CN106836548B - 预制剪力墙插入式钢板连接结构及其施工方法 - Google Patents
预制剪力墙插入式钢板连接结构及其施工方法 Download PDFInfo
- Publication number
- CN106836548B CN106836548B CN201710197725.8A CN201710197725A CN106836548B CN 106836548 B CN106836548 B CN 106836548B CN 201710197725 A CN201710197725 A CN 201710197725A CN 106836548 B CN106836548 B CN 106836548B
- Authority
- CN
- China
- Prior art keywords
- steel plate
- prefabricated shear
- plate
- shaped steel
- plates
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 185
- 239000010959 steel Substances 0.000 title claims abstract description 185
- 238000010276 construction Methods 0.000 title claims abstract description 19
- 230000008878 coupling Effects 0.000 claims abstract description 5
- 238000010168 coupling process Methods 0.000 claims abstract description 5
- 238000005859 coupling reaction Methods 0.000 claims abstract description 5
- 230000000149 penetrating effect Effects 0.000 claims description 6
- 238000009434 installation Methods 0.000 abstract description 8
- 230000005540 biological transmission Effects 0.000 abstract description 2
- 230000000694 effects Effects 0.000 abstract description 2
- 238000000034 method Methods 0.000 abstract description 2
- 238000004873 anchoring Methods 0.000 description 4
- 229910001294 Reinforcing steel Inorganic materials 0.000 description 2
- 238000007689 inspection Methods 0.000 description 2
- 230000002787 reinforcement Effects 0.000 description 2
- 239000002002 slurry Substances 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000006378 damage Effects 0.000 description 1
- 238000009415 formwork Methods 0.000 description 1
- 230000003014 reinforcing effect Effects 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Joining Of Building Structures In Genera (AREA)
- Load-Bearing And Curtain Walls (AREA)
Abstract
Description
Claims (6)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710197725.8A CN106836548B (zh) | 2017-03-29 | 2017-03-29 | 预制剪力墙插入式钢板连接结构及其施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710197725.8A CN106836548B (zh) | 2017-03-29 | 2017-03-29 | 预制剪力墙插入式钢板连接结构及其施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106836548A CN106836548A (zh) | 2017-06-13 |
CN106836548B true CN106836548B (zh) | 2023-09-22 |
Family
ID=59140989
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710197725.8A Active CN106836548B (zh) | 2017-03-29 | 2017-03-29 | 预制剪力墙插入式钢板连接结构及其施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106836548B (zh) |
Families Citing this family (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107724544A (zh) * | 2017-11-13 | 2018-02-23 | 中国地震局工程力学研究所 | 装配式剪力墙间的竖向多铰连接结构及施工方法 |
CN107842132B (zh) * | 2017-12-14 | 2024-01-09 | 兰州理工大学 | 一种抗弯剪的预制钢筋混凝土剪力墙连接装置和连接方法 |
CN108505647A (zh) * | 2018-05-29 | 2018-09-07 | 华侨大学 | 一种预制装配式压型钢板混凝土剪力墙及其施工方法 |
CN109024985A (zh) * | 2018-07-26 | 2018-12-18 | 河南城建学院 | 装配式剪力墙 |
CN109083412A (zh) * | 2018-08-03 | 2018-12-25 | 青岛理工大学 | 预制混凝土剪力墙装配式连接节点制作及安装方法 |
CN109138221B (zh) * | 2018-10-19 | 2023-10-13 | 山东大学 | 一种预制混凝土-钢板组合剪力墙拼接节点及施工方法 |
CN109555228B (zh) * | 2018-12-25 | 2023-12-22 | 中国建筑第二工程局有限公司 | 一种组装式预制pcf外墙板固定装置及其施工方法 |
CN110042946A (zh) * | 2019-04-30 | 2019-07-23 | 山东汇源杭萧钢构有限公司 | 装配式剪力墙及其施工方法 |
CN110700441A (zh) * | 2019-10-30 | 2020-01-17 | 上海应用技术大学 | 一种预制装配式混凝土剪力墙榫式钢节点连接结构 |
CN110872872A (zh) * | 2019-11-19 | 2020-03-10 | 辽宁省城乡市政工程集团有限责任公司 | 一种内置钢板混凝土与钢筋混凝土拼接剪力墙及施工工艺 |
CN111622381A (zh) * | 2020-06-11 | 2020-09-04 | 徐州力山建设工程有限公司 | 一种带工字钢的预制剪力墙水平接缝连接结构 |
CN111691574B (zh) * | 2020-06-24 | 2022-03-29 | 江苏中营仝建装配建筑科技有限公司 | 一种预制装配式剪力墙竖缝连接结构及其施工方法 |
CN114718212A (zh) * | 2022-03-16 | 2022-07-08 | 华南理工大学 | 抗剪连接件、预制剪力墙连接构造及预制剪力墙施工方法 |
CN115233833B (zh) * | 2022-08-17 | 2024-02-06 | 山西省安装集团股份有限公司 | 一种装配式剪力墙免套筒连接结构 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE2136025A1 (de) * | 1971-07-19 | 1973-06-07 | Hubert Jenzen | Euro-hohlzellen-montage-fertigbauverfahren mit einbetonierten betonhohlzellen |
CN2200169Y (zh) * | 1994-04-13 | 1995-06-07 | 机械工业部第四设计研究院 | 密封双滚推杆式步进梁机构 |
WO2012096639A1 (en) * | 2011-01-10 | 2012-07-19 | Johnson Frank K | Modular construction mold apparatus and method for constructing concrete buildings and structures |
CN103510639A (zh) * | 2013-10-15 | 2014-01-15 | 合肥工业大学 | 一种可恢复功能的叠合板式剪力墙及其实施方法 |
CN204266370U (zh) * | 2014-08-19 | 2015-04-15 | 崔鸿超 | 预制src-s-rc柱梁剪力墙支撑楼板装配式体系 |
CN205024882U (zh) * | 2015-07-07 | 2016-02-10 | 华北理工大学 | 预制装配式型钢混凝土剪力墙 |
-
2017
- 2017-03-29 CN CN201710197725.8A patent/CN106836548B/zh active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE2136025A1 (de) * | 1971-07-19 | 1973-06-07 | Hubert Jenzen | Euro-hohlzellen-montage-fertigbauverfahren mit einbetonierten betonhohlzellen |
CN2200169Y (zh) * | 1994-04-13 | 1995-06-07 | 机械工业部第四设计研究院 | 密封双滚推杆式步进梁机构 |
WO2012096639A1 (en) * | 2011-01-10 | 2012-07-19 | Johnson Frank K | Modular construction mold apparatus and method for constructing concrete buildings and structures |
CN103510639A (zh) * | 2013-10-15 | 2014-01-15 | 合肥工业大学 | 一种可恢复功能的叠合板式剪力墙及其实施方法 |
CN204266370U (zh) * | 2014-08-19 | 2015-04-15 | 崔鸿超 | 预制src-s-rc柱梁剪力墙支撑楼板装配式体系 |
CN205024882U (zh) * | 2015-07-07 | 2016-02-10 | 华北理工大学 | 预制装配式型钢混凝土剪力墙 |
Also Published As
Publication number | Publication date |
---|---|
CN106836548A (zh) | 2017-06-13 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106836548B (zh) | 预制剪力墙插入式钢板连接结构及其施工方法 | |
CN103104041A (zh) | 一种采用横向连接的装配式框架梁柱节点及施工方法 | |
CN101839061A (zh) | 现浇混凝土圆弧外墙体单侧支模体系及其施工方法 | |
CN104405041B (zh) | 钢结构建筑装配式预制楼板连接件及其安装方法 | |
KR101983719B1 (ko) | 교각 구조물용 영구거푸집 및 이를 이용한 교각 시공방법 | |
CN107201792A (zh) | 高层装配式单排孔预制剪力墙及其装配结构和施工方法 | |
CN113293890A (zh) | 基于钢板屈服耗能型干式连接件及施工方法 | |
CN110805144B (zh) | 全装配式高层/超高层混凝土框支结构体系及其施工方法 | |
CN109914589B (zh) | 一种预应力钢筋混凝土预制柱竖向连接结构及其施工方法 | |
CN113482308A (zh) | 装配式可调悬挑工字钢刚性拉杆外脚手架施工方法 | |
CN107060132B (zh) | 一种预制装配式剪力墙 | |
CN211396109U (zh) | 一种钢管柱组合墙 | |
CN208152303U (zh) | 一种采用槽型钢板连接的预制剪力墙水平接缝结构 | |
CN109208785B (zh) | 装配式叠合结构体系 | |
CN209323683U (zh) | 钢梁与砼结构连接结构 | |
CN215291420U (zh) | 一种可拆卸式建筑模板组件及装配式钢筋桁架楼承板 | |
CN214834737U (zh) | 一种插接式板面主次龙骨快装早拆耳形连接件 | |
CN210597793U (zh) | 一种加强装配式楼板整体性的连接节点 | |
CN211369158U (zh) | 一种带强水平连接节点的装配式剪力墙 | |
CN210947337U (zh) | 预制楼板加固结构 | |
CN209891381U (zh) | 一种建筑结构 | |
CN110700445A (zh) | 一种带强水平连接节点的装配式剪力墙 | |
CN218952448U (zh) | 一种纵肋空腔结构 | |
CN214739014U (zh) | 一种预制剪力墙钢板连接构造 | |
CN207934199U (zh) | 快速装配混凝土剪力墙与钢梁平面外抗震连接节点 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20240228 Address after: Unit 101, No. 2 Erzhi Lane, Xifeng Xingou New Area, Xilu Town, Chaoyang District, Shantou City, Guangdong Province, 515000 Patentee after: Li Canjie Country or region after: China Patentee after: Li Chunsheng Patentee after: Li Canguang Address before: No. 13 Chaoyang Street, Zhangjiakou, Hebei, Hebei Patentee before: HEBEI University OF ARCHITECTURE Country or region before: China |
|
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20240507 Address after: 518000, Building A, 202, Shengye Space, 52 Tiezi Road, Gongle Community, Xixiang Street, Bao'an District, Shenzhen, Guangdong Province Patentee after: Shenzhen Yuhong Construction Engineering Co.,Ltd. Country or region after: China Address before: Unit 101, No. 2 Erzhi Lane, Xifeng Xingou New Area, Xilu Town, Chaoyang District, Shantou City, Guangdong Province, 515000 Patentee before: Li Canjie Country or region before: China Patentee before: Li Chunsheng Patentee before: Li Canguang |