CN208361753U CN201820960581.7U CN201820960581U CN208361753U CN 208361753 U CN208361753 U CN 208361753U CN 201820960581 U CN201820960581 U CN 201820960581U CN 208361753 U CN208361753 U CN 208361753U
Authority
CN
China
Prior art keywords
tower crane
supporting plate
supporting leg
screw rod
buried structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820960581.7U
Other languages
Chinese (zh)
Inventor
鲁勇
贺斌
叶晨浩
宋晨
张晓刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Huashi Enterprises Co Ltd
Original Assignee
China Huashi Enterprises Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Huashi Enterprises Co Ltd filed Critical China Huashi Enterprises Co Ltd
Priority to CN201820960581.7U priority Critical patent/CN208361753U/en
Application granted granted Critical
Publication of CN208361753U publication Critical patent/CN208361753U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Jib Cranes (AREA)

Abstract

本实用新型涉及建筑设备技术领域,具体公开一种塔机支腿锚固预埋结构及塔机,塔机支腿锚固预埋结构包括多个支腿,还包括多个调节支架,所述调节支架包括:调节支板,具有第一平面;螺杆,连接于所述调节支板远离所述第一平面的一侧,且所述螺杆与所述第一平面垂直;及上调节螺母和下调节螺母,均螺接于所述螺杆;所述支腿包括支板,所述螺杆穿设于所述支板,且能够相对于所述支板沿其轴线运动,所述上调节螺母和所述下调节螺母分设于所述支板的两侧。本实用新型提供的塔机支腿锚固预埋结构能够快速的调节其垂直度,工作效率高,且精确度高。

The utility model relates to the technical field of construction equipment, and specifically discloses a tower crane outrigger anchoring pre-embedded structure and a tower crane. The tower crane outrigger anchoring pre-embedded structure includes a plurality of outriggers and also includes a plurality of adjustment brackets. The adjustment brackets It includes: an adjustment support plate with a first plane; a screw rod connected to the side of the adjustment support plate away from the first plane, and the screw rod is perpendicular to the first plane; and an upper adjustment nut and a lower adjustment nut , which are all screwed to the screw; the support leg includes a support plate, the screw rod passes through the support plate, and can move relative to the support plate along its axis, the upper adjustment nut and the lower The adjusting nuts are arranged on both sides of the support plate. The anchoring pre-embedded structure of the tower crane legs provided by the utility model can quickly adjust its verticality, has high working efficiency and high precision.

Description

A kind of tower crane supporting leg anchoring pre-buried structure and tower crane
Technical field
The utility model relates to Architectural Equipment technical field more particularly to a kind of tower crane supporting leg anchoring pre-buried structures and tower Machine.
Background technique
With the emergence of skyscraper, vertical transport relies on tower crane substantially to complete in work progress.Tower crane is made Be large special equipment because its volume is big, center of gravity is high, each duty cycle must reform basis, installation, disassembly, risk compared with Greatly, the wherein whether qualified safety for being related to entire tower crane of the pre-buried verticality of foundation for tower crane anchoring supporting leg.
In the prior art, tower crane supporting leg anchoring pre-buried structure includes four supporting legs being placed on ground, and supporting leg is remotely The fixed frame of one end setting of base, wherein fixed frame can limit the placement location of four supporting legs, and supporting leg is placed on ground, Voussoir is wedged in the lower end of supporting leg, to adjust the verticality of supporting leg.
Drawback of the prior art is that using voussoir tune since each supporting leg perpendicularity deviation requires to be less than or equal to 2mm The verticality of supporting leg is saved, so that tower crane supporting leg anchors pre-buried low efficiency, and pre-buried precision cannot control well.
Utility model content
One of the purpose of this utility model is to provide a kind of tower crane supporting leg anchoring pre-buried structure, to improve its pre-buried precision With pre-buried efficiency.
For this purpose, the utility model uses following technical scheme:
A kind of tower crane supporting leg anchoring pre-buried structure, including multiple supporting legs, further include multiple adjusting brackets, the adjusting bracket Include:
Adjust supporting plate;
Screw rod is connected to the top for adjusting supporting plate, and the screw rod is vertical with the adjusting supporting plate;And
Upper adjusting nut and lower adjusting nut, are bolted in the screw rod;
The supporting leg includes supporting plate, and the screw rod is arranged in the supporting plate, and the supporting plate can be along the axis of the screw rod Line adjusts position, and the upper adjusting nut and the lower adjusting nut are divided into the two sides up and down of the supporting plate, the lower adjusting Nut is connected to the bottom surface of the supporting plate.
Preferably, offering adjustment hole on the supporting plate, the screw rod is arranged through the adjustment hole.
Preferably, between the upper adjusting nut and the supporting plate and the lower adjusting nut and the supporting plate it Between be provided with gasket.
Preferably, the adjusting bracket further includes that one end is connected to four support rods for adjusting supporting plate upper surface, Four support rods and the adjusting supporting plate form tetragonous wimble structure, and the screw rod is connected to the another of four support rods End.
Preferably, the adjusting bracket further includes that one end is connected to three support rods for adjusting supporting plate upper surface, Three support rods and the adjusting supporting plate form trigone wimble structure, and the screw rod is connected to the another of three support rods End.
Preferably, the tower crane supporting leg anchoring pre-buried structure further includes Steel bar rack, the support rod and the reinforcing bar Bracket welding.
Preferably, the tower crane supporting leg anchoring pre-buried structure includes four supporting legs, and four supporting legs are located at On four angles of same square, an adjusting bracket, and four adjusting brackets are respectively connected on each supporting leg Centre distance away from the square is equal.
Preferably, the supporting leg further includes column, the upper surface of the supporting plate is fixed in one end of the column, another One end is provided with fixed frame.
Another of the utility model is designed to provide a kind of tower crane, to improve its safety.
For this purpose, the utility model uses following technical scheme:
A kind of tower crane anchors pre-buried structure including above-mentioned tower crane supporting leg.
The utility model has the beneficial effects that tower crane supporting leg anchoring pre-buried structure described in the utility model can be adjusted quickly Its verticality is saved, work efficiency is high, and accuracy is high.By survey crew to the pre-buried precision of tower crane supporting leg anchoring pre-buried structure It carries out an acceptance inspection, the pre-buried operation qualification rate of tower crane supporting leg anchoring pre-buried structure reaches 100%, and supporting leg maximum perpendicular degree deviation is 0.76mm。
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the tower crane supporting leg anchoring pre-buried structure of the utility model;
Fig. 2 is the structural schematic diagram of the adjusting bracket in the utility model;
Fig. 3 is the structural schematic diagram of the supporting leg in the utility model.
In figure:
1, supporting leg;11, supporting plate;111, adjustment hole;12, column;
2, adjusting bracket;21, supporting plate is adjusted;22, screw rod;23, upper adjusting nut;24, lower adjusting nut;25, support rod;
3, fixed frame.
Specific embodiment
Further illustrate the technical solution of the utility model below with reference to the accompanying drawings and specific embodiments.It can manage Solution, specific embodiment described herein are used only for explaining the utility model, rather than the restriction to the utility model.Separately It is outer it should also be noted that, illustrating only part relevant to the utility model for ease of description, in attached drawing and not all.
A kind of tower crane supporting leg anchoring pre-buried structure is present embodiments provided, mainly but is not limited to applied to the pre-buried of tower crane In structure, to improve the pre-buried precision and pre-buried efficiency of tower crane supporting leg anchoring pre-buried structure.
As shown in Figure 1-3, tower crane supporting leg provided in this embodiment anchors pre-buried structure, including multiple supporting legs 1, multiple adjustings Bracket 2, adjusting bracket 2 include adjusting supporting plate 21, screw rod 22, upper adjusting nut 23 and lower adjusting nut 24.
Screw rod 22 is connected to the top for adjusting supporting plate 21, and screw rod 22 is vertical with supporting plate 21 is adjusted;Upper 23 He of adjusting nut Lower adjusting nut 24 is bolted in screw rod 22.Supporting leg 1 includes supporting plate 11, and supporting plate 11 can be along the axis trimming position of screw rod 22 It sets, upper adjusting nut 23 and lower adjusting nut 24 are divided into the two sides up and down of supporting plate 11, and lower adjusting nut 24 is connected to supporting plate 11 Bottom surface.
After multiple supporting legs 1 are placed on ground, since the height of ground is different, the verticality of tower crane, this reality will affect It applies adjusting supporting plate 21 in example to contact with ground, screw rod 22 is arranged in adjustment hole 111.By being adjusted up lower adjusting nut 24, adjust The elevated height for saving supporting leg 1 can reduce the height of supporting leg 1, to keep multiple supporting legs 1 remote by lowering upper adjusting nut 23 One end of liftoff base is located on the same horizontal plane, to guarantee the verticality of entire tower crane.
Since screw rod 22 is tight compared with the cooperation of supporting plate 11, in setting, adjusting nut 23, which is avoided the occurrence of, adjusts downwards lower adjust The phenomenon that 24 supporting leg 1 of nut can not move down automatically.After the height adjustment of supporting leg 1, adjusting nut 23 is under in locking Adjusting nut 24, limitation supporting leg 1 are moved relative to adjusting bracket 2, avoid that the height of supporting leg 1 changes or supporting leg 1 inclines Tiltedly, and then ensure the verticality of entire tower crane.Tower crane supporting leg anchoring pre-buried structure can quickly adjust its verticality, work It is high-efficient, and accuracy is high.It carries out an acceptance inspection by survey crew to the tower crane supporting leg anchoring pre-buried precision of pre-buried structure, tower crane supporting leg The pre-buried operation qualification rate of anchoring pre-buried structure reaches 100%, and 1 maximum perpendicular degree deviation of supporting leg is to be able to maintain in 1mm Within, the verticality precision compared with tower crane supporting leg anchoring pre-buried structure in prior art the present embodiment greatly improves.
It is provided with gasket between upper adjusting nut 23 and supporting plate 11 and between lower adjusting nut 24 and supporting plate 11, from And up-regulation section nut 23, lower adjusting nut 24 and supporting plate 11 can be made to be more uniformly stressed, improve the stability of adjusting bracket 2.
As shown in Fig. 2, adjusting bracket 2 further include one end be connected to adjust 21 upper surface of supporting plate four support rods 25, four A support rod 25 and adjusting supporting plate 21 form tetragonous wimble structure, and screw rod 22 is connected to the other end of four support rods 25.
Adjusting bracket 2 also may include three support rods 25, and one end of each support rod 25, which is connected to, to be adjusted on supporting plate 21 Three support rods 25 on surface, three support rods 25 and adjusting supporting plate 21 form trigone wimble structure, and screw rod 22 is connected to three branch The other end of strut 25.Screw rod 22 is connected into supporting plate 11 by three or four support rods 25, the connection for improving screw rod 22 is strong Degree and stability, can be effectively ensured the verticality between supporting plate 11 and screw rod 22.The base as tower crane model 1250KNm or less Plinth anchors supporting leg and fixed frame quality is smaller, can choose using the adjusting bracket 2 being arranged there are three support rod 25, is adjusted with reducing Save the cost of bracket 2;As tower crane model 1250KNm or more, foundation anchor supporting leg and fixed frame quality are larger, Ke Yixuan It selects using the adjusting bracket 2 being arranged there are four support rod 25, to guarantee the intensity of adjusting bracket 2.
It further includes Steel bar rack that tower crane supporting leg, which anchors pre-buried structure, and Steel bar rack is set on ground comprising more steel Muscle is adjusted after supporting plate 21 passes through two adjacent reinforcing bars and is placed on ground, and support rod 25 is welded to connect in Steel bar rack, effectively Prevent tower crane supporting leg when concreting from anchoring pre-buried structure run-off the straight.
As shown in Figure 1, tower crane supporting leg anchoring pre-buried structure include four supporting legs 1, and four supporting legs 1 be located at it is same just On four rectangular angles, be respectively connected with an adjusting bracket 2 on each supporting leg 1, and center of four adjusting brackets 2 away from square away from From being equal, it thereby may be ensured that tower crane supporting leg anchors pre-buried structure uniform force, conducive to the verticality for keeping tower crane.
As shown in figure 3, the supporting plate 11 of supporting leg 1 offers adjustment hole 111, screw rod 22 is arranged through adjustment hole 111.Supporting plate 11 On offer multiple adjustment holes 111, the cross section of the supporting plate 11 in the present embodiment is square, the position at four angles of supporting plate 11 Adjustment hole 111 is offered, and the axis direction of knothole 111 is consistent with the axis direction of column 12, is needed due to adjusting supporting plate 21 It to pass through two adjacent reinforcing bars to be placed on ground, multiple adjustment holes 111 are set, it can be according to the actual situation by adjusting bracket 2 are arranged in adjustment hole 111 appropriate, but need to guarantee that four adjusting brackets 2 are equal away from the centre distance of square.
Supporting leg 1 further includes column 12, and the upper surface of supporting plate 11 is fixed in one end of column 12, and the other end is provided with fixation The cross section of frame 3, fixed frame 3 is square.The cross section of fixed frame 3 is square, and four supporting legs 1 are connected to fixed frame 3 Four angles on i.e. can guarantee four supporting legs 1 be located on four angles of same square, fixed frame 3 and column 12 in the present embodiment It is connected by pin shaft.
The assembling of tower crane supporting leg anchoring pre-buried structure in the present embodiment and pre-buried process are as follows:
1, according to tower crane horizontal layout situation and engineering practice and feature in Design of Construction Organization, by Project Technical people Member determines tower crane installation site.
2, according to the practical earth bearing strength in scene and foundation for tower crane foundation bearing pressure condition, determination is using pile foundation or natively Base.
3, tower crane blinding layer has been poured first, and the thickness of bed course must assure that greater than 100mm, blinding concrete solidification Intensity reaches the mountable supporting leg 1 in the rear C35.Before supporting leg 1 is installed, tower crane central cross line is released by figure on bed course, then Steel bar rack is set.
4, successively adjusting bracket 2, supporting leg 1, fixed frame 3 are combined into one from the bottom to top.Tower crane supporting leg is anchored pre-buried Structure is placed on ground, is measured to fixed frame 3, guarantees the verticality of its quadrangle, and guarantees that perpendicularity deviation is not more than 1mm.After regulating, Steel bar rack and adjusting bracket 2 are welded with electric welding.
5, foundation for tower crane concrete is poured, supporting leg 1 is measured again before pouring, it is ensured that verticality is not greater than 1mm It can carry out pouring operation.
When concreting, the centre for first having to anchor pre-buried structure from tower crane supporting leg is poured, when pouring appropriate height, it is necessary to It measures its verticality and is not greater than 1mm, can continue to pour.As long as concrete is poured at 1 upper surface 150mm of supporting leg, Guarantee installation requirement.Foundation for tower crane is when pouring, it is necessary to assure otherwise its levelness will directly affect vertical after tower crane is installed It spends and basis is caused to scrap.
The present embodiment additionally provides a kind of tower crane, pre-buried structure is anchored including above-mentioned tower crane supporting leg, in the present embodiment Tower crane stable structure.
Obviously, the above embodiments of the present invention is used for the purpose of clearly illustrating examples for clearly illustrating the present invention, and It is not limitations of the embodiments of the present invention.For those of ordinary skill in the art, in above description On the basis of can also make other variations or changes in different ways.There is no need and unable to give all embodiments Exhaustion.Any modifications, equivalent replacements, and improvements made within the spirit and principle of the present invention etc., should be included in Within the protection scope of the utility model claims.

Claims (9)

1. a kind of tower crane supporting leg anchors pre-buried structure, including multiple supporting legs (1), which is characterized in that further include multiple adjusting brackets (2), the adjusting bracket (2) includes:
It adjusts supporting plate (21);
Screw rod (22) is connected to the top for adjusting supporting plate (21), and the screw rod (22) and the adjusting supporting plate (21) are hung down Directly;And
Upper adjusting nut (23) and lower adjusting nut (24), are bolted in the screw rod (22);
The supporting leg (1) includes supporting plate (11), and the screw rod (22) is arranged in the supporting plate (11), and the supporting plate (11) can Along the axis trimming position of the screw rod (22), the upper adjusting nut (23) and the lower adjusting nut (24) are divided into described The two sides up and down of supporting plate (11), the lower adjusting nut (24) are connected to the bottom surface of the supporting plate (11).
2. tower crane supporting leg according to claim 1 anchors pre-buried structure, which is characterized in that offered on the supporting plate (11) Adjustment hole (111), the screw rod (22) are arranged through the adjustment hole (111).
3. tower crane supporting leg according to claim 1 anchors pre-buried structure, which is characterized in that the upper adjusting nut (23) with Gasket is provided between the supporting plate (11) and between the lower adjusting nut (24) and the supporting plate (11).
4. tower crane supporting leg according to claim 1 anchors pre-buried structure, which is characterized in that the adjusting bracket (2) is also wrapped It includes one end and is connected to four support rods (25) for adjusting supporting plate (21) upper surface, four support rods (25) and the tune It saves supporting plate (21) and forms tetragonous wimble structure, the screw rod (22) is connected to the other end of four support rods (25).
5. tower crane supporting leg according to claim 1 anchors pre-buried structure, which is characterized in that the adjusting bracket (2) is also wrapped It includes one end and is connected to three support rods (25) for adjusting supporting plate (21) upper surface, three support rods (25) and the tune It saves supporting plate (21) and forms trigone wimble structure, the screw rod (22) is connected to the other end of three support rods (25).
6. tower crane supporting leg according to claim 4 or 5 anchors pre-buried structure, which is characterized in that the tower crane supporting leg anchoring Pre-buried structure further includes Steel bar rack, and the support rod (25) and the Steel bar rack weld.
7. tower crane supporting leg according to claim 2 anchors pre-buried structure, which is characterized in that the tower crane supporting leg anchoring is pre-buried Structure includes four supporting legs (1), and four supporting legs (1) are located on four angles of same square, each branch An adjusting bracket (2), and four centre distances of the adjusting bracket (2) away from the square are respectively connected on leg (1) It is equal.
8. tower crane supporting leg according to claim 7 anchors pre-buried structure, which is characterized in that the supporting leg (1) further includes standing The upper surface of the supporting plate (11) is fixed in one end of column (12), the column (12), and the other end is provided with fixed frame (3).
9. a kind of tower crane, which is characterized in that anchor pre-buried structure including tower crane supporting leg described in claim 1-8 any one.
CN201820960581.7U 2018-06-21 2018-06-21 A kind of tower crane supporting leg anchoring pre-buried structure and tower crane Expired - Fee Related CN208361753U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820960581.7U CN208361753U (en) 2018-06-21 2018-06-21 A kind of tower crane supporting leg anchoring pre-buried structure and tower crane

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820960581.7U CN208361753U (en) 2018-06-21 2018-06-21 A kind of tower crane supporting leg anchoring pre-buried structure and tower crane

Publications (1)

Publication Number Publication Date
CN208361753U true CN208361753U (en) 2019-01-11

Family

ID=64925983

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820960581.7U Expired - Fee Related CN208361753U (en) 2018-06-21 2018-06-21 A kind of tower crane supporting leg anchoring pre-buried structure and tower crane

Country Status (1)

Country Link
CN (1) CN208361753U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115059108A (en) * 2022-07-14 2022-09-16 中建海峡建设发展有限公司 Tower crane foundation supporting device and levelness adjusting method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115059108A (en) * 2022-07-14 2022-09-16 中建海峡建设发展有限公司 Tower crane foundation supporting device and levelness adjusting method thereof

Similar Documents

Publication Publication Date Title
CN107090975B (en) Formwork erecting construction method for ultrahigh large-span concrete cast-in-place beam bailey truss
CN103243654B (en) Mounting method for steel anchor beam of cable-stayed bridge and assembly jig and cable bent tower mounting platform used in method
CN211113707U (en) Embedded positioning device for foundation bolt
CN206736864U (en) Hydraulic self-lifting cantilever heavy type arch dam shuttering work platform
CN113756561A (en) Novel cantilever scaffold building method for high-assembly-rate building
CN110485707A (en) Wall column formwork blocks levelling device and its construction method
CN204455856U (en) A kind of pressure mechanism in place of prefabricated pier
CN217027194U (en) Adjustable embedded type column base angle steel bracket
CN215802680U (en) Steel reinforced column mounting structure
CN208361753U (en) A kind of tower crane supporting leg anchoring pre-buried structure and tower crane
CN205894490U (en) Steel core concrete column and pile foundation connection structure
CN106978904A (en) A kind of lattice column locating guide device and the technique constructed using locating guide device
CN110670734A (en) Fixing device for pre-buried steel plate under shock insulation support and construction method thereof
CN113293790A (en) Pre-leveling tower foundation and leveling construction method thereof
CN206625249U (en) One plants case becomes Prefabricated steel construction basis
CN206784607U (en) The lower margin reinforced liner of construction in a kind of steel reinforced concrete structure cushion cap
CN215290247U (en) Easily build reinforced structure of formula tower crane foundation
CN214883824U (en) Pre-leveling tower foundation
CN215053064U (en) Lattice column verticality correction device
CN107165288A (en) The lower margin reinforced liner of construction in a kind of steel reinforced concrete structure cushion cap
CN204715362U (en) A kind of deep foundation ditch embedded column base bracing frame
CN103669566A (en) Steel reinforced concrete base of large-span net rack roof and construction method thereof
CN211228923U (en) Fixing device for pre-buried steel plate under shock insulation support
CN222770532U (en) Tower crane fixed support leg and tower crane embedded base
CN112982986A (en) Construction method of square pier template

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190111