CN202108039U - Cylindrical compound concrete macadam placepile - Google Patents

Cylindrical compound concrete macadam placepile Download PDF

Info

Publication number
CN202108039U
CN202108039U CN2011201574908U CN201120157490U CN202108039U CN 202108039 U CN202108039 U CN 202108039U CN 2011201574908 U CN2011201574908 U CN 2011201574908U CN 201120157490 U CN201120157490 U CN 201120157490U CN 202108039 U CN202108039 U CN 202108039U
Authority
CN
China
Prior art keywords
pile
core
macadam
rubble
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011201574908U
Other languages
Chinese (zh)
Inventor
王伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
University of Shaoxing
Original Assignee
University of Shaoxing
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by University of Shaoxing filed Critical University of Shaoxing
Priority to CN2011201574908U priority Critical patent/CN202108039U/en
Application granted granted Critical
Publication of CN202108039U publication Critical patent/CN202108039U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model discloses a cylindrical compound concrete macadam placepile which consists of a pile core and a macadam pile cover, wherein the pile core is formed by pouring cylindrical concrete, the macadam pile cover is poured with the pile core together, the pile core and the macadam pile cover are poured together to form a hydraulic compound pile body, and a reinforcement cage is erected in the pile core. The cylindrical compound concrete macadam placepile reduces and even eliminates the defect that the side deformation of a traditional macadam pile is larger, can effectively control the vertical sedimentation of a soft soil foundation, and can ensure the safe operation and use of an upper structure.

Description

A kind of cylinder type concrete crushed stone composite filling pile
Technical field
The utility model relates to a kind of cylinder type concrete crushed stone composite filling pile.
Background technology
After building structure such as house, speedway on the natural soft soil foundation, can cause the vertical sedimentation of bigger ground usually, this must carry out consolidation process to soft foundation with the safety own and the result of use of serious harm structure.The method that ground is handled mainly contains three types.The first kind is to reduce sedimentation, promptly weak soil is carried out replacement Treatment, replaces natural weak soil with harder soil or constructional materials, like grey local method, cement local method, concrete pile method.Second type is to quicken sedimentation, promptly before building structure, makes the sedimentation of soft foundation fulfil a part ahead of schedule through the engineering means or its settling rate is accelerated, and fast and stable is like preloading, vacuum method.The 3rd type between between the first kind and second type, has simultaneously and reduce sedimentation and the effect of quickening sedimentation, and like the broken stone pile method, rubble is harder than weak soil, simultaneously again for the discharge of soft water in soil provides passage, and the consolidation settlement of acceleration foundation soil.The 3rd class methods have preceding two types advantage, have received the favor of engineering circle, but the settling amount of its minimizing is limited and usually producing bigger lateral deformation near place, the face of land, influence the monolithic stability of superstructure.
The utility model content
The purpose of the utility model is to provide a kind of cylinder type concrete crushed stone composite filling pile; The cylinder type concrete crushed stone composite filling pile of the utility model reduces even has eliminated the bigger defective of traditional broken stone pile lateral deformation, and can effectively control the vertical sedimentation of soft foundation and guarantee the safe operation and the use of superstructure.
In order to achieve the above object, the technical scheme of the utility model is:
A kind of cylinder type concrete crushed stone composite filling pile, described composite filling pile comprise stake core that is formed by cylindrical concrete spouting and the rubble pile protection that is cast in the stake core; And the stake core is cast in the rubble pile protection, forms the compound pile body of cylinder type; Described stake in-core has set up reinforcing cage.The rubble pile protection of the utility model can adopt rubble, also can adopt coarse sand, and the compound of rubble and coarse sand, can certainly adopt the mixture with identical characteristics.
Described length of reinforcing cage is identical with stake core length, and perhaps length of reinforcing cage is shorter than a core length, or reinforcement placing cage not.
The beneficial effect of the utility model is: the utility model stake core adopts the concrete pile body to have and carries and the limit lateral metamorphosis, and outside broken stone pile cover has carrying and drainage, and twice immersed tube has compacted effect to foundation soil.The utility model makes full use of concrete and rubble engineering property separately; Form the concrete crushed stone composite filling pile; Have that core is reinforced and constraint lateral deformation, outside pile protection draining, three kinds of treatment effects such as basic unit is compacted on every side; Reduce even eliminated the bigger defective of traditional broken stone pile lateral deformation, and can effectively control the vertical sedimentation of soft foundation and guarantee the safe operation and the use of superstructure.
Description of drawings
Fig. 1 is the decomposing schematic representation of the utility model composite filling pile whole construction course.
Sketch map when wherein to be the first concrete pile crown together with the location steel sleeve begin to squeeze into ground like a figure among Fig. 1; Sketch map when to be the first concrete pile crown together with the location steel sleeve squeeze into ground fully like b figure among Fig. 1; Like c figure among Fig. 1 is the sketch map when in the steel sleeve of location, pouring into rubble; Like d figure among Fig. 1 is that the sketch map of location during steel sleeve extracted in vibration; Like e figure among Fig. 1 is the sketch map of the second concrete pile crown when squeezing into ground once more together with steel sleeve; Like f figure among Fig. 1 is the sketch map when placing reinforcing cage; Like g figure among Fig. 1 is sketch map when fluid concrete forms the stake core in the steel sleeve; Sketch map when scheming to accomplish the compound pile body of formation cylinder type like h among Fig. 1.
The specific embodiment
Embodiment 1
As shown in Figure 1; Fig. 1 is the decomposing schematic representation of whole construction course of a kind of cylinder type concrete crushed stone composite filling pile of present embodiment, and described composite filling pile comprises stake core 1 that is formed by cylindrical concrete spouting and the rubble pile protection 2 that is cast in stake core 1; (the rubble pile protection of the utility model can adopt rubble, also can adopt coarse sand, and the compound of rubble and coarse sand, can certainly adopt the mixture with identical characteristics.) and a stake core 1 be cast in rubble pile protection 2, form the compound pile body of cylinder type; Described stake core 1 internal frame is provided with reinforcing cage 3.The construction technology of the cylinder type concrete crushed stone composite filling pile of present embodiment; Pour into rubble (shown in c among Fig. 1) after comprising the steps: at first the first concrete pile crown 5 together to be squeezed into ground 7 (shown in b among Fig. 1) together with location steel sleeve 4 (shown in a among Fig. 1); Compacted foundation soil on every side simultaneously, location steel sleeve 4 (shown in d among Fig. 1) is extracted in vibration then; The second concrete pile crown 6 is squeezed into (shown in e among Fig. 1) on the original position rubble once more together with steel sleeve 1, and steel sleeve 1 is all squeezed in the ground 7, and steel sleeve 1 is extruded into annular rubble pile protection 2 with rubble, and is compacted foundation soil on every side once more simultaneously; Then in steel sleeve 1, place reinforcing cage 3 (shown in f among Fig. 1); And fluid concrete forms stake core 1 in steel sleeve 1; Pull out steel sleeve 1 (shown in g among Fig. 1) while pouring into a mould, up to extracting steel sleeve 1 fully, at this moment; Stake core 1 and be cast in rubble pile protection 2 forms the compound pile body of cylinder type (shown in h among Fig. 1); Partly construct accomplishing pile body behind its maintenance to the design age then.Reinforcing cage 3 length of present embodiment are identical with stake core 1 length, i.e. this pile body total length configuration reinforcement cage.This design length L=15.0m; Stake core 1 diameter d=0.4m mainly plays and reinforces and control lateral deformation effect; Rubble pile protection 2 D outer diameter are about 0.5m, mainly play drainage; Twice immersed tube makes the ground 7 around the stake produce the compacted district of the soil body that diameter is about 1.0-2.0m.This stake has that inner core is reinforced and constraint lateral deformation, outside draining, three kinds of treatment effects such as compacted on every side, can effectively control the vertical sedimentation of soft foundation and guarantee the safe operation and the use of superstructure.
Embodiment 2
As shown in Figure 1; Fig. 1 is the decomposing schematic representation of whole construction course of a kind of cylinder type concrete crushed stone composite filling pile of present embodiment, and described composite filling pile comprises stake core 1 that is formed by cylindrical concrete spouting and the rubble pile protection 2 that is cast in stake core 1; (the rubble pile protection of the utility model can adopt rubble, also can adopt coarse sand, and the compound of rubble and coarse sand, can certainly adopt the mixture with identical characteristics.) and a stake core 1 be cast in rubble pile protection 2, form the compound pile body of cylinder type; Described stake core 1 internal frame is provided with reinforcing cage 3.The construction technology of the cylinder type concrete crushed stone composite filling pile of present embodiment; Pour into rubble (shown in c among Fig. 1) after comprising the steps: at first the first concrete pile crown 5 together to be squeezed into ground 7 (shown in b among Fig. 1) together with location steel sleeve 4 (shown in a among Fig. 1); Compacted foundation soil on every side simultaneously, location steel sleeve 4 (shown in d among Fig. 1) is extracted in vibration then; The second concrete pile crown 6 is squeezed into (shown in e among Fig. 1) on the original position rubble once more together with steel sleeve 1, and steel sleeve 1 is all squeezed in the ground 7, and steel sleeve 1 is extruded into annular rubble pile protection 2 with rubble, and is compacted foundation soil on every side once more simultaneously; Then in steel sleeve 1, place reinforcing cage 3 (shown in f among Fig. 1); And fluid concrete forms stake core 1 in steel sleeve 1; Pull out steel sleeve 1 (shown in g among Fig. 1) while pouring into a mould, up to extracting steel sleeve 1 fully, at this moment; Stake core 1 and be cast in rubble pile protection 2 forms the compound pile body of cylinder type (shown in h among Fig. 1); Partly construct accomplishing pile body behind its maintenance to the design age then.This design length L=10.0m; Stake core 1 diameter d=0.6m mainly plays and reinforces and control lateral deformation effect; Rubble pile protection 2 D outer diameter are about 0.8m, mainly play drainage; Twice immersed tube makes the ground 7 around the stake produce the compacted district of the soil body that diameter is about 1.5-3.0m.Because inner core concrete pile body is thicker and actual upper load is less, this stake is not disposed reinforcing cage 3 or is needed only local configuration reinforcing cage 3 (as long as leaning on upper part local configuration reinforcing cage 3 at pile body).This stake has equally that inner core is reinforced and constraint lateral deformation, outside draining, three kinds of treatment effects such as compacted on every side, can effectively control the vertical sedimentation of soft foundation and guarantee the safe operation and the use of superstructure.

Claims (2)

1. cylinder type concrete crushed stone composite filling pile is characterized in that: described composite filling pile comprises stake core (1) that is formed by cylindrical concrete spouting and the rubble pile protection (2) that is cast in stake core (1); And stake core (1) is cast in rubble pile protection (2), forms the compound pile body of cylinder type; Described stake core (1) internal frame is provided with reinforcing cage (3).
2. a kind of cylinder type concrete crushed stone composite filling pile as claimed in claim 1; It is characterized in that: described reinforcing cage (3) length is identical with stake core (1) length; Perhaps reinforcing cage (3) is shorter in length than a core (1) length, or reinforcement placing cage (3) not.
CN2011201574908U 2011-05-18 2011-05-18 Cylindrical compound concrete macadam placepile Expired - Fee Related CN202108039U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011201574908U CN202108039U (en) 2011-05-18 2011-05-18 Cylindrical compound concrete macadam placepile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011201574908U CN202108039U (en) 2011-05-18 2011-05-18 Cylindrical compound concrete macadam placepile

Publications (1)

Publication Number Publication Date
CN202108039U true CN202108039U (en) 2012-01-11

Family

ID=45433477

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011201574908U Expired - Fee Related CN202108039U (en) 2011-05-18 2011-05-18 Cylindrical compound concrete macadam placepile

Country Status (1)

Country Link
CN (1) CN202108039U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102296593A (en) * 2011-05-18 2011-12-28 绍兴文理学院 Cylindrical compound bored concrete pile of concrete gravels and construction process thereof
CN109989397A (en) * 2019-03-19 2019-07-09 李兆灿 A kind of square combination formula cement-soil composite pile and its forming method
CN114439011A (en) * 2022-03-25 2022-05-06 刘俊男 Construction device for environment-friendly cast-in-place pile of constructional engineering

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102296593A (en) * 2011-05-18 2011-12-28 绍兴文理学院 Cylindrical compound bored concrete pile of concrete gravels and construction process thereof
CN109989397A (en) * 2019-03-19 2019-07-09 李兆灿 A kind of square combination formula cement-soil composite pile and its forming method
CN114439011A (en) * 2022-03-25 2022-05-06 刘俊男 Construction device for environment-friendly cast-in-place pile of constructional engineering
CN114439011B (en) * 2022-03-25 2023-09-01 明达海洋工程有限公司 Construction device for environment-friendly filling pile for constructional engineering

Similar Documents

Publication Publication Date Title
CN205088671U (en) Precast concrete drainage stake
CN103498486B (en) A kind of sleeve pipe that adopts implements the method for shutoff to ater-casting precipitation pipe well
CN102828498B (en) Method for constructing gravel pile of hoop of immersed tube for reinforcing soft foundation
CN103510511A (en) Top-reinforced cast-in-place concrete thin-wall pipe pile and construction method
CN206189392U (en) Prefabricated PVC sleeve concrete pile
CN202108039U (en) Cylindrical compound concrete macadam placepile
CN106958259B (en) A kind of concrete towers column foundation and its construction method
CN102296593A (en) Cylindrical compound bored concrete pile of concrete gravels and construction process thereof
CN105297717A (en) Composite foundation pile with lower portion enlarged diameter section and construction method of composite foundation pile
CN103015414A (en) Precast concrete post grouting pile and grouting process
CN102493472B (en) Deepwater soft soil foundation reverse construction method low pile cap composite foundation construction process for bridge
CN204456058U (en) A kind of constructing structure reducing building base subsidence speed
CN205501843U (en) Consolidate rigid framed arch bridge
CN202989939U (en) Vertical drainage well of ash storage yard
CN204590062U (en) A kind of pole tower pile used for transmission line
CN202202318U (en) Soft soil foundation long-concrete short-gravel pile and preloading combination processing apparatus
CN203514332U (en) Casing for blocking dewatering tube well of post-cast strip
CN201007002Y (en) Fragmental stone composite pile and construction equipment thereof
CN204000859U (en) The mutual foundation drainage pile for prestressed pipe of a kind of soft or hard interlayer
CN106400781B (en) A kind of method for prefabricating of prefabricated plastic casing reinforced concrete stake
CN204898645U (en) Building rubbish regeneration drainage CFG stake ground
CN205205847U (en) Frame construction of stake cushion cap
CN203498828U (en) Top reinforced cast-in-place concrete thin-wall pipe pile
CN203129163U (en) Reinforcing framework structure for dam foundation
CN102312424A (en) Soft soil foundation long-concrete short-gravel (LCSG) pile and preloading combined treatment method and device thereof

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120111