CN207919383U - A kind of hanging basket main truss front fulcrum height tunable arrangement - Google Patents

A kind of hanging basket main truss front fulcrum height tunable arrangement Download PDF

Info

Publication number
CN207919383U
CN207919383U CN201820105766.XU CN201820105766U CN207919383U CN 207919383 U CN207919383 U CN 207919383U CN 201820105766 U CN201820105766 U CN 201820105766U CN 207919383 U CN207919383 U CN 207919383U
Authority
CN
China
Prior art keywords
front fulcrum
hanging basket
bearing base
main truss
jack
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820105766.XU
Other languages
Chinese (zh)
Inventor
叶成银
田斌
刘彦军
李冰
樊泽民
陈豪举
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Road and Bridge Corp
CCCC SHEC Second Engineering Co Ltd
Original Assignee
China Road and Bridge Corp
CCCC SHEC Second Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Road and Bridge Corp, CCCC SHEC Second Engineering Co Ltd filed Critical China Road and Bridge Corp
Priority to CN201820105766.XU priority Critical patent/CN207919383U/en
Application granted granted Critical
Publication of CN207919383U publication Critical patent/CN207919383U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a kind of hanging basket main truss front fulcrum height tunable arrangement, the adjusting of hanging basket main truss height when changing suitable for box beam horizontal slope, including sliding ship connecting seat (3), bearing base (4), adjust lead screw (5), front fulcrum jack (9), the sliding ship connecting seat (3) is connect with bearing base (4) by adjusting lead screw (5), height of the bearing base (4) on adjusting lead screw (5) is adjustable, front fulcrum jack (9) is withstood below bearing base (4), for jacking up bearing base (4).This device provided by the utility model, increase between sliding ship connecting seat and bearing base and adjusts lead screw, coordinated by front fulcrum jack and adjusting nut, adjust the absolute altitude of main couple front fulcrum, several main couples of Hanging Basket are enable to be on same absolute altitude degree, ensure cradle structure stress and safety, realizes application of the Hanging Basket in horizontal slope variation bridge structure.

Description

A kind of hanging basket main truss front fulcrum height tunable arrangement
Technical field
The utility model belongs to technical field of building construction, and in particular to a kind of hanging basket main truss height tunable arrangement.
Background technology
Cradle cantilever construction technique is developed so far from the 1960s, it has also become a kind of pole in large and medium-sized bridge construction For the capital equipment that common construction means, Hanging Basket are constructed as cantilever method, application is very extensive.
Hanging Basket is chiefly used in straight line bridge or the larger curved bridge construction of sweep under normal circumstances, is seldom used in minor radius In curve construction.But due to the interference of existing building in city or other inevitable factors, the line style of bridge is often Can be more complicated, there are sweep is smaller and the continually changing situation of the horizontal slope caused by Curvature varying.It uses at present Hanging Basket be constant cross-section formula, the height of main couple can not be adjusted, if encounter box beam horizontal slope variation, can not pass through merely Track level measuring adjusting makes several main couples of Hanging Basket be on same absolute altitude, causes main couple to be turned round, and main couple and front beam Fulcrum not on same absolute altitude, so that front beam stress is changed, influence the structure safety and usability of Hanging Basket.
Utility model content
To solve to use the Hanging Basket of constant cross-section in the prior art, cause the hanging basket main truss when box beam horizontal slope changes Height cannot be adjusted, and main couple is caused to be turned round, and the fulcrum of main couple and front beam is on same absolute altitude, cause front beam by Power changes, the problem of influencing the structure safety and usability of Hanging Basket, and the utility model props up before providing a kind of hanging basket main truss Point height tunable arrangement, the device can be to avoid the generations of the above problem.
Technical solution adopted in the utility model is as follows:A kind of hanging basket main truss front fulcrum height tunable arrangement, the dress It sets including sliding ship connecting seat, bearing base, adjust lead screw, front fulcrum jack, the sliding ship connecting seat passes through adjusting with bearing base Lead screw connects, and height of the bearing base on adjusting lead screw is adjustable, and the front fulcrum jack is withstood below bearing base.
Further include track, sliding ship, the sliding ship connecting seat is connected on sliding ship, and the sliding ship is slidably installed on track.
Further include adjusting nut, the adjusting nut at least in the respectively setting one of the top and bottom of the bearing base, is adjusted Section nut is set on the adjusting lead screw.
Further include spring, anchor ear, the spring one end is fixed below bearing base, and the other end connects anchor ear, and anchor ear is sleeved on On front fulcrum jack.
Further include bracing members, is supported below the front fulcrum jack.
The sliding ship connecting seat connects integral, middle section hollow out by two I22b I-steel and four blocks of lateral steel plates, The front fulcrum jack is passed through from intermediate hollow area.
The track is two parallel tracks, is made by two I36b I-steel.
The adjusting lead screw uses specification for diameter 70mm, long 850mm, and material is 45# steel.
The utility model has the beneficial effects that:This hanging basket main truss front fulcrum height provided by the utility model adjusts dress It sets, increases adjusting lead screw between sliding ship connecting seat and bearing base and pass through front fulcrum jack when box beam horizontal slope changes Coordinate with feed screw nut is adjusted, adjusts the absolute altitude of main couple front fulcrum, several main couples of Hanging Basket is enable to be in same absolute altitude On degree, it is ensured that cradle structure stress and safety.It is adjusted by main couple front fulcrum height, realizes that Hanging Basket changes bridge knot in horizontal slope Application on structure also provides more more options for Hanging Basket cantilever box beam Alignment Design.
Other feature and advantage of the utility model will illustrate in the following description, and partial from specification It becomes apparent, or is understood by implementing the utility model.
Description of the drawings
Attached drawing is only used for showing the purpose of specific embodiment, and is not considered as limitations of the present invention, entire In attached drawing, identical reference mark indicates identical component.
Fig. 1:Hanging basket main truss general arrangement;
Fig. 2:Hanging basket main truss front fulcrum height adjusting system side view;
Fig. 3:Hanging basket main truss front fulcrum height adjusting system front view;
Fig. 4:A kind of example structure three-view diagram of sliding ship connecting seat.
Reference sign:1, track;2, sliding ship;3, sliding ship connecting seat;4, bearing base;5, lead screw is adjusted;6, spiral shell is adjusted It is female;7, spring;8, anchor ear;9, front fulcrum jack;10, bracing members;31, I-steel;32, lateral steel plate.
Specific implementation mode
The utility model is described in detail with reference to the accompanying drawings and examples, wherein attached drawing constitutes the application one Part, and for illustrating the utility model together with the embodiments of the present invention.But it will be appreciated by those skilled in the art that Following embodiment is not the unique restriction made to technical solutions of the utility model, every in technical solutions of the utility model spirit The lower any equivalents done of essence or change, are regarded as belonging to the scope of protection of the utility model.
As shown in Figure 1, Figure 2 and Figure 3, a kind of hanging basket main truss front fulcrum height tunable arrangement, including sliding ship connecting seat 3, Bearing base 4 adjusts lead screw 5, front fulcrum jack 9.Sliding ship connecting seat 3 is connect with bearing base 4 by adjusting lead screw 5, bearing base 4 Height on adjusting lead screw 5 is adjustable;Front fulcrum jack 9 is passed through from 3 central hollow region of sliding ship connecting seat, withstands on bearing base Below 4, related to bearing base 4 sliding ship connecting seat 3 plays the role of jack-up when front fulcrum jack stretches out.
The hanging basket main truss height tunable arrangement further includes track 1, sliding ship 2, adjusting nut 6, bracing members 10.Sliding ship Connecting seat 3 is connect by sliding ship axis pin with sliding ship 2, and sliding ship 2 is fallen on track 1, and sliding ship connecting seat 3 is along with sliding ship 2 in track 1 On move together.In the top and bottom of bearing base 4, each adjusting nut 6 that is arranged is set on adjusting lead screw 5, to bearing base 4 Play clamping and supporting role;Further, can two or more adjusting nuts 6 be set in 4 bottom of bearing base, in preceding branch Point jack plays bearing base 4 strong supporting role when falling after rise.Bracing members 10 are placed among track 1, for supporting preceding branch Point jack 9.
In order to keep the balance of object, track 1 to be arranged in parallel with two, sliding ship 2 is respectively seated at there are two also corresponding to On this two tracks;Sliding ship connecting seat 3 is connected on two sliding ships 2.In one embodiment, sliding ship connecting seat 3 can also be set Two are set to, is connected on two sliding ships 2, two sliding ship connecting seats 3 connect bearing base 4 jointly.In another embodiment, Sliding ship connecting seat 3 could be provided as an entirety and be located on two sliding ships 2, as shown in Figure 3, Figure 4, can more can guarantee in this way The stationarity of sliding ship connecting seat 3 and the levelness of bearing base 4;Further, in this embodiment, sliding ship connecting seat 3 can be by The lateral steel plates of two I22b I-steel 31 and four blocks 32 connect integral, and middle section is vacated, for placing front fulcrum jack 9, still further, in this embodiment, sliding ship connecting seat 3 can be connect by four adjusting lead screws 5 with bearing base 4 in quadrangle.
Front fulcrum jack 9 is placed at the intermediate gaps of track 1, sliding ship 2 and sliding ship connecting seat 3, front fulcrum jack 9 by Bracing members 10 support;Further, on this basis, front fulcrum jack 9 can also hang over bearing base by spring 7 and anchor ear 8 Lower section, spring 7 are fixed on 4 lower section of bearing base, and the other end connects anchor ear 8, and anchor ear 8 is sleeved on front fulcrum jack 9, before Hanging Basket When shifting, front fulcrum jack is bounced back, jack is made to come to nothing, spring 7 slings front fulcrum jack, with the Forward of Hanging Basket Forward, removes from by the process of artificial jack for moving, time saving and energy saving.
Further, the track is I36b I-steel, enhances stability, two I36b I-steel center spacing (i.e. two Track) 62cm, 1 Two bors d's oeuveres I16 channel steels are set every 1m and are laterally linked;Accordingly, two I22b of the sliding ship connecting seat 3 I-steel center spacing is also 62cm.
Further, the thickness of four blocks of the sliding ship connecting seat 3 lateral steel plates is respectively 2cm.
Further, the specification that the sliding ship axis pin uses is diameter 80mm, long 165mm, material 40Cr.
Further, for the specification that the adjusting lead screw 5 uses for diameter 70mm, long 850mm, material is 45# steel.
Further, the front fulcrum jack 9 is 200t self-locking jacks.
When curvilinear motion section box girder construction, since setting superelevation needs, the horizontal slope of box beam can become with the variation of curvature Change, the horizontal slope of the adjacent block of Hanging Basket cantilever also differs, and by front fulcrum jack 9 and adjusts the cooperation of lead screw 5, adjusts Hanging Basket master The absolute altitude of truss front fulcrum makes several main couples of Hanging Basket be in same absolute altitude, and detailed process is as follows:
The previous block concreting of step 1) finishes and after stretch-draw prestressing force mud jacking, track advancing, before preparing Hanging Basket It moves;
Step 2) loosens front fulcrum jack 9, so that sliding ship 2 is fallen on track 1, before jack pushing tow Hanging Basket of walking Move on to next block, hanging basket advancing in place after, bracing members 10 are placed on 9 lower section of front fulcrum jack;
Step 3) calculates main couple set height adjustment according to the height difference of track.The adjusting nut 6 of 4 top of bearing base is put Pine, quantity of margin are set height adjustment, and front fulcrum jack 9 slowly ejects, and bearing base 4 is jacked up, and measure main couple absolute altitude, it is ensured that Height difference between main couple adjusts the adjusting nut 6 of 4 upper and lower of bearing base, is allowed to hold out against with bearing base 4 within 5mm.
Step 4) continues to jack up on front fulcrum jack 9, and sliding ship 2 and track 1 is made to come to nothing about 1cm, will after leveling front fulcrum Front fulcrum jack 9 is locked, binds cantilever section reinforcing bar, casting concrete.
Step 5) repeats the above steps, and completes the construction of box beam whole block.
In the whole process, when Hanging Basket is walked, front fulcrum jack 9 is fallen, by adjusting lead screw 5 and adjusting nut 6 by Power, hanging basket advancing when concreting, front fulcrum jack 9 are jacked up, by jack stress, it is ensured that concreting process Middle bearing capacity is met the requirements.
Exemplified as above is only the explanation to the utility model, does not constitute protection domain limitation, every and the utility model It is identical or as design and belong within the scope of utility model protection.The component and structure category one's own profession that embodiment does not describe in detail Common or means known in industry, differ narration here.

Claims (10)

1. a kind of hanging basket main truss front fulcrum height tunable arrangement, it is characterised in that:Including sliding ship connecting seat (3), bearing base (4), lead screw (5), front fulcrum jack (9) are adjusted;The sliding ship connecting seat (3) is with bearing base (4) by adjusting lead screw (5) even It connects, height of the bearing base (4) on adjusting lead screw (5) is adjustable, and the front fulcrum jack is withstood under bearing base (4) Face.
2. hanging basket main truss front fulcrum height tunable arrangement as described in claim 1, it is characterised in that:Further include track (1), Sliding ship (2);The sliding ship connecting seat (3) is connected on sliding ship (2), and the sliding ship (2) is slidably installed on track (1).
3. hanging basket main truss front fulcrum height tunable arrangement as claimed in claim 1 or 2, it is characterised in that:Further include adjusting Nut (6);The adjusting nut (6) is at least in the respectively setting one of the top and bottom of the bearing base (4), the adjusting nut (6) it is set on the adjusting lead screw (5).
4. hanging basket main truss front fulcrum height tunable arrangement as claimed in claim 1 or 2, it is characterised in that:It further include spring (7), anchor ear (8);Described spring (7) one end is fixed below bearing base (4), and the other end connects anchor ear (8), and anchor ear (8) is sleeved on On front fulcrum jack (9).
5. hanging basket main truss front fulcrum height tunable arrangement as claimed in claim 3, it is characterised in that:Further include spring (7), Anchor ear (8);Described spring (7) one end is fixed below bearing base (4), and the other end connects anchor ear (8), and anchor ear (8) is sleeved on preceding branch On point jack (9).
6. hanging basket main truss front fulcrum height tunable arrangement as claimed in claim 1 or 2, it is characterised in that:It further include steel branch It supports (10), is supported on the front fulcrum jack (9) below.
7. hanging basket main truss front fulcrum height tunable arrangement as claimed in claim 4, it is characterised in that:Further include bracing members (10), it is supported on the front fulcrum jack (9) below.
8. hanging basket main truss front fulcrum height tunable arrangement as claimed in claim 1 or 2, it is characterised in that:The sliding ship connects Joint chair (3) connects integral, middle section hollow out, the front fulcrum jack by two I22b I-steel and four blocks of lateral steel plates (9) it is passed through from intermediate hollow area.
9. hanging basket main truss front fulcrum height tunable arrangement as claimed in claim 2, it is characterised in that:The track (1) is Parallel two are made by two I36b I-steel.
10. hanging basket main truss front fulcrum height tunable arrangement as described in claim 1, it is characterised in that:The adjusting lead screw (5) specification used is diameter 70mm, long 850mm, and material is 45# steel.
CN201820105766.XU 2018-01-23 2018-01-23 A kind of hanging basket main truss front fulcrum height tunable arrangement Active CN207919383U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820105766.XU CN207919383U (en) 2018-01-23 2018-01-23 A kind of hanging basket main truss front fulcrum height tunable arrangement

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820105766.XU CN207919383U (en) 2018-01-23 2018-01-23 A kind of hanging basket main truss front fulcrum height tunable arrangement

Publications (1)

Publication Number Publication Date
CN207919383U true CN207919383U (en) 2018-09-28

Family

ID=63605022

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820105766.XU Active CN207919383U (en) 2018-01-23 2018-01-23 A kind of hanging basket main truss front fulcrum height tunable arrangement

Country Status (1)

Country Link
CN (1) CN207919383U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110565542A (en) * 2019-09-12 2019-12-13 中交第三航务工程局有限公司 hanging basket for cantilever casting of small-curvature-radius continuous beam
CN110593103A (en) * 2019-05-28 2019-12-20 中国路桥工程有限责任公司 Multipoint adjustable hanging basket device and bridge construction process

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110593103A (en) * 2019-05-28 2019-12-20 中国路桥工程有限责任公司 Multipoint adjustable hanging basket device and bridge construction process
CN110565542A (en) * 2019-09-12 2019-12-13 中交第三航务工程局有限公司 hanging basket for cantilever casting of small-curvature-radius continuous beam
CN110565542B (en) * 2019-09-12 2024-03-12 中交第三航务工程局有限公司 Hanging basket for cantilever casting small curvature radius continuous beam

Similar Documents

Publication Publication Date Title
CN104674945B (en) Tree-like steel pipe column structure and construction method thereof
CN207919383U (en) A kind of hanging basket main truss front fulcrum height tunable arrangement
CN110331668A (en) A kind of back-cable-free cable-stayed bridge inclined in two-way V-shaped bridge tower construction method
CN110593103A (en) Multipoint adjustable hanging basket device and bridge construction process
CN103074854A (en) Rear supporting point triangular bracket hanging basket and bridge construction method using same
CN106522112A (en) Cable-stayed bridge side span beam section erecting system and method thereof
CN205676785U (en) Leveling block formwork for placing device at the bottom of a kind of Bridge Support Replacement beam
CN205636496U (en) A interim strutting arrangement that is used for support frame bridge crane and whole hole case roof beam
CN107059645A (en) A kind of Long span variable cross-section precast segmental beam assembling construction structure and construction method
CN102888815A (en) Pouring construction method of wide-angle V-shaped pier and 0# box girder
CN109723049A (en) Jack up drilling platform and its elevating method
CN207711012U (en) A kind of segment beam bottom board system
CN209816668U (en) Superelevation cable tower entablature construction support
CN107447686A (en) A kind of steel structure bridge building-supporting device
CN203049471U (en) Rear fulcrum triangular bracket hanging basket
CN210603860U (en) Loading support for detecting structural performance of prefabricated staircase
CN207812180U (en) A kind of straddle-type monorail fixes continuous beam entirely
CN106978783A (en) The Hanging Basket poured for skew web plate formula continuous beam cantilever
CN208266673U (en) A kind of adjustable laminated rubber bearing
CN206916616U (en) The bridge pad of bridge pad governor motion, adjustable height and adjustable inclination
CN110657977A (en) Loading support for detecting structural performance of assembled prefabricated staircase
CN103437292B (en) The lifting combination unit of inclined in two-way A shape king-tower cable stayed bridge template
CN106677557B (en) A kind of support protection structure and construction technology rising top replacement large-scale air spring
CN106812065A (en) A kind of concrete freely-supported pre-stressed box girder construction process
CN205654125U (en) Reinforcement support column of adjustable elevation