CN207919383U - A kind of hanging basket main truss front fulcrum height tunable arrangement - Google Patents
A kind of hanging basket main truss front fulcrum height tunable arrangement Download PDFInfo
- Publication number
- CN207919383U CN207919383U CN201820105766.XU CN201820105766U CN207919383U CN 207919383 U CN207919383 U CN 207919383U CN 201820105766 U CN201820105766 U CN 201820105766U CN 207919383 U CN207919383 U CN 207919383U
- Authority
- CN
- China
- Prior art keywords
- front fulcrum
- hanging basket
- bearing base
- main truss
- jack
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The utility model discloses a kind of hanging basket main truss front fulcrum height tunable arrangement, the adjusting of hanging basket main truss height when changing suitable for box beam horizontal slope, including sliding ship connecting seat (3), bearing base (4), adjust lead screw (5), front fulcrum jack (9), the sliding ship connecting seat (3) is connect with bearing base (4) by adjusting lead screw (5), height of the bearing base (4) on adjusting lead screw (5) is adjustable, front fulcrum jack (9) is withstood below bearing base (4), for jacking up bearing base (4).This device provided by the utility model, increase between sliding ship connecting seat and bearing base and adjusts lead screw, coordinated by front fulcrum jack and adjusting nut, adjust the absolute altitude of main couple front fulcrum, several main couples of Hanging Basket are enable to be on same absolute altitude degree, ensure cradle structure stress and safety, realizes application of the Hanging Basket in horizontal slope variation bridge structure.
Description
Technical field
The utility model belongs to technical field of building construction, and in particular to a kind of hanging basket main truss height tunable arrangement.
Background technology
Cradle cantilever construction technique is developed so far from the 1960s, it has also become a kind of pole in large and medium-sized bridge construction
For the capital equipment that common construction means, Hanging Basket are constructed as cantilever method, application is very extensive.
Hanging Basket is chiefly used in straight line bridge or the larger curved bridge construction of sweep under normal circumstances, is seldom used in minor radius
In curve construction.But due to the interference of existing building in city or other inevitable factors, the line style of bridge is often
Can be more complicated, there are sweep is smaller and the continually changing situation of the horizontal slope caused by Curvature varying.It uses at present
Hanging Basket be constant cross-section formula, the height of main couple can not be adjusted, if encounter box beam horizontal slope variation, can not pass through merely
Track level measuring adjusting makes several main couples of Hanging Basket be on same absolute altitude, causes main couple to be turned round, and main couple and front beam
Fulcrum not on same absolute altitude, so that front beam stress is changed, influence the structure safety and usability of Hanging Basket.
Utility model content
To solve to use the Hanging Basket of constant cross-section in the prior art, cause the hanging basket main truss when box beam horizontal slope changes
Height cannot be adjusted, and main couple is caused to be turned round, and the fulcrum of main couple and front beam is on same absolute altitude, cause front beam by
Power changes, the problem of influencing the structure safety and usability of Hanging Basket, and the utility model props up before providing a kind of hanging basket main truss
Point height tunable arrangement, the device can be to avoid the generations of the above problem.
Technical solution adopted in the utility model is as follows:A kind of hanging basket main truss front fulcrum height tunable arrangement, the dress
It sets including sliding ship connecting seat, bearing base, adjust lead screw, front fulcrum jack, the sliding ship connecting seat passes through adjusting with bearing base
Lead screw connects, and height of the bearing base on adjusting lead screw is adjustable, and the front fulcrum jack is withstood below bearing base.
Further include track, sliding ship, the sliding ship connecting seat is connected on sliding ship, and the sliding ship is slidably installed on track.
Further include adjusting nut, the adjusting nut at least in the respectively setting one of the top and bottom of the bearing base, is adjusted
Section nut is set on the adjusting lead screw.
Further include spring, anchor ear, the spring one end is fixed below bearing base, and the other end connects anchor ear, and anchor ear is sleeved on
On front fulcrum jack.
Further include bracing members, is supported below the front fulcrum jack.
The sliding ship connecting seat connects integral, middle section hollow out by two I22b I-steel and four blocks of lateral steel plates,
The front fulcrum jack is passed through from intermediate hollow area.
The track is two parallel tracks, is made by two I36b I-steel.
The adjusting lead screw uses specification for diameter 70mm, long 850mm, and material is 45# steel.
The utility model has the beneficial effects that:This hanging basket main truss front fulcrum height provided by the utility model adjusts dress
It sets, increases adjusting lead screw between sliding ship connecting seat and bearing base and pass through front fulcrum jack when box beam horizontal slope changes
Coordinate with feed screw nut is adjusted, adjusts the absolute altitude of main couple front fulcrum, several main couples of Hanging Basket is enable to be in same absolute altitude
On degree, it is ensured that cradle structure stress and safety.It is adjusted by main couple front fulcrum height, realizes that Hanging Basket changes bridge knot in horizontal slope
Application on structure also provides more more options for Hanging Basket cantilever box beam Alignment Design.
Other feature and advantage of the utility model will illustrate in the following description, and partial from specification
It becomes apparent, or is understood by implementing the utility model.
Description of the drawings
Attached drawing is only used for showing the purpose of specific embodiment, and is not considered as limitations of the present invention, entire
In attached drawing, identical reference mark indicates identical component.
Fig. 1:Hanging basket main truss general arrangement;
Fig. 2:Hanging basket main truss front fulcrum height adjusting system side view;
Fig. 3:Hanging basket main truss front fulcrum height adjusting system front view;
Fig. 4:A kind of example structure three-view diagram of sliding ship connecting seat.
Reference sign:1, track;2, sliding ship;3, sliding ship connecting seat;4, bearing base;5, lead screw is adjusted;6, spiral shell is adjusted
It is female;7, spring;8, anchor ear;9, front fulcrum jack;10, bracing members;31, I-steel;32, lateral steel plate.
Specific implementation mode
The utility model is described in detail with reference to the accompanying drawings and examples, wherein attached drawing constitutes the application one
Part, and for illustrating the utility model together with the embodiments of the present invention.But it will be appreciated by those skilled in the art that
Following embodiment is not the unique restriction made to technical solutions of the utility model, every in technical solutions of the utility model spirit
The lower any equivalents done of essence or change, are regarded as belonging to the scope of protection of the utility model.
As shown in Figure 1, Figure 2 and Figure 3, a kind of hanging basket main truss front fulcrum height tunable arrangement, including sliding ship connecting seat 3,
Bearing base 4 adjusts lead screw 5, front fulcrum jack 9.Sliding ship connecting seat 3 is connect with bearing base 4 by adjusting lead screw 5, bearing base 4
Height on adjusting lead screw 5 is adjustable;Front fulcrum jack 9 is passed through from 3 central hollow region of sliding ship connecting seat, withstands on bearing base
Below 4, related to bearing base 4 sliding ship connecting seat 3 plays the role of jack-up when front fulcrum jack stretches out.
The hanging basket main truss height tunable arrangement further includes track 1, sliding ship 2, adjusting nut 6, bracing members 10.Sliding ship
Connecting seat 3 is connect by sliding ship axis pin with sliding ship 2, and sliding ship 2 is fallen on track 1, and sliding ship connecting seat 3 is along with sliding ship 2 in track 1
On move together.In the top and bottom of bearing base 4, each adjusting nut 6 that is arranged is set on adjusting lead screw 5, to bearing base 4
Play clamping and supporting role;Further, can two or more adjusting nuts 6 be set in 4 bottom of bearing base, in preceding branch
Point jack plays bearing base 4 strong supporting role when falling after rise.Bracing members 10 are placed among track 1, for supporting preceding branch
Point jack 9.
In order to keep the balance of object, track 1 to be arranged in parallel with two, sliding ship 2 is respectively seated at there are two also corresponding to
On this two tracks;Sliding ship connecting seat 3 is connected on two sliding ships 2.In one embodiment, sliding ship connecting seat 3 can also be set
Two are set to, is connected on two sliding ships 2, two sliding ship connecting seats 3 connect bearing base 4 jointly.In another embodiment,
Sliding ship connecting seat 3 could be provided as an entirety and be located on two sliding ships 2, as shown in Figure 3, Figure 4, can more can guarantee in this way
The stationarity of sliding ship connecting seat 3 and the levelness of bearing base 4;Further, in this embodiment, sliding ship connecting seat 3 can be by
The lateral steel plates of two I22b I-steel 31 and four blocks 32 connect integral, and middle section is vacated, for placing front fulcrum jack
9, still further, in this embodiment, sliding ship connecting seat 3 can be connect by four adjusting lead screws 5 with bearing base 4 in quadrangle.
Front fulcrum jack 9 is placed at the intermediate gaps of track 1, sliding ship 2 and sliding ship connecting seat 3, front fulcrum jack 9 by
Bracing members 10 support;Further, on this basis, front fulcrum jack 9 can also hang over bearing base by spring 7 and anchor ear 8
Lower section, spring 7 are fixed on 4 lower section of bearing base, and the other end connects anchor ear 8, and anchor ear 8 is sleeved on front fulcrum jack 9, before Hanging Basket
When shifting, front fulcrum jack is bounced back, jack is made to come to nothing, spring 7 slings front fulcrum jack, with the Forward of Hanging Basket
Forward, removes from by the process of artificial jack for moving, time saving and energy saving.
Further, the track is I36b I-steel, enhances stability, two I36b I-steel center spacing (i.e. two
Track) 62cm, 1 Two bors d's oeuveres I16 channel steels are set every 1m and are laterally linked;Accordingly, two I22b of the sliding ship connecting seat 3
I-steel center spacing is also 62cm.
Further, the thickness of four blocks of the sliding ship connecting seat 3 lateral steel plates is respectively 2cm.
Further, the specification that the sliding ship axis pin uses is diameter 80mm, long 165mm, material 40Cr.
Further, for the specification that the adjusting lead screw 5 uses for diameter 70mm, long 850mm, material is 45# steel.
Further, the front fulcrum jack 9 is 200t self-locking jacks.
When curvilinear motion section box girder construction, since setting superelevation needs, the horizontal slope of box beam can become with the variation of curvature
Change, the horizontal slope of the adjacent block of Hanging Basket cantilever also differs, and by front fulcrum jack 9 and adjusts the cooperation of lead screw 5, adjusts Hanging Basket master
The absolute altitude of truss front fulcrum makes several main couples of Hanging Basket be in same absolute altitude, and detailed process is as follows:
The previous block concreting of step 1) finishes and after stretch-draw prestressing force mud jacking, track advancing, before preparing Hanging Basket
It moves;
Step 2) loosens front fulcrum jack 9, so that sliding ship 2 is fallen on track 1, before jack pushing tow Hanging Basket of walking
Move on to next block, hanging basket advancing in place after, bracing members 10 are placed on 9 lower section of front fulcrum jack;
Step 3) calculates main couple set height adjustment according to the height difference of track.The adjusting nut 6 of 4 top of bearing base is put
Pine, quantity of margin are set height adjustment, and front fulcrum jack 9 slowly ejects, and bearing base 4 is jacked up, and measure main couple absolute altitude, it is ensured that
Height difference between main couple adjusts the adjusting nut 6 of 4 upper and lower of bearing base, is allowed to hold out against with bearing base 4 within 5mm.
Step 4) continues to jack up on front fulcrum jack 9, and sliding ship 2 and track 1 is made to come to nothing about 1cm, will after leveling front fulcrum
Front fulcrum jack 9 is locked, binds cantilever section reinforcing bar, casting concrete.
Step 5) repeats the above steps, and completes the construction of box beam whole block.
In the whole process, when Hanging Basket is walked, front fulcrum jack 9 is fallen, by adjusting lead screw 5 and adjusting nut 6 by
Power, hanging basket advancing when concreting, front fulcrum jack 9 are jacked up, by jack stress, it is ensured that concreting process
Middle bearing capacity is met the requirements.
Exemplified as above is only the explanation to the utility model, does not constitute protection domain limitation, every and the utility model
It is identical or as design and belong within the scope of utility model protection.The component and structure category one's own profession that embodiment does not describe in detail
Common or means known in industry, differ narration here.
Claims (10)
1. a kind of hanging basket main truss front fulcrum height tunable arrangement, it is characterised in that:Including sliding ship connecting seat (3), bearing base
(4), lead screw (5), front fulcrum jack (9) are adjusted;The sliding ship connecting seat (3) is with bearing base (4) by adjusting lead screw (5) even
It connects, height of the bearing base (4) on adjusting lead screw (5) is adjustable, and the front fulcrum jack is withstood under bearing base (4)
Face.
2. hanging basket main truss front fulcrum height tunable arrangement as described in claim 1, it is characterised in that:Further include track (1),
Sliding ship (2);The sliding ship connecting seat (3) is connected on sliding ship (2), and the sliding ship (2) is slidably installed on track (1).
3. hanging basket main truss front fulcrum height tunable arrangement as claimed in claim 1 or 2, it is characterised in that:Further include adjusting
Nut (6);The adjusting nut (6) is at least in the respectively setting one of the top and bottom of the bearing base (4), the adjusting nut
(6) it is set on the adjusting lead screw (5).
4. hanging basket main truss front fulcrum height tunable arrangement as claimed in claim 1 or 2, it is characterised in that:It further include spring
(7), anchor ear (8);Described spring (7) one end is fixed below bearing base (4), and the other end connects anchor ear (8), and anchor ear (8) is sleeved on
On front fulcrum jack (9).
5. hanging basket main truss front fulcrum height tunable arrangement as claimed in claim 3, it is characterised in that:Further include spring (7),
Anchor ear (8);Described spring (7) one end is fixed below bearing base (4), and the other end connects anchor ear (8), and anchor ear (8) is sleeved on preceding branch
On point jack (9).
6. hanging basket main truss front fulcrum height tunable arrangement as claimed in claim 1 or 2, it is characterised in that:It further include steel branch
It supports (10), is supported on the front fulcrum jack (9) below.
7. hanging basket main truss front fulcrum height tunable arrangement as claimed in claim 4, it is characterised in that:Further include bracing members
(10), it is supported on the front fulcrum jack (9) below.
8. hanging basket main truss front fulcrum height tunable arrangement as claimed in claim 1 or 2, it is characterised in that:The sliding ship connects
Joint chair (3) connects integral, middle section hollow out, the front fulcrum jack by two I22b I-steel and four blocks of lateral steel plates
(9) it is passed through from intermediate hollow area.
9. hanging basket main truss front fulcrum height tunable arrangement as claimed in claim 2, it is characterised in that:The track (1) is
Parallel two are made by two I36b I-steel.
10. hanging basket main truss front fulcrum height tunable arrangement as described in claim 1, it is characterised in that:The adjusting lead screw
(5) specification used is diameter 70mm, long 850mm, and material is 45# steel.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820105766.XU CN207919383U (en) | 2018-01-23 | 2018-01-23 | A kind of hanging basket main truss front fulcrum height tunable arrangement |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820105766.XU CN207919383U (en) | 2018-01-23 | 2018-01-23 | A kind of hanging basket main truss front fulcrum height tunable arrangement |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207919383U true CN207919383U (en) | 2018-09-28 |
Family
ID=63605022
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820105766.XU Active CN207919383U (en) | 2018-01-23 | 2018-01-23 | A kind of hanging basket main truss front fulcrum height tunable arrangement |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207919383U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110565542A (en) * | 2019-09-12 | 2019-12-13 | 中交第三航务工程局有限公司 | hanging basket for cantilever casting of small-curvature-radius continuous beam |
CN110593103A (en) * | 2019-05-28 | 2019-12-20 | 中国路桥工程有限责任公司 | Multipoint adjustable hanging basket device and bridge construction process |
-
2018
- 2018-01-23 CN CN201820105766.XU patent/CN207919383U/en active Active
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110593103A (en) * | 2019-05-28 | 2019-12-20 | 中国路桥工程有限责任公司 | Multipoint adjustable hanging basket device and bridge construction process |
CN110565542A (en) * | 2019-09-12 | 2019-12-13 | 中交第三航务工程局有限公司 | hanging basket for cantilever casting of small-curvature-radius continuous beam |
CN110565542B (en) * | 2019-09-12 | 2024-03-12 | 中交第三航务工程局有限公司 | Hanging basket for cantilever casting small curvature radius continuous beam |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104674945B (en) | Tree-like steel pipe column structure and construction method thereof | |
CN207919383U (en) | A kind of hanging basket main truss front fulcrum height tunable arrangement | |
CN110331668A (en) | A kind of back-cable-free cable-stayed bridge inclined in two-way V-shaped bridge tower construction method | |
CN110593103A (en) | Multipoint adjustable hanging basket device and bridge construction process | |
CN103074854A (en) | Rear supporting point triangular bracket hanging basket and bridge construction method using same | |
CN106522112A (en) | Cable-stayed bridge side span beam section erecting system and method thereof | |
CN205676785U (en) | Leveling block formwork for placing device at the bottom of a kind of Bridge Support Replacement beam | |
CN205636496U (en) | A interim strutting arrangement that is used for support frame bridge crane and whole hole case roof beam | |
CN107059645A (en) | A kind of Long span variable cross-section precast segmental beam assembling construction structure and construction method | |
CN102888815A (en) | Pouring construction method of wide-angle V-shaped pier and 0# box girder | |
CN109723049A (en) | Jack up drilling platform and its elevating method | |
CN207711012U (en) | A kind of segment beam bottom board system | |
CN209816668U (en) | Superelevation cable tower entablature construction support | |
CN107447686A (en) | A kind of steel structure bridge building-supporting device | |
CN203049471U (en) | Rear fulcrum triangular bracket hanging basket | |
CN210603860U (en) | Loading support for detecting structural performance of prefabricated staircase | |
CN207812180U (en) | A kind of straddle-type monorail fixes continuous beam entirely | |
CN106978783A (en) | The Hanging Basket poured for skew web plate formula continuous beam cantilever | |
CN208266673U (en) | A kind of adjustable laminated rubber bearing | |
CN206916616U (en) | The bridge pad of bridge pad governor motion, adjustable height and adjustable inclination | |
CN110657977A (en) | Loading support for detecting structural performance of assembled prefabricated staircase | |
CN103437292B (en) | The lifting combination unit of inclined in two-way A shape king-tower cable stayed bridge template | |
CN106677557B (en) | A kind of support protection structure and construction technology rising top replacement large-scale air spring | |
CN106812065A (en) | A kind of concrete freely-supported pre-stressed box girder construction process | |
CN205654125U (en) | Reinforcement support column of adjustable elevation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |