CN106836644B - 一种钢筋混凝土柱的建造方法 - Google Patents
一种钢筋混凝土柱的建造方法 Download PDFInfo
- Publication number
- CN106836644B CN106836644B CN201611217994.8A CN201611217994A CN106836644B CN 106836644 B CN106836644 B CN 106836644B CN 201611217994 A CN201611217994 A CN 201611217994A CN 106836644 B CN106836644 B CN 106836644B
- Authority
- CN
- China
- Prior art keywords
- column
- bar
- double
- embedded parts
- double embedded
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C3/00—Structural elongated elements designed for load-supporting
- E04C3/30—Columns; Pillars; Struts
- E04C3/34—Columns; Pillars; Struts of concrete other stone-like material, with or without permanent form elements, with or without internal or external reinforcement, e.g. metal coverings
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G13/00—Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills
- E04G13/02—Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills for columns or like pillars; Special tying or clamping means therefor
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Mechanical Engineering (AREA)
- Reinforcement Elements For Buildings (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
本发明公开了一种钢筋混凝土柱的建造方法,首先制作好的对拉双埋件,完成柱基础承台、柱主筋安装及对拉双埋件以下部分的柱箍筋Ⅰ进行安装,并在柱主筋上设置对拉双埋件定位筋;然后,采用吊车将已经制作好的对拉双埋件吊至柱主筋上方,缓缓下落,在柱主筋即将穿过对拉双埋件过程中,将位于对拉双埋件内的柱箍筋Ⅱ同步放入,使柱箍筋Ⅱ随对拉双埋件一同缓缓下落,安装到指定位置;最后,完善柱钢筋龙骨,支模浇筑混凝土,完成混凝土柱。采用上述方法建造钢筋混凝土柱,有效避免了对拉双埋件安装时与柱主筋、柱箍筋Ⅰ、柱箍筋Ⅱ的安装冲突问题,确保了位于对拉双埋件拉杆上方以及下方的柱箍筋Ⅰ、柱箍筋Ⅱ的安装,有效保证了对拉双埋件的安装质量与钢筋混凝土柱的施工质量。
Description
技术领域
本发明涉及工业建筑工程,特别涉及一种钢筋混凝土柱的建造方法。
背景技术
在工业建筑工程中,预埋件是一种为后续施工工序准备的常见工具,一般是采用单钢板与锚爪焊接,然后进行预埋,其安装方法简单。但是对于柱对称面同位置同时需要设置埋件时,单钢板埋件无法满足抗拉力的要求,而对于对拉双埋件安装,则由于既不能在钢筋龙骨完成后安装,也不能先安装埋件,故施工难度较大。
发明内容
本发明所要解决的技术问题是提供一种钢筋混凝土柱的建造方法,使用该方法能够避免柱主筋、柱箍筋与对拉双埋件安装冲突,确保柱的施工质量。
为实现上述目的,本发明提供以下的技术方案:一种钢筋混凝土柱的建造方法,包括以下特征:
(1)制作对拉双埋件:所述对拉双埋件包括一对埋件本体,两个所述埋件本体之间连接若干互相平行的拉杆,两个所述埋件本体为对称设置,并且两个埋件本体之间为平行设置,所述拉杆的长度与柱箍筋围成的模具的宽度相适应,埋件本体的厚度与支设在钢筋龙骨上的模板的厚度相适应;
(2)完成柱的基础承台、柱主筋的安装;
(3)测定埋件位置;
(4)在测定的对拉双埋件的拉杆的下方安装柱箍筋Ⅰ;
(5)在柱主筋测定的对拉双埋件的安装位置处固定埋件定位筋,定位筋与拉杆垂直;
(6)将已经制作好的对拉双埋件吊装至柱主筋的上方,并缓慢下落对拉双埋件,在柱主筋在即将穿入对拉双埋件过程中,将位于对拉双埋件内的柱箍筋Ⅱ同步放入,箍在柱主筋上,使柱箍筋Ⅱ随对拉双埋件一同缓缓下落,当对拉双埋件下落到指定安装位置时,进行固定;
(7)完善柱主筋其他部分的钢筋龙骨;
(8)支设柱模板;
(9)向柱模板内浇注混凝土,并养护;
(10)待养护好后,拆除模板;
(11)验收。
优选的,在完成步骤(7)后,对钢筋部分进行分项验收,完成步骤(8)后,对模板部分进行分项验收。
优选的,在制作对拉双埋件时,将拉杆的两端分别与两个埋件本体焊接成一个整体。
优选的,在制作对拉双埋件时,埋件本体均采用钢板制作,拉杆采用型钢制作。
优选的,在吊装对拉双埋件时,使用吊车吊装。
采用上述技术方案,避免了对拉双埋件安装时与柱主筋、柱箍筋Ⅰ、柱箍筋Ⅱ的安装冲突问题,确保了位于对拉双埋件内的,以及下方的柱箍筋Ⅰ、Ⅱ的安装,有效保证了对拉双埋件的安装质量与钢筋混凝土柱的施工质量。
附图说明
图1是本发明的吊装起始时的状态示意图;
图2是本发明的吊装中期时的状态示意图;
图3是本发明的吊装到指定位置时的状态示意图。
具体实施方式
下面结合附图,通过对实施例的描述,对本发明做进一步说明:
本发明一种钢筋混凝土柱的建造方法,包括以下特征:
(1)制作对拉双埋件:所述对拉双埋件包括一对埋件本体1,两个所述埋件本体1之间连接5根互相平行的拉杆2,拉杆的两端分别与两个埋件本体焊接成一个整体,两个所述埋件本体1为对称设置,并且两个埋件本体1之间为平行设置,所述拉杆2的长度与柱箍筋围成的模具的宽度相适应,埋件本体1的厚度与支设在钢筋龙骨上的模板的厚度相适应;
(2)完成柱的基础承台3、柱主筋4的安装;
(3)测定埋件位置;
(4)在测定的对拉双埋件的拉杆的下方安装柱箍筋Ⅰ5;
(5)在柱主筋4测定的对拉双埋件的安装位置处固定埋件定位筋6,定位筋6与拉杆2垂直;
(6)如图1、2、3所示,将已经制作好的对拉双埋件吊装至柱主筋4的上方,并缓慢下落对拉双埋件,在柱主筋4在即将穿入对拉双埋件过程中,将位于对拉双埋件内的柱箍筋Ⅱ7同步放入,箍在柱主筋4上,使柱箍筋Ⅱ7随对拉双埋件一同缓缓下落,当对拉双埋件下落到指定安装位置时,进行固定;
(7)完善柱主筋4其他部分的钢筋龙骨,然后对钢筋部分进行分项验收;
(8)支设柱模板,然后对模板部分进行分项验收;
(9)向柱模板内浇注混凝土,并养护;
(10)待养护好后,拆除模板;
(11)验收。
为了节约成本,在制作对拉双埋件时,埋件本体1均采用钢板制作,拉杆2采用型钢制作。为了保证施工安全,在吊装对拉双埋件时,使用吊车吊装。
本发明首先制作好的对拉双埋件,完成柱基础承台3、柱主筋4安装及对拉双埋件以下部分的柱箍筋Ⅰ5进行安装,并在柱主筋4上设置对拉双埋件定位筋6;然后,采用吊车将已经制作好的对拉双埋件吊至柱主筋4上方,缓缓下落,在柱主筋4即将穿过对拉双埋件过程中,将位于对拉双埋件内的柱箍筋Ⅱ7同步放入,使柱箍筋Ⅱ7随对拉双埋件一同缓缓下落,安装到指定位置;最后,完善柱钢筋龙骨,支模浇筑混凝土,完成混凝土柱。采用上述方法建造钢筋混凝土柱,有效避免了对拉双埋件安装时与柱主筋4、柱箍筋Ⅰ5、柱箍筋Ⅱ7的安装冲突问题,确保了位于对拉双埋件内的以及下方的柱箍筋Ⅰ5、柱箍筋Ⅱ7的安装,有效保证了对拉双埋件的安装质量与钢筋混凝土柱的施工质量。
以上所述的仅是本发明的优选实施方式,应当指出,对于本领域的普通技术人员来说,在不脱离本发明创造构思的前提下,还可以做出若干变形和改进,这些都属于本发明的保护范围。
Claims (5)
1.一种钢筋混凝土柱的建造方法,其特征在于,包括以下特征:
(1)制作对拉双埋件:所述对拉双埋件包括一对埋件本体,两个所述埋件本体之间连接若干互相平行的拉杆,两个所述埋件本体为对称设置,并且两个埋件本体之间为平行设置,所述拉杆的长度与柱箍筋围成的模具的宽度相适应,埋件本体的厚度与支设在钢筋龙骨上的模板的厚度相适应;
(2)完成柱的基础承台、柱主筋的安装;
(3)测定埋件位置;
(4)在测定的对拉双埋件的拉杆的下方安装柱箍筋Ⅰ;
(5)在柱主筋测定的对拉双埋件的安装位置处固定埋件定位筋,定位筋与拉杆垂直;
(6)将已经制作好的对拉双埋件吊装至柱主筋的上方,并缓慢下落对拉双埋件,在柱主筋在即将穿入对拉双埋件过程中,将位于对拉双埋件内的柱箍筋Ⅱ同步放入,箍在柱主筋上,使柱箍筋Ⅱ随对拉双埋件一同缓缓下落,当对拉双埋件下落到指定安装位置时,进行固定;
(7)完善柱主筋其他部分的钢筋龙骨;
(8)支设柱模板;
(9)向柱模板内浇注混凝土,并养护;
(10)待养护好后,拆除模板;
(11)验收。
2.根据权利要求1所述的钢筋混凝土柱的建造方法,其特征在于,在完成步骤(7)后,对钢筋部分进行分项验收,完成步骤(8)后,对模板部分进行分项验收。
3.根据权利要求2所述的钢筋混凝土柱的建造方法,其特征在于,在制作对拉双埋件时,将拉杆的两端分别与两个埋件本体焊接成一个整体。
4.根据权利要求3所述的钢筋混凝土柱的建造方法,其特征在于,在制作对拉双埋件时,埋件本体均采用钢板制作,拉杆采用型钢制作。
5.根据权利要求1所述的钢筋混凝土柱的建造方法,其特征在于,在吊装对拉双埋件时,使用吊车吊装。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611217994.8A CN106836644B (zh) | 2016-12-26 | 2016-12-26 | 一种钢筋混凝土柱的建造方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611217994.8A CN106836644B (zh) | 2016-12-26 | 2016-12-26 | 一种钢筋混凝土柱的建造方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106836644A CN106836644A (zh) | 2017-06-13 |
CN106836644B true CN106836644B (zh) | 2019-01-01 |
Family
ID=59135643
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201611217994.8A Active CN106836644B (zh) | 2016-12-26 | 2016-12-26 | 一种钢筋混凝土柱的建造方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106836644B (zh) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109457869B (zh) * | 2018-11-13 | 2024-04-30 | 上海建工五建集团有限公司 | 混凝土柱护角的预埋方法及装置 |
CN112282072A (zh) * | 2020-10-20 | 2021-01-29 | 中国建筑第八工程局有限公司 | 群组重型埋件的埋设方法 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN203452195U (zh) * | 2013-07-25 | 2014-02-26 | 浙江精工钢结构集团有限公司 | 一种双预埋板对拉式预埋件 |
US20140373471A1 (en) * | 2013-06-20 | 2014-12-25 | Wayne A. Knepp | Column assembly for use in building foundation systems and methods of assembling same |
CN104343214A (zh) * | 2014-10-27 | 2015-02-11 | 广西建工集团联合建设有限公司 | 一种仿古建筑的斗拱预制钢筋骨架及其制作方法及仿古建筑钢筋混凝土斗拱的施工方法 |
CN104831815A (zh) * | 2015-05-26 | 2015-08-12 | 中国化学工程第三建设有限公司 | 一种梁侧面埋件及其安装方法 |
CN105133786A (zh) * | 2015-08-24 | 2015-12-09 | 河海大学 | 空腹式快速施工组合梁及其建造方法 |
EP3085843A1 (de) * | 2015-04-23 | 2016-10-26 | SCHÖCK BAUTEILE GmbH | Vorrichtung und verfahren zur wärmeentkopplung von betonierten gebäudeteilen |
-
2016
- 2016-12-26 CN CN201611217994.8A patent/CN106836644B/zh active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20140373471A1 (en) * | 2013-06-20 | 2014-12-25 | Wayne A. Knepp | Column assembly for use in building foundation systems and methods of assembling same |
CN203452195U (zh) * | 2013-07-25 | 2014-02-26 | 浙江精工钢结构集团有限公司 | 一种双预埋板对拉式预埋件 |
CN104343214A (zh) * | 2014-10-27 | 2015-02-11 | 广西建工集团联合建设有限公司 | 一种仿古建筑的斗拱预制钢筋骨架及其制作方法及仿古建筑钢筋混凝土斗拱的施工方法 |
EP3085843A1 (de) * | 2015-04-23 | 2016-10-26 | SCHÖCK BAUTEILE GmbH | Vorrichtung und verfahren zur wärmeentkopplung von betonierten gebäudeteilen |
CN104831815A (zh) * | 2015-05-26 | 2015-08-12 | 中国化学工程第三建设有限公司 | 一种梁侧面埋件及其安装方法 |
CN105133786A (zh) * | 2015-08-24 | 2015-12-09 | 河海大学 | 空腹式快速施工组合梁及其建造方法 |
Also Published As
Publication number | Publication date |
---|---|
CN106836644A (zh) | 2017-06-13 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101481935B (zh) | 一种预应力钢筋混凝土双t板及其胎模和生产方法 | |
CN108755984A (zh) | 基于砼方柱的后浇带支撑施工方法 | |
CN206784951U (zh) | 一种混凝土浇筑楼板厚度控制装置 | |
CN101659082A (zh) | 箱梁钢筋骨架整体绑扎、整体吊装系统及其施工方法 | |
CN106836644B (zh) | 一种钢筋混凝土柱的建造方法 | |
CN204098486U (zh) | 浇筑地下室顶板后浇带的混凝土吊模 | |
CN107237270A (zh) | 一种梁体结构的施工方法 | |
CN103306493A (zh) | 建筑物结构的加固方法 | |
CN204080650U (zh) | 一种用于路桥施工的边跨合拢吊架 | |
CN105133501A (zh) | 一种利用整体式提升托架的高墩施工方法 | |
CN206902913U (zh) | 一种高空大跨度悬挑结构 | |
CN103938664A (zh) | 一种塔机基础后加固的处理方法 | |
CN108316150A (zh) | 斜拉桥主塔及钢锚梁的施工系统和施工方法 | |
CN106759966A (zh) | 沉降后浇带型钢转换柱临时支撑施工方法 | |
CN207293909U (zh) | 一种预制梁钢筋骨架吊装装置 | |
CN103921347A (zh) | 预制t梁肋板钢筋、预应力管道固定抽插式安装模架 | |
CN108842799A (zh) | 一种大型杯口基础内模板设置方法 | |
CN204738454U (zh) | 一种墙柱纵向钢筋定位工具 | |
CN205024826U (zh) | 梁柱核心区滑动定位箍筋装置 | |
CN207268046U (zh) | 悬挂槽钢的混凝土梁 | |
CN108590042B (zh) | 一种用于控制钢筋保护层及楼板厚度的多功能马镫 | |
CN206667071U (zh) | 连续梁边跨合拢装置 | |
CN105369816A (zh) | 一种井坑基础斜侧面垫层支模结构及其施工方法 | |
CN102699997B (zh) | 后张法预应力梁纵向移梁系统及纵向移梁方法 | |
CN207348880U (zh) | 一种隧道中心排水沟定型模板 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |