CN106869116A - Spigot-and-socket fender post arrangement and method for construction - Google Patents
Spigot-and-socket fender post arrangement and method for construction Download PDFInfo
- Publication number
- CN106869116A CN106869116A CN201710179837.0A CN201710179837A CN106869116A CN 106869116 A CN106869116 A CN 106869116A CN 201710179837 A CN201710179837 A CN 201710179837A CN 106869116 A CN106869116 A CN 106869116A
- Authority
- CN
- China
- Prior art keywords
- guide wheel
- socket joint
- guide plate
- guide
- stake
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
- 238000010276 construction Methods 0.000 title claims abstract description 10
- 238000000034 method Methods 0.000 title claims abstract description 10
- 238000005452 bending Methods 0.000 claims description 14
- 239000002689 soil Substances 0.000 claims description 12
- 239000000203 mixture Substances 0.000 claims description 3
- 230000010412 perfusion Effects 0.000 claims description 3
- 239000000725 suspension Substances 0.000 claims description 3
- 238000009412 basement excavation Methods 0.000 claims description 2
- 238000005516 engineering process Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/34—Concrete or concrete-like piles cast in position ; Apparatus for making same
- E02D5/36—Concrete or concrete-like piles cast in position ; Apparatus for making same making without use of mouldpipes or other moulds
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/18—Bulkheads or similar walls made solely of concrete in situ
- E02D5/187—Bulkheads or similar walls made solely of concrete in situ the bulkheads or walls being made continuously, e.g. excavating and constructing bulkheads or walls in the same process, without joints
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B4/00—Drives for drilling, used in the borehole
- E21B4/16—Plural down-hole drives, e.g. for combined percussion and rotary drilling; Drives for multi-bit drilling units
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B7/00—Special methods or apparatus for drilling
- E21B7/001—Drilling a non circular hole
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2200/00—Geometrical or physical properties
- E02D2200/16—Shapes
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2200/00—Geometrical or physical properties
- E02D2200/16—Shapes
- E02D2200/165—Shapes polygonal
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- Structural Engineering (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geology (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- Geochemistry & Mineralogy (AREA)
- Physics & Mathematics (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Agricultural Machines (AREA)
Abstract
A kind of spigot-and-socket fender post arrangement and method for construction, implementing this scheme device therefor includes piling machine and socket joint stake machine, the work progress of the fender post that eight prism is constituted with socket joint stake:On the closure axis for needing to make fender post, a number of eight ribs stake is squeezed into piling machine, the prism of each two eight is separated by a distance for socket joint stake, in these are separated by a distance, constructed respectively the stake of socket joint with socket joint stake machine, make the two ends socket joint of socket joint stake in the eight ribs stake at two ends, produce the fender post of border closure.
Description
Technical field
The present invention relates to a kind of fender post arrangement and method for construction, particularly a kind of spigot-and-socket fender post arrangement and method for construction.
Background technology
The joint style of fender post is extremely important, and the fender post of other modes is connect by the way of flat mouth joint
Mouthful.
The content of the invention
The invention provides a kind of eight prism and the spigot-and-socket fender post arrangement and method for construction of socket joint stake mutually socket joint.
The present invention is achieved through the following technical solutions:
A kind of spigot-and-socket fender post arrangement and method for construction, implementing this scheme device therefor includes piling machine and socket joint stake machine.
The socket joint stake machine includes:Lower end of the guide rod is fixed on guide plate A, and the front end of guide plate A is fixed on the upper of anterior guide plate B
End, the lower end of anterior guide plate B is fixed on the middle upper portion of guide plate C, and the left end of guide plate C is fixed on the right-hand member of diagonal brace A, guide plate C's
Right-hand member is fixed on the left end of diagonal brace B;The rear end of guide plate A is fixed on the upper end of rear portion guide plate B, and the lower end of rear portion guide plate B is fixed on
The middle upper portion of guide plate D, the left end of guide plate D is fixed on the right-hand member of diagonal brace C, and the right-hand member of guide plate D is fixed on the left end of diagonal brace D;Tiltedly
The left end of the left end and diagonal brace C that support A is connected to principal axis A, and the right-hand member of diagonal brace B and the right-hand member of diagonal brace D are connected to
Main shaft B;Guide wheel A, guide wheel E, guide wheel C are sequentially provided with principal axis A, guide wheel B, guide wheel F, guide wheel D are sequentially provided with main shaft B;Guide wheel A
With on guide wheel B on cutting a chain A, guide wheel E and guide wheel F on cutting a chain C, guide wheel C and guide wheel D around one
Multiple bending tools are respectively mounted on cutting chain B, cutting chain A and cutting chain B, multiple rectangle knives are installed on cutting chain C;Guide plate C and
One bucket body of lower suspension of guide plate D;The inside of guide wheel A, guide wheel C and guide wheel F is respectively provided with power-driven system.
When the socket joint stake machine is used, guide rod is pressurizeed, and the power-driven system in guide wheel A drives guide wheel A to drive and cuts
Cut chain A to rotate forward, the power-driven system in guide wheel C drives guide wheel C to drive cutting chain B to rotate forward, the power in guide wheel F
Drive system drives guide wheel F to drive the C reversions of cutting chain, the multiple bending tools on multiple bending tools and cutting chain B on cutting chain A
Shovel takes soil in rotating forward, and the multiple rectangle knives on cutting chain C are shoveled in rotating backward and take soil, and soil is by bucket body
Dropped in bucket body during portion, after filling with, proposed outside hole equipment by guide rod, after unloading soil, returned in hole and work on, excavated and complete
Afterwards, the concrete perfusion in this hole, is made socket joint stake of the left and right two ends with bell and spigot.
The work progress of the fender post that eight prism is constituted with socket joint stake:Needing the closure axle of making fender post
On line, a number of eight ribs stake is squeezed into piling machine, the prism of each two eight is separated by a distance for socket joint stake, is separated by these
Distance in, constructed respectively the stake of socket joint with socket joint stake machine, make the two ends socket joint of socket joint stake in the eight ribs stake at two ends, produce
The fender post of border closure.
The invention has the advantages that:
The present invention can produce the spigot-and-socket fender post by eight prisms and socket joint mutually socket joint of border closure.
Brief description of the drawings
The present invention is further illustrated below in conjunction with the accompanying drawings:
Fig. 1 is the front view of this socket joint stake machine;
Fig. 2 is the rearview of socket joint stake machine;
Fig. 3 is A-A views of Fig. 1;
Fig. 4 is B-B views of Fig. 1;
Fig. 5 is the plan of eight prisms and the spigot-and-socket fender post of socket joint stake composition.
In figure:1st, guide rod, 2, guide plate A, 3, guide plate B, 4, guide plate C, 5, diagonal brace A, 6, diagonal brace B, 7, principal axis A, 8, main shaft B,
9th, guide wheel A, 10, guide wheel B, 11, cutting chain A, 12, bending tool, 13, bucket body, 15, diagonal brace C, 16, diagonal brace D, 17, guide plate D, 18,
Cutting chain B, 19, guide wheel C, 20, guide wheel D, 21, cutting chain C, 22, rectangle knife, 23, guide wheel E, 24, guide wheel F.
Specific embodiment
Accompanying drawing is a kind of specific embodiment of the invention, and the embodiment device therefor includes piling machine and socket joint stake machine.
Socket joint stake machine includes:Guide plate A2 is fixed in the lower end of guide rod 1, and the front end of guide plate A is fixed on the upper end of anterior guide plate B3,
The lower end of anterior guide plate B is fixed on the middle upper portion of guide plate C4, and the left end of guide plate C is fixed on the right-hand member of diagonal brace A5, the right side of guide plate C
End is fixed on the left end of diagonal brace B6;The rear end of guide plate A is fixed on the upper end of rear portion guide plate B, and the lower end of rear portion guide plate B is fixed on leads
The middle upper portion of plate D17, the left end of guide plate D is fixed on the right-hand member of diagonal brace C15, and the right-hand member of guide plate D is fixed on a left side of diagonal brace D16
End;The left end of diagonal brace A and the left end of diagonal brace C are connected to principal axis A 7, the right-hand member of diagonal brace B and the right-hand member difference of diagonal brace D
It is connected to main shaft B8;Guide wheel A9, guide wheel E23, guide wheel C19 are sequentially provided with principal axis A, guide wheel B10 are sequentially provided with main shaft B, are led
Wheel F24, guide wheel D20;Around a cutting chain on cutting a chain A11, guide wheel E and guide wheel F on guide wheel A and guide wheel B
Around a cutting chain B18 on C21, guide wheel C and guide wheel D, multiple bending tools 12 are respectively mounted on cutting chain A and cutting chain B, cut
Cut and installed on chain C multiple rectangle knives 22;One bucket body 13 of lower suspension of guide plate C and guide plate D;Guide wheel A, guide wheel C and guide wheel F
Inside be respectively provided with power-driven system.
A rectangle knife and two bending tools constitute a bell and spigot on the same section.
The side-anastomosis of the bell and spigot and eight prisms of the rectangle knife and bending tool composition.
When socket joint stake machine is used, guide rod is pressurizeed, and the power-driven system in guide wheel A drives guide wheel A to drive cutting chain A
Rotate forward, the power-driven system in guide wheel C drives guide wheel C to drive cutting chain B to rotate forward, the power drive in guide wheel F
System drive guide wheel F drives the C reversions of cutting chain, and the multiple bending tools on multiple bending tools and cutting chain B on cutting chain A are just
Soil is taken to shovel in rotation, the multiple rectangle knives on cutting chain C are shoveled in rotating backward and take soil, when soil is by bucket body top
Drop in bucket body, after filling with, proposed outside hole equipment by guide rod, after unloading soil, return in hole and work on, after the completion of excavation,
The concrete perfusion in this hole, is made socket joint stake of the left and right two ends with bell and spigot.
The work progress of the fender post that eight prisms are constituted with socket joint stake:On the closure axis for needing to make fender post, use
Piling machine squeezes into a number of eight ribs stake, and the prism of each two eight is separated by a distance for socket joint stake, separated by a distance at these
In, constructed respectively the stake of socket joint with socket joint stake machine, make the two ends socket joint of socket joint stake in the eight ribs stake at two ends, produce all traps
The fender post of conjunction.
Claims (3)
1. a kind of spigot-and-socket fender post arrangement and method for construction, implementing this scheme device therefor includes piling machine and socket joint stake machine, its feature
It is:
The socket joint stake machine includes:Guide rod(1)Guide plate A is fixed in lower end(2), the front end of guide plate A is fixed on anterior guide plate B(3)
Upper end, the lower end of anterior guide plate B is fixed on guide plate C(4)Middle upper portion, the left end of guide plate C is fixed on diagonal brace A(5)The right side
End, the right-hand member of guide plate C is fixed on diagonal brace B(6)Left end;The rear end of guide plate A is fixed on the upper end of rear portion guide plate B, rear portion guide plate B
Lower end be fixed on guide plate D(17)Middle upper portion, the left end of guide plate D is fixed on diagonal brace C(15)Right-hand member, the right-hand member of guide plate D
It is fixed on diagonal brace D(16)Left end;The left end of diagonal brace A and the left end of diagonal brace C are connected to principal axis A(7), the right side of diagonal brace B
The right-hand member of end and diagonal brace D is connected to main shaft B(8);Guide wheel A is sequentially provided with principal axis A(9), guide wheel E(23), guide wheel C
(19), guide wheel B is sequentially provided with main shaft B(10), guide wheel F(24), guide wheel D(20);Around a cutting on guide wheel A and guide wheel B
Chain A(11), around a cutting chain C on guide wheel E and guide wheel F(21), around a cutting chain B on guide wheel C and guide wheel D(18),
Multiple bending tools are respectively mounted on cutting chain A and cutting chain B(12), multiple rectangle knives are installed on cutting chain C(22);Guide plate C and
One bucket body of lower suspension of guide plate D(13);The inside of guide wheel A, guide wheel C and guide wheel F is respectively provided with power-driven system;
When the socket joint stake machine is used, guide rod is pressurizeed, and the power-driven system in guide wheel A drives guide wheel A to drive cutting chain A
Rotate forward, the power-driven system in guide wheel C drives guide wheel C to drive cutting chain B to rotate forward, the power drive in guide wheel F
System drive guide wheel F drives the C reversions of cutting chain, and the multiple bending tools on multiple bending tools and cutting chain B on cutting chain A are just
Soil is taken to shovel in rotation, the multiple rectangle knives on cutting chain C are shoveled in rotating backward and take soil, when soil is by bucket body top
Drop in bucket body, after filling with, proposed outside hole equipment by guide rod, after unloading soil, return in hole and work on, after the completion of excavation,
The concrete perfusion in this hole, is made socket joint stake of the left and right two ends with bell and spigot;
The work progress of the fender post that eight prism is constituted with socket joint stake:Needing the closure axis of making fender post
On, a number of eight ribs stake is squeezed into piling machine, the prism of each two eight is separated by a distance for socket joint stake, is separated by these
In distance, constructed respectively the stake of socket joint with socket joint stake machine, make the two ends socket joint of socket joint stake in the eight ribs stake at two ends, produce week
The fender post that trap is closed.
2. a kind of spigot-and-socket fender post arrangement and method for construction according to claim 1, it is characterised in that:Socket joint stake machine it is same
A rectangle knife and two bending tools constitute a bell and spigot on one section.
3. a kind of spigot-and-socket fender post arrangement and method for construction according to claim 2, it is characterised in that:The square of the socket joint stake machine
The bell and spigot of shape knife and bending tool composition and the side-anastomosis of eight prism.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710179837.0A CN106869116A (en) | 2017-03-23 | 2017-03-23 | Spigot-and-socket fender post arrangement and method for construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710179837.0A CN106869116A (en) | 2017-03-23 | 2017-03-23 | Spigot-and-socket fender post arrangement and method for construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106869116A true CN106869116A (en) | 2017-06-20 |
Family
ID=59172876
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710179837.0A Withdrawn CN106869116A (en) | 2017-03-23 | 2017-03-23 | Spigot-and-socket fender post arrangement and method for construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106869116A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107237317A (en) * | 2017-07-16 | 2017-10-10 | 慕乾喜 | Bending wall manufacture machinery and production program |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH06306853A (en) * | 1993-04-26 | 1994-11-01 | Koichi Uemura | Construction of underground structure |
CN105586965A (en) * | 2016-03-14 | 2016-05-18 | 宗超 | Device for manufacturing pile walls with buckled triangular piles and cross piles |
CN105625371A (en) * | 2015-12-31 | 2016-06-01 | 刘玉燕 | Stirring and drilling machine for square and round combined piles |
CN105735273A (en) * | 2016-03-14 | 2016-07-06 | 陈兆英 | Device for manufacturing pile walls with triangular piles in inserted connection with cross piles |
CN106088190A (en) * | 2016-08-27 | 2016-11-09 | 魏新蕾 | Abnormity groover |
CN106149754A (en) * | 2016-07-06 | 2016-11-23 | 詹晨 | A kind of Geotechnical Engineering retaining wall intelligence builds machine |
-
2017
- 2017-03-23 CN CN201710179837.0A patent/CN106869116A/en not_active Withdrawn
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH06306853A (en) * | 1993-04-26 | 1994-11-01 | Koichi Uemura | Construction of underground structure |
CN105625371A (en) * | 2015-12-31 | 2016-06-01 | 刘玉燕 | Stirring and drilling machine for square and round combined piles |
CN105586965A (en) * | 2016-03-14 | 2016-05-18 | 宗超 | Device for manufacturing pile walls with buckled triangular piles and cross piles |
CN105735273A (en) * | 2016-03-14 | 2016-07-06 | 陈兆英 | Device for manufacturing pile walls with triangular piles in inserted connection with cross piles |
CN106149754A (en) * | 2016-07-06 | 2016-11-23 | 詹晨 | A kind of Geotechnical Engineering retaining wall intelligence builds machine |
CN106088190A (en) * | 2016-08-27 | 2016-11-09 | 魏新蕾 | Abnormity groover |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107237317A (en) * | 2017-07-16 | 2017-10-10 | 慕乾喜 | Bending wall manufacture machinery and production program |
CN107237317B (en) * | 2017-07-16 | 2019-07-05 | 刘俊一 | Bending wall manufacture machinery and production program |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US5544435A (en) | Brush rake | |
CA2495337C (en) | Ditch digging bucket | |
US2309223A (en) | Brush cutter | |
USRE48744E1 (en) | Object lifting, pulling and digging apparatus | |
US6490815B1 (en) | Excavator bucket with ripping implement | |
CN106869116A (en) | Spigot-and-socket fender post arrangement and method for construction | |
CN201138942Y (en) | Garlic combine-harvester | |
CN215530508U (en) | Residual stump and stump planing, crushing, soil loosening and farming combined integrated machine | |
CN205993112U (en) | A kind of harvester for peanut with Self-balancing | |
CN207700252U (en) | A kind of multifunctional excavator hydraulic efficiency manipulator | |
CN111576519A (en) | Cutting, breaking and shoveling integrated rock stratum excavator | |
CN107217695B (en) | Bulldozer | |
CA2455695A1 (en) | Multi-shank ripper | |
CN206323783U (en) | A kind of harvester for peanut of use crank and rocker mechanism | |
JP2012147718A (en) | Grass mower | |
KR101716364B1 (en) | Shovel using excavator | |
CN211959965U (en) | A irrigation equipment for tealeaves is planted | |
CN203618316U (en) | Spiral ditcher | |
CN207538094U (en) | A kind of multifunctional excavator | |
AU744468B1 (en) | A hole cleaning and/or forming tool | |
CN212367854U (en) | Efficient soil loosening device for agricultural planting | |
CN216195030U (en) | Pipeline excavation device for construction | |
CN205266234U (en) | American ginseng excavates to spread puts harvester | |
CN106894457A (en) | A kind of concavo-convex connection socket stake production program | |
CN114108728B (en) | High-efficient ditch construction is with digging truck |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WW01 | Invention patent application withdrawn after publication | ||
WW01 | Invention patent application withdrawn after publication |
Application publication date: 20170620 |