CN106909111A - Multifunctional control panel and multifunctional control method - Google Patents
Multifunctional control panel and multifunctional control method Download PDFInfo
- Publication number
- CN106909111A CN106909111A CN201710210515.8A CN201710210515A CN106909111A CN 106909111 A CN106909111 A CN 106909111A CN 201710210515 A CN201710210515 A CN 201710210515A CN 106909111 A CN106909111 A CN 106909111A
- Authority
- CN
- China
- Prior art keywords
- signal
- panel
- control
- output
- switch key
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B19/00—Programme-control systems
- G05B19/02—Programme-control systems electric
- G05B19/04—Programme control other than numerical control, i.e. in sequence controllers or logic controllers
- G05B19/042—Programme control other than numerical control, i.e. in sequence controllers or logic controllers using digital processors
- G05B19/0423—Input/output
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B2219/00—Program-control systems
- G05B2219/20—Pc systems
- G05B2219/25—Pc structure of the system
- G05B2219/25314—Modular structure, modules
Landscapes
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Engineering & Computer Science (AREA)
- Automation & Control Theory (AREA)
- Electric Propulsion And Braking For Vehicles (AREA)
- Train Traffic Observation, Control, And Security (AREA)
Abstract
The invention discloses a kind of Multifunctional control panel and multifunctional control method.Wherein, the method includes:Multifunctional control panel is applied to track train monitoring, including:Switch key panel, integrated control panel and output board, wherein, switch key panel, the input of the push button signalling for receiving switch key, and the indication signal of integrated control panel is received, and the corresponding indicatrix of indication signal is shown;Integrated control panel, push button signalling for gathering switch key panel, and the status signal of output board, acquisition indication signal and output control signal respectively is processed push button signalling and status signal, and indication signal and output control signal are respectively sent to switch key panel and output board;Output board, for carrying out output control according to output control signal.The present invention solves the technical problem that control panel in correlation technique has security and stability.
Description
Technical field
The present invention relates to multi-functional control field, in particular to a kind of Multifunctional control panel and Multifunctional controlling
Method processed.
Background technology
At present, tramcar shuttles in urban inner, in operating in same traffic environment with convention traffic instrument, and with
BRT public transit systems using identical stop mode, i.e., website stop, but it is different with BRT public transit system tracks be, track
The track of train uses non-isolated mode, because track is shallower, does not influence car lane, so other vehicles also may be used
With the normally travel on rail, this feature becomes the big advantage that tramcar incorporates urban mass-transit system, but this
Advantage also brings the test of the security and stability to tramcar control system, and control panel is in vehicle in drivers' cab
The core position of control system, therefore, the Multifunctional control panel for realizing a set of dependable performance stabilization is current urgently to be resolved hurrily
Problem.
There is a problem of security and stability for control panel in above-mentioned correlation technique, not yet propose at present effective
Solution.
The content of the invention
A kind of Multifunctional control panel and multifunctional control method are the embodiment of the invention provides, at least to solve correlation
In technology there is the technical problem of security and stability in control panel.
A kind of one side according to embodiments of the present invention, there is provided Multifunctional control panel, including:Multi-functional control face
Plate is applied to track train monitoring, including:Switch key panel, integrated control panel and output board, wherein, switch key panel,
Input for receiving the push button signalling of switch key, and the indication signal of integrated control panel is received, and to indication signal pair
The indicatrix answered is shown;The state of integrated control panel, the push button signalling for gathering switch key panel, and output board
Signal, is processed push button signalling and status signal acquisition indication signal and output control signal respectively, and by indication signal
Switch key panel and output board are respectively sent to output control signal;Output board, for being carried out according to output control signal
Output control.
Alternatively, also include:Metal plate is installed, for fixing Multifunctional control panel, install metal plate include it is following at least it
One:Front panel, rear board, film on surface, mounting column.
Alternatively, switch key panel is provided with:Indicator lamp, button warns buzzer;Integrated control panel is provided with:It is micro-
Control unit MCU, double-unit traction controller/controller local area network's CAN isolates acquisition module, isolation and amplifier
Module;Output board is provided with:External signal acquisition module, relay output module.
Alternatively, Multifunctional control panel includes:Control panel A, control panel B and control panel C, wherein, chain of command
Plate A, for realizing at least one following control:Locomotive cab state, battery and lifting are bent;Control panel B, for realizing
Below at least one control:Locomotive operation direction, lamp inside and outside drivers' cab;Control panel C, for realize it is following control at least it
One:Car door, wiper, brake hard, steering indicating light, warning lamp, curtain lifting.
Other side according to embodiments of the present invention, additionally provides a kind of multifunctional control method, multi-functional control side
Method is applied to track train monitoring, including:Gather switch key panel push button signalling, and output board status signal;It is right
Push button signalling and status signal are processed acquisition indication signal and output control signal respectively;The indication signal and defeated that will be obtained
Go out control signal and be respectively sent to switch key panel and output board, wherein, the corresponding indicatrix of indication signal is in switch key
Display panel, output control signal is used for output board controlled output.
Alternatively, the indication signal and output control signal of acquisition are respectively sent to switch key panel and output board bag
Include:Prioritization is carried out to indication signal and output control signal and obtains safe class;According to safe class by indication signal
Switch key panel and output board are respectively sent to output control signal.
Alternatively, respectively acquisition indication signal and output control signal bag is processed push button signalling and status signal
Include:According to indication signal and output control signal, state of a control information is generated;By state of a control information be sent to Train Control and
Management system TCMS;Receive state of a control feedback informations of the TCMS according to state of a control feedback of the information;Fed back according to state of a control
Information, is processed push button signalling and status signal acquisition indication signal and output control signal respectively.
Other side according to embodiments of the present invention, additionally provides a kind of integrated control panel, and integrated control panel is applied to
Track train is monitored, including:The shape of isolation acquisition module, the push button signalling for gathering switch key panel, and output board
State signal;Micro-control unit MCU, obtain respectively indication signal and output control for being processed push button signalling and status signal
Signal processed;Isolation and amplifier module, for the indication signal and output control signal of acquisition to be respectively sent into switch key panel
And output board, wherein, the corresponding indicatrix of indication signal is used for output board control in switch key Display panel, output control signal
System output.
Alternatively, isolation and amplifier module includes:Sequencing unit, for entering row major to indication signal and output control signal
Level sequence obtains safe class;Transmitting element, for being sent indication signal and output control signal respectively according to safe class
To switch key panel and output board.
Other side according to embodiments of the present invention, additionally provides a kind of multifunctional control method, multi-functional control side
Method is applied to track train monitoring, including:Switch key panel receive switch key push button signalling input, and by gather
Push button signalling is sent to integrated control panel;Integrated control panel gathers the push button signalling of switch key panel, and output board shape
State signal, is processed push button signalling and status signal acquisition indication signal and output control signal respectively, and will indicate to believe
Number and output control signal be respectively sent to switch key panel and output board;Switch key panel receives the finger of integrated control panel
Show signal, and the corresponding indicatrix of indication signal is shown;Output board carries out output control according to output control signal.
In embodiments of the present invention, track train is monitored using Multifunctional control panel, wherein, the Multifunctional controlling
Panel processed includes switch key panel, integrated control panel and output board, and the button of switch key is received using switch key panel
The input of signal, and the indication signal of integrated control panel is received, and the corresponding indicatrix of indication signal is shown;It is integrated
Control panel gather switch key panel push button signalling, and output board status signal, push button signalling and status signal are entered
Row treatment obtains indication signal and output control signal respectively, and indication signal and output control signal are respectively sent into switch
Key panel and output board;Output board carries out output control according to output control signal, is controlled so as to solve in correlation technique
There is the technical problem of security and stability in panel.
Brief description of the drawings
Accompanying drawing described herein is used for providing a further understanding of the present invention, constitutes the part of the application, this hair
Bright schematic description and description does not constitute inappropriate limitation of the present invention for explaining the present invention.In the accompanying drawings:
Fig. 1 is the schematic diagram of Multifunctional control panel according to embodiments of the present invention;
Fig. 2 is the overall structure figure of Multifunctional control panel A according to embodiments of the present invention;
Fig. 3 is the overall structure figure of Multifunctional control panel B according to embodiments of the present invention;
Fig. 4 is the overall structure figure of Multifunctional control panel C according to embodiments of the present invention;
Fig. 5 is the schematic diagram of control panel circuit logic according to embodiments of the present invention;
Fig. 6 is the flow chart of multifunctional control method according to embodiments of the present invention;
Fig. 7 is the schematic diagram of integrated control panel according to embodiments of the present invention;And
Fig. 8 is the flow chart of optional multifunctional control method according to embodiments of the present invention.
Specific embodiment
In order that those skilled in the art more fully understand the present invention program, below in conjunction with the embodiment of the present invention
Accompanying drawing, is clearly and completely described to the technical scheme in the embodiment of the present invention, it is clear that described embodiment is only
The embodiment of a part of the invention, rather than whole embodiments.Based on the embodiment in the present invention, ordinary skill people
The every other embodiment that member is obtained under the premise of creative work is not made, should all belong to the model of present invention protection
Enclose.
It should be noted that term " first ", " in description and claims of this specification and above-mentioned accompanying drawing
Two " it is etc. for distinguishing similar object, without for describing specific order or precedence.It should be appreciated that so using
Data can exchange in the appropriate case, so as to embodiments of the invention described herein can with except illustrating herein or
Order beyond those of description is implemented.Additionally, term " comprising " and " having " and their any deformation, it is intended that cover
Lid is non-exclusive to be included, for example, the process, method, system, product or the equipment that contain series of steps or unit are not necessarily limited to
Those steps or unit clearly listed, but may include not list clearly or for these processes, method, product
Or other intrinsic steps of equipment or unit.
Regarding to the issue above, in embodiments of the present invention there is provided a kind of Multifunctional control panel, wherein, the Multifunctional controlling
Panel application processed is monitored in track train, is specifically described below.
A kind of one side according to embodiments of the present invention, there is provided Multifunctional control panel, wherein, multi-functional control face
Plate is applied to track train monitoring, and Fig. 1 is the schematic diagram of Multifunctional control panel according to embodiments of the present invention, as shown in figure 1,
The Multifunctional control panel includes:Switch key panel 11, integrated control panel 13 and output board 15.Below to the multi-functional control
Panel is illustrated.
Switch key panel 11, the input of the push button signalling for receiving switch key, and receive integrated control panel
Indication signal, and the corresponding indicatrix of indication signal is shown.
The status signal of integrated control panel 13, the push button signalling for gathering switch key panel, and output board, to pressing
Key signals and status signal are processed acquisition indication signal and output control signal respectively, and by indication signal and output control
Signal is respectively sent to switch key panel and output board.
Output board 15, for carrying out output control according to output control signal.
By above-described embodiment, track train is monitored using Multifunctional control panel, wherein, the multi-functional control
Panel includes switch key panel 11, integrated control panel 13 and output board 15, and switch key is received using switch key panel 11
Push button signalling input, and receive the indication signal of integrated control panel, and the corresponding indicatrix of indication signal is shown
Show;Integrated control panel 13 gather switch key panel push button signalling, and output board status signal, to push button signalling and shape
State signal is processed acquisition indication signal and output control signal respectively, and indication signal and output control signal are sent out respectively
Deliver to switch key panel and output board;Output board 15 carries out output control according to output control signal, so as to solve correlation
In technology there is the technical problem of security and stability in control panel.
Further, the Multifunctional control panel can also include:Metal plate is installed, for fixing Multifunctional control panel,
Installing metal plate can include at least one of:Front panel, rear board, film on surface, mounting column.
In addition, switch key panel can be provided with:Indicator lamp, button, warning buzzer are, it is necessary to explanation, train
Control and monitoring system (TCMS), can combine outside collection signal and realize to each control of train by Multifunctional control panel button
The control of unit processed, and by real-time control feedback of status to TCMS, while TCMS passes through decision state information realization to multi-functional
Control panel is monitored, additionally, in addition to being controlled using manual key, can also be realized to multi-functional control by TCMS communication instructions
Panel network is controlled, and various states can also be accompanied by state instruction and warning function;Integrated control panel is provided with:Micro-control unit
MCU, double-unit traction controller/controller local area network's CAN isolates acquisition module, isolation and amplifier module;It is defeated
Ejecting plate is provided with:External signal acquisition module, relay output module.
Specifically, the tramcar monitoring integrated multi-functional control panel of the embodiment of the present invention, often covers multi-functional control
Panel includes three kinds of control panels (control panel A, B, C), and every kind of Multifunctional control panel structure is consistent, including switch key
Panel, integrated control panel, output board, installation metal plate.Keypad is provided with indicator lamp, button, warning buzzer;Integrated control panel
In addition to being provided with MCU processors, MVB/CAN communication modules, isolation acquisition module, isolation and amplifier module, IO are also provided with
Expansion module, wherein, isolation acquisition module collection switch key panel and output board train status gather signal, by MCU
Indication signal and output control signal are respectively sent to by switch key panel and output board by isolation and amplifier module after reason,
Additionally, MCU processors will also in real time complete the communication with TCMS, completion train status information exchanges place with TCMS control information
Science and engineering is made, and completes control panel and train operator monitoring simultaneously, the function of control train safety, and I/O expansion module is more for solving
The problem that the I/O port of MCU cannot meet during the collection of status information.Output board can include external signal acquisition module, relay
Output module, redundancy DB9 communication interfaces, wherein, the output control signal that output board is provided according to integrated control panel completes relay
Device is exported, while external signal collecting work is realized, additionally, output board is also train+24V D/C power access ports, and for realizing
The input of train power supply;Installing metal plate can include front panel, back shroud, film on surface, and mounting column etc..
Alternatively, Multifunctional control panel includes:Control panel A, control panel B and control panel C, wherein, chain of command
Plate A, for realizing at least one following control:Locomotive cab state, battery and lifting are bent;Control panel B, for realizing
Below at least one control:Locomotive operation direction, lamp inside and outside drivers' cab;Control panel C, for realize it is following control at least it
One:Car door, wiper, brake hard, steering indicating light, warning lamp, curtain lifting.
An optional embodiment of the present invention is described in detail below in conjunction with the accompanying drawings.
As shown in Figures 2 to 4, three kinds of control panels that a set of Multifunctional control panel includes are respectively:Multi-functional control
Panel A, Multifunctional control panel B, Multifunctional control panel C, and every kind of Multifunctional control panel structure is consistent, mainly includes
Switch key panel, integrated control panel, output board, installation sheet metal component.Wherein, each panel overall structure is described as follows:
Control panel A:
Structural member explanation:1-switch key plate, 2-integrated control panel, 3-output board, 4-front panel (sheet metal component),
5-back shroud (sheet metal component), 6-mounting column (sheet metal component), 7-tri-state switch (drivers' cab status lock), 8-connector, 9-
Film on surface;Function partition description:Multifunctional control panel A is mainly responsible for locomotive cab state, battery, the control of lifting bow
System;External interface explanation:X01 is power inlet, and X11, X12 are standard DB9 redundancy communication interfaces, and X02 is that car external signal is defeated
Enter, relay output interface.
Control panel B:
Structural member explanation:1-switch key plate, 2-integrated control panel, 3-output board, 4-front panel (sheet metal component),
5-back shroud (sheet metal component), 6-mounting column (sheet metal component), 7-connector, 8-film on surface;Function partition description:Many work(
Can control panel B be mainly responsible for locomotive operation direction, inside and outside drivers' cab lamp control (driver's indoor lamp, front and rear fog lamp, dipped beam
Lamp, clearance lamps);External interface explanation:X01 is power inlet, and X11, X12 are standard DB9 redundancy communication interfaces, remaining interface
It is the input of car external signal, relay output interface.
Control panel C:
Structural member explanation:1-switch key plate, 2-integrated control panel, 3-output board, 4-front panel (sheet metal component),
5-back shroud (sheet metal component), 6-mounting column (sheet metal component), 7-two condition switch (turning indicator control), 8-connector, 9-table
Mask;Function partition description:Multifunctional control panel B is mainly responsible for locomotive high beam, car door and (selects door, open the door, open in left and right
" 1 " door, close the door, door release), wiper (interval brush, low speed brush, at a high speed brush, stop brush, brush once, spray water), brake hard,
Steering indicating light, warning lamp, the control of curtain lifting;External interface explanation:X01 is power inlet, and X11, X12 are that standard DB9 is superfluous
Remaining communication interface, remaining interface is the input of car external signal, relay output interface.
It should be noted that the structure and operation principle of above-mentioned three pieces of panels are completely the same, it is each many in conjunction with Fig. 2 to Fig. 4
Each control panel course of work is stated as follows by console board overall structure figure and Fig. 5 control panel circuit logic schematic diagrams:
Panel is switched on power by X01 power inlets, and slave station identity accesses vehicle network to each panel through X11, X12 communication interface,
Other interfaces correspondence is accessed in train.
When track train works, Multifunctional control panel is simultaneously by panel button operating state and the outer input signal of car
Through isolating during Acquisition Circuit and I/O expansion circuit collect the MCU of integrated control panel, it is each that MCU processors will gather signal correspondence
Logic function setting value is dealt with, and process signal is exported to output board by spacing output circuit.
While output control signal, panel carries out the communication with train network simultaneously, and TCMS trains are sent in real time
And the state of a control information of panel, and receive TCMS and send to the control information of panel, panel will also have influence on traffic safety
Control information prioritization, pointed out according to safe class, alarm lamp treatment, to have influence on important traffic safety incite somebody to action
The operations such as cut-out output, traction block, brake hard can be made, train safety is monitored simultaneously with train operator, play dual guarantor
The effect of shield.
External power source is introduced in output board treatment and provided outside communication interface, be also responsible for integrated control panel isolation and amplifier
Control signal is exported in train by relay.
Cooperated by above-mentioned three pieces of panels, constitute the high tramcar monitoring one of a set of security, stability
Change Multifunctional control panel.
According to embodiments of the present invention, there is provided a kind of embodiment of the method for function control method, it is necessary to explanation, attached
The step of flow of figure is illustrated can perform in the such as one group computer system of computer executable instructions, though also,
So logical order is shown in flow charts, but in some cases, can be with shown different from order execution herein
Or the step of description.
Fig. 6 is the flow chart of multifunctional control method according to embodiments of the present invention, as shown in fig. 6, the method is included such as
Lower step:
The status signal of step S602, the push button signalling of collection switch key panel, and output board.
Step S604, is processed push button signalling and status signal acquisition indication signal and output control signal respectively.
Step S606, switch key panel and output are respectively sent to by the indication signal and output control signal of acquisition
Plate, wherein, the corresponding indicatrix of indication signal is in switch key Display panel, and it is defeated that output control signal is used for output board control
Go out.
By above-mentioned steps, the status signal of the push button signalling of collection switch key panel, and output board, then to button
Signal and status signal processed respectively acquisition indication signal and output control signal, then, will obtain indication signal and
Output control signal is respectively sent to switch key panel and output board, wherein, the corresponding indicatrix of indication signal is pressed in switch
Key Display panel, output control signal is used for output board controlled output, and then solves control panel presence peace in correlation technique
The technical problem of full property and stability.
In above-mentioned steps S602 to step S606, push button signalling and status signal are processed and is obtained indication signal respectively
And output control signal, the indication signal and output control signal of acquisition are then respectively sent to switch key panel and defeated again
Ejecting plate, wherein, the corresponding indicatrix of indication signal is in switch key Display panel, and it is defeated that output control signal is used for output board control
Go out.
Alternatively, the indication signal and output control signal of acquisition are respectively sent to switch key panel and output board bag
Include:Prioritization is carried out to indication signal and output control signal and obtains safe class;According to safe class by indication signal
Switch key panel and output board are respectively sent to output control signal.
Alternatively, respectively acquisition indication signal and output control signal bag is processed push button signalling and status signal
Include:According to indication signal and output control signal, state of a control information is generated;By state of a control information be sent to Train Control and
Management system TCMS;Receive state of a control feedback informations of the TCMS according to state of a control feedback of the information;Fed back according to state of a control
Information, is processed push button signalling and status signal acquisition indication signal and output control signal respectively.
Other side according to embodiments of the present invention, additionally provides a kind of integrated control panel, and integrated control panel is applied to
Track train is monitored, and Fig. 7 is the schematic diagram of integrated control panel according to embodiments of the present invention, as shown in fig. 7, the integrated control panel
Including:Isolation acquisition module 71, micro-control unit MCU73 and isolation and amplifier module 75.The integrated control panel is carried out below
Describe in detail.
The status signal of isolation acquisition module 71, the push button signalling for gathering switch key panel, and output board.
Micro-control unit MCU73, indication signal and defeated is obtained for being processed push button signalling and status signal respectively
Go out control signal.
Isolation and amplifier module 75, for the indication signal and output control signal of acquisition to be respectively sent into switch key face
Plate and output board, wherein, the corresponding indicatrix of indication signal is used for output board in switch key Display panel, output control signal
Controlled output.
By above-described embodiment, using the push button signalling for isolating acquisition module collection switch key panel, and output board
Status signal, then, push button signalling and status signal are processed using micro-control unit MCU are obtained indication signal respectively
And output control signal, the indication signal and output control signal of acquisition be respectively sent to switch key face by isolation and amplifier module
Plate and output board, wherein, the corresponding indicatrix of indication signal is used for output board in switch key Display panel, output control signal
Controlled output.
Alternatively, isolation and amplifier module includes:Sequencing unit, for entering row major to indication signal and output control signal
Level sequence obtains safe class;Transmitting element, for being sent indication signal and output control signal respectively according to safe class
To switch key panel and output board.
Other side according to embodiments of the present invention, additionally provides a kind of multifunctional control method, multi-functional control side
Method is applied to track train monitoring, and Fig. 8 is the flow chart of optional multifunctional control method according to embodiments of the present invention, such as schemes
Shown in 8, the method comprises the following steps:
Step 801, switch key panel receives the input of the push button signalling of switch key, and the push button signalling hair that will be gathered
Deliver to integrated control panel.
The status signal of step S803, the push button signalling of integrated control panel collection switch key panel, and output board, it is right
Push button signalling and status signal are processed acquisition indication signal and output control signal respectively, and indication signal and output are controlled
Signal processed is respectively sent to switch key panel and output board.
Step S805, switch key panel receives the indication signal of integrated control panel, and to the corresponding instruction of indication signal
Amount is shown.
Step S807, output board carries out output control according to output control signal.
By above-described embodiment, the push button signalling of switch key panel is gathered using integrated control panel, and output board
Status signal, then, is processed push button signalling and status signal acquisition indication signal and output control signal respectively, and will
Indication signal and output control signal are respectively sent to switch key panel and output board, then switch key panel receives integrated control
The indication signal of making sheet, and the corresponding indicatrix of indication signal is shown;Output board carries out defeated according to output control signal
Go out control.
In above-mentioned steps 801 to step S807, the push button signalling of switch key panel is gathered using integrated control panel, with
And the status signal of output board, then, push button signalling and status signal is processed and obtain respectively indication signal and output control
Signal processed, and indication signal and output control signal are respectively sent to switch key panel and output board, then switch key face
Plate receives the indication signal of integrated control panel, and the corresponding indicatrix of indication signal is shown;Output board is controlled according to output
Signal processed carries out output control.
It should be noted that the tramcar monitoring integrated multi-functional control panel of the embodiment of the present invention, with following excellent
Point:
Two-wire is operable:Panel may participate in network service, realize beyond locomotive operating state monitor in real time, display, net
Network may participate in the big novelty that operation is this panel, i.e., in addition to panel button can carry out respective operations, network can also pass through
Panel concentration key two-wire is operated, and priority level is determined by the safe class of corresponding function between two operations, final to be capable of achieving
Network, manually the collaboration accessible operation of two-wire, realize two-wire monitoring integration.
Safe duplicate protection:Network increases many places potential safety hazard and judges signal, once judge that train has potential safety hazard, meeting
Pointed out according to safe class, alarm lamp treatment, to have influence on traffic safety will make cut-out output, traction block,
Brake hard etc. is operated, and train safety is monitored simultaneously with train operator, plays a part of duplicate protection.
Pattern is changeable:Multifunctional control panel has two kinds of mode of operations:Network mode (TCMS patterns), contingency mode.
TCMS can be carried out under network mode to be communicated with control panel, monitor the input/output state of control panel, it is possible to carry out network
Manipulation.Contingency mode is TCMS fault modes, is a big advantage of this Multifunctional control panel, when (the network event of TCMS failures
Barrier) when, control panel can still carry out every input/output function and normally control, and alarm network failure.This advantage enters one
Step increased the security of control system, the potential safety hazard of train when can effectively avoid network failure.
The embodiments of the present invention are for illustration only, and the quality of embodiment is not represented.
In the above embodiment of the present invention, the description to each embodiment all emphasizes particularly on different fields, and does not have in certain embodiment
The part of detailed description, may refer to the associated description of other embodiment.
In several embodiments provided herein, it should be understood that disclosed technology contents, can be by other
Mode is realized.Wherein, device embodiment described above is only schematical, such as division of described unit, Ke Yiwei
A kind of division of logic function, can there is other dividing mode when actually realizing, such as multiple units or component can combine or
Person is desirably integrated into another system, or some features can be ignored, or does not perform.Another, shown or discussed is mutual
Between coupling or direct-coupling or communication connection can be the INDIRECT COUPLING or communication link of unit or module by some interfaces
Connect, can be electrical or other forms.
The unit that is illustrated as separating component can be or may not be it is physically separate, it is aobvious as unit
The part for showing can be or may not be physical location, you can with positioned at a place, or can also be distributed to multiple
On unit.Some or all of unit therein can be according to the actual needs selected to realize the purpose of this embodiment scheme.
In addition, during each functional unit in each embodiment of the invention can be integrated in a processing unit, it is also possible to
It is that unit is individually physically present, it is also possible to which two or more units are integrated in a unit.Above-mentioned integrated list
Unit can both be realized in the form of hardware, it would however also be possible to employ the form of SFU software functional unit is realized.
If the integrated unit is to realize in the form of SFU software functional unit and as independent production marketing or use
When, can store in a computer read/write memory medium.Based on such understanding, technical scheme is substantially
The part for being contributed to prior art in other words or all or part of the technical scheme can be in the form of software products
Embody, the computer software product is stored in a storage medium, including some instructions are used to so that a computer
Equipment (can be personal computer, server or network equipment etc.) perform each embodiment methods described of the invention whole or
Part steps.And foregoing storage medium includes:USB flash disk, read-only storage (ROM, Read-Only Memory), arbitrary access are deposited
Reservoir (RAM, Random Access Memory), mobile hard disk, magnetic disc or CD etc. are various can be with store program codes
Medium.
The above is only the preferred embodiment of the present invention, it is noted that for the ordinary skill people of the art
For member, under the premise without departing from the principles of the invention, some improvements and modifications can also be made, these improvements and modifications also should
It is considered as protection scope of the present invention.
Claims (10)
1. a kind of Multifunctional control panel, it is characterised in that the Multifunctional control panel is applied to track train monitoring, bag
Include:Switch key panel, integrated control panel and output board, wherein,
The switch key panel, the input of the push button signalling for receiving switch key, and receive the integrated control panel
Indication signal, and the corresponding indicatrix of the indication signal is shown;
The shape of the integrated control panel, the push button signalling for gathering the switch key panel, and the output board
State signal, is processed the push button signalling and the status signal and obtain respectively the indication signal and the output control
Signal, and the indication signal and the output control signal are respectively sent to the switch key panel and the output
Plate;
The output board, for carrying out output control according to the output control signal.
2. Multifunctional control panel according to claim 1, it is characterised in that also include:
Metal plate is installed, for fixing the Multifunctional control panel, the installation metal plate includes at least one of:Front panel,
Rear board, film on surface, mounting column.
3. Multifunctional control panel according to claim 1, it is characterised in that
The switch key panel is provided with:Indicator lamp, button warns buzzer;
The integrated control panel is provided with:Micro-control unit MCU, double-unit traction controller/controller local area network CAN lead to
Letter module, isolates acquisition module, isolation and amplifier module;
The output board is provided with:External signal acquisition module, relay output module.
4. Multifunctional control panel according to claim 1, it is characterised in that the Multifunctional control panel includes:Control
Panel A processed, control panel B and control panel C, wherein,
The control panel A, for realizing at least one following control:Locomotive cab state, battery and lifting are bent;
The control panel B, for realizing at least one following control:Locomotive operation direction, lamp inside and outside drivers' cab;
The control panel C, for realizing at least one following control:Car door, wiper, brake hard, steering indicating light, warning
Lamp, curtain lifting.
5. a kind of multifunctional control method, it is characterised in that the multifunctional control method is applied to track train monitoring, bag
Include:
Gather switch key panel the push button signalling, and output board status signal;
The push button signalling and the status signal is processed and obtain respectively the indication signal and output control letter
Number;
The indication signal for obtaining and the output control signal are respectively sent to the switch key panel and described defeated
Ejecting plate, wherein, in the switch key Display panel, the output control signal is used for the corresponding indicatrix of the indication signal
The output board controlled output.
6. method according to claim 5, it is characterised in that by the indication signal for obtaining and output control letter
Number being respectively sent to the switch key panel and the output board includes:
Prioritization is carried out to the indication signal and the output control signal and obtains safe class;
The indication signal and the output control signal are respectively sent to by the switch key face according to the safe class
Plate and the output board.
7. method according to claim 5, it is characterised in that process the push button signalling and the status signal
Obtaining the indication signal and the output control signal respectively includes:
According to the indication signal and the output control signal, the state of a control information is generated;
The state of a control information is sent to Train Control and management system TCMS;
Receive state of a control feedback informations of the TCMS according to the state of a control feedback of the information;
According to the state of a control feedback information, the push button signalling and the status signal is processed and obtain respectively described
Indication signal and the output control signal.
8. a kind of integrated control panel, it is characterised in that the integrated control panel is applied to track train monitoring, including:
The status signal of isolation acquisition module, the push button signalling for gathering switch key panel, and output board;
Micro-control unit MCU, obtain respectively the instruction letter for being processed the push button signalling and the status signal
Number and the output control signal;
Isolation and amplifier module, for the indication signal for obtaining and the output control signal to be respectively sent into the switch
Key panel and the output board, wherein, the corresponding indicatrix of the indication signal is described in the switch key Display panel
Output control signal is used for the output board controlled output.
9. integrated control panel according to claim 8, it is characterised in that the isolation and amplifier module includes:
Sequencing unit, safe class is obtained for carrying out prioritization to the indication signal and the output control signal;
Transmitting element, for the indication signal and the output control signal to be respectively sent into institute according to the safe class
State switch key panel and the output board.
10. a kind of multifunctional control method, it is characterised in that the multifunctional control method is applied to track train monitoring, bag
Include:
Switch key panel receives the input of the push button signalling of switch key, and the push button signalling for gathering is sent to integrated
Control panel;
The integrated control panel gathers the push button signalling of the switch key panel, and output board status signal, it is right
The push button signalling and the status signal is processed obtain respectively the indication signal and the output control signal, and will
The indication signal and the output control signal are respectively sent to the switch key panel and the output board;
The switch key panel receives the indication signal of the integrated control panel, and to the corresponding indicatrix of the indication signal
Shown;
The output board carries out output control according to the output control signal.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710210515.8A CN106909111B (en) | 2017-03-31 | 2017-03-31 | Multifunctional control panel and multifunctional control method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710210515.8A CN106909111B (en) | 2017-03-31 | 2017-03-31 | Multifunctional control panel and multifunctional control method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106909111A true CN106909111A (en) | 2017-06-30 |
CN106909111B CN106909111B (en) | 2020-04-14 |
Family
ID=59195308
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710210515.8A Active CN106909111B (en) | 2017-03-31 | 2017-03-31 | Multifunctional control panel and multifunctional control method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106909111B (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107728569A (en) * | 2017-10-25 | 2018-02-23 | 中车株洲电力机车有限公司 | A kind of city rail vehicle control circuit and control method |
CN108891300A (en) * | 2018-07-12 | 2018-11-27 | 中铁磁浮科技(成都)有限公司 | A kind of suspension control method of medium-and low-speed maglev train |
CN108891427A (en) * | 2018-07-27 | 2018-11-27 | 中车浦镇庞巴迪运输系统有限公司 | Using the manual control panel of integrated form circuit board and small button layout |
CN112249092A (en) * | 2020-10-30 | 2021-01-22 | 株洲中车时代电气股份有限公司 | Console interaction system |
CN112977538A (en) * | 2019-12-02 | 2021-06-18 | 中车唐山机车车辆有限公司 | Urban rail vehicle traction safety control system and method |
CN113147802A (en) * | 2021-04-01 | 2021-07-23 | 浙江网新智能技术有限公司 | Intelligent switch module of train driving operation console |
Citations (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5819189A (en) * | 1996-04-12 | 1998-10-06 | Hk Systems, Inc. | Control system for a monorail vehicle |
KR20070066497A (en) * | 2005-12-22 | 2007-06-27 | 한국철도기술연구원 | Aspect display unit of light rail vehicle for displaying on lcd |
CN201327574Y (en) * | 2008-12-19 | 2009-10-14 | 张家港市万科信息技术有限公司 | Intelligent control panel device |
CN201367026Y (en) * | 2009-02-20 | 2009-12-23 | 南车株洲电力机车有限公司 | Structure of control console in operator's cab of electrical locomotive |
CN202413795U (en) * | 2011-11-24 | 2012-09-05 | 南车青岛四方机车车辆股份有限公司 | Console of metro cab |
CN102985278A (en) * | 2010-07-20 | 2013-03-20 | 三菱电机株式会社 | In-cab display system and display control method for in-cab display device |
CN103112459A (en) * | 2011-11-17 | 2013-05-22 | 中国北车股份有限公司大连电力牵引研发中心 | Engine control device, engine control system and engine control method |
CN203241733U (en) * | 2012-12-28 | 2013-10-16 | 博世汽车部件(苏州)有限公司 | General control panel and machinery equipment |
CN204296724U (en) * | 2014-12-26 | 2015-04-29 | 成都市新筑路桥机械股份有限公司 | Compact tramcar driving position |
CN204631516U (en) * | 2015-05-19 | 2015-09-09 | 中国船舶重工集团公司第七一一研究所 | Yacht integration display control unit and yacht control desk |
CN104977863A (en) * | 2015-05-29 | 2015-10-14 | 中央电视台 | Control panel |
JP2016215741A (en) * | 2015-05-18 | 2016-12-22 | 日本信号株式会社 | Platform fence and control method for opening and closing of platform fence |
-
2017
- 2017-03-31 CN CN201710210515.8A patent/CN106909111B/en active Active
Patent Citations (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5819189A (en) * | 1996-04-12 | 1998-10-06 | Hk Systems, Inc. | Control system for a monorail vehicle |
KR20070066497A (en) * | 2005-12-22 | 2007-06-27 | 한국철도기술연구원 | Aspect display unit of light rail vehicle for displaying on lcd |
CN201327574Y (en) * | 2008-12-19 | 2009-10-14 | 张家港市万科信息技术有限公司 | Intelligent control panel device |
CN201367026Y (en) * | 2009-02-20 | 2009-12-23 | 南车株洲电力机车有限公司 | Structure of control console in operator's cab of electrical locomotive |
CN102985278A (en) * | 2010-07-20 | 2013-03-20 | 三菱电机株式会社 | In-cab display system and display control method for in-cab display device |
CN103112459A (en) * | 2011-11-17 | 2013-05-22 | 中国北车股份有限公司大连电力牵引研发中心 | Engine control device, engine control system and engine control method |
CN202413795U (en) * | 2011-11-24 | 2012-09-05 | 南车青岛四方机车车辆股份有限公司 | Console of metro cab |
CN203241733U (en) * | 2012-12-28 | 2013-10-16 | 博世汽车部件(苏州)有限公司 | General control panel and machinery equipment |
CN204296724U (en) * | 2014-12-26 | 2015-04-29 | 成都市新筑路桥机械股份有限公司 | Compact tramcar driving position |
JP2016215741A (en) * | 2015-05-18 | 2016-12-22 | 日本信号株式会社 | Platform fence and control method for opening and closing of platform fence |
CN204631516U (en) * | 2015-05-19 | 2015-09-09 | 中国船舶重工集团公司第七一一研究所 | Yacht integration display control unit and yacht control desk |
CN104977863A (en) * | 2015-05-29 | 2015-10-14 | 中央电视台 | Control panel |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107728569A (en) * | 2017-10-25 | 2018-02-23 | 中车株洲电力机车有限公司 | A kind of city rail vehicle control circuit and control method |
CN108891300A (en) * | 2018-07-12 | 2018-11-27 | 中铁磁浮科技(成都)有限公司 | A kind of suspension control method of medium-and low-speed maglev train |
CN108891427A (en) * | 2018-07-27 | 2018-11-27 | 中车浦镇庞巴迪运输系统有限公司 | Using the manual control panel of integrated form circuit board and small button layout |
CN112977538A (en) * | 2019-12-02 | 2021-06-18 | 中车唐山机车车辆有限公司 | Urban rail vehicle traction safety control system and method |
CN112249092A (en) * | 2020-10-30 | 2021-01-22 | 株洲中车时代电气股份有限公司 | Console interaction system |
CN113147802A (en) * | 2021-04-01 | 2021-07-23 | 浙江网新智能技术有限公司 | Intelligent switch module of train driving operation console |
CN113147802B (en) * | 2021-04-01 | 2023-02-28 | 浙江网新智能技术有限公司 | Intelligent switch module of train driving operation console |
Also Published As
Publication number | Publication date |
---|---|
CN106909111B (en) | 2020-04-14 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106909111A (en) | Multifunctional control panel and multifunctional control method | |
CN105365850B (en) | Tramcar network control system | |
CN105101094B (en) | Train operation control system | |
CN104751669B (en) | Internet of Vehicles based intelligent driving assisting system and method | |
CN105781318B (en) | Car's door controlling mthods, systems and devices based on rail vehicle | |
CN101612948B (en) | Method for comprehensively monitoring running safety of self-wheel running special equipment and monitoring device thereof | |
CN109318937B (en) | Train control system | |
CN110466566A (en) | A kind of method and system based on the free time in front of train tracking relationship screening headstock | |
CN111071297B (en) | Train network control system and train | |
CN104960554B (en) | Station interval integrated system provided with double hosts based on functional allocation | |
CN106476855A (en) | Realize the system and method for control handing-over between rolling stock section and test run line | |
CN108819984B (en) | Passenger alarm output control circuit of unmanned subway train | |
CN108189862A (en) | A kind of modern tram operation monitoring system | |
CN104554346B (en) | Train runing parameters real-time monitoring system | |
CN109398424A (en) | A kind of detection system of non-communicating vehicle intrusion | |
CN112550361B (en) | ATP and LKJ integrated vehicle-mounted equipment | |
CN105501259B (en) | Suitable for the ground controlled approach and system of CBTC | |
CN109532964A (en) | A kind of railway level-crossing control system | |
CN107364468A (en) | Long-range isolation circuit, the brake fault shielding system of crewless train and method | |
CN106301842A (en) | Municipal rail train controls and diagnostic system communication network redundancy structure | |
Neil | On board train control and monitoring systems | |
CN110239575A (en) | Multiply two logic control implementations and the systems for taking two based on two | |
CN209142147U (en) | A kind of safety return circuit | |
CN112780146A (en) | Train door control system and control method | |
CN104071192A (en) | Integrated monitoring system for urban railways |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |