CN106836192A - 一种装配式地下墙及其施工法 - Google Patents
一种装配式地下墙及其施工法 Download PDFInfo
- Publication number
- CN106836192A CN106836192A CN201710195875.5A CN201710195875A CN106836192A CN 106836192 A CN106836192 A CN 106836192A CN 201710195875 A CN201710195875 A CN 201710195875A CN 106836192 A CN106836192 A CN 106836192A
- Authority
- CN
- China
- Prior art keywords
- wall
- chain knife
- chain
- ground
- assembled
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/20—Bulkheads or similar walls made of prefabricated parts and concrete, including reinforced concrete, in situ
Abstract
本发明提出的是一种装配式地下墙及其施工法,其地下墙1由底墙1‑1和若干墙1‑2装配而成;相邻两墙1的装配拼接处分别设有凹凸子口,即一墙的凸台嵌入另一墙的凹槽内,墙1的底部和两侧设有轨道2,施工时轨道2上装有链刀3,链刀3由链条3‑1和安装在链条3‑1上的刀具3‑2组成,链刀3工作时仅挖掘墙1底部的岩土,墙1和底部的链刀3同时向下运行,下部墙1的上平面随着链刀下降到距地面设定的高度后,再装配拼接上部墙1‑2,相邻两墙的接口处在进入地下前先进行焊接,使之成为一体。优点:邻两墙1的装配处采用凹凸嵌入焊接拼接,连接安全可靠,墙1自身带有挖掘其底部岩土的链刀,工厂预制墙1,现场拼接后分块或者整体下降,施工简单,施工周期短,成本低。
Description
技术领域
本发明涉及的是一种装配式地下墙及其施工法,属于土木工程基础施工技术领域。
背景技术
现有地下连续墙技术是在地面上利用挖槽机械,在泥浆护壁的条件下,开挖岀一条狭长的深槽,在槽内吊放钢筋笼,浇筑水下混凝土筑成一个单元槽段,如此逐段进行。其主要缺陷:1)槽内水下施工质量难以控制和检测、施工周期长;2)槽段之间的接口施工困难且易渗水;3)开槽机械较高,且要沿着周长移动应用场合受到限制。
发明内容
本发明提出的是一种装配式地下墙及其施工法,其目的旨在克服现有技术存在的缺陷,其主要优点:相邻两墙1的装配处采用凹凸嵌入焊接拼接,连接安全可靠,密封性好;墙1自身带有挖掘其底部岩土的链刀,工厂预制墙,现场拼接后分块或者整体下降,施工简单,施工周期短,成本低。
本发明的技术解决方案:地下墙1由底墙1-1和若干墙1-2装配而成;相邻两墙1的装配拼接处分别设有钢结构的凹凸子口,即一墙的凸台嵌入另一墙的凹槽内,分A、B两种结构:A、同一墙的接口处既有凹槽又有凸台,另一墙反之; B、一墙为凹槽,另一墙为凸台; 墙1的底部和两侧设有轨道2,施工时轨道2上装有链刀3,链刀3由链条3-1和安装在链条3-1上的刀具3-2组成,链刀3工作时仅挖掘墙1底部的岩土,墙1和底部的链刀3同时向下运行,下部墙1的上平面随着链刀下降到距地面设定的高度后,再装配拼接上部墙1-2,相邻两墙的接口处在进入地下前先进行焊接,使之成为一体。
本发明的优点:邻两墙1的装配处采用凹凸嵌入焊接拼接,连接安全可靠,墙1自身带有挖掘其底部岩土的链刀,工厂预制墙1,现场拼接后分块或者整体下降,施工简单,施工周期短,成本低。
附图说明
图1是相邻两墙1的装配拼接处分别设有钢结构的凹凸子口,即一墙的凸台嵌入另一墙的凹槽内的结构示意图;
图2是图1的A-A视图,也是底墙1-1和上部墙1-2行焊接成为一体的结构示意图
图3是图1的B向视图,也是由驱动动力装置5-1、弃土处理装置5-2和机架5-3组成的链刀驱动装置5的结构示意图,也是链刀3、链刀驱动装置5和墙1组成施工状态的结构示意图;
图4是图3的C-C视图,也是墙1中间部分的剖视图;
图5是图2的Ⅰ局部的放大视图,也是底墙1-1底部的轨道2的结构示意图,也是泥浆管路装置6在底墙1-1上的泥浆喷嘴6-1和泥浆管路6-2的结构示意图;
图6是图2的Ⅱ局部的放大视图,也是相邻两墙1接口处一墙为凹槽,另一墙为凸台,在相邻两墙的相同位置设有若干孔,拼接时在孔内插有销轴7的结构示意图,也是相邻两墙1的接口处焊接有连接钢板8,且焊接后的厚度不大于地下墙1的厚度的结构示意图;
图7是链刀3的结构示意图,也是链条3-1和刀具3-2的结构示意图;
图8是另一种可空间弯曲链刀3的结构示意图,也是链条3-1和刀具3-2的结构示意图;
图9是拼装底部墙1-1,通过焊接使之成为一整体,安装链刀3和驱动装置5的结构示意图;
图10是墙1-1底部链刀3挖掘岩土,侧面由下向上运行的链刀3将已挖掘的岩土带至上方,墙1-1和底部的链刀3一起下降至设定位置的结构示意图;
图11是拆除驱动装置5,上部链刀3断开后的结构示意图;
图12是图11的A-A视图,也是底墙1-1的结构示意图,也是底墙1-1上平面下降到距地面设定的高度位置的结构示意图;
图13是装配拼接上部墙1-2,安装链刀3和驱动装置5后的结构示意图;
图14是图13的A-A视图,也是拼接时在孔内插入销轴7,接口处利用钢板8焊接使之成为一体的结构示意图;
图15是墙1-1底部链刀3挖掘岩土,侧面由下向上运行的链刀3将已挖掘的岩土带至上方,已焊接成一体的墙1和底部的链刀3一起下降到设定位置的结构示意图;
图16是完成全部墙1的装配拼接施工的结构示意图;
图17是图16的A向视图,也是墙1施工完后抽出临时工装4的结构示意图。
图中的1是地下墙,由底墙1-1和若干墙1-2装配而成;1-1是地下墙1的底墙;1-2是地下墙1的底墙以上的墙;2是墙1的底部和两侧设有的轨道;3是挖掘岩土的链刀,由链条3-1和安装在链条3-1上的刀具3-2组成;3-1是组成链刀3的链条;3-2是组成链刀3的刀具;4是施工时的临时工装;5是链刀驱动装置,由驱动动力装置5-1、弃土处理装置5-2和机架5-3组成;5-1是驱动动力装置;5-2是弃土处理装置;5-3是机架;6是泥浆管路装置;6-1是墙1底部上的泥浆喷嘴;6-2是墙1内部的泥浆管路;7是墙1拼接时在孔内插的销轴;8是墙1拼接时焊接的钢板。
具体实施方式
地下墙1由底墙1-1和若干墙1-2装配而成;相邻两墙1的装配拼接处分别设有钢结构的凹凸子口,即一墙的凸台嵌入另一墙的凹槽内,分A、B两种结构:A、同一墙的接口处既有凹槽又有凸台,另一墙反之; B、一墙为凹槽,另一墙为凸台;墙1的底部和两侧设有轨道2,施工时轨道2上装有链刀3,链刀3由链条3-1和安装在链条3-1上的刀具3-2组成,链刀3工作时仅挖掘墙1底部的岩土,墙1和底部的链刀3同时向下运行,下部墙1的上平面随着链刀下降到距地面设定的高度后,再装配拼接上部墙1-2,相邻两墙的接口处在进入地下前先进行焊接,使之成为一体。
所述的相邻两墙接口处一墙为凹槽,另一墙为凸台,在相邻两墙的相同位置设有若干孔,拼接时在孔内插有销轴。
所述的相邻两墙的接口处焊接有连接钢板,且焊接后的厚度不大于地下墙的厚度。
所述的具体施工法分如下步骤:
1)预制墙1-1和墙1-2各模块;
2)清理现场,使之满足施工条件;
3)将预制的墙1-1和墙1-2的各模块运至现场;
4)拼装底部墙1-1,通过焊接使之成为一整体,安装链刀3和驱动装置等;
5)启动驱动装置,墙1-1底部链刀3挖掘岩土,侧面由下向上运行的链刀3将已挖掘的岩土带至上方;
6)墙1-1和底部的链刀3一起下降;
7)墙1-1的上平面下降到距地面设定的高度,停止驱动装置;
8)装配拼接上部墙1-2,接口处焊接,使之成为一体;
9)启动驱动装置,墙1-1底部链刀3挖掘岩土,侧面由下向上运行的链刀3将已挖掘的岩土带至上方;
10)已焊接成一体的墙1和底部的链刀3一起下降;
11)已焊接成一体的墙1的上平面下降到距地面设定的高度,停止驱动装置;
12)装配拼接上部墙1-2,接口处焊接,使之成为一体;
重复上述9)至12)的施工,直至完成全部墙1的装配拼接施工。
下面结合附图进一步描述本发明的技术方案:
如图1~图8所示,地下墙1由底墙1-1和若干墙1-2装配而成;相邻两墙1的装配拼接处分别设有钢结构的凹凸子口,即一墙的凸台嵌入另一墙的凹槽内,分A、B两种结构:A、同一墙的接口处既有凹槽又有凸台,另一墙反之; B、一墙为凹槽,另一墙为凸台。 墙1的底部和两侧设有轨道2,施工时轨道2上装有链刀3,链刀3的宽度小于接口处凹槽口部的宽度,链刀3由链条3-1和安装在链条3-1上的刀具3-2组成,驱动动力装置5-1驱动链刀3,链刀3工作时仅挖掘墙1底部的岩土,由下向上运行的链刀3将墙1底部已挖掘的岩土带至上方,装置5-2将链刀3从墙1底部带上来的岩土与链刀3分离,墙1和底部链刀3同时向下运行,下部墙1-1的上平面随着链刀下降到距地面设定的高度后,再装配拼接上部墙1-2,相邻两墙的接口处在进入地下前先进行焊接,使之成为一体;相邻两墙接口处一墙为凹槽,另一墙为凸台,在相邻两墙的相同位置设有若干孔,拼接时在孔内插有销轴7;相邻两墙的接口处焊接有连接钢板8,且焊接后的厚度不大于地下墙的厚度。
如图9~图17所示,具体施工法分如下步骤:
1)预制墙1-1和墙1-2各模块;
2)清理现场,使之满足施工条件;
3)将预制的墙1-1和墙1-2的各模块运至现场;
4)拼装底部墙1-1,通过焊接使之成为一整体,安装链刀3和驱动装置5等;
5)启动驱动装置5,墙1-1底部链刀3挖掘岩土,侧面由下向上运行的链刀3将已挖掘的岩土带至上方;
6)墙1-1和底部的链刀3一起下降;
7)墙1-1的上平面下降到距地面设定的高度,停止驱动装置5;
8)装配拼接上部墙1-2,接口处焊接,使之成为一体;
9)启动驱动装置5,墙1-1底部链刀3挖掘岩土,侧面由下向上运行的链刀3将已挖掘的岩土带至上方;
10)已焊接成一体的墙1和底部的链刀3一起下降;
11)已焊接成一体的墙1的上平面下降到距地面设定的高度,停止驱动装置5;
12)装配拼接上部墙1-2,接口处焊接,使之成为一体;
重复上述9)至12)的施工,直至完成全部墙1的装配拼接施工。
Claims (4)
1.一种装配式地下墙,其特征是地下墙(1)由底墙(1-1)和若干墙(1-2)装配而成;相邻两墙(1)的装配拼接处分别设有钢结构的凹凸子口,即一墙的凸台嵌入另一墙的凹槽内,分A、B两种结构:A、同一墙的接口处既有凹槽又有凸台,另一墙反之; B、一墙为凹槽,另一墙为凸台;墙(1)的底部和两侧设有轨道(2),施工时轨道(2)上装有链刀(3),链刀(3)由链条(3-1)和安装在链条(3-1)上的刀具(3-2)组成,链刀(3)工作时仅挖掘墙(1)底部的岩土,墙(1)和底部的链刀(3)同时向下运行,下部墙(1)的上平面随着链刀下降到距地面设定的高度后,再装配拼接上部墙(1-2),相邻两墙的接口处在进入地下前先进行焊接,使之成为一体。
2.根据权利要求1所述的一种装配式地下墙,其特征是所述的相邻两墙接口处一墙为凹槽,另一墙为凸台,在相邻两墙的相同位置设有若干孔,拼接时在孔内插有销轴。
3.根据权利要求1所述的一种装配式地下墙,其特征是所述的相邻两墙的接口处焊接有连接钢板,且焊接后的厚度不大于地下墙的厚度。
4.根据权利要求1所述的一种装配式地下墙,其特征是所述的具体施工法分如下步骤:
1)预制墙(1-1)和墙(1-2)各模块;
2)清理现场,使之满足施工条件;
3)将预制的墙(1-1)和墙(1-2)的各模块运至现场;
4)拼装底部墙(1-1),通过焊接使之成为一整体,安装链刀(3)和驱动装置等;
5)启动驱动装置,墙(1-1)底部链刀(3)挖掘岩土,侧面由下向上运行的链刀(3)将已挖掘的岩土带至上方;
6)墙(1-1)和底部的链刀(3)一起下降;
7)墙(1-1)的上平面下降到距地面设定的高度,停止驱动装置;
8)装配拼接上部墙(1-2),接口处焊接,使之成为一体;
9)启动驱动装置,墙(1-1)底部链刀(3)挖掘岩土,侧面由下向上运行的链刀(3)将已挖掘的岩土带至上方;
10)已焊接成一体的墙(1)和底部的链刀(3)一起下降;
11)已焊接成一体的墙(1)的上平面下降到距地面设定的高度,停止驱动装置;
12)装配拼接上部墙(1-2),接口处焊接,使之成为一体;
重复上述9)至12)的施工,直至完成全部墙(1)的装配拼接施工。
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710195875.5A CN106836192A (zh) | 2017-03-29 | 2017-03-29 | 一种装配式地下墙及其施工法 |
PCT/CN2018/080790 WO2018177306A1 (zh) | 2017-03-29 | 2018-03-28 | 一种装配式地下墙及其施工法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710195875.5A CN106836192A (zh) | 2017-03-29 | 2017-03-29 | 一种装配式地下墙及其施工法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106836192A true CN106836192A (zh) | 2017-06-13 |
Family
ID=59141351
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710195875.5A Pending CN106836192A (zh) | 2017-03-29 | 2017-03-29 | 一种装配式地下墙及其施工法 |
Country Status (2)
Country | Link |
---|---|
CN (1) | CN106836192A (zh) |
WO (1) | WO2018177306A1 (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108035338A (zh) * | 2017-11-24 | 2018-05-15 | 上海市机械施工集团有限公司 | 预制地墙及其施工方法 |
WO2018177306A1 (zh) * | 2017-03-29 | 2018-10-04 | 王燏斌 | 一种装配式地下墙及其施工法 |
WO2023066326A1 (zh) * | 2021-10-21 | 2023-04-27 | 王树生 | 一种沉墙基础及其施工装置和施工法 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5985021A (ja) * | 1982-11-05 | 1984-05-16 | Kajima Corp | 地下連続壁工法及びその工法に使用する装置 |
JPS62233328A (ja) * | 1986-04-01 | 1987-10-13 | Fusao Sakano | 爪付篦型バケットを備えた掘削装置本体を介して置き去り式に擁壁を設置する設置装置 |
JPH04179726A (ja) * | 1990-11-13 | 1992-06-26 | Kazutoshi Isachi | 簡易地下連続壁工法における壁体用部材と該壁体用部材を使用した簡易地下連続壁工法 |
CN103334422B (zh) * | 2013-06-26 | 2015-07-15 | 中国建筑股份有限公司 | 一种可装配埋入式预制空心地下连续墙及其施工方法 |
CN105887806A (zh) * | 2016-06-13 | 2016-08-24 | 上海强劲地基工程股份有限公司 | 装配式地下连续墙及其施工方法 |
Family Cites Families (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2260103Y (zh) * | 1996-08-05 | 1997-08-20 | 郭同元 | 桩 |
CN106836192A (zh) * | 2017-03-29 | 2017-06-13 | 王燏斌 | 一种装配式地下墙及其施工法 |
-
2017
- 2017-03-29 CN CN201710195875.5A patent/CN106836192A/zh active Pending
-
2018
- 2018-03-28 WO PCT/CN2018/080790 patent/WO2018177306A1/zh active Application Filing
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5985021A (ja) * | 1982-11-05 | 1984-05-16 | Kajima Corp | 地下連続壁工法及びその工法に使用する装置 |
JPS62233328A (ja) * | 1986-04-01 | 1987-10-13 | Fusao Sakano | 爪付篦型バケットを備えた掘削装置本体を介して置き去り式に擁壁を設置する設置装置 |
JPH04179726A (ja) * | 1990-11-13 | 1992-06-26 | Kazutoshi Isachi | 簡易地下連続壁工法における壁体用部材と該壁体用部材を使用した簡易地下連続壁工法 |
CN103334422B (zh) * | 2013-06-26 | 2015-07-15 | 中国建筑股份有限公司 | 一种可装配埋入式预制空心地下连续墙及其施工方法 |
CN105887806A (zh) * | 2016-06-13 | 2016-08-24 | 上海强劲地基工程股份有限公司 | 装配式地下连续墙及其施工方法 |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2018177306A1 (zh) * | 2017-03-29 | 2018-10-04 | 王燏斌 | 一种装配式地下墙及其施工法 |
CN108035338A (zh) * | 2017-11-24 | 2018-05-15 | 上海市机械施工集团有限公司 | 预制地墙及其施工方法 |
WO2023066326A1 (zh) * | 2021-10-21 | 2023-04-27 | 王树生 | 一种沉墙基础及其施工装置和施工法 |
Also Published As
Publication number | Publication date |
---|---|
WO2018177306A1 (zh) | 2018-10-04 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107059877A (zh) | 一种施工时底部带有链刀的基础及其施工法 | |
CN110043264B (zh) | 一种顶进预制矩形竖井结构型式的施工方法 | |
CN107460882B (zh) | 一种深基坑封闭止水的支护排桩施工方法 | |
KR101051965B1 (ko) | 지하연속벽 시공용 패널 조인트 및 이를 이용한 지하연속벽 시공방법 | |
WO2018133740A1 (zh) | 一种地下建筑及其施工法 | |
CN106836192A (zh) | 一种装配式地下墙及其施工法 | |
KR100936471B1 (ko) | 배수 구조를 갖는 세그먼트에 의한 원형 지보공 구조체 및 이를 이용한 실드터널을 시공하는 방법 | |
WO2018177307A1 (zh) | 一种装配式地下建筑及其施工法 | |
CN107514262A (zh) | 盾构管廊的施工方法 | |
KR100877452B1 (ko) | 쓰리아치 굴착 터널의 중간벽체 시공 방법 | |
WO2018133711A1 (zh) | 一种桥墩基础及其施工法 | |
WO2018133746A1 (zh) | 一种由桩和墙组成的地下建筑物及其施工法 | |
WO2018177304A1 (zh) | 一种装配式地下建筑及其施工法 | |
CN208594938U (zh) | 一种自走型开放式盾构掘进机 | |
CN106759464A (zh) | 一种地下建筑及其施工法 | |
CN107964971B (zh) | 一种采用pba工法施工的地铁车站的降水方法 | |
WO2018133742A1 (zh) | 一种用于地下墙施工的切槽装置及其施工法 | |
CN207727550U (zh) | 一种装配式地下墙 | |
CN111322086A (zh) | 一种泄水洞与正线隧道的连接构造 | |
CN207228156U (zh) | 一种由桩和墙组成的地下建筑物 | |
CN106836188A (zh) | 一种用于装配式地下建筑的凹槽桩及其施工法 | |
CN105569572A (zh) | 方形钻头 | |
CN207727613U (zh) | 一种装配式地下建筑 | |
CN207419440U (zh) | 一种用于装配式地下建筑的凹槽桩 | |
WO2018177308A1 (zh) | 一种装配式地下建筑接口结构及其施工法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB02 | Change of applicant information | ||
CB02 | Change of applicant information |
Address after: 214000 No. 226, Xi Da Road, Mei Cun town, Xin Wu District, Wuxi, Jiangsu Applicant after: Wang Yubin Address before: 214000 Xinhua Road 121, Meishan Town, Wuxi New District, Jiangsu Applicant before: Wang Yubin |
|
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170613 |