CN102146672B - 一种在岩溶地区的桩基施工方法 - Google Patents

一种在岩溶地区的桩基施工方法 Download PDF

Info

Publication number
CN102146672B
CN102146672B CN 201110061813 CN201110061813A CN102146672B CN 102146672 B CN102146672 B CN 102146672B CN 201110061813 CN201110061813 CN 201110061813 CN 201110061813 A CN201110061813 A CN 201110061813A CN 102146672 B CN102146672 B CN 102146672B
Authority
CN
China
Prior art keywords
steel casing
solution cavity
boring
pile foundation
construction
Prior art date
Application number
CN 201110061813
Other languages
English (en)
Other versions
CN102146672A (zh
Inventor
李新广
连浩
李永卿
米万富
朱铁迈
顾玉峰
鄢全成
佟建武
刘林
于志勇
Original Assignee
中铁六局集团有限公司
中铁六局集团天津铁路建设有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 中铁六局集团有限公司, 中铁六局集团天津铁路建设有限公司 filed Critical 中铁六局集团有限公司
Priority to CN 201110061813 priority Critical patent/CN102146672B/zh
Publication of CN102146672A publication Critical patent/CN102146672A/zh
Application granted granted Critical
Publication of CN102146672B publication Critical patent/CN102146672B/zh

Links

Abstract

本发明公开了一种在岩溶地区的桩基施工方法。该桩基施工方法是在桩基施工过程中遇到溶洞后立即采取钢护筒跟进的应急措施以防止塌孔,然后采用抛片石、粘土并挤压的方法对溶洞进行封堵及加固处理,最后再按照常规的钢筋混凝土灌注桩成型工艺完成桩基施工过程,这样不仅无需对钻孔进行回填处理,因此不会延误工期,而且施工成本低且安全可靠。

Description

一种在岩溶地区的粧基施工方法
技术领域
[0001] 本发明属于桥涵桩基施工技术领域,特别是涉及ー种在岩溶地区的桩基施工方法。
背景技术
[0002] 溶洞是指因雨水或地下水溶解侵蚀石灰岩层而在大地中形成的空洞,又称钟乳洞、石灰岩洞,多分布于岩溶地区,具有隐蔽性强、空间分布规律性差、难以预测等特点。
[0003] 随着城乡建设的飞速发展,现有的公路和铁路已无法满足交通的要求,因此需要修建大量的鉄路及公路。当公路与鉄路相交时就需要在交汇处修建立交桥。目前常用的立交桥修建方法是先在待修建处的地基中设置所需数量的桩基以形成基础,然后在上述基础上建造多个桥墩,最后在这些桥墩的顶部搭设箱梁即可形成立交桥。其中桩基多采用钢筋混凝土灌注桩,这种桩基的施工方法是先在工程现场的地基上待钻孔处利用钻机上的钻头向下垂直钻孔至设计标高而形成钻孔,同时配制泥浆护壁,然后取出钻头,之后在上述钻孔中安放钢筋笼及导管,然后连续灌注混凝土的同时上提导管,直至混凝土灌注完毕并固结后即可形成桩基。但在桩基的施工过程中,如果该处的地基中存在溶洞时,就有可能因钻孔的侧壁受カ不均匀而出现偏孔、塌孔等问题,目前遇到这种问题时工程技术人员通常是采取回填、人工挖孔或者采用振动全护筒桩基施工设备等措施进行处理。其中回填方法是将土壌回填到钻孔中再进行二次钻孔,这样不仅会使施工成本大幅度升高,而且エ期长。人工挖孔方法是在利用钻机向下钻孔过程中遇到溶洞时,停止钻孔,然后施工人员下到上述已形成的上部钻孔中,之后配合简单机械继续挖掘成孔,同时对溶洞进行局部处理,最后安放钢筋笼及导管并灌注混凝土成桩,但是很显然这种方法易出现因塌孔而造成施工人员被埋以及中毒身亡等危险,所以安全性较差。采用振动全护筒桩基施工设备方法是利用专门的振动护筒桩基设备对桩基进行施工,缺点是成本较高且需要将桩基进行回填,因此エ期较长。
发明内容
[0004] 为了解决上述问题,本发明的目的在于提供ー种操作难度小、施工成本低且安全性好的在岩溶地区的桩基施工方法。
[0005] 为了达到上述目的,本发明提供的在岩溶地区的桩基施工方法包括按顺序进行的下列步骤:
[0006] I、在工程现场的地基上待钻孔处利用冲击钻向下垂直钻孔至设计标高以形成钻孔,同时配制泥浆护壁,然后取出钻头;
[0007] 2、当在钻孔内发现溶洞时,測量溶洞至孔ロ之间的距离;
[0008] 3、分多节加工管状钢护筒,并采用钢筋将上述钢护筒的两端依次焊接在一起,以防其因振动或挤压而产生变形;
[0009] 4、在孔ロ周围的地面上搭设钢管支架,并在该支架的四周设置拉锚以保证其稳定性,然后在钢护筒的顶部设置多块枕木作为垫板,以防止振动锤的提拉作用将已经连接好的钢护筒拉断;
[0010] 5、采用吊车将钢护筒的下端放入孔ロ的内部,然后利用振动锤作用钢护筒的上端,以使其匀速沉入钻孔中,直至钢护筒的下端到达溶洞的位置,停止振动;
[0011] 6、向孔内抛入片石和粘土,然后利用冲击钻将上述片石和粘土挤向溶洞而将该溶洞封堵,以使溶洞侧向土体结构得到加强;
[0012] 7、继续利用振动锤作用钢护筒的上端,直至钢护筒的下端越过溶洞的位置,停止振动;
[0013] 8、最后按照常规的方式在钻孔内在安放钢筋笼及导管,然后连续灌注混凝土的同时上提导管,直到混凝土灌注完毕并固结即可完成整个桩基施工过程。
[0014] 本发明提供的在岩溶地区的桩基施工方法是在桩基施工过程中遇到溶洞后立即采取钢护筒跟进的应急措施,然后采用抛片石、粘土并挤压的方法对溶洞进行封堵及加固处理,最后再按照常规的钢筋混凝土灌注桩成型エ艺完成桩基施工过程,这样不仅无需对钻孔进行回填处理,因此不会延误エ期,而且施工成本低且安全可靠。
附图说明
[0015] 图I-图5为采用本发明提供的在岩溶地区的桩基施工方法时整个施工过程示意图。
具体实施方式
[0016] 下面结合附图和具体实施例对本发明提供的在岩溶地区的桩基施工方法进行详细说明。
[0017] 如图I-图5所示,本发明提供的在岩溶地区的桩基施工方法包括按顺序进行的下列步骤:
[0018] I、在工程现场的地基上待钻孔处利用冲击钻I向下垂直钻孔至设计标高以形成钻孔2,同时配制泥浆护壁,然后取出钻头;
[0019] 2、当在钻孔2内发现溶洞3时,測量溶洞3至孔ロ之间的距离;
[0020] 3、分多节加工管状钢护筒4,并采用钢筋将上述多节钢护筒4的两端依次焊接在一起,以防其因振动或挤压而产生变形;
[0021] 4、在孔ロ周围的地面上搭设钢管支架5,并在该支架5的四周设置拉锚6以保证其稳定性,然后在钢护筒4的顶部设置多块枕木7作为垫板,以防止振动锤8的提拉作用将已经连接好的钢护筒4拉断;
[0022] 5、采用吊车将钢护筒4的下端放入孔ロ的内部,然后利用振动锤8作用钢护筒4的上端,以使其匀速沉入钻孔2中,直至钢护筒4的下端到达溶洞3的位置,停止振动;
[0023] 6、向孔内抛入片石和粘土 9,然后利用冲击钻I将上述片石和粘土 9挤向溶洞3而将该溶洞3回填,以使溶洞侧向土体结构得到加强;
[0024] 7、继续利用振动锤8作用钢护筒4的上端,直至钢护筒4的下端越过溶洞3的位
置,停止振动;
[0025] 8、最后按照常规的方式在钻孔2内在安放钢筋笼及导管,然后连续灌注混凝土的同时上提导管,直到混凝土灌注完毕并固结即可完成整个桩基施工过程。
[0026] 所述的钢护筒4的直径略大于钻孔2的直径。
[0027] 所述的钢护筒4的总长度大于溶 洞3至孔ロ之间的距离。

Claims (3)

1. 一种在岩溶地区的桩基施工方法,其特征在于:所述的桩基施工方法包括按顺序进行的下列步骤: 1)在工程现场的地基上待钻孔处利用冲击钻(I)向下垂直钻孔至设计标高以形成钻孔(2),同时配制泥浆护壁,然后取出钻头; 2)当在钻孔(2)内发现溶洞(3)时,測量溶洞(3)至孔ロ之间的距离; 3)分多节加工管状钢护筒(4),并采用钢筋将上述多节钢护筒(4)的两端依次焊接在一起; 4)在孔ロ周围的地面上搭设钢管支架(5),并在该支架(5)的四周设置拉锚¢),然后 在钢护筒(4)的顶部设置多块枕木(7)作为垫板; 5)采用吊车将钢护筒(4)的下端放入孔ロ的内部,然后利用振动锤(8)作用钢护筒(4)的上端,以使其匀速沉入钻孔(2)中,直至钢护筒(4)的下端到达溶洞(3)的位置,停止振动; 6)向孔内抛入片石和粘土(9),然后利用冲击钻(I)将上述片石和粘土(9)挤向溶洞(3)而将该溶洞(3)封堵; 7)继续利用振动锤(8)作用钢护筒(4)的上端,直至钢护筒(4)的下端越过溶洞(3)的位置,停止振动; 8)最后按照常规的方式在钻孔(2)内安放钢筋笼及导管,然后连续灌注混凝土的同时上提导管,直到混凝土灌注完毕并固结即可完成整个桩基施工过程。
2.根据权利要求I所述的在岩溶地区的桩基施工方法,其特征在于:所述的钢护筒(4)的直径略大于钻孔⑵的直径。
3.根据权利要求I所述的在岩溶地区的桩基施工方法,其特征在于:所述的钢护筒(4)的总长度大于溶洞(3)至孔ロ之间的距离。
CN 201110061813 2011-03-15 2011-03-15 一种在岩溶地区的桩基施工方法 CN102146672B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201110061813 CN102146672B (zh) 2011-03-15 2011-03-15 一种在岩溶地区的桩基施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201110061813 CN102146672B (zh) 2011-03-15 2011-03-15 一种在岩溶地区的桩基施工方法

Publications (2)

Publication Number Publication Date
CN102146672A CN102146672A (zh) 2011-08-10
CN102146672B true CN102146672B (zh) 2012-09-05

Family

ID=44421128

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201110061813 CN102146672B (zh) 2011-03-15 2011-03-15 一种在岩溶地区的桩基施工方法

Country Status (1)

Country Link
CN (1) CN102146672B (zh)

Families Citing this family (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102425082A (zh) * 2011-09-09 2012-04-25 中铁二院工程集团有限责任公司 高速铁路岩溶强烈发育车站道岔区路基加固构造
CN102704834B (zh) * 2012-05-30 2014-06-18 山东华邦建设集团有限公司 频振护筒式钻孔机
CN102912789B (zh) * 2012-10-24 2014-12-10 中色十二冶金建设有限公司 喀斯特地貌下机械成孔方法
CN103147435A (zh) * 2013-02-23 2013-06-12 西山煤电建筑工程集团有限公司 采空区建筑工程地基处理方法
CN105672309B (zh) * 2016-02-22 2017-11-28 北龙建设集团有限公司 岩溶地区嵌岩桩成孔可回收超长钢护筒护壁方法
CN109667537B (zh) * 2017-10-16 2020-06-30 湖北中南勘察基础工程有限公司 一种勘察充填卵石土溶洞的钻进工艺
CN107938676B (zh) * 2017-11-21 2020-06-30 重庆建工市政交通工程有限责任公司 一种穿越全填充型溶洞的桩基施工方法
CN108086308B (zh) * 2017-12-12 2020-02-07 中国建筑第八工程局有限公司 填海区局部暗埋淤泥包上冲孔灌注桩的施工方法
CN108049397A (zh) * 2017-12-22 2018-05-18 中交第三航务工程局有限公司宁波分公司 岩溶地质钻孔桩的施工方法
CN109914455A (zh) * 2019-03-29 2019-06-21 广西鑫豪建筑工程有限公司 一种建筑物地基灌注桩施工方法
CN110145230A (zh) * 2019-04-23 2019-08-20 上海勃利燃气设备有限公司 一种水平定向钻进拉管方法
CN110629766A (zh) * 2019-08-19 2019-12-31 中铁十八局集团有限公司 一种桥墩深抗滑桩穿过岩溶孤洞的安全开挖方法

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1490467A (zh) * 2003-08-05 2004-04-21 胡柏英 一种复合摩擦桩的结构及其施工方法
CN101122131A (zh) * 2007-08-14 2008-02-13 蓝冰 一种用管件桩嵌岩的基坑支护桩
CN101255698A (zh) * 2008-01-23 2008-09-03 湖南省建筑工程集团总公司 流砂层及砂砾层动水双液高压注浆堵水施工方法
CN101298769A (zh) * 2008-06-19 2008-11-05 浙江省建工集团有限责任公司 一种针对溶洞地区的桩砼灌注法
CN101525881A (zh) * 2009-04-01 2009-09-09 中铁二院工程集团有限责任公司 岩溶地层桩孔护壁构造及桩孔施工方法
CN101634142A (zh) * 2009-08-13 2010-01-27 广东省基础工程公司 一种多重钢套管溶洞填充预处理施工方法
CN101691751A (zh) * 2009-08-31 2010-04-07 中建三局第三建设工程有限责任公司 超长人工挖孔桩穿越溶洞施工方法及穿越溶洞的超长桩
CN201567572U (zh) * 2009-10-28 2010-09-01 湖南省交通科学研究院 钢筋笼+钢护筒组合护筒结构

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1490467A (zh) * 2003-08-05 2004-04-21 胡柏英 一种复合摩擦桩的结构及其施工方法
CN101122131A (zh) * 2007-08-14 2008-02-13 蓝冰 一种用管件桩嵌岩的基坑支护桩
CN101255698A (zh) * 2008-01-23 2008-09-03 湖南省建筑工程集团总公司 流砂层及砂砾层动水双液高压注浆堵水施工方法
CN101298769A (zh) * 2008-06-19 2008-11-05 浙江省建工集团有限责任公司 一种针对溶洞地区的桩砼灌注法
CN101525881A (zh) * 2009-04-01 2009-09-09 中铁二院工程集团有限责任公司 岩溶地层桩孔护壁构造及桩孔施工方法
CN101634142A (zh) * 2009-08-13 2010-01-27 广东省基础工程公司 一种多重钢套管溶洞填充预处理施工方法
CN101691751A (zh) * 2009-08-31 2010-04-07 中建三局第三建设工程有限责任公司 超长人工挖孔桩穿越溶洞施工方法及穿越溶洞的超长桩
CN201567572U (zh) * 2009-10-28 2010-09-01 湖南省交通科学研究院 钢筋笼+钢护筒组合护筒结构

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
应文兵.浅谈溶洞区桩基础施工技术.《中国高新技术企业》.2009,(第6期), *
李誉.岩溶地区桥梁桩基施工技术.《施工技术》.2008,(第5期), *

Also Published As

Publication number Publication date
CN102146672A (zh) 2011-08-10

Similar Documents

Publication Publication Date Title
CN101644160B (zh) 高地应力软岩卸压施工方法
CN101614125B (zh) V级围岩隧道施工方法
CN101736760B (zh) 一种预应力抗浮锚杆施工方法
CN104612162B (zh) 一种地铁车站深基坑开挖施工方法
CN106050266B (zh) 富水砂卵石地层隧道内盾构区间联络通道暗挖的施工方法
CN102518135B (zh) 水平旋喷土锚和灌注桩复合基坑支护施工工法
CN106400782B (zh) 一种利用旋挖钻机施工基坑围护钻孔咬合桩的施工方法
CN106402490B (zh) 基于钢套头工具管的粉砂土地层顶管顶进施工方法
CN1307348C (zh) 地下结构半逆作法反向连接施工方法
CN102251777B (zh) 一种岩溶隧道大规模溶腔处理方法
CN101122130B (zh) 一种建筑物或桥梁基础用的随钻跟管桩的施工方法
CN106369223B (zh) 一种粉砂土地层顶管施工方法
CN100587170C (zh) 筒式地下车库的建造方法
CN104631470B (zh) 高水位大粒径砂砾石地质深基坑组合支护施工方法
CN101560770B (zh) 一种深建筑基坑支护体系
KR101022382B1 (ko) 비개착식 지하터널 축조 장치 및 방법
CN203846485U (zh) 长桩冲击钻成孔施工装置
CN106837351A (zh) 隧道岩溶水探测处治方法
CN103321244B (zh) 砂土地基既有建筑增设地下室的施工方法
CN1837506B (zh) 一种在运营中的隧道上方开挖箱形结构的施工方法
CN109208637A (zh) 在既有隧道基础上新增明挖车站的施工方法
CN101509263A (zh) 钢盖板盖挖法基坑结构及其施工方法
KR101067707B1 (ko) 현장타설 콘크리트말뚝과 그라우팅 기둥을 이용한 주열식 토류벽 차수 시공방법
CN102748040B (zh) 地铁大跨度车站主体结构及其柱拱法施工方法
CN102660955B (zh) 一种基坑边坡支护的快速施工方法

Legal Events

Date Code Title Description
PB01 Publication
C06 Publication
SE01 Entry into force of request for substantive examination
C10 Entry into substantive examination
GR01 Patent grant
C14 Grant of patent or utility model