CN106812068A - A kind of device for progressively turning down suspension bridge construction phase temporary support height - Google Patents

A kind of device for progressively turning down suspension bridge construction phase temporary support height Download PDF

Info

Publication number
CN106812068A
CN106812068A CN201710047470.7A CN201710047470A CN106812068A CN 106812068 A CN106812068 A CN 106812068A CN 201710047470 A CN201710047470 A CN 201710047470A CN 106812068 A CN106812068 A CN 106812068A
Authority
CN
China
Prior art keywords
husky
plate
fine sand
bearing
base
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710047470.7A
Other languages
Chinese (zh)
Inventor
张文明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Southeast University
Original Assignee
Southeast University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Southeast University filed Critical Southeast University
Priority to CN201710047470.7A priority Critical patent/CN106812068A/en
Publication of CN106812068A publication Critical patent/CN106812068A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Abstract

The invention discloses a kind of device for progressively turning down suspension bridge construction phase temporary support height, including bearing top board, base-plate, husky groove, fine sand and valve;The bearing top board is bolted below steel truss girder lower boom, and bearing top board is arranged below bearing rubber layer, and bearing rubber layer is arranged below base-plate;The husky groove is to be surrounded to be located in husky trough floor by husky groove side plate four sides, form a top-open structure, fine sand is provided with husky groove, the base-plate is located on the top surface of fine sand, the Internal periphery of husky groove side plate leaves gap with the periphery of base-plate, and husky groove side plate is provided with the valve for fine sand to be discharged;The husky trough floor is placed on bridge tower sill top surface, and is bolted with it, and the thickness of the fine sand is exactly that bearing needs padded height with husky bottom land plate thickness sum.The present invention using husky groove cuff fine sand, can support carriers base plate, using the synchronous symmetrical discharge fine sand of valve, be capable of achieving the stepless of bearing and turn down.

Description

A kind of device for progressively turning down suspension bridge construction phase temporary support height
Technical field
The present invention relates to a kind of device for progressively turning down height of support, and in particular to a kind of steel trussed girder suspension bridge construction time by The device of the low stiff girder temporary support height of step.
Background technology
Suspension bridge is across a kind of maximum bridge type of ability.China's landforms are complicated, and river valley gathers, and has greatly to Longspan Bridge Large span suspension bridge construction also achieves huge progress over amount demand, and nearly 30 years.
Suspension bridge is made up of the component such as anchorage, bridge tower, main cable saddle, scattered cable saddle, main push-towing rope, cord clip, suspension rod and stiff girder.Construction Sequentially it is usually:Construction anchorage and bridge tower → installation main cable saddle and scattered cable saddle → erection main push-towing rope → installation cord clip and suspension rod → lifting Stiff girder.Stiff girder has two kinds of common forms:Steel box-girder and steel truss girder.
For steel box-girder suspension bridge, deck paving is laid on orthotropic top board.Every linear meter(lin.m.) weight of deck paving is remote Less than every linear meter(lin.m.) weight of steel box-girder, deck paving will not cause stiff girder than larger vertical displacement, therefore be hung in steel box-girder Just the permanent bearing of formula can be rectified with mounting rail after the completion of dress.
For steel trussed girder suspension bridge, steel bridge deck (orthotropic plate) or concrete bridge deck need to be laid on steel truss girder Plate, then lays deck paving on floorings.Steel bridge deck is generally slightly smaller than steel truss girder per linear meter(lin.m.) weight per linear meter(lin.m.) weight, or Both are quite.Per linear meter(lin.m.) weight more than the every linear meter(lin.m.) weight of steel truss girder, the former is usually 2~3 times of the latter to concrete slab.Steel After the completion of trusses lifting, its absolute altitude is more than bridge completion state designed elevation;Treat floorings install and deck paving after the completion of, steel truss girder Absolute altitude can just be reduced to bridge completion state designed elevation.Installed with during deck paving in floorings, steel truss girder absolute altitude progressively drops It is low.Face, it is necessary to be installed in beam-ends after the completion of steel truss girder lifting to prevent the formal bearing in this work progress to be damaged When bearing, after after floorings installation with formal bearing replace temporary support.The height of construction time temporary support need to be more than into The height of the formal bearing of bridge like state.If the height of temporary support is equal to the height of formal bearing, steel truss beam end beam section is online Knuckle will be produced in shape, it is also unfavorable to steel truss beam stress.With the installation of floorings, steel truss girder absolute altitude is gradually reduced, it is necessary to will Temporary support is progressively turned down.If do not turned down, steel truss beam end beam section will produce reverse knuckle on linear, to steel truss beam stress Also it is unfavorable.
For turning down temporary support highly, the more commonly used method is:Install temporary support when with some cushion blocks by its It is padded;When need to reduce height, with jack by steel truss beam-ends jack-up, part cushion block is taken out, then put down steel truss beam-ends.It is this Method has following some deficiency:
(1) it is inconvenient to construct, and process is cumbersome, influences the duration;
(2) with jack by steel truss beam-ends jack-up during, it is unfavorable to steel girder member bar stress.
(3) height turned down is limited by cushion block height, it is impossible to realize stepless turning down.
In order to overcome above-mentioned deficiency, a kind of device that easily can progressively turn down temporary support height need to be developed.
The content of the invention
The temporary support height method for turning down sound traditional the invention aims to overcome the shortcomings of suspension bridge, there is provided one Kind of simple, easy to process, effect is significant the temporary support of design highly turns down device, using the fine sand in the husky groove in bearing lower section by Step discharge, can gradually reduce height of support.
The technical solution adopted by the present invention is:A kind of device for progressively turning down suspension bridge construction phase temporary support height, bag Include bearing top board, base-plate, husky groove, fine sand and valve;
The bearing top board is bolted below steel truss girder lower boom, and bearing top board is arranged below bearing rubber Layer, bearing rubber layer is arranged below base-plate;
The husky groove is to be surrounded to be located in husky trough floor by husky groove side plate four sides, forms a top-open structure, husky groove Fine sand is inside provided with, the base-plate is located on the top surface of fine sand, Internal periphery and the periphery of base-plate of husky groove side plate are left Gap, husky groove side plate is provided with the valve for fine sand to be discharged;
The husky trough floor is placed on bridge tower sill top surface, and is bolted with it, the thickness of the fine sand with Husky bottom land plate thickness sum is exactly that bearing needs padded height.
Preferably, the Internal periphery of the husky groove side plate is 1~2mm with the gap on the periphery of base-plate, it is ensured that bearing Base plate can freely decline in husky groove.
Preferably, the valve quantity is multiple, husky groove side plate bottom position is arranged symmetrically in.
Sand groove shape of the invention determines according to base-plate shape, by base-plate outline to 1~2mm of external expansion, i.e., It is husky groove in-profile.Husky groove side plate is used for cuff fine sand, and undertakes the lateral pressure that bearing compression fine sand causes, and need to have foot Enough strength and stiffness.
Fine sand particle of the present invention is as far as possible small, is easy to be discharged from sand discharge valve.Fine sand original depth (undertake abutment pressure it Before) the fine sand decrement that need to cause comprising abutment pressure, can determine according to calculating.
The present invention enables fine sand to undertake the vertical pressure that bearing is transmitted with husky groove cuff fine sand.By valve by fine sand Discharge, is capable of achieving the stepless of height of support and turns down.When height of support is reduced to specified altitude assignment, valve is closed.
Beneficial effect
" a kind of device for progressively turning down suspension bridge construction phase temporary support height " of the invention has following excellent performance:
(1) present invention is discharged fine sand using valve, is capable of achieving the stepless of height of support and is turned down.
(2) bearing turn down operation process is simple and convenient, eliminates the mistake of the utilization jack jacking stiff girder of conventional method Journey.
(3) valve quantity of the present invention is more than one, and is arranged symmetrically in husky groove outside, is capable of achieving multiple valve and synchronously arranges It is husky, it is to avoid the inclination of bearing.
Brief description of the drawings
Fig. 1 is the stereogram of apparatus of the present invention;
Fig. 2 is the side view of apparatus of the present invention;
Fig. 3 is the top view of apparatus of the present invention;
Have in figure:Steel truss girder lower boom 1;Bearing top board 2;Bearing rubber layer 3;Base-plate 4;Husky groove side plate 5;Husky bottom land Plate 6;Valve 7;Fine sand 8;Bridge tower sill 9.
Specific embodiment
Further the present invention will be described with reference to the accompanying drawings and detailed description.
A kind of as Figure 1-3, device for progressively turning down suspension bridge construction phase temporary support height, including bearing top board 2, Base-plate 4, husky groove, fine sand 8 and valve 7;
The bearing top board 2 is bolted below steel truss girder lower boom 1, and bearing top board 2 is arranged below bearing Rubber layer 3, bearing rubber layer 3 is arranged below base-plate 4;
The husky groove is to be surrounded to be located in husky trough floor 6 by the husky four sides of groove side plate 5, forms a top-open structure, husky Fine sand 8 is provided with groove, the base-plate 4 is located on the top surface of fine sand 8, the Internal periphery of husky groove side plate 5 and the week of base-plate 4 While leaving 1~2mm gaps, husky groove side plate 5 is provided with the valve 7 for fine sand 8 to be discharged;
The husky trough floor 6 is placed on the top surface of bridge tower sill 9, and is bolted with it, the thickness of the fine sand 8 It is exactly that bearing needs padded height with the thickness sum of husky trough floor 6.
The fine sand decrement that the original depth (before undertaking abutment pressure) of the fine sand 8 need to cause comprising abutment pressure, Can determine according to calculating.Fine sand 8 is subject to the Confinement effect of husky groove side plate 5, can undertake the vertical pressure of the transmission of base-plate 4.
The quantity of the valve 7 is more than one, is arranged symmetrically in the outside of husky groove side plate 5 near bottom position.In branch seat height When degree needs to reduce, open valve 7 and discharge fine sand, be capable of achieving the stepless of height of support and turn down.Treat that bearing is reduced to and specify height When spending, valve 7 is closed.As long as synchronous open valve, it is possible to symmetrically discharges fine sand, it is to avoid base-plate 4 is inclined.
Embodiments of the present invention are described in detail above in association with accompanying drawing, but the present invention is not limited to described reality Apply mode.For one of ordinary skill in the art, in the range of principle of the invention and technological thought, to these implementations Mode carries out implementation method and carries out various changes, modification, replacement and deformation still falling within protection scope of the present invention.

Claims (3)

1. a kind of device for progressively turning down suspension bridge construction phase temporary support height, it is characterised in that:Including bearing top board, bearing Base plate, husky groove, fine sand and valve;
The bearing top board is bolted below steel truss girder lower boom, and bearing top board is arranged below bearing rubber layer, Bearing rubber layer is arranged below base-plate;
The husky groove is to be surrounded to be located in husky trough floor by husky groove side plate four sides, forms a top-open structure, is set in husky groove There is fine sand, the base-plate is located on the top surface of fine sand, the Internal periphery of husky groove side plate leaves gap with the periphery of base-plate, Husky groove side plate is provided with the valve for fine sand to be discharged;
The husky trough floor is placed on bridge tower sill top surface, and is bolted with it, thickness and the sand groove of the fine sand Base plate thickness sum is exactly that bearing needs padded height.
2. a kind of device for progressively turning down suspension bridge construction phase temporary support height according to claim 1, its feature exists In:The Internal periphery of the husky groove side plate is 1 ~ 2mm with the gap on the periphery of base-plate.
3. a kind of device for progressively turning down suspension bridge construction phase temporary support height according to claim 1, its feature exists In:The valve quantity is multiple, is arranged symmetrically in husky groove side plate bottom position.
CN201710047470.7A 2017-01-22 2017-01-22 A kind of device for progressively turning down suspension bridge construction phase temporary support height Pending CN106812068A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710047470.7A CN106812068A (en) 2017-01-22 2017-01-22 A kind of device for progressively turning down suspension bridge construction phase temporary support height

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710047470.7A CN106812068A (en) 2017-01-22 2017-01-22 A kind of device for progressively turning down suspension bridge construction phase temporary support height

Publications (1)

Publication Number Publication Date
CN106812068A true CN106812068A (en) 2017-06-09

Family

ID=59111447

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710047470.7A Pending CN106812068A (en) 2017-01-22 2017-01-22 A kind of device for progressively turning down suspension bridge construction phase temporary support height

Country Status (1)

Country Link
CN (1) CN106812068A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109906814A (en) * 2019-04-12 2019-06-21 宁波植物园景区管理有限公司 Cultivation box in a kind of raw xylophyta water of sponge urban rainwater garden water-wet

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001262515A (en) * 2000-03-23 2001-09-26 Taisei Corp Method for constructing temporary bearing
KR20070016378A (en) * 2005-08-03 2007-02-08 명보산공 주식회사 Method of constructing temporary bridge and Rotation Apparatus therefor
CN201087322Y (en) * 2007-07-26 2008-07-16 中铁二局股份有限公司 Large tonnage box beam construction temporary support saddle
CN101424128A (en) * 2008-12-12 2009-05-06 中建三局建设工程股份有限公司 Civil engineering construction flask device
KR20100073881A (en) * 2008-12-23 2010-07-01 (주)씨씨엘 코리아 Dummy bearing for bridge using sand and upper structure of bridge supporting method thterewith
CN202055180U (en) * 2011-05-10 2011-11-30 天津城市建设学院 Rack unloading sand box of cast-in-site bridge
CN202466416U (en) * 2012-01-04 2012-10-03 广东中匠工程建设有限公司 Force-bearing type settling sand barrel
CN204185774U (en) * 2014-08-29 2015-03-04 中交第二航务工程局有限公司 Steel pipe support relief sand jack
CN205557315U (en) * 2016-04-30 2016-09-07 湖北益通建设股份有限公司 Pier cap top temporary support

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001262515A (en) * 2000-03-23 2001-09-26 Taisei Corp Method for constructing temporary bearing
KR20070016378A (en) * 2005-08-03 2007-02-08 명보산공 주식회사 Method of constructing temporary bridge and Rotation Apparatus therefor
CN201087322Y (en) * 2007-07-26 2008-07-16 中铁二局股份有限公司 Large tonnage box beam construction temporary support saddle
CN101424128A (en) * 2008-12-12 2009-05-06 中建三局建设工程股份有限公司 Civil engineering construction flask device
KR20100073881A (en) * 2008-12-23 2010-07-01 (주)씨씨엘 코리아 Dummy bearing for bridge using sand and upper structure of bridge supporting method thterewith
CN202055180U (en) * 2011-05-10 2011-11-30 天津城市建设学院 Rack unloading sand box of cast-in-site bridge
CN202466416U (en) * 2012-01-04 2012-10-03 广东中匠工程建设有限公司 Force-bearing type settling sand barrel
CN204185774U (en) * 2014-08-29 2015-03-04 中交第二航务工程局有限公司 Steel pipe support relief sand jack
CN205557315U (en) * 2016-04-30 2016-09-07 湖北益通建设股份有限公司 Pier cap top temporary support

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109906814A (en) * 2019-04-12 2019-06-21 宁波植物园景区管理有限公司 Cultivation box in a kind of raw xylophyta water of sponge urban rainwater garden water-wet

Similar Documents

Publication Publication Date Title
CN103669114B (en) Ballast bed base prefabricated slab and application thereof
CN102767137B (en) Anti-seismic large deformation expansion device of comb plate
CN108130833A (en) The method for correcting error of sedimentation offset non-fragment orbit
CN108951322A (en) A kind of ballastless track structure sedimentation lifting apparatus and its lifting method
CN206886602U (en) A kind of highway bridge construction drilling platform
CN209338921U (en) A kind of high-speed railway subgrade differential settlement reinforcing lifting leveling structure
CN107245912A (en) A kind of Foam lightweight soil railway bed structure and engineering method
CN105239502B (en) Uniform force transmission device used for bridge support and installation method of uniform force transmission device
CN105297620B (en) Steel plate spherical crown polymer mortar structure support and construction method thereof
CN110080454A (en) LPM light filling body Construction of Cast-in-situ Concrete Hollow
CN204112169U (en) City rail system
CN106812068A (en) A kind of device for progressively turning down suspension bridge construction phase temporary support height
CN106522036A (en) Adjustable type ballastless track structure, ballastless track and adjustment method
CN206245730U (en) A kind of cast-in-place pitched roof double template structure
CN109750561B (en) Structure for preventing slurry pumping on surface layer of ballastless track bed plate foundation bed and construction method
CN108571330A (en) A method of processing subway bottom plate rear pouring tape percolating water
CN208586468U (en) The secondary scalable general railway roadbed of pouring type
JP2010229696A (en) Repair method for laborsaving track
CN208685404U (en) A kind of improvement type wooden footway paving structure
CN108560330A (en) The scalable general railway roadbed of secondary pouring type and its construction method
CN106812065A (en) A kind of concrete freely-supported pre-stressed box girder construction process
CN207919383U (en) A kind of hanging basket main truss front fulcrum height tunable arrangement
CN110144767A (en) Help broad way based structures and construction method
CN104047213A (en) Pavement repairing method capable of resolving settlement velocity difference between hard soil and soft soil
CN209066195U (en) Railway high-filled embankment vertically in iris type box-structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170609