CN106703809B - A kind of method that open air trestle multi-branched ore body induction caving forms coating - Google Patents

A kind of method that open air trestle multi-branched ore body induction caving forms coating Download PDF

Info

Publication number
CN106703809B
CN106703809B CN201710028699.6A CN201710028699A CN106703809B CN 106703809 B CN106703809 B CN 106703809B CN 201710028699 A CN201710028699 A CN 201710028699A CN 106703809 B CN106703809 B CN 106703809B
Authority
CN
China
Prior art keywords
ore
coating
ore body
goaf
slump
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201710028699.6A
Other languages
Chinese (zh)
Other versions
CN106703809A (en
Inventor
李海英
黄笃学
任凤玉
张永坤
刘云华
王金龙
王洪秋
温海民
王文学
潘才
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan University of Science and Engineering WUSE
HBIS Co Ltd
Original Assignee
Wuhan University of Science and Engineering WUSE
HBIS Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan University of Science and Engineering WUSE, HBIS Co Ltd filed Critical Wuhan University of Science and Engineering WUSE
Priority to CN201710028699.6A priority Critical patent/CN106703809B/en
Publication of CN106703809A publication Critical patent/CN106703809A/en
Application granted granted Critical
Publication of CN106703809B publication Critical patent/CN106703809B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C41/00Methods of underground or surface mining; Layouts therefor
    • E21C41/16Methods of underground mining; Layouts therefor
    • E21C41/22Methods of underground mining; Layouts therefor for ores, e.g. mining placers
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C41/00Methods of underground or surface mining; Layouts therefor
    • E21C41/26Methods of surface mining; Layouts therefor
    • E21C41/30Methods of surface mining; Layouts therefor for ores, e.g. mining placers

Abstract

The invention discloses a kind of methods that open air trestle multi-branched ore body induction caving forms coating, it is characterized in that, in the exploitation of multi-branched ore body open air trestle application sublevel caving method, the extracting drift across pitch of each branch ore body is arranged, from top to bottom by segmenting cooperation back production, originally part broken ore is left as safe bed course, as back production segmentation moves down, in the continuous goaf of ribbon that vertical range direction forms exposed earth's surface, promote interlayer country rock with increase gradually unstability slabbing or the slump of two sides goaf surface area, slabbing or the barren rock of slump are piled up on broken ore.The present invention utilizes the emitting property self-assembling formation coating of country rock in ore exploitation process, compared with current avalanche side slope rock or backfill barren rock form the conventional method of coating, time and the expense to form coating can not only be saved, and the barren rock lumpiness of formed coating is larger, can effectively reduce the loss late and the rate of dilution of broken ore.

Description

A kind of method that open air trestle multi-branched ore body induction caving forms coating
Technical field
The present invention relates to metalliferous deposit underground mining technical field, specifically a kind of open air trestle multi-branched ore body induction The method of inbreak formation coating.
Background technique
It is generally useless using avalanche side slope country rock or backfill at present in the metal mine of multi-branched ore body open air trestle exploitation The conventional method of stone forms coating, these methods form the expensive of coating, and the rock fragmentation of formed coating Smaller, during underground broken ore is released, coating barren rock flows faster mixed volume is big, causes mine loss and dilution big. Therefore, multi-branched ore body open air trestle exploitation transitional period, because coating be artificially formed it is time-consuming it is expensive with and initially The problems such as lumpiness small deterioration ore drawing effect, frequently result in that production capacity linking in mine is difficult to be reduced with mining benefit.For this purpose, inventing one kind The method that open air trestle multi-branched ore body induction caving forms coating, enables coating self-assembling formation, and ensure covering The lumpiness of layer barren rock is significant.
Summary of the invention
The purpose of the present invention is to provide a kind of open air trestle multi-branched ore body induction caving formed coating method, To solve the critical issue in above-mentioned background technique.
To achieve the above object, the present invention provides the following technical solutions:
A kind of method that open air trestle multi-branched ore body induction caving forms coating, each branch ore body across pitch arrangement Along the pulse extracting drift forms a plurality of band-like continuous goaf in vertical range direction, promotes interlayer country rock with two sides goaf table The barren rock of the increase of area gradually unstability slabbing or slump, slabbing or slump is piled up on stope broken ore, forms covering Layer.
As a further solution of the present invention:Along the pulse the extracting drift position leave the horizontal distance l of ore body lower wall by Following formula determines:
In formula:α is the slanting angle of ore body, (°);β is disk side angle of spot hole in back production blasthole, (°), β=55 °~60 °;H is segmentation Highly, m;B is the horizontal breadth of ore body, m.
As a further solution of the present invention:Along the pulse extracting drift fan shaped medium length hole explosion back production, each step pitch It is collapsed with upper segmentation, forms continuous goaf, promote two wall country rock slabbings or slump, be piled up in the remaining ore granular media of back production On, coating needed for forming lower part body to be dug up mine.
As a further solution of the present invention:Back production depth H and length L need to meet following formula:
L≥10δ
In formula:α is the slanting angle of ore body, (°);δ is thickness of interlayer, m;RtTension for the jointed rockmass after exploitation reduction is strong Degree, t/m2, exploitation weakening coefficient is 0.21~0.56;ρ is the density of jointed rockmass, t/m3
As a further solution of the present invention:Along the pulse until each step pitch ore removal of extracting drift to micro- dew goaf, The not spacious sky of end mouth is kept, prevents impact harm caused by side wall country rock slabbing, while ore-rock interface level need to be kept to decline, control It makes two wall country rocks and continues slabbing or slump, be piled up on the remaining ore granular media of back production, formed needed for the body to be dug up mine of lower part Coating.
As a further solution of the present invention:When the goaf constitutes a threat to safely to back production, in goaf side wall Country rock slabbing is formed before coating, need to be left from Roof of access road and be counted the safe bed course of ore that thickness is not less than 3m, avoid adopting The impact harm that dead zone country rock slabbing or slump may cause.
Compared with prior art, the beneficial effects of the invention are as follows:The project amount that a large amount of worker forms coating is saved, Using emitting property of country rock, the self-assembling formation coating in ore exploitation process can not only save mining time and expense, but also shape At coating barren rock lumpiness it is larger, advantageously reduce its lower loss late and the rate of dilution of the ore during ore drawing.With the method Formed coating, have many advantages, such as it is safe and efficient, environmentally friendly with it is at low cost.The present invention is especially suitable for high-dipping stratiform, like stratiform Ore body, 50 °~80 ° of inclination angle, thickness of interlayer are less than the small area of 20m, rainfall or the convenient open air trestle exploitation of subdrainage Metal mine.
Detailed description of the invention
Fig. 1 is the position view of extracting drift and branch's ore body along the pulse.
Fig. 2 is the cross-sectional view of A-A in Fig. 1.
Fig. 3 is the cross-sectional view of C-C in Fig. 1.
In figure:The 1- stage transports the tunnel Chuan Mai, 2- ramp, 3- segmentation tunnel, 4- segmentation connection lane, 5- downcast, 6- go back tos Extracting drift, 9- cutting tunnel, 10- cut well, 11- back production blasthole along the pulse by ventilating shaft, 7- mine chute, 8-.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
Please refer to Fig. 1~3, in the embodiment of the present invention, a kind of open air trestle multi-branched ore body induction caving forms covering The method of layer, along orebody trend arrangement extracting drift 8 along the pulse, position need to meet fill sublevel caving and recycling ore and Along orebody trend and the requirement for forming the continuous goaf of ribbon in deepening direction, route position leave ore body lower wall it is horizontal away from From l by formulaIt determines.
Along the pulse cutting tunnel 9 is beaten in 8 end of extracting drift, cuts in tunnel 9 and beats cutting well 10, to cut well 10 as the scope of freedom Form cutting groove.
Along the pulse the back production blasthole 11 in extracting drift 8 is no more than ore limits in principle, the same segmentation of multiple-limb ore body Ore cooperates with back production using extracting drift 8 along the pulse, is forming the continuous goaf of ribbon along vertical range direction, is leaving Two sides lose the interlayer country rock of support, with increase gradually unstability slabbing or the slump of two sides goaf surface area, slabbing or slump Barren rock be piled up on broken ore granular media, ultimately form the coating of adequate thickness.
Ore along 8 back production avalanche of extracting drift along the pulse is transported to mine chute 7 by segmentation connection lane 4, through under mine chute 7 It is put into the stage transport tunnel Chuan Mai 1.
Each segmentation connection lane 4 is tunneled by being segmented tunnel 3;Couple between each segmentation tunnel 3 through ramp 2;It is fresh it is distinguished and admirable by into Ventilating shaft 5 enters segmentation connection lane 4 and arrives each working face, and waste air is discharged to earth's surface by returnairshaft 6.
The process for stoping process being respectively segmented, identical as sublevel caving method without sill pillar, the ore of extraction can pass through underground haulage System is transported, and dew exploitation field can also be transported to by measure footrill, is transported by upside-down mounting by open air transport system.
It is obvious to a person skilled in the art that invention is not limited to the details of the above exemplary embodiments, Er Qie In the case where without departing substantially from spirit or essential attributes of the invention, the present invention can be realized in other specific forms.Therefore, no matter From the point of view of which point, the present embodiments are to be considered as illustrative and not restrictive, and the scope of the present invention is by appended power Benefit requires rather than above description limits, it is intended that all by what is fallen within the meaning and scope of the equivalent elements of the claims Variation is included within the present invention.Any reference signs in the claims should not be construed as limiting the involved claims.This Outside, it should be understood that although this specification is described in terms of embodiments, but not each embodiment only includes an independence Technical solution, this description of the specification is merely for the sake of clarity, and those skilled in the art should make specification For an entirety, the technical solutions in the various embodiments may also be suitably combined, formed it will be appreciated by those skilled in the art that Other embodiments.

Claims (2)

1. a kind of method that open air trestle multi-branched ore body induction caving forms coating, which is characterized in that in multi-branched mine In the exploitation of body open air trestle application sublevel caving method, the across pitch of extracting drift along the pulse of each branch ore body is arranged, from top to bottom Promote interlayer country rock with two in the continuous goaf of ribbon that vertical range direction forms exposed earth's surface by segmenting cooperation back production The barren rock of the increase of side goaf surface area gradually unstability slabbing or slump, slabbing or slump be piled up in stope broken ore it On, self-assembling formation coating;Along the pulse the horizontal distance l that ore body lower wall is left in the extracting drift position is determined by following formula:
α is the slanting angle of ore body, (°) in formula;β is disk side angle of spot hole in back production blasthole, (°), β=55 °~60 °;H is height of lift, m;B is the horizontal breadth of ore body, m;Along the pulse extracting drift fan shaped medium length hole explosion back production, each step pitch with upper segmentation It collapses, forms continuous goaf, promote two wall country rock slabbings or slump, be piled up in the safe bed course of ore granular media left when back production On, form the required coating of lower part body to be dug up mine.
2. the method that a kind of open air trestle multi-branched ore body induction caving according to claim 1 forms coating, It is characterized in that, back production depth H and length L need to meet following formula:
L≥10δ;
α is the slanting angle of ore body, (°) in formula;δ is thickness of interlayer, m;RtFor the tensile strength of the jointed rockmass after exploitation reduction, t/m2, Exploiting weakening coefficient is 0.21~0.56;ρ is the density of jointed rockmass, t/m3;Along the pulse each step pitch ore removal of extracting drift Until micro- dew goaf, the not spacious sky of end mouth is kept;When goaf side wall country rock slabbing or slump activity are to stope When safety constitutes a threat to, before forming coating, leaves from Roof of access road and counts the safe bed course of ore that thickness is not less than 3m, The impact harm that may cause to avoid goaf country rock slabbing or slump.
CN201710028699.6A 2017-01-16 2017-01-16 A kind of method that open air trestle multi-branched ore body induction caving forms coating Expired - Fee Related CN106703809B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710028699.6A CN106703809B (en) 2017-01-16 2017-01-16 A kind of method that open air trestle multi-branched ore body induction caving forms coating

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710028699.6A CN106703809B (en) 2017-01-16 2017-01-16 A kind of method that open air trestle multi-branched ore body induction caving forms coating

Publications (2)

Publication Number Publication Date
CN106703809A CN106703809A (en) 2017-05-24
CN106703809B true CN106703809B (en) 2018-11-23

Family

ID=58907533

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710028699.6A Expired - Fee Related CN106703809B (en) 2017-01-16 2017-01-16 A kind of method that open air trestle multi-branched ore body induction caving forms coating

Country Status (1)

Country Link
CN (1) CN106703809B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108049870B (en) * 2018-01-10 2019-03-29 鞍钢集团矿业有限公司 The induction caving mining methods of high-dipping middle thickness orebody of the upper disk containing unstable rock stratum
CN109973091B (en) * 2019-02-20 2021-08-24 北京昊华能源股份有限公司 Coal mining method for multi-branch coal body
CN110017170B (en) * 2019-04-09 2020-09-25 中国华冶科工集团有限公司 Prevention and control method for underground ore mining ground pressure disaster

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU885556A1 (en) * 1980-02-14 1981-11-30 За витель ----0,4 Method of stripping the working levels of a mine pit
RU2165018C2 (en) * 1999-07-14 2001-04-10 Акционерная компания "АЛРОСА" ЗАО Method of combined mining of flooded mineral deposits
CN100535387C (en) * 2005-05-23 2009-09-02 东北大学 Improved sublevel caving method without bottom column
CN104806243B (en) * 2015-03-09 2017-04-05 东北大学 A kind of wedge shape switching transition method of open air trestle exploitation
CN104863591B (en) * 2015-06-16 2017-12-08 东北大学 Goaf controls inbreak and earth's surface filling administering method
CN105041315B (en) * 2015-06-26 2017-06-23 东北大学 A kind of open air trestle Wall ore adopts strata control method

Also Published As

Publication number Publication date
CN106703809A (en) 2017-05-24

Similar Documents

Publication Publication Date Title
CN108612530B (en) Mining method for hanging wall surrounding rock crushing inclined medium-thickness ore body
CN105019904B (en) Mining- machine-based slowly inclined thin ore vein mechanized continuous mining method
CN101338674B (en) Non-pillar sublevel caving mining method for direct loading for ore
CN104806244B (en) Filling mining method for slant middle-thick ore body
CN103590831B (en) A kind of gentle dip is thin-the novel mining methods of middle thickness orebody
CN101967973B (en) Open stope-caving combined mining method
CN108547618A (en) A kind of two steps mining methods leave the recovery process of studding
CN104481543B (en) Stage shrink caved stopes
CN101368482B (en) Novel technique of slight-pitch ore body overall mining method
CN111894584B (en) Cemented filling mining method for fully-pseudo-arranged reserved roadway of slowly-inclined thin ore body
CN110617065B (en) Stope structure arrangement mode of steep-dip extremely-thin ore vein cut-wall filling mining method
CN110566206B (en) Separate mining and filling mining method for upper and lower cut walls of rock ores with steeply inclined extremely thin veins
CN109869150B (en) Mine resource subsection full-mining local-charging mining method
CN106703809B (en) A kind of method that open air trestle multi-branched ore body induction caving forms coating
CN110359914A (en) A kind of safe, inexpensive combined section mining methods of gently inclined medium thick orebody
CN104632220A (en) Mining method with adjustable and controllable structure size of gentle dip medium-thickness ore body strip column reconstructed stope
CN106837335A (en) Truck cooperates with ore removal sill pillars sublevel caving method
CN106640080A (en) Deep part high-stress environment self-stabilizing arched stope arrangement mining method
CN104612692B (en) Formation continuous filling mining method followed by segmentation ore caving polycrystalline substance
CN109899070B (en) Slow-inclination medium-thickness ore body solid-waste-free filling mining method based on ellipsoid ore drawing structure
CN108150173A (en) A kind of high-dipping medium-thickness broken orebody single route induction caving mining codes
CN104179505A (en) Phosphorus ore underground mining method
CN101737051A (en) Covering layer forming method of blind ore bodies
CN105298493A (en) Nondestructive explosion mining method for underground gently-inclined thin-layered jade mine
CN108952725A (en) A kind of low dilution mining methods suitable for slight slope and thin ore body

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181123

CF01 Termination of patent right due to non-payment of annual fee