CN106703037A - Construction technology for artificial bored pile - Google Patents

Construction technology for artificial bored pile Download PDF

Info

Publication number
CN106703037A
CN106703037A CN201510772276.6A CN201510772276A CN106703037A CN 106703037 A CN106703037 A CN 106703037A CN 201510772276 A CN201510772276 A CN 201510772276A CN 106703037 A CN106703037 A CN 106703037A
Authority
CN
China
Prior art keywords
concrete
water
construction process
funnel
hole construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510772276.6A
Other languages
Chinese (zh)
Inventor
王玲
朱明�
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Liaoning Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Liaoning Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Liaoning Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201510772276.6A priority Critical patent/CN106703037A/en
Publication of CN106703037A publication Critical patent/CN106703037A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D15/00Handling building or like materials for hydraulic engineering or foundations
    • E02D15/02Handling of bulk concrete specially for foundation or hydraulic engineering purposes
    • E02D15/04Placing concrete in mould-pipes, pile tubes, bore-holes or narrow shafts
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D19/00Keeping dry foundation sites or other areas in the ground
    • E02D19/06Restraining of underground water
    • E02D19/10Restraining of underground water by lowering level of ground water
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/0023Cast, i.e. in situ or in a mold or other formwork

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Hydrology & Water Resources (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

A construction technology for an artificial bored pile is characterized in that concrete is stirred normally during guide tube lowering and funnel assembly, the concrete is increased by one grade, three more tanks of concrete are stirred and stored in a trolley under the condition that the funnel is fully filled, the guide tube is prevented from being filled with water which leads to strip breaking, the concrete in the trolley is fed into the funnel while the concrete in the guide tube falls, water is prevented from being elevated, and the concrete quality is guaranteed; the tube is lifted with pouring and tamping until the specified pouring height is reached, and the technology is completed; after pouring, the poured concrete is full and free of pores after water at a bearing platform is drained; a basic plane is formed through shoveling, and pouring is performed on the bearing platform to complete the production task. The construction technology for the artificial bored pile has the advantages that labor is saved, the construction speed is high, the time is short, and the safety is high.

Description

A kind of hole construction process of bored concrete pile
Technical field
The present invention relates to hole construction process of bored concrete pile field.
Background technology
During power circuit rebuilding construction, there is basic effluent greatly, again can not be using machinery There are 220 KVs to be currently running above equipment construction, geological conditions is very complicated, construct It is everywhere problem for integrally considering construction that difficulty is big, and the duration is again tight.To next procedure Difficulty is brought, cast concrete is a problem.
The content of the invention
The invention aims to be rapidly completed filling pile construction, spy provides a kind of hole Construction process of bored concrete pile.
The invention provides a kind of hole construction process of bored concrete pile, it is characterised in that:Described Hole construction process of bored concrete pile, concrete is carried out just while lower guide, group funnel is started Often stirring, concrete improves a label, in the case where funnel is filled to have stirred three tank deposits more In handcart, water broken strip on guide is prevented, when guide concrete falls the mixed of handcart simultaneously Solidifying soil is put into funnel simultaneously, it is ensured that water does not come up, it is ensured that concrete quality;With pour with carry cylinder, With making firm by ramming, the height to cast regulation stops, and completes technique;After the completion of perfusion, to cushion cap position The full pore-free of concrete poured into a mould after water discharge;Base surface is shoveled out, cast cushion cap completes production and appoints Business.
According to the hole construction process of bored concrete pile described in claim 1, it is characterised in that:Institute The hole construction process of bored concrete pile stated, conserved by 28 days, and it is strong that iron tower foundation reaches design Degree carries out subsequent operation.
According to the hole construction process of bored concrete pile described in claim 1, it is characterised in that:Institute The hole construction process of bored concrete pile stated, while foundation pit is dug, because water is big using increasing Plus drained surface two is used for specially drawing water.
Advantages of the present invention:
Hole construction process of bored concrete pile of the present invention, saves manpower, and speed of application is fast, Time is short, safe.
Specific embodiment
Embodiment 1
The invention provides a kind of hole construction process of bored concrete pile, it is characterised in that:Described Hole construction process of bored concrete pile, concrete is carried out just while lower guide, group funnel is started Often stirring, concrete improves a label, in the case where funnel is filled to have stirred three tank deposits more In handcart, water broken strip on guide is prevented, when guide concrete falls the mixed of handcart simultaneously Solidifying soil is put into funnel simultaneously, it is ensured that water does not come up, it is ensured that concrete quality;With pour with carry cylinder, With making firm by ramming, the height to cast regulation stops, and completes technique;After the completion of perfusion, to cushion cap position The full pore-free of concrete poured into a mould after water discharge;Base surface is shoveled out, cast cushion cap completes production and appoints Business.
According to the hole construction process of bored concrete pile described in claim 1, it is characterised in that:Institute The hole construction process of bored concrete pile stated, conserved by 28 days, and it is strong that iron tower foundation reaches design Degree carries out subsequent operation.
According to the hole construction process of bored concrete pile described in claim 1, it is characterised in that:Institute The hole construction process of bored concrete pile stated, while foundation pit is dug, because water is big using increasing Plus drained surface two is used for specially drawing water.
Embodiment 2
The invention provides a kind of hole construction process of bored concrete pile, it is characterised in that:Described Hole construction process of bored concrete pile, concrete is carried out just while lower guide, group funnel is started Often stirring, concrete improves a label, in the case where funnel is filled to have stirred three tank deposits more In handcart, water broken strip on guide is prevented, when guide concrete falls the mixed of handcart simultaneously Solidifying soil is put into funnel simultaneously, it is ensured that water does not come up, it is ensured that concrete quality;With pour with carry cylinder, With making firm by ramming, the height to cast regulation stops, and completes technique;After the completion of perfusion, to cushion cap position The full pore-free of concrete poured into a mould after water discharge;Base surface is shoveled out, cast cushion cap completes production and appoints Business.
According to the hole construction process of bored concrete pile described in claim 1, it is characterised in that:Institute The hole construction process of bored concrete pile stated, conserved by 28 days, and it is strong that iron tower foundation reaches design Degree carries out subsequent operation.
Embodiment 3
The invention provides a kind of hole construction process of bored concrete pile, it is characterised in that:Described Hole construction process of bored concrete pile, concrete is carried out just while lower guide, group funnel is started Often stirring, concrete improves a label, in the case where funnel is filled to have stirred three tank deposits more In handcart, water broken strip on guide is prevented, when guide concrete falls the mixed of handcart simultaneously Solidifying soil is put into funnel simultaneously, it is ensured that water does not come up, it is ensured that concrete quality;With pour with carry cylinder, With making firm by ramming, the height to cast regulation stops, and completes technique;After the completion of perfusion, to cushion cap position The full pore-free of concrete poured into a mould after water discharge;Base surface is shoveled out, cast cushion cap completes production and appoints Business.
According to the hole construction process of bored concrete pile described in claim 1, it is characterised in that:Institute The hole construction process of bored concrete pile stated, while foundation pit is dug, because water is big using increasing Plus drained surface two is used for specially drawing water.

Claims (3)

1. a kind of hole construction process of bored concrete pile, it is characterised in that:Described hole perfusion Pile constructing process, concrete is normally stirred while lower guide, group funnel is started, and is mixed Solidifying soil improves a label, in the case where funnel is filled to have stirred three tank deposits in handcart more In, prevent water broken strip on guide, when guide concrete fall simultaneously handcart concrete simultaneously In input funnel, it is ensured that water does not come up, it is ensured that concrete quality;With pouring with carrying cylinder, with making firm by ramming, Height to cast regulation stops, and completes technique;After the completion of perfusion, to after the discharge of cushion cap position water The full pore-free of the concrete of cast;Base surface is shoveled out, cast cushion cap completes production task.
2. according to the hole construction process of bored concrete pile described in claim 1, it is characterised in that: Described hole construction process of bored concrete pile, conserved by 28 days, and iron tower foundation reaches design Intensity carries out subsequent operation.
3. according to the hole construction process of bored concrete pile described in claim 1, it is characterised in that: Described hole construction process of bored concrete pile, while foundation pit is dug, due to the big use of water Increase drained surface two to be used for specially drawing water.
CN201510772276.6A 2015-11-12 2015-11-12 Construction technology for artificial bored pile Pending CN106703037A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510772276.6A CN106703037A (en) 2015-11-12 2015-11-12 Construction technology for artificial bored pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510772276.6A CN106703037A (en) 2015-11-12 2015-11-12 Construction technology for artificial bored pile

Publications (1)

Publication Number Publication Date
CN106703037A true CN106703037A (en) 2017-05-24

Family

ID=58930106

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510772276.6A Pending CN106703037A (en) 2015-11-12 2015-11-12 Construction technology for artificial bored pile

Country Status (1)

Country Link
CN (1) CN106703037A (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101158153A (en) * 2007-10-15 2008-04-09 南通建筑工程总承包有限公司 Construction method for manual digging pile
CN103031839A (en) * 2013-01-10 2013-04-10 中铁七局集团第三工程有限公司 Construction method of hand-dug piles
US20130177359A1 (en) * 2011-05-02 2013-07-11 North American Pile Driving Inc. Method and Apparatus for Ground Improvement Using Compacted Aggregate Columns
CN104047283A (en) * 2014-05-26 2014-09-17 范振捷 No-water underwater filling construction method of space-expanding pile

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101158153A (en) * 2007-10-15 2008-04-09 南通建筑工程总承包有限公司 Construction method for manual digging pile
US20130177359A1 (en) * 2011-05-02 2013-07-11 North American Pile Driving Inc. Method and Apparatus for Ground Improvement Using Compacted Aggregate Columns
CN103031839A (en) * 2013-01-10 2013-04-10 中铁七局集团第三工程有限公司 Construction method of hand-dug piles
CN104047283A (en) * 2014-05-26 2014-09-17 范振捷 No-water underwater filling construction method of space-expanding pile

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
吕峻等: "浅析人工挖孔灌注桩的施工工艺", 《绵阳经济技术高等专科学校学报》 *
梁炳钊等: "人工成孔灌注桩施工工艺在桩基础施工中的应用", 《森林工程》 *

Similar Documents

Publication Publication Date Title
CN103498486B (en) A kind of sleeve pipe that adopts implements the method for shutoff to ater-casting precipitation pipe well
CN102587663A (en) Concrete construction process of steel tube columns of super-high-rise building
CN108547641A (en) The bottom stab ilization system and its construction method in rich water soft stratum heavy haul railway tunnel
CN106223354B (en) The construction method of shallow foundation stay in place form
CN106337391A (en) Long piled wharf panel bottom large-area damage repairing construction method
CN107268599A (en) A kind of embedded large-scale filling solution cavity ruggedized construction of substrate and reinforcement means
CN203441376U (en) Plugging structure for drop shaft
CN103147707B (en) Complete treatment method for pile bottom sediment
CN103741651B (en) A kind of concrete teeth groove stiling basin and construction method thereof
CN206971247U (en) A kind of concrete plinth foundation ruggedized construction being placed on Unloading Rock
CN102704478B (en) Building anchor rod construction technology
CN106703037A (en) Construction technology for artificial bored pile
CN205348154U (en) Positioning orientation slip casting resistance to plucking bears precast pile
CN104594349A (en) Hydraulic lifting construction method for recycling steel casing in pile foundation engineering
CN103911991B (en) Quick pile-splicing construction method for prestressed concrete PS (poly styrene) pile fracture
CN207308898U (en) A kind of coated sand core shooting machine adds sand system
CN103132508A (en) Pile-filling machine
CN204780928U (en) Major diameter bored concrete pile concrete first set groundwater increment controlling means
CN204247953U (en) A kind of tundish centralizer
CN206034946U (en) Structure is handled to large -scale pressure vertical shaft concrete defect based on slipform technology
CN202108039U (en) Cylindrical compound concrete macadam placepile
CN209722955U (en) A kind of filling pile cage of reinforcement
CN202248279U (en) Concrete overflow time controlling rod for steel pipe concrete jacking construction process
CN208949893U (en) A kind of oblique suspension device of the auxiliary of foundation pit
CN104314072B (en) A kind of construction method of special-shaped in situ concrete pile

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170524

RJ01 Rejection of invention patent application after publication