B (zh) | 2017-05-16 | 2017-05-16 | 一种在搭建完工的楼板上临时开设大孔洞的方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106958351B (zh) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH04333776A (ja) * | 1991-05-02 | 1992-11-20 | Mitsubishi Heavy Ind Ltd | ビルの建設方法と同建設方法に使用されるビルの建設装置 |
JPH0913658A (ja) * | 1995-06-28 | 1997-01-14 | Natl House Ind Co Ltd | 足場板支持構造 |
JPH09317186A (ja) * | 1996-06-01 | 1997-12-09 | Takaaki Hamada | 開口部閉塞兼用ドレーン回収具 |
CN103480889A (zh) * | 2013-09-23 | 2014-01-01 | 中国五冶集团有限公司 | 专用于对顶梁进行钻孔的装置及其施工方法 |
CN205576923U (zh) * | 2016-05-10 | 2016-09-14 | 温州市建设监理有限公司 | 一种用于逆作法预埋格构柱施工的定位架 |
-
2017
- 2017-05-16 CN CN201710341340.4A patent/CN106958351B/zh active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH04333776A (ja) * | 1991-05-02 | 1992-11-20 | Mitsubishi Heavy Ind Ltd | ビルの建設方法と同建設方法に使用されるビルの建設装置 |
JPH0913658A (ja) * | 1995-06-28 | 1997-01-14 | Natl House Ind Co Ltd | 足場板支持構造 |
JPH09317186A (ja) * | 1996-06-01 | 1997-12-09 | Takaaki Hamada | 開口部閉塞兼用ドレーン回収具 |
CN103480889A (zh) * | 2013-09-23 | 2014-01-01 | 中国五冶集团有限公司 | 专用于对顶梁进行钻孔的装置及其施工方法 |
CN205576923U (zh) * | 2016-05-10 | 2016-09-14 | 温州市建设监理有限公司 | 一种用于逆作法预埋格构柱施工的定位架 |
Also Published As
Publication number | Publication date |
---|---|
CN106958351B (zh) | 2019-04-12 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104846829A (zh) | 预留盾构穿越复合式基坑围护墙及其施工方法 | |
CN109610881A (zh) | 一种既有多层建筑改造中预应力梁托换断柱施工方法 | |
CN111894204A (zh) | 一种钢管混凝土叠合柱施工方法 | |
CN105586985B (zh) | 一种地铁围护结构的修建方法及一种地铁围护结构 | |
CN108193894A (zh) | 绳锯拆除混凝土墙体的施工方法 | |
CN110847915A (zh) | 浅埋粉细砂层双侧壁临时支撑跳割拆除分段回顶施工工艺 | |
CN106065628B (zh) | 基于永临结合理念的大直径自来水管安全防护施工方法 | |
CN108797323B (zh) | 一种适用于硬质地层的钢栈桥 | |
CN114837088A (zh) | 一种公路上承台的施工方法 | |
CN108166772B (zh) | 一种柱包钢加固变截面节点的加固方法 | |
CN109024670B (zh) | 埋地高压电缆上穿地下综合管廊保护加固体系及加固方法 | |
CN109056710A (zh) | 一种硬质地层钢管桩及其施工方法 | |
CN110565667B (zh) | 一种具有注浆平台的钢板桩围堰 | |
CN110552445B (zh) | 一种主体墙柱结构预留拉结筋的施工工艺 | |
CN101725147A (zh) | 低净空间下先插后喷型钢旋喷桩围护结构施工工艺 | |
CN106958351B (zh) | 一种在搭建完工的楼板上临时开设大孔洞的方法 | |
CN115897600A (zh) | 一种新建基坑紧临既有地铁车站深基坑近接区施工方法 | |
CN113266019B (zh) | 一种基坑钢管支撑体系的施工工法 | |
CN206173993U (zh) | 水中十字梁塔吊基础 | |
CN213448506U (zh) | 置于基坑围护桩之间的封堵结构 | |
CN210561510U (zh) | 铁路线路防护装置 | |
CN104131816B (zh) | 一种运营中地铁隧道地下墙开门洞的施工方法 | |
CN113863675A (zh) | 一种主变洞结构混凝土施工方法 | |
CN210685474U (zh) | 一种混凝土托换结构 | |
CN110230238B (zh) | 铁路线路防护装置及防护方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB02 | Change of applicant information |
Address after: 230000 East Fozhang Road and North Tingyun Road Office Building, Hefei Economic and Technological Development Zone, Anhui Province Applicant after: China National Chemical Engineering Third Construction Co., Ltd. Address before: 232038 No. 98 Dongshan Road, Tianjiaan District, Huainan City, Anhui Province Applicant before: China National Chemical Engineering Third Construction Co., Ltd. |
|
CB02 | Change of applicant information | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20190918 Address after: 230000 Office of Fozhang Road East and Tingyun Road North, Hefei Economic and Technological Development Zone, Anhui Province Co-patentee after: CHINA CHEMICAL ENGINEERING HEAVY MECHANIZATION CO., LTD. Patentee after: China National Chemical Engineering Third Construction Co., Ltd. Address before: 230000 East Fozhang Road and North Tingyun Road Office Building, Hefei Economic and Technological Development Zone, Anhui Province Patentee before: China National Chemical Engineering Third Construction Co., Ltd. |
|
TR01 | Transfer of patent right |