CN106791712A - A kind of monitoring system and method in construction site - Google Patents

A kind of monitoring system and method in construction site Download PDF

Info

Publication number
CN106791712A
CN106791712A CN201710083248.2A CN201710083248A CN106791712A CN 106791712 A CN106791712 A CN 106791712A CN 201710083248 A CN201710083248 A CN 201710083248A CN 106791712 A CN106791712 A CN 106791712A
Authority
CN
China
Prior art keywords
construction site
monitoring information
monitoring
module
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710083248.2A
Other languages
Chinese (zh)
Inventor
周欣
祝飞飞
林思成
余仁民
沈超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Dongsheng Xincheng Construction Group Co Ltd
Original Assignee
Jiangsu Dongsheng Xincheng Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Dongsheng Xincheng Construction Group Co Ltd filed Critical Jiangsu Dongsheng Xincheng Construction Group Co Ltd
Priority to CN201710083248.2A priority Critical patent/CN106791712A/en
Publication of CN106791712A publication Critical patent/CN106791712A/en
Pending legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04NPICTORIAL COMMUNICATION, e.g. TELEVISION
    • H04N7/00Television systems
    • H04N7/18Closed-circuit television [CCTV] systems, i.e. systems in which the video signal is not broadcast

Abstract

The present invention relates to monitoring field, more particularly to a kind of monitoring system and method in construction site.The present invention aids in monitoring by unmanned plane, the collection of image and video is carried out to engineering construction whole process, can there are effective grasp construction speed and security situation, safety management is the important component of project management, prevent industrial accident, it is the basis of finished item set objective, is also the guarantee that project is able to smoothly implement.Strengthen Safety Management, the need for it is crucial to carry out safety inspection, typically by strengthening staffing, increases the inspection frequency to realize, but this mode can not completely adapt to existing Large-scale Project Construction and manage.So the present invention is applied to during heavy construction Safety Management, increase the safety reliability of job site, reduce the probability that security incident occurs.

Description

A kind of monitoring system and method in construction site
Technical field
The present invention relates to monitoring field, more particularly to a kind of monitoring system and method in construction site.
Background technology
With the continuous propulsion of Urbanization in China, the positive fast development of construction industry, the project scale of construction is increasing, and construction is difficult Degree more and more higher, project management is faced with increasing challenge.Safety management is the important component of project management, Du Exhausted industrial accident, is the basis of finished item set objective, is also the guarantee that project is able to smoothly implement.Strengthen bursting tube Reason, it is crucial to carry out safety inspection, typically by strengthening staffing, increases the inspection frequency to realize, but this mode is The need for existing Large-scale Project Construction can not completely being adapted to and being managed.So, attempt using a series of high-tech hands such as unmanned planes Section is applied to during heavy construction Safety Management, and personnel to NULLCHECK high are needed to some safety inspections, also some ground Square personnel cannot be introduced into checking place that the safety reliability of increase job site reduces the probability that security incident occurs.
The content of the invention
For the problem that prior art is present, now there is provided a kind of monitoring system and method in construction site.
Specific technical scheme is as follows:
A kind of monitoring method in construction site, including:
Step S1, unmanned plane shoots and sends the monitoring information in construction site;
Step S2, mobile phone is received and stores the monitoring information;
Step S3, the mobile phone shows the monitoring information, and analyzes the potential safety hazard that the monitoring information is present.
Preferably, the monitoring information includes video or picture.
Preferably, also include after the step S3:
Step S4, the result of the potential safety hazard of the mobile phone display analysis.
Preferably, the unmanned plane shoots the monitoring information of elevator and/or tower crane and/or scaffold.
The beneficial effect of above-mentioned technical proposal is:
According to the monitor mode that the past is traditional, eminence faces side, suspension scaffold structure alien invasion, large scale equipment point hazardous area Domain is all the blind area for checking, easily there is potential safety hazard.After above-mentioned technical proposal introduces unmanned plane, sky can be carried out to job site The supervision of middle cruising auxiliary security, by controlling unmanned plane during flying to the place of " people to not, can't see ", and by clearly according to Whether piece observation state herein is reliable.Human and material resources, financial resources are largely saved.
Brief description of the drawings
Fig. 1 is a kind of structural representation of the embodiment of the monitoring system in construction site of the invention;
Fig. 2 is a kind of flow chart of the embodiment of the monitoring method in construction site of the invention.
Specific embodiment
It should be noted that in the case where not conflicting, following technical proposals can be mutually combined between technical characteristic.
Specific embodiment of the invention is further described below in conjunction with the accompanying drawings:
A kind of monitoring system in construction site, as shown in figure 1, including:
Unmanned plane, shoots and sends the monitoring information in construction site;
Receiver module, connects unmanned plane, receives monitoring information;
Memory module, connects receiver module, stores monitoring information;
First display module, connects receiver module, display monitoring information;
Analysis module, connects receiver module, obtains the potential safety hazard that simultaneously analysis monitoring information is present.
In the present embodiment, unmanned plane can shoot the situation in construction site, and the monitoring information that will be shot sends, and receives Module receives monitoring information, is stored by memory module, the first display module display monitoring information, and analysis module is by inside The analysis of software, can analyze potential safety hazard present in monitoring information.
In a preferred embodiment of the invention, monitoring information includes video or picture.
In a preferred embodiment of the invention, analysis module is also connected with the second display module, and the second display module is used to The result of display analysis module analysis.
In a preferred embodiment of the invention, receiver module, memory module, the first display module and analysis module are integrated In a mobile terminal.
In a preferred embodiment of the invention, memory module includes nonvolatile memory;And/or
First display module is liquid crystal display.
In a preferred embodiment of the invention, unmanned plane shoots construction elevator and/or tower crane and/or scaffold/or applies The monitoring information of work human behavior.
In above-described embodiment, can fly to eminence and face side, suspension scaffold structure alien invasion, large scale equipment point hazardous area Domain is all the blind area for checking, easily there is potential safety hazard.After this time introduces unmanned plane, aerial cruising can be carried out to job site auxiliary Security control is helped, by controlling unmanned plane during flying to the place of " people to not, can't see ", and this is observed by clear photograph Whether the state at place is reliable.Human and material resources, financial resources are largely saved.
A kind of monitoring method in construction site, as shown in Fig. 2 including:
Step S1, unmanned plane shoots and sends the monitoring information in construction site;
Step S2, mobile phone is received and stores monitoring information;
The potential safety hazard that step S3, mobile phone display monitoring information, and analysis monitoring information are present.
In a preferred embodiment of the invention, monitoring information includes video or picture.
In a preferred embodiment of the invention, also include after step S3:
Step S4, the result of the potential safety hazard of mobile phone display analysis.
In a preferred embodiment of the invention, unmanned plane shoots elevator and/or tower crane and/or scaffold/or constructor The monitoring information of member's behavior.
Unattended flow is constituted including " early-stage preparations --- flight check --- data processing " three parts, its operator Formula is that operating personnel manipulate the SUAV for being provided with high-definition camera by ground control system, or by GPS navigation system System design flight path, flies to associated construction region or makes an inspection tour site safety gathered data, passes ground back by wireless transmitting system Face receiver, ground receiver is decoded by signal, and the data that airborne acquisition is arrived are shown in real time in display terminal.
Early-stage preparations mainly include:Safety inspection scheme is formulated, safety inspection place and circuit is selected, prepares basic number According to determining unmanned plane landing place etc..Preliminary preparation is the important prerequisite that unmanned plane is applied to site safety management, only Early-stage preparations enough fully, just can guarantee that unmanned plane during flying check quality, reach the effect got twice the result with half the effort.
Flight check mainly includes:Assembling unmanned plane, checks unmanned plane mechanical performance, power supply, camera, remote control system, Unmanned plane is taken off, flight is controlled, flight is patrolled, land.The unmanned plane of certain heavy construction pinpoints safety inspection by manually operating Complete, safety patrol is taken off using manual remote control, then switches to automatic state of flight, and nobody is controlled using GPS positioning system Machine is patrolled by scheduled circuit, and the mode for completing to be landed by manual remote control after inspection task is carried out.
Data processing mainly includes:Data are downloaded and arrangement, data processing, data interpretation, formation report, Data storage Deng.Data preparation is the core that unmanned plane is applied to safety management in construction site, can in time find that construction is existing by data preparation The hidden danger of field presence is simultaneously effectively disposed, and reduces the probability that industrial accident occurs.
In above-described embodiment, aided in by unmanned plane timely, image and/or video are carried out to engineering construction whole process Collection, can there is following some effect:
(1) it is effective to grasp construction speed and quality condition;
(3) be training, exchange data foundation is provided;
(4) appraised and chosen excellent for engineering and picture and video data are provided;
(5) effectively prevent security incident generation;
By explanation and accompanying drawing, the exemplary embodiments of the ad hoc structure of specific embodiment are given, based on essence of the invention God, can also make other conversions.Although foregoing invention proposes existing preferred embodiment, however, these contents are not intended as Limitation.
For a person skilled in the art, after reading described above, various changes and modifications undoubtedly will be evident that. Therefore, appending claims should regard the whole variations and modifications for covering true intention of the invention and scope as.In power Any and all scope and content of equal value, are all considered as still belonging to the intent and scope of the invention in the range of sharp claim.
Case study on implementation:
Certain heavy construction is one and integrates " office building, high-rise apartment building, garage parking, market, supermarket, underground people's air defense " Comprehensive engineering, 2 layers of underground, 23 layers on the ground, building height 99.6m, overall floorage is up to 250,000 square metres.Construction process It is middle to there is the dangerous larger part-to-item project more than certain scale such as " deep basal pit, high and big die plate support, builder's jack ", Wherein deep basal pit maximum cutting depth 7m, the maximum scaffolding height 18m of high and big die plate support, builder's jack maximum scaffolding height 24m.Construction area broad covered area, Safety Risk in Production is high, organizes and coordinates difficulty greatly, in order to increase field surveillance management intensity, Project management department takes the safety management mode of " based on hand inspection, supplemented by unmanned plane inspection ".By aerial inspection analysis in time A series of security risks that the aspects such as job site work high above the ground, fire-fighting are present, find that personnel's ground check is difficult to see in time Potential safety hazard, it is to avoid the generation of security incident.

Claims (10)

1. a kind of monitoring system in construction site, it is characterised in that including:
Unmanned plane, shoots and sends the monitoring information in construction site;
Receiver module, connects the unmanned plane, receives the monitoring information;
Memory module, connects the receiver module, stores the monitoring information;
First display module, connects the receiver module, shows the monitoring information;
Analysis module, connects the receiver module, obtains and analyze the potential safety hazard that the monitoring information is present.
2. the monitoring system in construction site according to claim 1, it is characterised in that the monitoring information include video or Picture.
3. the monitoring system in construction site according to claim 1, it is characterised in that the analysis module is also connected with second Display module, second display module is used to show the result of the analysis module analysis.
4. the monitoring system in construction site according to claim 1, it is characterised in that the receiver module, the storage Module, first display module and the analysis module are integrated in a mobile terminal.
5. the monitoring system in construction site according to claim 1, it is characterised in that the memory module includes non-volatile Property memory;And/or first display module be liquid crystal display.
6. the monitoring system in construction site according to claim 1, it is characterised in that the unmanned plane shoots construction elevator And/or tower crane and/or scaffold/or the monitoring information of workmen's behavior.
7. a kind of monitoring method in construction site, it is characterised in that including:
Step S1, unmanned plane captured in real-time simultaneously sends the monitoring information in construction site;
Step S2, mobile phone is received and stores the monitoring information;
Step S3, the mobile phone shows the monitoring information, and analyzes the potential safety hazard that the monitoring information is present.
8. the monitoring method in construction site according to claim 7, it is characterised in that the monitoring information include video or Picture.
9. the monitoring method in construction site according to claim 7, it is characterised in that also include after the step S3:
Step S4, the result of the potential safety hazard of the mobile phone display analysis.
10. the monitoring method in construction site according to claim 7, it is characterised in that the unmanned plane shoots construction electricity Ladder and/or tower crane and/or scaffold and/or the monitoring information of workmen's behavior.
CN201710083248.2A 2017-02-16 2017-02-16 A kind of monitoring system and method in construction site Pending CN106791712A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710083248.2A CN106791712A (en) 2017-02-16 2017-02-16 A kind of monitoring system and method in construction site

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710083248.2A CN106791712A (en) 2017-02-16 2017-02-16 A kind of monitoring system and method in construction site

Publications (1)

Publication Number Publication Date
CN106791712A true CN106791712A (en) 2017-05-31

Family

ID=58958666

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710083248.2A Pending CN106791712A (en) 2017-02-16 2017-02-16 A kind of monitoring system and method in construction site

Country Status (1)

Country Link
CN (1) CN106791712A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107244422A (en) * 2017-08-11 2017-10-13 成都希德电子信息技术有限公司 Unmanned plane accessory system is used in tower crane construction
CN107450589A (en) * 2017-07-25 2017-12-08 广东容祺智能科技有限公司 A kind of construction safety based on unmanned plane is maked an inspection tour and early warning system
CN108445767A (en) * 2018-05-16 2018-08-24 安徽建筑大学 A kind of visualized presence safety supervision management system based on unmanned plane
CN108469727A (en) * 2018-04-23 2018-08-31 湖南城市学院 A kind of construction of prevention work platform of skyscraper
CN109557935A (en) * 2018-11-01 2019-04-02 广州圣安环保科技有限公司 A kind of safety monitoring during construction method and system based on unmanned plane
CN110351525A (en) * 2019-07-22 2019-10-18 吴江市腾凯通信工程有限公司 A kind of road construction site monitoring system
CN113705952A (en) * 2021-06-24 2021-11-26 中建七局安装工程有限公司 Intelligent building management and control system based on field information

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2000060870A1 (en) * 1999-04-08 2000-10-12 Internet Pictures Corporation Remote controlled platform for camera
US20120169842A1 (en) * 2010-12-16 2012-07-05 Chuang Daniel B Imaging systems and methods for immersive surveillance
CN105516362A (en) * 2016-01-21 2016-04-20 韩松 System and method for monitoring engineering project operation site
CN105684435A (en) * 2016-01-13 2016-06-15 张阳 Alarm method and system for sport field
CN205883418U (en) * 2016-08-12 2017-01-11 苏州安特智物联科技有限公司 Building site personnel video registration system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2000060870A1 (en) * 1999-04-08 2000-10-12 Internet Pictures Corporation Remote controlled platform for camera
US20120169842A1 (en) * 2010-12-16 2012-07-05 Chuang Daniel B Imaging systems and methods for immersive surveillance
CN105684435A (en) * 2016-01-13 2016-06-15 张阳 Alarm method and system for sport field
CN105516362A (en) * 2016-01-21 2016-04-20 韩松 System and method for monitoring engineering project operation site
CN205883418U (en) * 2016-08-12 2017-01-11 苏州安特智物联科技有限公司 Building site personnel video registration system

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107450589A (en) * 2017-07-25 2017-12-08 广东容祺智能科技有限公司 A kind of construction safety based on unmanned plane is maked an inspection tour and early warning system
CN107244422A (en) * 2017-08-11 2017-10-13 成都希德电子信息技术有限公司 Unmanned plane accessory system is used in tower crane construction
CN108469727A (en) * 2018-04-23 2018-08-31 湖南城市学院 A kind of construction of prevention work platform of skyscraper
CN108445767A (en) * 2018-05-16 2018-08-24 安徽建筑大学 A kind of visualized presence safety supervision management system based on unmanned plane
CN108445767B (en) * 2018-05-16 2021-04-27 安徽建筑大学 Visual on-site safety supervision and management system based on unmanned aerial vehicle
CN109557935A (en) * 2018-11-01 2019-04-02 广州圣安环保科技有限公司 A kind of safety monitoring during construction method and system based on unmanned plane
CN110351525A (en) * 2019-07-22 2019-10-18 吴江市腾凯通信工程有限公司 A kind of road construction site monitoring system
CN113705952A (en) * 2021-06-24 2021-11-26 中建七局安装工程有限公司 Intelligent building management and control system based on field information

Similar Documents

Publication Publication Date Title
CN106791712A (en) A kind of monitoring system and method in construction site
CN110255380B (en) Crane operation method and device
CN107202793A (en) A kind of detecting system and method for detecting external wall mass defect
CN111341068B (en) Construction method of drilling site dangerous area early warning system based on deep learning
CN104994346A (en) Intelligent construction safety management monitoring system and image alarm processing method thereof
CN104732700B (en) Based on the fire alarm system taken photo by plane in the air
CN103116360A (en) Unmanned aerial vehicle obstacle avoidance controlling method
CN105989682A (en) Safety early warning and monitoring system and monitoring method for construction machinery under power transmission line
CN101650866A (en) Fire detecting system applied to unmanned helicopter and fire detecting method thereof
CN105511491B (en) A kind of unmanned plane device for driving away and method
CN103647936A (en) Environmental monitoring system
CN109711348A (en) Intelligent monitoring method and system based on the long-term real-time architecture against regulations in hollow panel
CN207473031U (en) Unmanned plane inspection fault diagnosis system
CN104715556A (en) Fire alarm method based on aerial photography
CN111882834A (en) Implementation method of collapse early warning system under large-space roof fire
CN105096043A (en) Deep-foundation-pit construction-site automatic patrol and emergency command device and working method thereof
CN103761827A (en) Fire monitor system
CN206775646U (en) A kind of engineering construction safety mechanism for monitoring
CN108984899B (en) BIM project real-time progress supervision method
CN203132755U (en) Wireless intelligent online pull-monitoring system
CN115660241A (en) Digital mine inspection system and implementation method
CN116007542A (en) Unmanned aerial vehicle intelligent detection system based on BIM
CN206192397U (en) A kind of wireless Reconnaissance system of oil field fire protection
CN114723388A (en) Intelligent building site comprehensive safe operation informatization monitoring system
CN106686354A (en) Drone patrol measuring system and measuring method thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170531

RJ01 Rejection of invention patent application after publication