CN106759091A - 一种适用于船闸引航道的高桩墩式驳岸结构 - Google Patents
一种适用于船闸引航道的高桩墩式驳岸结构 Download PDFInfo
- Publication number
- CN106759091A CN106759091A CN201710107682.XA CN201710107682A CN106759091A CN 106759091 A CN106759091 A CN 106759091A CN 201710107682 A CN201710107682 A CN 201710107682A CN 106759091 A CN106759091 A CN 106759091A
- Authority
- CN
- China
- Prior art keywords
- flow blocking
- approach
- pile foundation
- estabilishing
- piled
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 230000000903 blocking effect Effects 0.000 claims abstract description 28
- 238000010276 construction Methods 0.000 abstract description 22
- 238000009412 basement excavation Methods 0.000 abstract description 3
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 239000004744 fabric Substances 0.000 description 1
- 238000007667 floating Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000000034 method Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B3/00—Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
- E02B3/04—Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
- E02B3/06—Moles; Piers; Quays; Quay walls; Groynes; Breakwaters ; Wave dissipating walls; Quay equipment
- E02B3/066—Quays
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D19/00—Keeping dry foundation sites or other areas in the ground
- E02D19/02—Restraining of open water
- E02D19/04—Restraining of open water by coffer-dams, e.g. made of sheet piles
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Environmental & Geological Engineering (AREA)
- Ocean & Marine Engineering (AREA)
- Mechanical Engineering (AREA)
- Revetment (AREA)
Abstract
本发明公开了一种适用于船闸引航道的高桩墩式驳岸结构,岸侧陆上打设桩基,所述桩基为间隔设置,所述桩基上现浇上部墩台,所述上部墩台下部设隔流板桩,所述隔流板桩为连续设置,所述隔流板桩的位置为靠近所述桩基一侧纵向设置,从而隔断横向的水流,满足老船闸引航道与新建船闸引航道的隔流作用。所述上部墩台设置靠泊装置,用以靠泊船舶。本发明还公开了施工方法。本发明不仅施工期不占用河道而影响老船闸引航道正常运行,而且避免了大开挖;同时陆上打桩基然后现浇上部墩台结构,加快了施工进度节省了工程投资;上部墩台下通过设置隔流板桩从而起到隔流作用,并且上部墩台可以通过设置靠泊装置来靠泊船舶。
Description
技术领域
本发明涉及航道工程领域,具体涉及一种高桩墩式驳岸结构,适用于船闸引航道。
背景技术
中国内河水运主通道的布局规划是“两横一纵十八线”,由20余条河流组成的约15000km航道,目前我国已在长江干线、京杭运河、西江干线和嘉陵江、汉江、湘江、赣江、右江及红水河等建船闸900余座,其中大中型船闸300余座。船闸的修建大大改善了航道的航运条件,提高了航道的通航等级,提高了航道的通过能力。
随着经济的发展以及船舶大型化,使得原有已建的一些船闸等级偏低、结构不合理、通畅性差、通航保证率不高,无法适应新时代经济发展和船舶大型化的要求,因此需在原有船闸附近新建或扩建船闸。在原有船闸附近新建或扩建船闸,往往具有周边建筑物(构筑物)密集,易受水利枢纽、桥梁限制,施工期不能断航、断流、环境影响要求高,地质条件复杂等特点。
船闸引航道包括导航段、调顺段、停泊段和制动段等。根据引航道及连接段、口门段等不同的平面布置与结构功能,引航道水工结构可采用多种结构型式。引航道导航和靠船建筑物结构型式应根据地质条件、水流条件、水位变幅、船行波、船闸规模、材料来源、施工条件和使用要求等因素确定,并且在选择结构型式时应考虑技术经济条件,力求结构简单、耐久性好,并便于施工。常规引航道驳岸结构型式有重力式结构、浮式趸船结构、墩板结构、框格结构及边坡挡墙结构等。通常在原有船闸附近新建或扩建船闸,引航道驳岸建设需设置施工围堰然后开挖边坡,这不仅无法解决施工空间狭小,施工期不能断航的问题,而且工程投资较大。
本驳岸结构采用在靠河侧的驳岸端部建设高桩墩式结构,利用陆上打设桩基础,现浇上部墩台,并且在上部墩台下设置隔流板桩,从而满足原船闸引航道与新建船闸引航道的隔流作用。本驳岸结构不仅施工期不占用河道而影响老船闸正常运行,而且避免了大开挖,同时考虑陆上打桩然后现浇上部墩台结构,加快了施工进度节省了工程投资,墩台下通过设置隔流板桩从而起到隔流作用,并且上部结构可以通过设置靠泊装置来靠泊船舶。本驳岸结构兼具驳岸、船舶靠泊、隔流等功能,结构安全可靠、经济、施工方便,应用前景广阔。
发明内容
为了解决上述技术问题,本发明采用如下技术方案:
一种适用于船闸引航道的高桩墩式驳岸结构,岸侧陆上打设桩基,所述桩基上现浇上部墩台,所述上部墩台下部设隔流板桩,从而满足老船闸引航道与新建船闸引航道的隔流作用,满足老船闸引航道与新建船闸引航道的隔流作用。
更进一步,所述桩基为间隔设置。
更进一步,所述上部墩台设置靠泊装置,用以靠泊船舶。
更进一步,所述隔流板桩为连续设置。
更进一步,所述隔流板桩的位置为靠近所述桩基一侧纵向设置,从而隔断横向的水流。
有益效果:本发明不仅施工期不占用河道而影响老船闸引航道正常运行,而且避免了大开挖;同时陆上打桩基然后现浇上部墩台结构,加快了施工进度节省了工程投资;上部墩台下通过设置隔流板桩从而起到隔流作用,并且上部墩台可以通过设置靠泊装置来靠泊船舶。
附图说明
图1为本发明的断面图。
图中:1桩基、2隔流流板桩、3上部墩台、4现有引航道泥面、5新建引航道设计泥面、6 陆域泥面线、7 设计水位。
具体实施方式
如图1所示,一种适用于船闸引航道的高桩墩式驳岸结构,岸侧陆上打设桩基1,所述桩基1为间隔设置,可选取8根桩基1,形成上下左右四个方位均为3根桩基1、横截面为矩形或正方形,所述桩基1上现浇上部墩台3,所述上部墩台3下设隔流板桩2,所述隔流板桩2为连续设置,所述隔流板桩2的位置为靠近所述桩基一侧纵向设置,从而隔断横向的水流,满足老船闸引航道与新建船闸引航道的隔流作用。所述上部墩台3设置靠泊装置(图中未示),用以靠泊船舶。本高桩墩式驳岸结构的桩基1的左侧为新建引航道设计泥面5,本高桩墩式驳岸结构的桩基1的右侧为现有引航道泥面4,陆域泥面线6位于设计水位7上方。
本发明的施工流程如下:
1、根据高桩墩式结构的现行规范进行结构稳定、强度等计算,确定桩基型式、桩基间距、桩基长度、上部结构等。请详细描述。
2、结合引航道深度要求,确定隔流板桩的型式和入土深度等。请详细描述。
3、施工驳岸结构下部桩基及隔流板桩结构。
4、施工驳岸结构上部结构。
5、新建引航道施工。
Claims (5)
1.一种适用于船闸引航道的高桩墩式驳岸结构,其特征在于:岸侧陆上打设桩基,所述桩基上现浇上部墩台,所述上部墩台下部设隔流板桩,从而满足老船闸引航道与新建船闸引航道的隔流作用。
2.如权利要求1所述的适用于船闸引航道的高桩墩式驳岸结构,其特征在于:所述桩基为间隔设置。
3.如权利要求1所述的适用于船闸引航道的高桩墩式驳岸结构,其特征在于:所述上部墩台设置靠泊装置,用以靠泊船舶。
4.如权利要求1所述的适用于船闸引航道的高桩墩式驳岸结构,其特征在于:所述隔流板桩为连续设置。
5.如权利要求1或4所述的适用于船闸引航道的高桩墩式驳岸结构,其特征在于:所述隔流板桩的位置为靠近所述桩基一侧纵向设置,从而隔断横向的水流。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710107682.XA CN106759091A (zh) | 2017-02-27 | 2017-02-27 | 一种适用于船闸引航道的高桩墩式驳岸结构 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710107682.XA CN106759091A (zh) | 2017-02-27 | 2017-02-27 | 一种适用于船闸引航道的高桩墩式驳岸结构 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106759091A true CN106759091A (zh) | 2017-05-31 |
Family
ID=58960774
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710107682.XA Pending CN106759091A (zh) | 2017-02-27 | 2017-02-27 | 一种适用于船闸引航道的高桩墩式驳岸结构 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106759091A (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107190701A (zh) * | 2017-07-13 | 2017-09-22 | 中国电建集团中南勘测设计研究院有限公司 | 一种靠船建筑物及系统 |
CN111827239A (zh) * | 2020-07-27 | 2020-10-27 | 曹灵涛 | 装配式靠船墩施工方法 |
CN113481932A (zh) * | 2021-07-20 | 2021-10-08 | 上海市政工程设计研究总院(集团)有限公司 | 高桩承台式海堤 |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH09165725A (ja) * | 1995-12-19 | 1997-06-24 | Osaka Prefecture | 生態系を考慮した護岸構造物 |
CN102154997A (zh) * | 2011-05-23 | 2011-08-17 | 东南大学 | 一种生态型护岸结构 |
CN202482815U (zh) * | 2011-12-16 | 2012-10-10 | 中交第二航务工程勘察设计院有限公司 | 桩板组合式生态护岸结构 |
CN204039974U (zh) * | 2014-08-29 | 2014-12-24 | 江苏省交通规划设计院股份有限公司 | 一种桩式防浪复合型生态护岸结构 |
CN204676485U (zh) * | 2015-02-04 | 2015-09-30 | 南通航运职业技术学院 | 一种生态经济型护岸结构 |
CN104975582A (zh) * | 2015-07-10 | 2015-10-14 | 彭伟 | 导流隔流堤及其导流方式 |
CN204919467U (zh) * | 2015-07-07 | 2015-12-30 | 交通运输部天津水运工程科学研究所 | 一种用于离岸船闸上引航道的隔流堤 |
CN206655180U (zh) * | 2017-02-27 | 2017-11-21 | 中交第三航务工程勘察设计院有限公司 | 一种适用于船闸引航道的高桩墩式驳岸结构 |
-
2017
- 2017-02-27 CN CN201710107682.XA patent/CN106759091A/zh active Pending
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH09165725A (ja) * | 1995-12-19 | 1997-06-24 | Osaka Prefecture | 生態系を考慮した護岸構造物 |
CN102154997A (zh) * | 2011-05-23 | 2011-08-17 | 东南大学 | 一种生态型护岸结构 |
CN202482815U (zh) * | 2011-12-16 | 2012-10-10 | 中交第二航务工程勘察设计院有限公司 | 桩板组合式生态护岸结构 |
CN204039974U (zh) * | 2014-08-29 | 2014-12-24 | 江苏省交通规划设计院股份有限公司 | 一种桩式防浪复合型生态护岸结构 |
CN204676485U (zh) * | 2015-02-04 | 2015-09-30 | 南通航运职业技术学院 | 一种生态经济型护岸结构 |
CN204919467U (zh) * | 2015-07-07 | 2015-12-30 | 交通运输部天津水运工程科学研究所 | 一种用于离岸船闸上引航道的隔流堤 |
CN104975582A (zh) * | 2015-07-10 | 2015-10-14 | 彭伟 | 导流隔流堤及其导流方式 |
CN206655180U (zh) * | 2017-02-27 | 2017-11-21 | 中交第三航务工程勘察设计院有限公司 | 一种适用于船闸引航道的高桩墩式驳岸结构 |
Non-Patent Citations (1)
Title |
---|
顾宽海等: "上海油墩港航道整治工程东大盈船闸扩建方案研究", 《水运工程》 * |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107190701A (zh) * | 2017-07-13 | 2017-09-22 | 中国电建集团中南勘测设计研究院有限公司 | 一种靠船建筑物及系统 |
CN111827239A (zh) * | 2020-07-27 | 2020-10-27 | 曹灵涛 | 装配式靠船墩施工方法 |
CN113481932A (zh) * | 2021-07-20 | 2021-10-08 | 上海市政工程设计研究总院(集团)有限公司 | 高桩承台式海堤 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105672197A (zh) | 加高加固堤岸的方法及结构 | |
CN107514006A (zh) | 一种用于浅海或浅河桥梁基础的筑岛作业施工方法 | |
CN106759091A (zh) | 一种适用于船闸引航道的高桩墩式驳岸结构 | |
CN109610487A (zh) | 一种拉森钢板桩围堰及其施工方法 | |
CN104790410B (zh) | 一种适用于浅水淤泥河道的基坑开挖支护方法 | |
CN103374900A (zh) | 建设于淤泥质地基上的重力式码头及其施工方法 | |
Ruggeri et al. | Renovation of quay walls to meet more demanding requirements: Italian experiences | |
CN206655180U (zh) | 一种适用于船闸引航道的高桩墩式驳岸结构 | |
CN107034906A (zh) | 海上浅插式钢圆筒基槽开挖换填施工方法 | |
CN106854864A (zh) | 港口工程连排式预应力钢筋混凝土大管桩新结构 | |
CN110004873A (zh) | 基于桩基结构的导流防波堤 | |
CN108411934B (zh) | 浮式管桩、堤坝挡土结构及其施工方法 | |
CN113047215B (zh) | 一种中板桩高桩码头结构 | |
CN110004876A (zh) | 适用于软土地基的低桩重力式码头及其施工方法 | |
CN104878720B (zh) | 桩基半重力式承台码头及其施工方法 | |
CN204644956U (zh) | 一种海岸防波堤 | |
CN105887760B (zh) | 一种生态型的破损护岸修复结构 | |
CN211621441U (zh) | 直立式堤防结构 | |
CN113585168A (zh) | 一种适用于深厚泥炭质土软基的板桩接岸式高桩码头结构及施工方法 | |
CN208685530U (zh) | 一种消船行波式驳岸结构 | |
CN205421307U (zh) | 一种新型内河透空式倒π型低桩承台结构 | |
CN206655186U (zh) | 一种前疏排桩高桩承台护岸结构 | |
CN201713761U (zh) | 空腹封闭式钢沉箱围堰 | |
CN215629710U (zh) | 一种适用于深厚泥炭质土软基的板桩接岸式高桩码头结构 | |
CN110939101A (zh) | 直立式堤防结构及其施工方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB02 | Change of applicant information |
Address after: No. 831 zhaojiaman Road, Xuhui District, Shanghai Applicant after: CCCC THIRD HARBOR CONSULTANTS Co.,Ltd. Address before: 200032 831 Zhaojia Bang Road, Xuhui District, Shanghai Applicant before: CCCC THIRD HARBOR CONSULTANTS Co.,Ltd. |
|
CB02 | Change of applicant information | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170531 |
|