CN106812156A - 一种装配式地下建筑及其施工法 - Google Patents
一种装配式地下建筑及其施工法 Download PDFInfo
- Publication number
- CN106812156A CN106812156A CN201710195882.5A CN201710195882A CN106812156A CN 106812156 A CN106812156 A CN 106812156A CN 201710195882 A CN201710195882 A CN 201710195882A CN 106812156 A CN106812156 A CN 106812156A
- Authority
- CN
- China
- Prior art keywords
- wall
- stake
- chain
- chain knife
- knife
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/045—Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
Landscapes
- Engineering & Computer Science (AREA)
- Environmental & Geological Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Bulkheads Adapted To Foundation Construction (AREA)
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710195882.5A CN106812156A (zh) | 2017-03-29 | 2017-03-29 | 一种装配式地下建筑及其施工法 |
PCT/CN2018/080791 WO2018177307A1 (fr) | 2017-03-29 | 2018-03-28 | Bâtiment souterrain préfabriqué et son procédé de construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710195882.5A CN106812156A (zh) | 2017-03-29 | 2017-03-29 | 一种装配式地下建筑及其施工法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106812156A true CN106812156A (zh) | 2017-06-09 |
Family
ID=59116406
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710195882.5A Pending CN106812156A (zh) | 2017-03-29 | 2017-03-29 | 一种装配式地下建筑及其施工法 |
Country Status (2)
Country | Link |
---|---|
CN (1) | CN106812156A (fr) |
WO (1) | WO2018177307A1 (fr) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107386295A (zh) * | 2017-07-24 | 2017-11-24 | 能诚集团有限公司 | 一种地下建筑物的沉降施工装置 |
WO2018177307A1 (fr) * | 2017-03-29 | 2018-10-04 | 王燏斌 | Bâtiment souterrain préfabriqué et son procédé de construction |
CN113818495A (zh) * | 2021-09-16 | 2021-12-21 | 中南大学 | 一种针对低频表面波隔振的周期性桩-墙结构及施工方法 |
CN114164881A (zh) * | 2021-10-21 | 2022-03-11 | 王树生 | 用于网格状地下建筑物下沉施工的主辅双挖掘装置 |
WO2023066327A1 (fr) * | 2021-10-21 | 2023-04-27 | 王树生 | Procédé de construction pour bâtiment souterrain comprenant une fondation de paroi de renfoncement |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5985021A (ja) * | 1982-11-05 | 1984-05-16 | Kajima Corp | 地下連続壁工法及びその工法に使用する装置 |
JPS62233328A (ja) * | 1986-04-01 | 1987-10-13 | Fusao Sakano | 爪付篦型バケットを備えた掘削装置本体を介して置き去り式に擁壁を設置する設置装置 |
JPH04179726A (ja) * | 1990-11-13 | 1992-06-26 | Kazutoshi Isachi | 簡易地下連続壁工法における壁体用部材と該壁体用部材を使用した簡易地下連続壁工法 |
CN2260103Y (zh) * | 1996-08-05 | 1997-08-20 | 郭同元 | 桩 |
CN103334422B (zh) * | 2013-06-26 | 2015-07-15 | 中国建筑股份有限公司 | 一种可装配埋入式预制空心地下连续墙及其施工方法 |
Family Cites Families (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105887806B (zh) * | 2016-06-13 | 2018-08-24 | 上海强劲地基工程股份有限公司 | 装配式地下连续墙及其施工方法 |
CN106812156A (zh) * | 2017-03-29 | 2017-06-09 | 王燏斌 | 一种装配式地下建筑及其施工法 |
-
2017
- 2017-03-29 CN CN201710195882.5A patent/CN106812156A/zh active Pending
-
2018
- 2018-03-28 WO PCT/CN2018/080791 patent/WO2018177307A1/fr active Application Filing
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5985021A (ja) * | 1982-11-05 | 1984-05-16 | Kajima Corp | 地下連続壁工法及びその工法に使用する装置 |
JPS62233328A (ja) * | 1986-04-01 | 1987-10-13 | Fusao Sakano | 爪付篦型バケットを備えた掘削装置本体を介して置き去り式に擁壁を設置する設置装置 |
JPH04179726A (ja) * | 1990-11-13 | 1992-06-26 | Kazutoshi Isachi | 簡易地下連続壁工法における壁体用部材と該壁体用部材を使用した簡易地下連続壁工法 |
CN2260103Y (zh) * | 1996-08-05 | 1997-08-20 | 郭同元 | 桩 |
CN103334422B (zh) * | 2013-06-26 | 2015-07-15 | 中国建筑股份有限公司 | 一种可装配埋入式预制空心地下连续墙及其施工方法 |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2018177307A1 (fr) * | 2017-03-29 | 2018-10-04 | 王燏斌 | Bâtiment souterrain préfabriqué et son procédé de construction |
CN107386295A (zh) * | 2017-07-24 | 2017-11-24 | 能诚集团有限公司 | 一种地下建筑物的沉降施工装置 |
CN113818495A (zh) * | 2021-09-16 | 2021-12-21 | 中南大学 | 一种针对低频表面波隔振的周期性桩-墙结构及施工方法 |
CN114164881A (zh) * | 2021-10-21 | 2022-03-11 | 王树生 | 用于网格状地下建筑物下沉施工的主辅双挖掘装置 |
WO2023066327A1 (fr) * | 2021-10-21 | 2023-04-27 | 王树生 | Procédé de construction pour bâtiment souterrain comprenant une fondation de paroi de renfoncement |
Also Published As
Publication number | Publication date |
---|---|
WO2018177307A1 (fr) | 2018-10-04 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106812156A (zh) | 一种装配式地下建筑及其施工法 | |
CN103615273A (zh) | 方钢约束混凝土拱架壁后充填锚注支护体系及施工方法 | |
CN103061771B (zh) | 复采矿井综采面切眼掘进及其支护方法 | |
CN103306682B (zh) | 一种大跨度高边墙地下空间建筑物及其开挖支护方法 | |
CN105781595B (zh) | 一种矩形或类矩形断面地下工程机械分部暗挖建造方法 | |
CN104912101A (zh) | 一种综合管廊的掘进拼装结构及其施工方法 | |
CN104047621B (zh) | 基于顶部小净距地下室开挖条件的高断面横通道施工方法 | |
CN110374091A (zh) | 一种矩形抗滑桩机械成孔施工方法 | |
CN103939115A (zh) | 一种半暗挖法施工棚洞的方法及结构 | |
CN204457789U (zh) | 一种用桩拱墙支撑扩挖大直径盾构隧道建造的地铁车站 | |
CN103470268B (zh) | 零间距不对称双洞隧道结构及其施工方法 | |
CN110924960A (zh) | 盾构先始发后施工车站结构的地铁施工方法 | |
CN106930768A (zh) | 隧洞施工方法及应用 | |
CN104746520A (zh) | 一种用于先浅后深的基坑支护结构及方法 | |
WO2018177304A1 (fr) | Bâtiment souterrain préfabriqué et son procédé de construction | |
CN207512777U (zh) | 装配式地下管廊 | |
CN207714369U (zh) | 一种装配式地下建筑 | |
CN203655324U (zh) | 方钢约束混凝土拱架壁后充填锚注支护体系 | |
CN106836192A (zh) | 一种装配式地下墙及其施工法 | |
CN105804084B (zh) | 一种临近已开挖深基坑的小基坑开挖施工方法 | |
CN111322086A (zh) | 一种泄水洞与正线隧道的连接构造 | |
US20020195274A1 (en) | Underground shell-pile continuous wall job practice and its special drill | |
CN208533542U (zh) | 一种采用三级梯次联合体系的基坑支护结构 | |
CN211924173U (zh) | 一种泄水洞与正线隧道的连接构造 | |
CN207727613U (zh) | 一种装配式地下建筑 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB02 | Change of applicant information |
Address after: 214000 No. 226, Xi Da Road, Mei Cun town, Xin Wu District, Wuxi, Jiangsu Applicant after: Wang Yubin Address before: 214000 Xinhua Road 121, Meishan Town, Wuxi New District, Jiangsu Applicant before: Wang Yubin |
|
CB02 | Change of applicant information | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170609 |
|
RJ01 | Rejection of invention patent application after publication |