CN106894640A - One kind builds device and its application method by laying bricks or stones - Google Patents

One kind builds device and its application method by laying bricks or stones Download PDF

Info

Publication number
CN106894640A
CN106894640A CN201710172672.4A CN201710172672A CN106894640A CN 106894640 A CN106894640 A CN 106894640A CN 201710172672 A CN201710172672 A CN 201710172672A CN 106894640 A CN106894640 A CN 106894640A
Authority
CN
China
Prior art keywords
masonry
mortar joint
joint device
mortar
hawk
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710172672.4A
Other languages
Chinese (zh)
Other versions
CN106894640B (en
Inventor
陈骏
张欣
王远航
秦长金
余祥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
First Construction Co Ltd of China Construction Third Engineering Division
China Construction Third Bureau Green Industry Investment Co Ltd
Original Assignee
First Construction Co Ltd of China Construction Third Engineering Division
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by First Construction Co Ltd of China Construction Third Engineering Division filed Critical First Construction Co Ltd of China Construction Third Engineering Division
Priority to CN201710172672.4A priority Critical patent/CN106894640B/en
Publication of CN106894640A publication Critical patent/CN106894640A/en
Application granted granted Critical
Publication of CN106894640B publication Critical patent/CN106894640B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/20Tools or apparatus for applying mortar
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/18Adjusting tools; Templates

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Finishing Walls (AREA)

Abstract

The present invention provides one kind and builds device and its application method by laying bricks or stones.This builds device by laying bricks or stones includes horizontally and vertically mortar joint device.Horizontal mortar joint device includes two slide rails being oppositely arranged, two the first conditioning boxes, two the first fasteners and scrapes hawk.Two the bottom of slide rail can in the horizontal direction be slided relative to masonry, chute is provided with the inside of two slide rails, scraping hawk can in the horizontal direction slide in chute, two sides of the first conditioning box fix with wherein one two ends of slide rail be connected respectively, two the first fasteners are arranged in two the first locating slots and are fixedly connected with another slide rail respectively, vertical mortar joint device is compassingly set at upside and the left and right sides of one piece of masonry facade, constituted between the inwall and masonry facade of vertical mortar joint device and fill out stock tank, the height for filling out stock tank is the standard thickness of vertical mortar mortar joint.The present invention can effectively control masonry flatness, mortar joint plumpness, thickness homogeneous, rely on small to operating personnel's technology, fill up the blank of masonry construction apparatus field.

Description

One kind builds device and its application method by laying bricks or stones
Technical field
Device and its application method are built by laying bricks or stones the present invention relates to masonry construction technical field, more particularly to one kind.
Background technology
At present, masonry structure is generally using building block and the construction method of mortar.Because masonry project is a pure work by hand Industry, its quality fluctuation is big, it is impossible to be effectively ensured.A large amount of have that masonry flatness is undesirable, mortar joint is not full, thickness is not inconsistent Situations such as conjunction is required, has a strong impact on the quality of masonry and uses safety.
The content of the invention
Device and its user are built by laying bricks or stones it is an object of the invention to provide a kind of masonry mortar joint quality is good and masonry is smooth Method.
The present invention for the scheme that is used of solution above-mentioned technical problem for:
One kind builds device by laying bricks or stones, and it includes horizontal mortar joint device and vertical mortar joint device, and the horizontal mortar joint device includes two phases To set slide rail, two the first conditioning boxes, two the first fasteners and scrape hawk;Two slide rails along masonry level side To the both sides for being respectively arranged at the masonry, the bottom of two slide rails can in the horizontal direction be slided relative to the masonry, Chute is provided with the inside of two slide rails, the hawk of scraping can in the horizontal direction be slided in chute, two first tune Save two ends fixing of the side of frame respectively with wherein one slide rail to be connected, the opposite side of two the first conditioning boxes is provided with first Locating slot, described two first fasteners are arranged in two the first locating slots and are fixedly connected with another slide rail respectively, described to scrape The height of the distance from bottom masonry horizontal plane of hawk is the standard thickness of horizontal mortar mortar joint, and the vertical mortar joint device is around setting Upside and the left and right sides of one piece of masonry facade are placed in, are constituted between the inwall and masonry facade of the vertical mortar joint device and is filled out slurry Groove, it is described fill out stock tank height be vertical mortar mortar joint standard thickness.
In such scheme, the vertical mortar joint device includes the second conditioning box, the second fastener and keeper, the positioning Part includes the adjustable plate and location-plate that are mutually connected vertically, and the second locating slot, second fastening are provided with the adjustable plate Part is arranged in second locating slot and is connected with the second conditioning box, and second conditioning box is respectively arranged at one with the location-plate The left side and right side of block masonry facade.
In such scheme, the horizontal mortar joint device also includes being respectively arranged at two the two of slide rail outer surface handles.
In such scheme, rubbing surface that two slide rails are in contact with masonry and rubbing of scraping that hawk is in contact with chute Wiping face is provided with wearing layer.
The described application method for building device by laying bricks or stones, comprises the following steps:
1)Two slide rails being oppositely arranged are respectively arranged at the both sides of the masonry along the horizontal direction of masonry;
2)Two sides of the first conditioning box are fixed with wherein one two ends of slide rail respectively and is connected, while according to the chi of building block Two the first fasteners of very little regulation be arranged in two positions of the first locating slot and by two opposite sides of the first conditioning box with it is another One slide rail is fixedly connected;
3)Hawk will be scraped to be installed in the chute of two slide rails;
4)Mortar is laid in basic unit;
5)First piece of masonry is placed, is close to masonry facade and is placed vertical levels mortar joint device, mortar is layed in and is filled out in stock tank;
6)Second piece of masonry is placed, after placement is finished, vertical mortar joint device is drawn upwardly out, and vertical mortar joint device is moved on to second Block masonry facade is set, and mortar is layed in and is filled out in stock tank;
7)Repeat step 6)Built by laying bricks or stones until this layer of vertical mortar joint of building block and finished;
8)After having laid ground floor building block, horizontal mortar joint device is positioned over masonry top surface, two slide rail movements is promoted, if any resistance Hinder, then wall out-of-flatness at obstruction need to be rebuild, if slip is accessible, wall leveling degree meets the requirements;
9)Hawk will be scraped and shift end onto, and before mortar is placed on scrapes hawk, hawk is scraped in promotion, and mortar tiles along groove, ash to be doctored After plate shifts the other end onto, remaining slurry is removed;
10)Horizontal mortar joint device is pushed to next section of horizontal direction, repeat step 9), until this layer of horizontal mortar paving of masonry If finishing;
11)Repeat step 5)To 10), until whole face building wall is finished.
In such scheme, step 8)In the middle steps for promoting two slide rails to move it is arranged at outside two slide rails by promotion Two handles on surface are moved promoting two slide rails.
In such scheme, the vertical mortar joint device includes the second conditioning box, the second fastener and keeper, the positioning Part includes the adjustable plate and location-plate that are mutually connected vertically, and the second locating slot, second fastening are provided with the adjustable plate Part is arranged in second locating slot and is connected with the second conditioning box, and the conditioning box is respectively arranged at one piece of block with the location-plate The left side and right side of body facade.
In such scheme, step 5)In be close to masonry facade place vertical levels mortar joint device the step of in also include basis The size of building block adjusts the second fastener and is arranged in the position of the second locating slot and the second conditioning box is fixedly connected with keeper The step of.
The beneficial effects of the invention are as follows:The present invention can effectively control masonry flatness, mortar joint plumpness, thickness homogeneous, behaviour Make easy, small is relied on to operating personnel's technology, filled up the blank in this field of masonry construction equipment.
Brief description of the drawings
Fig. 1 is the use state figure for building device by laying bricks or stones provided in an embodiment of the present invention.
Fig. 2 is the side view of the horizontal mortar joint device in Fig. 1.
Fig. 3 is the side view of the vertical mortar joint device in Fig. 1.
Fig. 4 is the top view of the horizontal mortar joint device in Fig. 1.
Specific embodiment
Below in conjunction with drawings and Examples, further the present invention will be described, but present disclosure is not limited solely to The following examples.
As shown in Figures 1 to 4, it is the structural representation for building device by laying bricks or stones provided in an embodiment of the present invention.It includes level Mortar joint device and vertical mortar joint device 5.
The horizontal mortar joint device includes two slide rails being oppositely arranged, 1, two the first conditioning boxes, 2, two the first fasteners 3rd, 4, two handles 6 of hawk and wearing layer 7 are scraped.Two slide rails 1 are respectively arranged at the both sides of masonry along the horizontal direction of masonry.Two The bottom of bar slide rail 1 can in the horizontal direction be slided relative to masonry.The inner side of two slide rails 1 is provided with chute.Scraping hawk 4 can Slided in the horizontal direction in chute.Two sides of the first conditioning box 2 fix with wherein one two ends of slide rail 1 connect respectively Connect, the opposite side of two the first conditioning boxes 2 is provided with the first locating slot 8, and two the first fasteners 3 are arranged in two respectively One locating slot 8 is fixedly connected with another slide rail 1.The height for scraping the distance from bottom masonry horizontal plane of hawk 4 is horizontal mortar ash The standard thickness of seam.Two handles 6 are respectively arranged at two outer surfaces of slide rail 1.The rubbing surface that two slide rails 1 are in contact with masonry And scrape the rubbing surface that hawk 4 is in contact with chute and be provided with wearing layer 7.
Vertical mortar joint device 5 is compassingly set at upside and the left and right sides of one piece of masonry facade, the inwall of vertical mortar joint device 5 Constituted between masonry facade and fill out stock tank 14, the height for filling out stock tank 14 is the standard thickness of vertical mortar mortar joint.In the present embodiment In, vertical mortar joint device 5 includes the second conditioning box 9, the second fastener 10 and keeper, and keeper includes what is be mutually connected vertically Adjustable plate 11 and location-plate 12, are provided with the second locating slot 13 on adjustable plate 11, the second fastener 10 is arranged in the second locating slot 13 are connected with the second conditioning box 9, and the second conditioning box 9 is respectively arranged at one piece of left side and right side of masonry facade with location-plate 12.
The present embodiment also builds the application method of device by laying bricks or stones including this, comprises the following steps:
1)The slide rail 1 that two are oppositely arranged is respectively arranged at the both sides of masonry along the horizontal direction of masonry;
2)Two sides of the first conditioning box 2 are fixed with wherein one two ends of slide rail 1 respectively and is connected, while according to building block Size adjusts two the first fasteners 3 and is arranged in two positions of the first locating slot 8 and by two opposite sides of the first conditioning box 2 It is fixedly connected with another slide rail 1;
3)Hawk 4 will be scraped to be installed in the chute of two slide rails 1;
4)Mortar is laid in basic unit;
5)First piece of masonry is placed, is close to masonry facade and is placed vertical levels mortar joint device 5, mortar is layed in and is filled out in stock tank;
6)Second piece of masonry is placed, after placement is finished, vertical mortar joint device 5 is drawn upwardly out, and vertical mortar joint device 5 is moved on to the Two pieces of masonry facades are set, and mortar is layed in and is filled out in stock tank;
7)Repeat step 6)Built by laying bricks or stones until this layer of vertical mortar joint of building block and finished;
8)After having laid ground floor building block, horizontal mortar joint device is positioned over masonry top surface, promotes two slide rails 1 to move, if any Hinder, then wall out-of-flatness at obstruction need to be rebuild, if slip is accessible, wall leveling degree meets the requirements;
9)Hawk 4 will be scraped and shift end onto, and before mortar is placed on scrapes hawk 4, hawk 4 is scraped in promotion, and mortar tiles along groove, to be doctored After hawk 4 shifts the other end onto, remaining slurry is removed;
10)Horizontal mortar joint device is pushed to next section of horizontal direction, repeat step 9), until this layer of horizontal mortar paving of masonry If finishing;
11)Repeat step 5)To 10), until whole face building wall is finished.
In the present embodiment, step 8)It is that two cunnings are arranged at by promotion in the middle steps for promoting two slide rails 1 to move Two handles 6 of the outer surface of rail 1 are moved promoting two slide rails 1.
In the present embodiment, step 5)In be close to masonry facade place vertical levels mortar joint device 5 the step of in also include Size according to building block adjusts the second fastener 10 and is arranged in the position of the second locating slot 13 and by the second conditioning box 9 and keeper The step of being fixedly connected.

Claims (8)

1. one kind builds device by laying bricks or stones, it is characterised in that it includes horizontal mortar joint device and vertical mortar joint device, the horizontal mortar joint dress Put including two slide rails being oppositely arranged, two the first conditioning boxes, two the first fasteners and scrape hawk;Two slide rail edges The horizontal direction of masonry is respectively arranged at the both sides of the masonry, and the bottom of two slide rails can be relative to the masonry along water Square to slip, chute is provided with the inside of two slide rails, the hawk of scraping can in the horizontal direction be slided in chute, Two sides of the first conditioning box fix with wherein one two ends of slide rail be connected respectively, and the opposite side of two the first conditioning boxes is equal The first locating slot is provided with, described two first fasteners are arranged in two the first locating slots and are fixed with another slide rail and connect respectively Connect, the height of the distance from bottom masonry horizontal plane for scraping hawk is the standard thickness of horizontal mortar mortar joint, the vertical mortar joint Device is compassingly set at upside and the left and right sides of one piece of masonry facade, between the inwall and masonry facade of the vertical mortar joint device Composition fills out stock tank, it is described fill out stock tank height be vertical mortar mortar joint standard thickness.
2. as claimed in claim 1 by laying bricks or stones device is built, it is characterised in that the vertical mortar joint device includes the second conditioning box, the Two fasteners and keeper, the keeper include the adjustable plate and location-plate that are mutually connected vertically, are set on the adjustable plate There is the second locating slot, second fastener is arranged in second locating slot and is connected with the second conditioning box, second regulation Frame is respectively arranged at one piece of left side and right side of masonry facade with the location-plate.
3. as claimed in claim 1 by laying bricks or stones device is built, it is characterised in that the horizontal mortar joint device also includes being respectively arranged at two Two handles of bar slide rail outer surface.
4. build device by laying bricks or stones as claimed in claim 1, it is characterised in that the rubbing surface that two slide rails are in contact with masonry with And scrape the rubbing surface that hawk is in contact with chute and be provided with wearing layer.
5. the application method of device is built by laying bricks or stones as claimed in claim 1, it is characterised in that comprised the following steps:
1)Two slide rails being oppositely arranged are respectively arranged at the both sides of the masonry along the horizontal direction of masonry;
2)Two sides of the first conditioning box are fixed with wherein one two ends of slide rail respectively and is connected, while according to the chi of building block Two the first fasteners of very little regulation be arranged in two positions of the first locating slot and by two opposite sides of the first conditioning box with it is another One slide rail is fixedly connected;
3)Hawk will be scraped to be installed in the chute of two slide rails;
4)Mortar is laid in basic unit;
5)First piece of masonry is placed, is close to masonry facade and is placed vertical levels mortar joint device, mortar is layed in and is filled out in stock tank;
6)Second piece of masonry is placed, after placement is finished, vertical mortar joint device is drawn upwardly out, and vertical mortar joint device is moved on to second Block masonry facade is set, and mortar is layed in and is filled out in stock tank;
7)Repeat step 6)Built by laying bricks or stones until this layer of vertical mortar joint of building block and finished;
8)After having laid ground floor building block, horizontal mortar joint device is positioned over masonry top surface, two slide rail movements is promoted, if any resistance Hinder, then wall out-of-flatness at obstruction need to be rebuild, if slip is accessible, wall leveling degree meets the requirements;
9)Hawk will be scraped and shift end onto, and before mortar is placed on scrapes hawk, hawk is scraped in promotion, and mortar tiles along groove, ash to be doctored After plate shifts the other end onto, remaining slurry is removed;
10)Horizontal mortar joint device is pushed to next section of horizontal direction, repeat step 9), until this layer of horizontal mortar paving of masonry If finishing;
11)Repeat step 5)To 10), until whole face building wall is finished.
6. application method as claimed in claim 5, it is characterised in that step 8)It is in the middle steps for promoting two slide rails to move Two the two of slide rail outer surface handles are arranged at by promotion to promote two slide rails to move.
7. application method as claimed in claim 5, it is characterised in that the vertical mortar joint device includes the second conditioning box, the Two fasteners and keeper, the keeper include the adjustable plate and location-plate that are mutually connected vertically, are set on the adjustable plate Have the second locating slot, second fastener is arranged in second locating slot and is connected with the second conditioning box, the conditioning box with The location-plate is respectively arranged at one piece of left side and right side of masonry facade.
8. application method as claimed in claim 7, it is characterised in that step 5)In be close to masonry facade place vertical levels ash Also include that adjusting the second fastener according to the size of building block is arranged in the position of the second locating slot and by the in the step of seam device The step of two conditioning boxes are fixedly connected with keeper.
CN201710172672.4A 2017-03-21 2017-03-21 A kind of masonry device and its application method Active CN106894640B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710172672.4A CN106894640B (en) 2017-03-21 2017-03-21 A kind of masonry device and its application method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710172672.4A CN106894640B (en) 2017-03-21 2017-03-21 A kind of masonry device and its application method

Publications (2)

Publication Number Publication Date
CN106894640A true CN106894640A (en) 2017-06-27
CN106894640B CN106894640B (en) 2019-01-04

Family

ID=59193106

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710172672.4A Active CN106894640B (en) 2017-03-21 2017-03-21 A kind of masonry device and its application method

Country Status (1)

Country Link
CN (1) CN106894640B (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108487651A (en) * 2018-03-11 2018-09-04 福州清河源环保科技有限公司 One kind is built a wall with quickly plastering mould bases
CN110656783A (en) * 2019-09-09 2020-01-07 中国一冶集团有限公司 High-precision portable horizontal laying device for masonry mortar
CN111456469A (en) * 2020-04-16 2020-07-28 中国十七冶集团有限公司 Portable masonry mortar joint controller
CN111691693A (en) * 2020-06-03 2020-09-22 上海宝冶集团有限公司 Adjusting tool for vertical mortar joints of building blocks and using method thereof
CN112761362A (en) * 2020-12-28 2021-05-07 山东建筑大学 Horizontal mortar joint adjusting device with high-elasticity vertical clamp
CN114737779A (en) * 2022-03-15 2022-07-12 中国建筑第八工程局有限公司 Equal-thickness mortar smearing device for aerated bricks on construction site and construction method thereof
CN115199037A (en) * 2022-07-21 2022-10-18 中国一冶集团有限公司 Superimposed sheet plate seam construction processing apparatus
CN115234029A (en) * 2022-08-05 2022-10-25 中建八局装饰工程有限公司 Method for repairing and parting brick wall and parting module thereof

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB347309A (en) * 1929-02-04 1931-04-30 James William Kavanagh Machine or apparatus for laying composition, such as mortar for bricks
US4074503A (en) * 1975-11-21 1978-02-21 Robert Duncan Watt Brick laying device
CN101892747A (en) * 2009-05-20 2010-11-24 上海奥伯应用技术工程有限公司 Mortar spreader for building wall and using method thereof
CN104563532A (en) * 2013-10-28 2015-04-29 辽宁科技学院 Vertical mortar joint mortar spreading device for small hollow block wall
CN204456926U (en) * 2015-01-16 2015-07-08 翁绳朝 A kind of grout spreading board for laying bricks
CN205153565U (en) * 2015-11-20 2016-04-13 山西四建集团有限公司 Vertical mortar joint control tool of brickwork infilled wall

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB347309A (en) * 1929-02-04 1931-04-30 James William Kavanagh Machine or apparatus for laying composition, such as mortar for bricks
US4074503A (en) * 1975-11-21 1978-02-21 Robert Duncan Watt Brick laying device
CN101892747A (en) * 2009-05-20 2010-11-24 上海奥伯应用技术工程有限公司 Mortar spreader for building wall and using method thereof
CN104563532A (en) * 2013-10-28 2015-04-29 辽宁科技学院 Vertical mortar joint mortar spreading device for small hollow block wall
CN204456926U (en) * 2015-01-16 2015-07-08 翁绳朝 A kind of grout spreading board for laying bricks
CN205153565U (en) * 2015-11-20 2016-04-13 山西四建集团有限公司 Vertical mortar joint control tool of brickwork infilled wall

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108487651A (en) * 2018-03-11 2018-09-04 福州清河源环保科技有限公司 One kind is built a wall with quickly plastering mould bases
CN108487651B (en) * 2018-03-11 2020-07-17 福州清河源环保科技有限公司 Quick plastering formwork for wall building
CN110656783A (en) * 2019-09-09 2020-01-07 中国一冶集团有限公司 High-precision portable horizontal laying device for masonry mortar
CN111456469A (en) * 2020-04-16 2020-07-28 中国十七冶集团有限公司 Portable masonry mortar joint controller
CN111691693A (en) * 2020-06-03 2020-09-22 上海宝冶集团有限公司 Adjusting tool for vertical mortar joints of building blocks and using method thereof
CN112761362A (en) * 2020-12-28 2021-05-07 山东建筑大学 Horizontal mortar joint adjusting device with high-elasticity vertical clamp
CN114737779A (en) * 2022-03-15 2022-07-12 中国建筑第八工程局有限公司 Equal-thickness mortar smearing device for aerated bricks on construction site and construction method thereof
CN115199037A (en) * 2022-07-21 2022-10-18 中国一冶集团有限公司 Superimposed sheet plate seam construction processing apparatus
CN115199037B (en) * 2022-07-21 2023-05-16 中国一冶集团有限公司 Laminated slab joint construction treatment device
CN115234029A (en) * 2022-08-05 2022-10-25 中建八局装饰工程有限公司 Method for repairing and parting brick wall and parting module thereof

Also Published As

Publication number Publication date
CN106894640B (en) 2019-01-04

Similar Documents

Publication Publication Date Title
CN106894640A (en) One kind builds device and its application method by laying bricks or stones
CN110565900B (en) Construction process of wear-resistant terrace
CN207538350U (en) A kind of assembled cantilever stair
CN206346503U (en) The horizontal mortar laying apparatus of concrete block masonry
CN104712085A (en) Large-area wear-resistant concrete ground construction method
CN113775081B (en) Construction method of inner and outer leaf composite wall body of archaize building
CN106381980A (en) Floor tile paving process
CN111042392A (en) Construction method of SDHH type disassembly-free formwork foam concrete partition wall
CN105625589A (en) Exterior wall insulation structure and manufacture method thereof
CN206521929U (en) The leveling work head of laser leveling machine
CN112627535A (en) Flatness control method for large-area carborundum wear-resistant terrace
CN210798338U (en) Mortar laying and seam scraping integrated construction device for wall masonry
CN105525700A (en) Method for building indoor wall body by high-precision building blocks and wall body structure
CN112049365B (en) Indoor terrace construction method and indoor terrace structure applied to same
CN108560330A (en) The scalable general railway roadbed of secondary pouring type and its construction method
CN210508290U (en) Slide rail formula ceramic tile ash smoothing device with handle
CN207526073U (en) A kind of ceramic tile positioning and gap control device
CN113374283A (en) Construction method for improving masonry quality and progress
CN220377894U (en) Mortar spreading and pointing integrated machine for masonry of filled wall
CN206397075U (en) Tooth form floating rule
CN206448501U (en) A kind of floor covering layers locating rack
CN206189815U (en) Floating screed isolation joint molding sleeve spare
CN215407259U (en) Floor tile ash laying and flattening device
CN215107032U (en) Mortar strickle-off ruler for paving bricks
CN219569603U (en) Concrete leveling system for leveling non-bottom floor slab

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20220928

Address after: 430040, No. 1, Soochow Road, Dongxihu District, Hubei, Wuhan

Patentee after: CHINA CONSTRUCTION THIRD BUREAU FIRST ENGINEERING Co.,Ltd.

Patentee after: CHINA CONSTRUCTION THIRD ENGINEERING BUREAU GREEN INDUSTRY INVESTMENT Co.,Ltd.

Address before: 430040, No. 1, Soochow Road, Dongxihu District, Hubei, Wuhan

Patentee before: CHINA CONSTRUCTION THIRD BUREAU FIRST ENGINEERING Co.,Ltd.