CN106760571A - 预制梁构件快速就位及调整的工装及方法 - Google Patents
预制梁构件快速就位及调整的工装及方法 Download PDFInfo
- Publication number
- CN106760571A CN106760571A CN201611244199.8A CN201611244199A CN106760571A CN 106760571 A CN106760571 A CN 106760571A CN 201611244199 A CN201611244199 A CN 201611244199A CN 106760571 A CN106760571 A CN 106760571A
- Authority
- CN
- China
- Prior art keywords
- support frame
- precast beam
- beam unit
- self
- absolute altitude
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/14—Conveying or assembling building elements
- E04G21/16—Tools or apparatus
- E04G21/18—Adjusting tools; Templates
- E04G21/1808—Holders for bricklayers' lines, bricklayers' bars; Sloping braces
- E04G21/1816—Adjustable positioning means between line-holder bars and construction
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/14—Conveying or assembling building elements
- E04G21/16—Tools or apparatus
- E04G21/18—Adjusting tools; Templates
- E04G21/1841—Means for positioning building parts or elements
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
本发明提供了一种预制梁构件快速就位及调整的工装及方法,本发明将原有在预制构件下搭设临时支撑架的体系改为在预制构件下设置平移式工具架的工装系统,整个工装系统由可调工具式支撑架、可移动自锁式支撑架等装置组成,所述自锁式支撑架的顶部设置有第一标高调节可动顶托,所述自锁式支撑架的顶部两侧设置有垂至地面的垂直度控制线锤,所述自锁式支撑架的底部设置有可锁定滑轮,能完成适用于构件快速临时固定、标高、垂直度及水平位置调节功能,实现预制构件快速定位,减少施工现场支撑架搭设,支撑架可以平移,实现快速移动,可重复利用。
Description
技术领域
本发明涉及一种预制梁构件快速就位及调整的工装及方法。
背景技术
随着装配式混凝土结构大面积应用,预制装配式建筑建造过程中,构件吊装安装过程中需要进行临时位置定位以及标高控制,目前大多采用在构件下搭设大面积支撑架的形式,这种方式耗费工期较长,后期还需人工进行拆除,效率较低。
装配式混凝土结构水平构件施工过程中,需要对预制构件进行临时定位及标高垂直度调整,构件固定就位后的标高、水平位置直接影响整体结构质量以及后续楼层构件施工控制,目前施工现场所采用的固定体系为在预制构件下搭设支撑架的方式,支撑架搭设和拆除需要花费人工、占用工期。
发明内容
本发明的目的在于提供一种预制梁构件快速就位及调整的工装及方法,能够提高预制构件施工效率、降低工期、提高预制构件施工工业化程度。
为解决上述问题,本发明提供一种预制梁构件快速就位及调整的工装,包括:
分别支撑于预制梁构件底部两端的可移动自锁式支撑架,所述自锁式支撑架的顶部设置有第一标高调节可动顶托,所述自锁式支撑架的顶部两侧设置有垂至地面的垂直度控制线锤,所述自锁式支撑架的底部设置有可锁定滑轮;
支撑于预制梁构件底部的所述可移动自锁式支撑架之间的可调工具式支撑架,所述可调工具式支撑架的顶部设置有第二标高调节可动顶托,预制梁构件架设于所述第一标高调节可动顶托和第二标高调节可动顶托上。
进一步的,在上述工装中,所述第一标高调节可动顶托和/或第二标高调节可动顶托分别包括相互连接的内螺杆和外螺杆,所述外螺杆上设置有内螺纹,所述内螺杆上设置有外螺纹,所述内螺纹和外螺纹配合,调整所述内螺杆和外螺杆的连接长度。
进一步的,在上述工装中,所述可调工具式支撑架的底部设置有八字形撑脚。
进一步的,在上述工装中,所述可调工具式支撑架由一根支撑杆组成,所述支撑杆的顶部连接有所述第二标高调节可动顶托。
进一步的,在上述工装中,所述可移动自锁式支撑架由四根支撑杆组成方形框架,每根支撑杆的顶部连接有第一标高调节可动顶托,每根支撑杆的底部设置有可锁定滑轮,所述方形框架顶部两侧设置有垂至地面的垂直度控制线锤。
根据本发明的另一面,提供一种预制梁构件快速就位及调整的方法,包括:
按照预制梁构件的安装轴线,通过可移动自锁式支撑架底部的可锁定滑轮,将可移动自锁式支撑架初步移动到预制梁构件待安装的水平位置,其中,所述自锁式支撑架的顶部设置有第一标高调节可动顶托,所述自锁式支撑架的顶部两侧设置有垂至地面的垂直度控制线锤,所述自锁式支撑架的底部设置有可锁定滑轮;
根据预制梁构件尺寸,通过可移动自锁式支撑架底部的可锁定滑轮调整可移动自锁式支撑架之间的横向间距大小;
通过垂直度控制线锤测量并精确调整预制梁构件的水平位置后,锁定所述自锁式支撑架的底部的可锁定滑轮;
将预制梁构件吊装至所述第一标高调节可动顶托上;
测量预制梁构件的标高,通过所述第一标高调节可动顶托调整预制梁构件的标高后,在预制梁构件底部的所述可移动自锁式支撑架之间的支撑可调工具式支撑架,所述可调工具式支撑架的顶部设置有第二标高调节可动顶托,预制梁构件架设于所述第二标高调节可动顶托上;
移除所述可移动自锁式支撑架,在待预制梁构件与现浇结构施工完成后,移除可调工具式支撑架。
进一步的,在上述方法中,所述第一标高调节可动顶托和/或第二标高调节可动顶托分别包括:相互连接的内螺杆和外螺杆,所述外螺杆上设置有内螺纹,所述内螺杆上设置有外螺纹,所述内螺纹和外螺纹配合,调整所述内螺杆和外螺杆的连接长度。
进一步的,在上述方法中,所述可调工具式支撑架的底部设置有八字形撑脚。
进一步的,在上述方法中,所述可调工具式支撑架由一根支撑杆组成,所述支撑杆的顶部连接有所述第二标高调节可动顶托。
进一步的,在上述方法中,所述可移动自锁式支撑架由四根支撑杆组成方形框架,每根支撑杆的顶部连接有第一标高调节可动顶托,每根支撑杆的底部设置有可锁定滑轮,所述方形框架顶部两侧设置有垂至地面的垂直度控制线锤。
与现有技术相比,本发明将原有在预制构件下搭设临时支撑架的体系改为在预制构件下设置平移式工具架的工装系统,整个工装系统由可调工具式支撑架、可移动自锁式支撑架等装置组成,所述自锁式支撑架的顶部设置有第一标高调节可动顶托,所述自锁式支撑架的顶部两侧设置有垂至地面的垂直度控制线锤,所述自锁式支撑架的底部设置有可锁定滑轮,能完成适用于构件快速临时固定、标高、垂直度及水平位置调节功能,实现预制构件快速定位,减少施工现场支撑架搭设,支撑架可以平移,实现快速移动,可重复利用,避免支撑架反复搭设、拆除的重复劳动,提高预制装配式建筑施工效率与质量,降低工期,提高预制构件施工工业化程度、减少人工、缩短工期。
附图说明
图1是本发明一实施例的预制梁构件快速就位及调整的工装的正视图;
图2是图1中沿A-A线的剖面图;
图3是图1的侧视图;
图4是本发明一实施例的垂直度控制线锤的安装俯视图;
图5是图1的俯视图。
具体实施方式
为使本发明的上述目的、特征和优点能够更加明显易懂,下面结合附图和具体实施方式对本发明作进一步详细的说明。
如图1~5所示,本发明提供一种预制梁构件快速就位及调整的工装,包括:
分别支撑于预制梁构件1底部两端的可移动自锁式支撑架2,所述自锁式支撑架2的顶部设置有第一标高调节可动顶托21,所述自锁式支撑架2的顶部两侧设置有垂至地面的垂直度控制线锤22,所述自锁式支撑架2的底部设置有可锁定滑轮23;所述锁定滑轮上设置有滑轮锁扣24;
支撑于预制梁构件1底部的所述可移动自锁式支撑架2之间的可调工具式支撑架3,所述可调工具式支撑架的顶部设置有第二标高调节可动顶托,预制梁构件架设于所述第一标高调节可动顶托和第二标高调节可动顶托上。本发明将原有在预制构件下搭设临时支撑架的体系改为在预制构件下设置平移式工具架的工装系统,整个工装系统由可调工具式支撑架、可移动自锁式支撑架等装置组成,所述自锁式支撑架的顶部设置有第一标高调节可动顶托,所述自锁式支撑架的顶部两侧设置有垂至地面的垂直度控制线锤,所述自锁式支撑架的底部设置有可锁定滑轮,能完成适用于构件快速临时固定、标高、垂直度及水平位置调节功能,实现预制构件快速定位,减少施工现场支撑架搭设,支撑架可以平移,实现快速移动,可重复利用,避免支撑架反复搭设、拆除的重复劳动,提高预制装配式建筑施工效率与质量,降低工期,提高预制构件施工工业化程度、减少人工、缩短工期。
本发明一实施例中,如图1~3所示,所述第一标高调节可动顶托和/或第二标高调节可动顶托分别包括相互连接的内螺杆和外螺杆,所述外螺杆上设置有内螺纹,所述内螺杆上设置有外螺纹,所述内螺纹和外螺纹配合,调整所述内螺杆和外螺杆的连接长度。
本发明一实施例中,如图1和3所示,所述可调工具式支撑架3的底部设置有八字形撑脚,以提高装置的简易性,及定位和支撑的稳定性。
本发明一实施例中,如图1和3所示,所述可调工具式支撑架3由一根支撑杆组成,所述支撑杆的顶部连接有所述第二标高调节可动顶托。
本发明一实施例中,如图1和3所示,所述可移动自锁式支撑架2由四根支撑杆组成方形框架,每根支撑杆的顶部连接有第一标高调节可动顶托,每根支撑杆的底部设置有可锁定滑轮,所述方形框架顶部两侧设置有垂至地面的垂直度控制线锤,方形框架可保证支撑的可靠、稳定性。
如图1~5所示,本发明还提供一种预制梁构件快速就位及调整的方法,包括:
按照预制梁构件的安装轴线,通过可移动自锁式支撑架底部的可锁定滑轮,将可移动自锁式支撑架初步移动到预制梁构件待安装的水平位置,其中,所述自锁式支撑架的顶部设置有第一标高调节可动顶托,所述自锁式支撑架的顶部两侧设置有垂至地面的垂直度控制线锤,所述自锁式支撑架的底部设置有可锁定滑轮;
根据预制梁构件尺寸,通过可移动自锁式支撑架底部的可锁定滑轮调整可移动自锁式支撑架之间的横向间距大小;
通过垂直度控制线锤测量并精确调整预制梁构件的水平位置后,锁定所述自锁式支撑架的底部的可锁定滑轮;
将预制梁构件吊装至所述第一标高调节可动顶托上;
测量预制梁构件的标高,通过所述第一标高调节可动顶托调整预制梁构件的标高后,在预制梁构件底部的所述可移动自锁式支撑架之间的支撑可调工具式支撑架,所述可调工具式支撑架的顶部设置有第二标高调节可动顶托,预制梁构件架设于所述第二标高调节可动顶托上;
移除所述可移动自锁式支撑架,在待预制梁构件与现浇结构施工完成后,移除可调工具式支撑架。本发明将原有在预制构件下搭设临时支撑架的体系改为在预制构件下设置平移式工具架的工装系统,整个工装系统由可调工具式支撑架、可移动自锁式支撑架等装置组成,所述自锁式支撑架的顶部设置有第一标高调节可动顶托,所述自锁式支撑架的顶部两侧设置有垂至地面的垂直度控制线锤,所述自锁式支撑架的底部设置有可锁定滑轮,能完成适用于构件快速临时固定、标高、垂直度及水平位置调节功能,实现预制构件快速定位,减少施工现场支撑架搭设,支撑架可以平移,实现快速移动,可重复利用,避免支撑架反复搭设、拆除的重复劳动,提高预制装配式建筑施工效率与质量,降低工期,提高预制构件施工工业化程度、减少人工、缩短工期。
本发明一实施例中,所述第一标高调节可动顶托和/或第二标高调节可动顶托分别包括:相互连接的内螺杆和外螺杆,所述外螺杆上设置有内螺纹,所述内螺杆上设置有外螺纹,所述内螺纹和外螺纹配合,调整所述内螺杆和外螺杆的连接长度。
本发明一实施例中,所述可调工具式支撑架的底部设置有八字形撑脚,以提高装置的简易性,及定位和支撑的稳定性。
本发明一实施例中,所述可调工具式支撑架由一根支撑杆组成,所述支撑杆的顶部连接有第二标高调节可动顶托。
本发明一实施例中,所述可移动自锁式支撑架由四根支撑杆组成方形框架,每根支撑杆的顶部连接有第一标高调节可动顶托,每根支撑杆的底部设置有可锁定滑轮,所述方形框架顶部两侧设置有垂至地面的垂直度控制线锤,方形框架可保证支撑的可靠、稳定性。
综上所述,本发明将原有在预制构件下搭设临时支撑架的体系改为在预制构件下设置平移式工具架的工装系统,整个工装系统由可调工具式支撑架、可移动自锁式支撑架等装置组成,所述自锁式支撑架的顶部设置有第一标高调节可动顶托,所述自锁式支撑架的顶部两侧设置有垂至地面的垂直度控制线锤,所述自锁式支撑架的底部设置有可锁定滑轮,能完成适用于构件快速临时固定、标高、垂直度及水平位置调节功能,实现预制构件快速定位,减少施工现场支撑架搭设,支撑架可以平移,实现快速移动,可重复利用,避免支撑架反复搭设、拆除的重复劳动,提高预制装配式建筑施工效率与质量,降低工期,提高预制构件施工工业化程度、减少人工、缩短工期。
本说明书中各个实施例采用递进的方式描述,每个实施例重点说明的都是与其他实施例的不同之处,各个实施例之间相同相似部分互相参见即可。
显然,本领域的技术人员可以对发明进行各种改动和变型而不脱离本发明的精神和范围。这样,倘若本发明的这些修改和变型属于本发明权利要求及其等同技术的范围之内,则本发明也意图包括这些改动和变型在内。
Claims (10)
1.一种预制梁构件快速就位及调整的工装,其特征在于,包括:
分别支撑于预制梁构件底部两端的可移动自锁式支撑架,所述自锁式支撑架的顶部设置有第一标高调节可动顶托,所述自锁式支撑架的顶部两侧设置有垂至地面的垂直度控制线锤,所述自锁式支撑架的底部设置有可锁定滑轮;
支撑于预制梁构件底部的所述可移动自锁式支撑架之间的可调工具式支撑架,所述可调工具式支撑架的顶部设置有第二标高调节可动顶托,预制梁构件架设于所述第一标高调节可动顶托和第二标高调节可动顶托上。
2.如权利要求1所述的预制梁构件快速就位及调整的工装,其特征在于,所述第一标高调节可动顶托和/或第二标高调节可动顶托分别包括相互连接的内螺杆和外螺杆,所述外螺杆上设置有内螺纹,所述内螺杆上设置有外螺纹,所述内螺纹和外螺纹配合,调整所述内螺杆和外螺杆的连接长度。
3.如权利要求1所述的预制梁构件快速就位及调整的工装,其特征在于,所述可调工具式支撑架的底部设置有八字形撑脚。
4.如权利要求1所述的预制梁构件快速就位及调整的工装,其特征在于,所述可调工具式支撑架由一根支撑杆组成,所述支撑杆的顶部连接有所述第二标高调节可动顶托。
5.如权利要求1至4任一项所述的预制梁构件快速就位及调整的工装,其特征在于,所述可移动自锁式支撑架由四根支撑杆组成方形框架,每根支撑杆的顶部连接有第一标高调节可动顶托,每根支撑杆的底部设置有可锁定滑轮,所述方形框架顶部两侧设置有垂至地面的垂直度控制线锤。
6.一种预制梁构件快速就位及调整的方法,其特征在于,包括:
按照预制梁构件的安装轴线,通过可移动自锁式支撑架底部的可锁定滑轮,将可移动自锁式支撑架初步移动到预制梁构件待安装的水平位置,其中,所述自锁式支撑架的顶部设置有第一标高调节可动顶托,所述自锁式支撑架的顶部两侧设置有垂至地面的垂直度控制线锤,所述自锁式支撑架的底部设置有可锁定滑轮;
根据预制梁构件尺寸,通过可移动自锁式支撑架底部的可锁定滑轮调整可移动自锁式支撑架之间的横向间距大小;
通过垂直度控制线锤测量并精确调整预制梁构件的水平位置后,锁定所述自锁式支撑架的底部的可锁定滑轮;
将预制梁构件吊装至所述第一标高调节可动顶托上;
测量预制梁构件的标高,通过所述第一标高调节可动顶托调整预制梁构件的标高后,在预制梁构件底部的所述可移动自锁式支撑架之间的支撑可调工具式支撑架,所述可调工具式支撑架的顶部设置有第二标高调节可动顶托,预制梁构件架设于所述第二标高调节可动顶托上;
移除所述可移动自锁式支撑架,在待预制梁构件与现浇结构施工完成后,移除可调工具式支撑架。
7.如权利要求6所述的预制梁构件快速就位及调整的方法,其特征在于,所述第一标高调节可动顶托和/或第二标高调节可动顶托分别包括:相互连接的内螺杆和外螺杆,所述外螺杆上设置有内螺纹,所述内螺杆上设置有外螺纹,所述内螺纹和外螺纹配合,调整所述内螺杆和外螺杆的连接长度。
8.如权利要求6所述的预制梁构件快速就位及调整的方法,其特征在于,所述可调工具式支撑架的底部设置有八字形撑脚。
9.如权利要求6所述的预制梁构件快速就位及调整的方法,其特征在于,所述可调工具式支撑架由一根支撑杆组成,所述支撑杆的顶部连接有所述第二标高调节可动顶托。
10.如权利要求6至9任一项所述的预制梁构件快速就位及调整的方法,其特征在于,所述可移动自锁式支撑架由四根支撑杆组成方形框架,每根支撑杆的顶部连接有第一标高调节可动顶托,每根支撑杆的底部设置有可锁定滑轮,所述方形框架顶部两侧设置有垂至地面的垂直度控制线锤。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611244199.8A CN106760571B (zh) | 2016-12-29 | 2016-12-29 | 预制梁构件快速就位及调整的工装及方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611244199.8A CN106760571B (zh) | 2016-12-29 | 2016-12-29 | 预制梁构件快速就位及调整的工装及方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106760571A true CN106760571A (zh) | 2017-05-31 |
CN106760571B CN106760571B (zh) | 2022-07-19 |
Family
ID=58928756
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201611244199.8A Active CN106760571B (zh) | 2016-12-29 | 2016-12-29 | 预制梁构件快速就位及调整的工装及方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106760571B (zh) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109534175A (zh) * | 2018-12-25 | 2019-03-29 | 上海建工五建集团有限公司 | 预制梁吊装稳定支架及其方法 |
CN109914268A (zh) * | 2019-04-23 | 2019-06-21 | 五冶集团上海有限公司 | 一种用于预制梁板安装的可调式卸落装置 |
CN112933673A (zh) * | 2021-02-03 | 2021-06-11 | 中冶北方(大连)工程技术有限公司 | 浓缩机的双车移动装置及方法 |
CN112933671A (zh) * | 2021-02-03 | 2021-06-11 | 中冶北方(大连)工程技术有限公司 | 滚动式移动浓缩机 |
CN112933674A (zh) * | 2021-02-03 | 2021-06-11 | 中冶北方(大连)工程技术有限公司 | 浓缩机的移动装置及方法 |
CN114165063A (zh) * | 2021-10-26 | 2022-03-11 | 山东高速工程建设集团有限公司 | 一种预制梁构件快速就位及调整的工装及方法 |
Citations (20)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB917796A (en) * | 1960-03-23 | 1963-02-06 | Claude De Grivel | Improved device for adjusting the verticality of door-posts and the like construction elements |
AU3068577A (en) * | 1976-11-16 | 1979-05-24 | San M G De | Erecting a construction using premanufactured elements |
BE880974A (fr) * | 1979-12-31 | 1980-04-16 | Lillo Francois Di | Dispositif destine a faciliter la pose de briques et analogues |
BE1012220A3 (nl) * | 1998-10-05 | 2000-07-04 | Timmermans Johannes Jacobus | Inrichting voor het ondersteunen van een metselprofiel. |
EP1106748A2 (en) * | 1999-12-03 | 2001-06-13 | Gino Cerato | Supporting and holding device for positioning formworks |
WO2002095163A2 (en) * | 2001-05-18 | 2002-11-28 | Lanka Richard I | Form brace with adjustable face |
CN102061809A (zh) * | 2010-12-29 | 2011-05-18 | 王道利 | 砌墙防偏装置 |
CN103061524A (zh) * | 2013-02-05 | 2013-04-24 | 广东省工业设备安装公司 | 钢结构复杂节点的活动式仿形定位架 |
CN103485549A (zh) * | 2013-09-23 | 2014-01-01 | 中国五冶集团有限公司 | 基于对大型预埋件的定位装置及其定位方法 |
CN203383518U (zh) * | 2013-07-26 | 2014-01-08 | 周思艺 | 泥工专用垂直水平靠方 |
CN103659216A (zh) * | 2013-11-18 | 2014-03-26 | 浙江杭萧钢构股份有限公司 | 装配式钢筋桁架楼承板自动装配装置 |
CN204212442U (zh) * | 2014-11-12 | 2015-03-18 | 山东三箭建设工程股份有限公司 | 一种高精度定位导向装置 |
CN204252556U (zh) * | 2014-11-27 | 2015-04-08 | 陈青帅 | 一种线锤架 |
CN204715775U (zh) * | 2015-06-15 | 2015-10-21 | 中民筑友有限公司 | 梁端定位支撑装置及梁柱节点 |
CN105587130A (zh) * | 2014-11-14 | 2016-05-18 | 五冶集团上海有限公司 | 一种空间网壳焊接球定位装置及其使用方法 |
CN205296874U (zh) * | 2015-12-17 | 2016-06-08 | 深圳市福田建安建设集团有限公司 | 桩柱一体化信息化施工监测定位装置 |
CN205369950U (zh) * | 2015-12-18 | 2016-07-06 | 国家电网公司 | 预埋件定位器 |
CN105781125A (zh) * | 2016-03-04 | 2016-07-20 | 李藏柱 | 一种装配式建筑的安装方法 |
CN106013434A (zh) * | 2016-07-18 | 2016-10-12 | 江苏工程职业技术学院 | 一种预制装配式结构中间梁柱节点固定结构及安装方法 |
CN206753089U (zh) * | 2016-12-29 | 2017-12-15 | 上海建工五建集团有限公司 | 预制梁构件快速就位及调整的工装 |
-
2016
- 2016-12-29 CN CN201611244199.8A patent/CN106760571B/zh active Active
Patent Citations (20)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB917796A (en) * | 1960-03-23 | 1963-02-06 | Claude De Grivel | Improved device for adjusting the verticality of door-posts and the like construction elements |
AU3068577A (en) * | 1976-11-16 | 1979-05-24 | San M G De | Erecting a construction using premanufactured elements |
BE880974A (fr) * | 1979-12-31 | 1980-04-16 | Lillo Francois Di | Dispositif destine a faciliter la pose de briques et analogues |
BE1012220A3 (nl) * | 1998-10-05 | 2000-07-04 | Timmermans Johannes Jacobus | Inrichting voor het ondersteunen van een metselprofiel. |
EP1106748A2 (en) * | 1999-12-03 | 2001-06-13 | Gino Cerato | Supporting and holding device for positioning formworks |
WO2002095163A2 (en) * | 2001-05-18 | 2002-11-28 | Lanka Richard I | Form brace with adjustable face |
CN102061809A (zh) * | 2010-12-29 | 2011-05-18 | 王道利 | 砌墙防偏装置 |
CN103061524A (zh) * | 2013-02-05 | 2013-04-24 | 广东省工业设备安装公司 | 钢结构复杂节点的活动式仿形定位架 |
CN203383518U (zh) * | 2013-07-26 | 2014-01-08 | 周思艺 | 泥工专用垂直水平靠方 |
CN103485549A (zh) * | 2013-09-23 | 2014-01-01 | 中国五冶集团有限公司 | 基于对大型预埋件的定位装置及其定位方法 |
CN103659216A (zh) * | 2013-11-18 | 2014-03-26 | 浙江杭萧钢构股份有限公司 | 装配式钢筋桁架楼承板自动装配装置 |
CN204212442U (zh) * | 2014-11-12 | 2015-03-18 | 山东三箭建设工程股份有限公司 | 一种高精度定位导向装置 |
CN105587130A (zh) * | 2014-11-14 | 2016-05-18 | 五冶集团上海有限公司 | 一种空间网壳焊接球定位装置及其使用方法 |
CN204252556U (zh) * | 2014-11-27 | 2015-04-08 | 陈青帅 | 一种线锤架 |
CN204715775U (zh) * | 2015-06-15 | 2015-10-21 | 中民筑友有限公司 | 梁端定位支撑装置及梁柱节点 |
CN205296874U (zh) * | 2015-12-17 | 2016-06-08 | 深圳市福田建安建设集团有限公司 | 桩柱一体化信息化施工监测定位装置 |
CN205369950U (zh) * | 2015-12-18 | 2016-07-06 | 国家电网公司 | 预埋件定位器 |
CN105781125A (zh) * | 2016-03-04 | 2016-07-20 | 李藏柱 | 一种装配式建筑的安装方法 |
CN106013434A (zh) * | 2016-07-18 | 2016-10-12 | 江苏工程职业技术学院 | 一种预制装配式结构中间梁柱节点固定结构及安装方法 |
CN206753089U (zh) * | 2016-12-29 | 2017-12-15 | 上海建工五建集团有限公司 | 预制梁构件快速就位及调整的工装 |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109534175A (zh) * | 2018-12-25 | 2019-03-29 | 上海建工五建集团有限公司 | 预制梁吊装稳定支架及其方法 |
CN109914268A (zh) * | 2019-04-23 | 2019-06-21 | 五冶集团上海有限公司 | 一种用于预制梁板安装的可调式卸落装置 |
CN109914268B (zh) * | 2019-04-23 | 2024-06-04 | 五冶集团上海有限公司 | 一种用于预制梁板安装的可调式卸落装置 |
CN112933673A (zh) * | 2021-02-03 | 2021-06-11 | 中冶北方(大连)工程技术有限公司 | 浓缩机的双车移动装置及方法 |
CN112933671A (zh) * | 2021-02-03 | 2021-06-11 | 中冶北方(大连)工程技术有限公司 | 滚动式移动浓缩机 |
CN112933674A (zh) * | 2021-02-03 | 2021-06-11 | 中冶北方(大连)工程技术有限公司 | 浓缩机的移动装置及方法 |
CN114165063A (zh) * | 2021-10-26 | 2022-03-11 | 山东高速工程建设集团有限公司 | 一种预制梁构件快速就位及调整的工装及方法 |
Also Published As
Publication number | Publication date |
---|---|
CN106760571B (zh) | 2022-07-19 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106760571A (zh) | 预制梁构件快速就位及调整的工装及方法 | |
CN104755681B (zh) | 面板支撑托架 | |
CN204298720U (zh) | 一种设置有索导管定位装置的混凝土箱梁 | |
CN108979130A (zh) | 一种可调节模板高度的侧墙单侧立模装置和施工方法 | |
CN109707175A (zh) | 逆作法超长钢柱高精度的自动定位调垂系统及施工方法 | |
CN105604336A (zh) | 钢柱安装定位装置及安装定位方法 | |
CN206753089U (zh) | 预制梁构件快速就位及调整的工装 | |
CN104675179B (zh) | 自升式钢塔安装用吊架装置及钢塔施工方法 | |
CN104499619A (zh) | 一种pc外挂墙底部调节组件 | |
US10710856B2 (en) | Utility tower leveling apparatus and method | |
CN104773654B (zh) | 一种水泥电杆排杆装置 | |
CN205777411U (zh) | 适用于不平整场地高度可调的移动式门式架支撑装置 | |
CN103434933B (zh) | 一种大型构件吊装就位装置及就位方法 | |
CN105442868A (zh) | 一种可调式钢结构网壳拼装胎架 | |
CN104405233B (zh) | 一种门窗安装方法 | |
CN104164974B (zh) | 建筑物浇筑方法及其使用的浇筑模具系统 | |
CN206616694U (zh) | 预制叠合梁与预制柱连接处快速定位调整工装 | |
CN114482495A (zh) | 平整度可控的大面积工业厂房地坪施工装置及施工方法 | |
KR101001157B1 (ko) | 포장평탄화장비 | |
CN205035001U (zh) | 发电机装卸装置 | |
CN104328981B (zh) | 一种门窗附框定位安装方法 | |
CN206512611U (zh) | 一种悬挂式空轨桥墩安装用地上工装 | |
CN103626050B (zh) | 救援舱定位底座及救援用起重机 | |
CN110005437A (zh) | 用于隧道内的中隔墙、其安装设备和安装方法 | |
CN206360389U (zh) | 预制水平构件与叠合梁连接处快速定位调整工装 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |