CN209722955U - A kind of filling pile cage of reinforcement - Google Patents
A kind of filling pile cage of reinforcement Download PDFInfo
- Publication number
- CN209722955U CN209722955U CN201920256043.4U CN201920256043U CN209722955U CN 209722955 U CN209722955 U CN 209722955U CN 201920256043 U CN201920256043 U CN 201920256043U CN 209722955 U CN209722955 U CN 209722955U
- Authority
- CN
- China
- Prior art keywords
- steel
- cage
- reinforcing bar
- steel cylinder
- reinforcement cage
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 230000002787 reinforcement Effects 0.000 title claims abstract description 27
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 40
- 239000010959 steel Substances 0.000 claims abstract description 40
- 230000003014 reinforcing effect Effects 0.000 claims abstract description 13
- 210000003205 muscle Anatomy 0.000 claims abstract description 10
- 239000002689 soil Substances 0.000 abstract description 7
- 239000013049 sediment Substances 0.000 abstract description 5
- 239000002002 slurry Substances 0.000 abstract description 5
- 239000004568 cement Substances 0.000 abstract description 4
- 230000000630 rising effect Effects 0.000 abstract description 4
- 230000001681 protective effect Effects 0.000 abstract description 3
- 238000010276 construction Methods 0.000 description 5
- 238000010586 diagram Methods 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 238000000465 moulding Methods 0.000 description 1
- 230000035515 penetration Effects 0.000 description 1
- 125000006850 spacer group Chemical group 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
The utility model discloses a kind of filling pile cage of reinforcement, including the steel reinforcement cage constituted by indulging muscle and tie hoop, the steel reinforcement cage is arranged in steel cylinder, is welded with longitudinal bracing reinforcing bar in the inner wall of steel cylinder, longitudinal bracing reinforcing bar is welded to connect by cross-brace reinforcing bar and steel reinforcement cage.Steel reinforcement cage is arranged in steel cylinder the utility model; pass through the protective effect of steel cylinder; it solves high back filled region cement slurry to penetrate into soil; the problem of reducing concrete strength and increasing concrete usage amount; the problems such as capable of preventing from causing collapse hole excessive a leakiness, broken pile, layering, reaming shrinkage cavity, bottom hole sediment, rising of steel cage again, guarantee the Forming Quality of bored concrete pile.
Description
Technical field
The utility model relates to a kind of filling pile cage of reinforcement, belong to construction foundation working technical field.
Background technique
Currently, construction is during high back filled region carries out pile foundation construction, high back filled region soil property leakiness is being poured
Cement slurry can penetrate into soil in the process, can reduce concrete strength and increase concrete usage amount, but because of soil condition and
The gap of steel reinforcement cage and stake holes, causes that a leakiness, broken pile, layering, reaming shrinkage cavity, bottom hole sediment be excessive, steel reinforcement cage to collapse hole
The problems such as floating, causes quality after the completion of construction not meet specification and design requirement, carries out secondary phenomenon of doing over again.
Utility model content
A kind of the purpose of the utility model is to provide structures filling pile cage of reinforcement simple, easy for construction, at low cost,
The steel reinforcement cage is able to solve high back filled region cement slurry and penetrates into soil, reduces concrete strength and increases concrete usage amount
The problem of, and can prevent from causing collapse hole that a leakiness, broken pile, layering, reaming shrinkage cavity, bottom hole sediment be excessive, rising of steel cage
The problems such as, guarantee the Forming Quality of bored concrete pile.
The technical solution of the utility model includes: a kind of filling pile cage of reinforcement, including the reinforcing bar constituted by indulging muscle and tie hoop
Cage, the steel reinforcement cage are arranged in steel cylinder, are welded with longitudinal bracing reinforcing bar in the inner wall of steel cylinder, longitudinal bracing reinforcing bar passes through cross
It is welded to connect to spacer bar and steel reinforcement cage.
Further, the vertical muscle is evenly arranged on around tie hoop upper and is bundled on tie hoop by tied silk.
Further, equilateral triangle supporting rib is welded in the steel cylinder.
Due to the adoption of the above technical scheme, utility model has the advantages that steel reinforcement cage is arranged in steel the utility model
It in cylinder, by the protective effect of steel cylinder, solves high back filled region cement slurry and penetrates into soil, reduce concrete strength and increasing
The problem of adding concrete usage amount, and can prevent from causing collapse hole a leakiness, broken pile, layering, reaming shrinkage cavity, bottom hole sediment mistake
The problems such as more, rising of steel cage, guarantee the Forming Quality of bored concrete pile.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model;
Fig. 2 is the top view of Fig. 1.
Description of symbols: 1- indulges muscle, 2- tie hoop, 3- equilateral triangle supporting rib, 4- steel cylinder, 5- longitudinal bracing steel
Muscle, 6- cross-brace reinforcing bar.
Specific embodiment
It is right with reference to the accompanying drawings and examples in order to keep the purpose of this utility model, technical solution and advantage clearer
The utility model is described in further detail.
The embodiments of the present invention: the structural schematic diagram of filling pile cage of reinforcement is as shown in Figure 1, include by vertical muscle 1 and spiral shell
The steel reinforcement cage that stirrup 2 is constituted is revolved, the vertical muscle 1 is evenly arranged on around tie hoop 2 upper and is bundled in spiral hoop by tied silk
On muscle 2;The steel reinforcement cage is arranged in steel cylinder 4, is welded with longitudinal bracing reinforcing bar 5, longitudinal bracing reinforcing bar in the inner wall of steel cylinder 4
5 are welded to connect by cross-brace reinforcing bar 6 and steel reinforcement cage.Equilateral triangle supporting rib 3 is welded in the steel cylinder 4.
Steel reinforcement cage is arranged in steel cylinder 4 the utility model, by the protective effect of steel cylinder 4, solves high back filled region water
Slurry penetration the problem of reducing concrete strength and increase concrete usage amount, and can prevent from causing collapse hole into soil
The problems such as stake leakiness, broken pile, layering, reaming shrinkage cavity, bottom hole sediment be excessive, rising of steel cage, guarantees the molding matter of bored concrete pile
Amount.
Claims (3)
1. a kind of filling pile cage of reinforcement, including the steel reinforcement cage being made of vertical muscle (1) and tie hoop (2), it is characterised in that: described
Steel reinforcement cage setting in the steel cylinder (4), be welded with longitudinal bracing reinforcing bar (5) in the inner wall of steel cylinder (4), longitudinal bracing reinforcing bar (5)
It is welded to connect by cross-brace reinforcing bar (6) and steel reinforcement cage.
2. filling pile cage of reinforcement according to claim 1, it is characterised in that: the vertical muscle (1) is evenly arranged on tie hoop
(2) it above and by tied silk is bundled on tie hoop (2) around.
3. filling pile cage of reinforcement according to claim 1, it is characterised in that: be welded with equilateral triangle in the steel cylinder (4)
Shape supporting rib (3).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920256043.4U CN209722955U (en) | 2019-02-28 | 2019-02-28 | A kind of filling pile cage of reinforcement |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920256043.4U CN209722955U (en) | 2019-02-28 | 2019-02-28 | A kind of filling pile cage of reinforcement |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209722955U true CN209722955U (en) | 2019-12-03 |
Family
ID=68684453
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201920256043.4U Expired - Fee Related CN209722955U (en) | 2019-02-28 | 2019-02-28 | A kind of filling pile cage of reinforcement |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209722955U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111794444A (en) * | 2020-07-31 | 2020-10-20 | 曹宝军 | Passive building stainless steel assembled reinforcement structure system |
-
2019
- 2019-02-28 CN CN201920256043.4U patent/CN209722955U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111794444A (en) * | 2020-07-31 | 2020-10-20 | 曹宝军 | Passive building stainless steel assembled reinforcement structure system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101220593A (en) | Fastening method of post-treating pipe pile break with pre-stress pipe pile construction | |
CN103114578B (en) | Grouting molding pedestal pile and construction method thereof and pedestal expanding device | |
CN110629748A (en) | Anti structure that floats of bored concrete pile steel reinforcement cage | |
CN208472708U (en) | A kind of grouting behind shaft or drift lining filling pile structure | |
CN209722955U (en) | A kind of filling pile cage of reinforcement | |
CN206570955U (en) | A kind of prefabricated post single hole provisions for grouting | |
CN104314075A (en) | Conical concrete pile tip, tubular pile provided with pile tip and production method of tubular pile | |
CN101492916A (en) | High-strength corrugated sleeve foundation pile and on-site pouring method thereof | |
CN101397793A (en) | Rammed concrete stiffening cement mixing pile and construction method thereof | |
CN209243750U (en) | The bindiny mechanism of concrete precast pile and pile foundation support table | |
CN201007002Y (en) | Fragmental stone composite pile and construction equipment thereof | |
CN102296593A (en) | Cylindrical compound bored concrete pile of concrete gravels and construction process thereof | |
CN202108039U (en) | Cylindrical compound concrete macadam placepile | |
CN102261066B (en) | Preparation process of self-adaptive pressure-reducing drainage pipe pile | |
CN206529881U (en) | The constructing device of cushion cap and ground girder construction | |
CN110670579A (en) | Hoop pile for pile foundation engineering and foundation treatment and construction process thereof | |
CN205999887U (en) | Boring steel reinforcement cage hoop slip casting broken stone pile | |
CN204780892U (en) | Tubular pile crack reinforcement structure of high strength | |
CN205444093U (en) | Bank structure | |
CN205604283U (en) | Building bar planting concrete column | |
CN205259173U (en) | Be applied to novel resistance to compression foundation pile of excavation supporting engineering | |
CN203222808U (en) | Foundation processing structure for floating sluice | |
CN201390960Y (en) | High-strength corrugated sleeve foundation pile | |
CN105604317B (en) | A kind of thin-walled square chest hollow floor core and its anti-float method | |
CN206752294U (en) | A kind of attachment structure of Conveyor belt post and pile foundation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP03 | Change of name, title or address |
Address after: Beijing road 563000 in Guizhou province Zunyi city Honghuagang District No. 57 Patentee after: The Third Construction Co.,Ltd. of China Construction Fourth Engineering Bureau Address before: Beijing road 563003 in Guizhou province Zunyi city Honghuagang District No. 57 Patentee before: THE THIRD CONSTRUCTION & ENGINEERING CO. OF CCFED |
|
CP03 | Change of name, title or address | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20191203 |
|
CF01 | Termination of patent right due to non-payment of annual fee |