CN210603860U - Loading support for detecting structural performance of prefabricated staircase - Google Patents

Loading support for detecting structural performance of prefabricated staircase Download PDF

Info

Publication number
CN210603860U
CN210603860U CN201921716991.8U CN201921716991U CN210603860U CN 210603860 U CN210603860 U CN 210603860U CN 201921716991 U CN201921716991 U CN 201921716991U CN 210603860 U CN210603860 U CN 210603860U
Authority
CN
China
Prior art keywords
support
eminence
vertical
prefabricated staircase
structural performance
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921716991.8U
Other languages
Chinese (zh)
Inventor
周超锋
庞瑞
许启铿
刘强
武书增
张斌
弋学亮
蒋敏敏
刘恺
秦守婉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan University of Technology
Original Assignee
Henan University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan University of Technology filed Critical Henan University of Technology
Priority to CN201921716991.8U priority Critical patent/CN210603860U/en
Application granted granted Critical
Publication of CN210603860U publication Critical patent/CN210603860U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model relates to an assembled prefabricated staircase structural performance detects uses loading support, the eminence support frame of loading support includes vertical support and the horizontal support that extends along the fore-and-aft direction, be provided with a plurality of vertical support altitude mixture control holes along upper and lower direction interval arrangement on the vertical support, be provided with on the horizontal support be used for with correspond the horizontal support connecting hole that vertical support altitude mixture control hole cooperation was used, the horizontal support links to each other with vertical support through the support connecting rod of removable dress in horizontal support connecting hole and in corresponding vertical support altitude mixture control hole, support the connecting rod level and set up, there is the eminence support backing plate at the top of horizontal support through top bolt releasable connection, the top of eminence support backing plate is provided with the eminence contact support complex eminence horizontal support column that is used for. The utility model provides an among the prior art can't undertake the technical problem of great bearing capacity and damage the screw thread easily when loading through the screw thread screw rod, can realize that the structural performance under the great load detects.

Description

Loading support for detecting structural performance of prefabricated staircase
Technical Field
The utility model relates to an assembled prefabricated staircase structural performance among the building construction technical field detects and uses loading support.
Background
The improvement is opened for forty years, and along with the development of the urbanization process and the promotion of novel urbanization in China, the construction industry in China has remarkable achievements in the aspects of technical progress and construction scale, and becomes one of the prop industries of national economy in China. However, the traditional building industry mode has more problems, such as larger resource and energy consumption, serious environmental pollution, lagged industrial technology and the like, and cannot adapt to the theme of green, environment-friendly and low-carbon development in the world at present. Therefore, during the twelve-five planning period in China, the building industrialization is highly valued by the party center and the state department. The building industrialization adopts the production modes of standardized design, industrialized production, assembled construction, integrated decoration and informatization management, can better realize the purposes of energy conservation, emission reduction and resource conservation, and is an important way for realizing transformation and upgrading of the building industry at present. In 2016, 8 months, research on strengthening planning and design of green buildings, assembly buildings and the like is clearly proposed by the state department, and the rapid development of the assembly buildings is determined in a routine conference of the state department in 9 months, so that the energy conservation and emission reduction in the building field are promoted.
Under the premise of responding to national policies, the assembly type building industry is actively spread in the national building market, and various assembly type component processing factories such as assembly type shear walls, assembly type laminated slabs, assembly type columns, assembly type beams and assembly type stairs also appear like spring shoots after rain. The stair is as main vertical traffic passageway and the green passageway of life in the building structure, plays the effect of the heaviness when earthquake comes. In order to ensure the quality of the construction engineering, corresponding structural performance detection tests are carried out on the prefabricated parts according to a certain sampling proportion when the prefabricated parts enter a construction site, and the detection contents comprise bearing capacity, deflection and crack width. The prefabricated staircase is different from other prefabricated components, and the supporting planes at the two ends of the prefabricated staircase in the actual building structure are not at the same height, so that great difficulty is brought to the detection of the structural performance, and the detection of the structural performance of the prefabricated staircase is realized by means of a special loading device.
The loading device comprises a loading source and a prefabricated staircase loading support, wherein the prefabricated staircase support is composed of vertical supports and parallel supports, the vertical supports are composed of support rod groups, upper cross rods and lower cross rods, cross rods III are fixed above the upper cross rods, cross rods IV are fixed above the lower cross rods, and the heights of the cross rods III and IV are adjusted through vertically arranged screw rods. During the use, adjust the height of horizontal pole III and horizontal pole IV according to the floor height of prefabricated staircase, place prefabricated staircase on detecting the support according to actual installation condition, adopt concentrated load or equipartition load to carry out structural performance to prefabricated staircase and detect.
The problem that this kind of prefabricated stair loading support exists now lies in: when adapting to different prefabricated staircase heights, the support height of vertical support needs to be adjusted, the support height of vertical support is adjusted through three screws arranged along the transverse interval in the prior art, though the stepless adjustment of height can be realized, the dead weight and the loading force of staircase are born through the threaded bolts during the loading test, because the external load that three threaded bolts can bear is very limited, the threads of the bolts are easy to damage, the large bearing capacity test cannot be carried out, the service life of the screws is very short, and the screws need to be frequently replaced.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide an assembled prefabricated staircase structural performance detects uses loading support to damage the technical problem of screw thread on the screw rod easily when solving among the prior art and can't undertake great bearing capacity and loading through the screw thread screw rod.
In order to solve the technical problem, the utility model provides a technical scheme as follows:
the utility model provides an assembled prefabricated staircase structural performance detects uses loading support, including controlling the stair low department of arranging and supporting with the stair eminence, the stair eminence is supported and is included the eminence support frame, the eminence support frame includes vertical support and the horizontal support of arranging along the fore-and-aft direction, be provided with a plurality of vertical support altitude mixture control holes of arranging along upper and lower direction interval on the vertical support, be provided with on the horizontal support and be used for with the horizontal support connecting hole that corresponds vertical support altitude mixture control hole cooperation and use, horizontal support links to each other with vertical support through the support connecting rod of removable dress in horizontal support connecting hole and the vertical support altitude mixture control hole of following, the support connecting rod level sets up, the top of horizontal support has the eminence to support the backing plate through top bolt releasable connection, the top of eminence support backing plate is provided.
Spacing muscle of eminence of interval arrangement about the top of eminence support backing plate is provided with, the spacing muscle of eminence and the horizontal support column normal running fit of eminence, and the horizontal support column of eminence is solid cylinder.
Vertical support includes the vertical I-steel post of interval arrangement around, and vertical I-steel post includes left flange board, right flange board and connects the middle web between left and right flange board, and vertical support altitude mixture control hole is seted up on corresponding left flange board and right flange board.
The transverse support comprises two channel steel beams which are arranged at left and right intervals and are respectively arranged on two sides of the vertical I-shaped steel column, and the transverse support connecting hole is formed in the groove bottom of each channel steel beam.
The notches of the two channel steel beams are arranged back to back.
A plurality of reinforcing rib plates which are arranged at intervals in the front-rear direction are arranged in the notches of the channel steel beam.
The top bolts are vertically arranged and are connected with the upper side leg parts of the high-position supporting base plate and the channel steel beam.
The prefabricated staircase loading support further comprises a supporting platform, and both the stair low support and the stair high support are arranged on the supporting platform.
The bottom of vertical support is fixed in on the supporting platform through first rag bolt.
And limiting piers for limiting the left and right movement of the stair low support are fixed on the left and right sides of the stair low support on the supporting platform through second foundation bolts.
The utility model has the advantages that: when using, in the face of the prefabricated stair of high difference, the height that needs the horizontal support column of adjustment eminence and its adaptation, because different model specifications, the prefabricated stair of co-altitude have a lot, in order to satisfy the prefabricated stair of co-altitude not, the adjustable range that needs the stair eminence to support is wider the utility model discloses in, at first wear to adorn in horizontal support connecting hole and the vertical bracing altitude mixture control hole that corresponds the height through the support link, the height of adjustment horizontal support, realize the coarse adjustment, then realize the fine setting through the eminence support backing plate of selecting suitable thickness, with the final height of confirming the horizontal support column of eminence, realize the approximate stepless altitude mixture control of horizontal support column through the cooperation of selection and coarse setting, satisfy the prefabricated stair of various height models. During loading, the prefabricated staircase and the loading force are borne by the support connecting rods, and compared with the threaded screw rod in the prior art, the horizontally arranged support connecting rods can bear larger loading force and are not easy to damage.
Drawings
Fig. 1 is a schematic structural view of a loading bracket according to an embodiment of the present invention;
FIG. 2 is a schematic view of the engagement of the upper support mat with the upper lateral support column of FIG. 1;
FIG. 3 is a schematic view of the lower support beam and the lower lateral support column of FIG. 1;
fig. 4 is a side view of fig. 3.
Detailed Description
An embodiment of a loading support for detecting structural performance of an assembled prefabricated staircase is shown in figures 1-4:
the loading support 14 comprises a supporting platform 1, a stair low support 15 and a stair high support 16 which are arranged on the left and right, an inverted T-shaped groove (not shown in the figure) is formed in the supporting platform, an inverted T-shaped block connected with foundation bolts is conveniently filled in the loading support, the stair high support 16 comprises a high support frame, the high support frame comprises a vertical support and a transverse support extending along the front and rear direction, the vertical support comprises vertical I-shaped steel columns 2 arranged at the front and rear sides at intervals, each vertical I-shaped steel column comprises a left flange plate 17, a right flange plate and a middle web plate connected between the left flange plate and the right flange plate, and the bottoms of the vertical I-shaped steel columns are fixed on the supporting platform 1 through first foundation bolts. The left flange plate and the right flange plate of each vertical I-shaped steel column are provided with a front row and a rear row of vertical supporting height adjusting holes 18, and each row of vertical supporting height adjusting holes are formed by a plurality of vertical supporting height adjusting holes which are arranged at intervals along the vertical direction. The transverse support comprises two channel steel beams 19 which are arranged on the left side and the right side at intervals and are respectively arranged on the two sides of the vertical H-shaped steel column, notches of the two channel steel beams are arranged in a back-to-back mode, and a plurality of reinforcing rib plates 3 which are arranged at intervals in the front-to-back direction are welded in the notches of the channel steel beams. Offer on channel-section steel crossbeam 19's the tank bottom be used for with correspond the horizontal support connecting hole that the vertical braces altitude mixture control hole cooperation was used, horizontal support links to each other with vertical braces through removable dress in horizontal support connecting hole and the support connecting rod 8 that corresponds in the vertical braces altitude mixture control hole, and the support connecting rod level sets up, and the axis of support connecting rod extends the setting along controlling the direction, and in this embodiment, the support connecting rod is stud structure, and the both ends threaded connection of support connecting rod has fixation nut. The top of horizontal support has eminence supporting backing plate 4 through top bolt releasable connection, in this embodiment, has seted up upside bolt perforation 20 on the eminence supporting backing plate, sets up the downside bolt perforation that corresponds the setting with the upside bolt perforation on the upside shank of channel-section steel crossbeam, and top bolt 8 wears to adorn in upside bolt perforation and downside bolt perforation. Spacing muscle 10 of eminence of interval arrangement around welded fastening has on the last face of eminence support backing plate, has placed the horizontal support column 5 of eminence that length extends along the fore-and-aft direction between the spacing muscle of eminence, and in this embodiment, the horizontal support column 5 of eminence is solid cylinder structure, but the horizontal support column free rotation of eminence.
The stair low support 15 comprises a low support beam 6 with the length extending along the front-back direction, the low support beam is composed of I-shaped steel and reinforcing rib plates fixed in grooves in two sides of the I-shaped steel in a welding mode, the top of the low support beam is provided with low limiting ribs 11 arranged at the front and back at intervals, a low transverse support column 12 with the length extending along the front-back direction is placed between the low limiting ribs, the low transverse support column is of a solid cylindrical structure, and the low transverse support column can move back and forth. The left side and the right side of the stair low support on the supporting platform are fixed with limiting piers 7 for limiting the left and right movement of the stair low support through second foundation bolts 13, and the left and right positions of the stair low support can be adjusted by changing the left and right positions of the limiting piers.
According to the requirements of the specification 'precast concrete stairway' (JG/T562-2018), the detection of the structural performance of the precast stairway needs to meet the constraint of a fixed hinged support at one end and the constraint of a sliding hinged support at the other end. Aiming at the restriction conditions of the two supports, the corresponding structure in the utility model is briefly explained, as shown in fig. 2, when in manufacture, after the high support backing plate 4 is firmly fixed, the high transverse support column 5 is placed at the central line of the high support backing plate 4; selecting a proper amount of high position limiting ribs 10, placing the high position limiting ribs on the high position supporting base plate 4 and tangent to the high position transverse supporting columns 5; the high position limiting ribs 10 are welded with the high position supporting base plate 4, so that the high position transverse supporting columns can be enabled to generate corner displacement and cannot generate translation displacement in the left and right directions. As shown in fig. 3, the upper surface of the lower support beam 6 can be directly used as the support surface of the sliding hinge support, firstly, the lower transverse support column 12 is placed at the center line of the lower support beam 6, and a plurality of lower limit ribs 11 are welded at positions about 50mm away from the center line, so that the lower limit ribs can protect the sliding hinge support and prevent the lower transverse support column from separating from the upper surface of the lower support beam 6 when the horizontal displacement of the component is too large during loading.
During concrete test, according to the left and right spans of the prefabricated staircase to be detected, the proper position fixing limiting pier is selected to realize the fixing of the support at the lower part of the staircase. According to the height that is detected prefabricated staircase, select to support connecting rod and the cooperation of suitable vertical support altitude mixture control hole, couple together two channel-section steel crossbeams through supporting the connecting rod, also couple together two channel-section steel crossbeams and vertical I-steel post, then on selecting the eminence support backing plate of suitable thickness to be fixed in two channel-section steel crossbeams, support the high-end of prefabricated staircase on the horizontal support column of eminence, support the bottom of prefabricated staircase on the horizontal support column of low department, just can carry out the load test to prefabricated staircase to detect its structural performance. The requirements of the span of different prefabricated stairways are met by the left and right movement of the stair low support, and the prefabricated stairways with different heights are adapted by the position selection of the vertical support height adjusting hole with the proper height and the selection of the high support base plate with the proper thickness, so that the prefabricated staircase loading support has good universality; the prefabricated staircase loading support integrally adopts an assembly type structure, and a staircase low support, each vertical I-shaped steel column, each channel steel beam and a high support base plate can be independently disassembled to facilitate transportation and field assembly; the weight of the prefabricated staircase and the experimental loading force are borne by the supporting connecting rods, and the structural performance detection of the prefabricated staircase under large loading force can be realized.

Claims (10)

1. The utility model provides an assembled prefabricated staircase structural performance detects uses loading support, includes that the low department of stair who arranges about supports and the stair eminence supports, and the stair eminence supports including the eminence support frame, its characterized in that: the eminence support frame includes vertical braces and the horizontal support of arranging along the fore-and-aft direction, be provided with a plurality of vertical braces altitude mixture control holes of following up and down direction interval arrangement on the vertical braces, be provided with on the horizontal braces and be used for with the horizontal brace connecting hole that corresponds vertical braces altitude mixture control hole cooperation and use, horizontal brace links to each other with vertical braces through the support connecting rod of removable wearing in horizontal brace connecting hole and corresponding vertical braces altitude mixture control hole, the support connecting rod level sets up, top bolt releasable connection has the eminence to support the backing plate at the top of horizontal brace, the top of eminence support the backing plate is provided with and is used for supporting complex eminence horizontal brace with the eminence.
2. The loading support for detecting the structural performance of the prefabricated staircase according to the claim 1, characterized in that: the top of eminence support backing plate is provided with the spacing muscle of eminence of interval arrangement about, and the spacing muscle of eminence and the horizontal support column normal running fit of eminence.
3. The loading support for detecting the structural performance of the prefabricated staircase according to the claim 1, characterized in that: vertical support includes the vertical I-steel post of interval arrangement around, and vertical I-steel post includes left flange board, right flange board and connects the middle web between left and right flange board, and vertical support altitude mixture control hole is seted up on corresponding left flange board and right flange board.
4. The loading support for detecting the structural performance of the prefabricated staircase according to the claim 3, wherein: the transverse support comprises two channel steel beams which are arranged at left and right intervals and are respectively arranged on two sides of the vertical I-shaped steel column, and the transverse support connecting hole is formed in the groove bottom of each channel steel beam.
5. The loading support for detecting the structural performance of the prefabricated staircase according to the claim 4, wherein: the notches of the two channel steel beams are arranged back to back.
6. The loading support for detecting the structural performance of the prefabricated staircase according to claim 5, wherein: a plurality of reinforcing rib plates which are arranged at intervals in the front-rear direction are arranged in the notches of the channel steel beam.
7. The loading support for detecting the structural performance of the prefabricated staircase according to the claim 4, wherein: the top bolts are vertically arranged and are connected with the upper side leg parts of the high-position supporting base plate and the channel steel beam.
8. The loading support for detecting the structural performance of the prefabricated staircase according to any one of the claims 1 to 7, wherein: the prefabricated staircase loading support further comprises a supporting platform, and both the stair low support and the stair high support are arranged on the supporting platform.
9. The loading support for detecting the structural performance of the prefabricated staircase according to the claim 8, wherein: the bottom of vertical support is fixed in on the supporting platform through first rag bolt.
10. The loading support for detecting the structural performance of the prefabricated staircase according to the claim 8, wherein: and limiting piers for limiting the left and right movement of the stair low support are fixed on the left and right sides of the stair low support on the supporting platform through second foundation bolts.
CN201921716991.8U 2019-10-14 2019-10-14 Loading support for detecting structural performance of prefabricated staircase Expired - Fee Related CN210603860U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921716991.8U CN210603860U (en) 2019-10-14 2019-10-14 Loading support for detecting structural performance of prefabricated staircase

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921716991.8U CN210603860U (en) 2019-10-14 2019-10-14 Loading support for detecting structural performance of prefabricated staircase

Publications (1)

Publication Number Publication Date
CN210603860U true CN210603860U (en) 2020-05-22

Family

ID=70696045

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921716991.8U Expired - Fee Related CN210603860U (en) 2019-10-14 2019-10-14 Loading support for detecting structural performance of prefabricated staircase

Country Status (1)

Country Link
CN (1) CN210603860U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110657977A (en) * 2019-10-14 2020-01-07 河南工业大学 Loading support for detecting structural performance of assembled prefabricated staircase
CN113670588A (en) * 2021-07-27 2021-11-19 浙江宝业现代建筑工业化制造有限公司 Test stand for testing structural performance of stairs with different specifications

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110657977A (en) * 2019-10-14 2020-01-07 河南工业大学 Loading support for detecting structural performance of assembled prefabricated staircase
CN113670588A (en) * 2021-07-27 2021-11-19 浙江宝业现代建筑工业化制造有限公司 Test stand for testing structural performance of stairs with different specifications

Similar Documents

Publication Publication Date Title
CN109914244B (en) Weak bracket system suitable for high-tower reinforced concrete combined beam steel structure installation and bottom and top plate concrete pouring and operation method thereof
CN210603860U (en) Loading support for detecting structural performance of prefabricated staircase
CN106541489B (en) Bridge deck prefabricated formwork system
CN111441572A (en) Inverted supporting system of floor support plate
CN211498526U (en) Self-lifting type corrugated steel web cast-in-situ box girder hanging basket
CN110657977A (en) Loading support for detecting structural performance of assembled prefabricated staircase
CN111441244A (en) Steel-concrete composite beam concrete bridge deck construction support and construction method thereof
CN111218987A (en) Bearing type net rack construction method
CN209194353U (en) It is a kind of to ride integral type bracket suitable for the construction of Bridge High-pier 0# block
CN212533752U (en) Bridge construction support
CN212201278U (en) Inverted supporting system of floor support plate
CN211472207U (en) Suspension beam system for hoisting prefabricated section box girder
CN100497834C (en) Construction equipment for integral roof-holding highway bridge top structure
CN218060397U (en) Fixing system for equipment installation
CN102953344A (en) Climbing cone type triangular cantilever bracket
CN206015523U (en) The built-in steel anchor beam accurate positioning device of free-standing Sarasota
CN111005324B (en) Support-free suspension and locking construction method for assembled type segmental box girder
CN114876209A (en) Steel reinforced beam sectional construction method for limited hoisting
CN108729640B (en) Mounting method of cantilever plate of assembled building
CN208361753U (en) A kind of tower crane supporting leg anchoring pre-buried structure and tower crane
CN206917125U (en) A kind of assembled stair
CN220813441U (en) Large-section rectangular high pier capping beam construction platform supporting system
CN220099676U (en) High pier large cantilever bent cap construction support
CN217352582U (en) Tower machine basis auxiliary stay device
CN218346883U (en) Super-large-span shear wall profile steel hidden beam non-jig support suspension type mounting device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200522

Termination date: 20211014